TW@ESI 24th January 2016 Hope that you and all your families had a good weekend. The following is a forecast of the next week By now we have most of our employees on this discussion group except ... Ludovic, Clinton, Lino, Victor, Daniele, Pawlu,... Please... All of you.. Join!!

Upload: simon-abela

Post on 13-Apr-2017

196 views

Category:

Business


0 download

TRANSCRIPT

Page 1: TW@ESI 24th January 2016

TW@ESI24th January 2016Hope that you and all your families had a good weekend. The following is a forecast of the next week

By now we have most of our employees on this discussion group except ... Ludovic, Clinton, Lino, Victor, Daniele, Pawlu,... Please... All of you.. Join!!

Page 2: TW@ESI 24th January 2016

Projects and deadlines

• We are presently executing a number of fast track projects and I would like to summarise the major ones them as follows:– 14_081 - Siggiewi Primary School BMS- We are really

nearly done now and if we make a last push here we can complete soon

– 13_076 - MDH Block D Ext MAU- Same as above ... We can really try to finish off by end of Jan 2016

– 12_043_Life_Sciences- This is a hot project and we need to complete yesterday- we need to focus on a close out program here

Page 3: TW@ESI 24th January 2016

Projects and deadlines– 14_089_MGA_DAC_PA_Va and 14_027_SCM_FTIS- DAC –

This is now nearly all wrapped up- excluding snags by others– 15_008 - Aurobindo PH02 BMS- The project has been

delayed by the contractor – so my message is to press on doing software until the contractor starts meeting the deadlines- we soon will have to continue on this project soon

– 15_033_Westin_7-AHU- The plan is to commission within Feb 2016 (this delay is due to the fact that we have a delay in carrying out the installation due to Hotel operations). We now have to continue installation on site here- Dennis will be supervising the installation here

Page 4: TW@ESI 24th January 2016

DesignLast week• Revised Intercontinental P&IDs for MCC-1 as per SAA site feedback

& re-submitted• Concluded OTM work order SAS-000525• MDH D00-CC1 Internal Cable Numbers• Partex labels – compiled list to order, to release next week• Partex printers further research (nearly concluded)• Intercontinental – Started MCC-1 Panel DesignNext Week• Partex labels – Release order• Intercontinental – Continue MCC-1 Panel Design/ Release Panel

Material quotes• MDH MAU D00-CC1 As Built update

Page 5: TW@ESI 24th January 2016

Installation

• Next week– Life Sciences Commissioning– ESI premises– SCM FTIAS and MGA faults and snags

Page 6: TW@ESI 24th January 2016

Panel Build• Reassembly of Westin Panel• PPM on panel of GSD• Life Sciences Smoke Panel Changes on site

Page 7: TW@ESI 24th January 2016

Mater Dei

• We have some extremely good news here- we have signed off a new 7 year contract with MDH. This is an extremely important contract for ESI and we have won it with everyones hard work.

• Things are coming back to normal with the MDH operation and maintenance tasks- I expect all of you to pull the rope and get things normal and in line- it would be good to start getting feedback of what was done during the week and what is planned for the next from MDH

Page 8: TW@ESI 24th January 2016

Development and Commissioning• We have done large important steps on finishing off the Parliament we

need to get the documentation out of the way too to avoid us going time and time again on site- IT IS NOW A PRORITY AND WE NEED TO GET A COMPLETION CERTIFICATION- LVA is to come up with a plan by 29/2

• The last issues on the DAC for SCM PH2- IT IS NOW A PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION

• SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this

• The Bosch HSDK interface is well advanced and we awaiting the client• The PLC/SCADA team have been working on the FUN Tests of MAU• We have also been addressing a number of issues for TSP Two Man

rule

Page 9: TW@ESI 24th January 2016

Development and Commissioning• There is huge amount of work to do with the commissioning of Life

Sciences 12_043!! We are on a very tight time frame here and we need to dig really deep and perform

• OTM urgent jobs and snags were also done in the last weeks• Another project that needs attention is CCA Villa ... There are still

snags to be addressed- (wifi router, Intruder alarm door contact and false alarms)

• The Siggiewi Primary school project – we need to close off – the quicker the better!!

• Aurobindo is another important and, now, fast track project We are awaiting the main contractor for us to start commissioning the Priority A items

• Hilton small projects –calorifier monitoring

Page 10: TW@ESI 24th January 2016

Sales and Business Development

• We have been working on Home automation offerings, an offer for James Catering, an offer for Portomaso casino controls, quotes for OTM (some of which are quite large) and quotes for variations for existing projects.

Page 11: TW@ESI 24th January 2016

• Many thanks to the people who have contributed already... I will shortly put out a summary of what was collected

Page 12: TW@ESI 24th January 2016

Team ESI• I urge you all to follow this blog and keep up to date with what is

happening at ESI • I await all your feedback on all the ESI discussions – without this

feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment

• Please urge and assist all you colleagues to have a linkedin profile and join this discussion group

• Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for

• Send me pictures of all your work and what you are up to , so that I may create some videos on this blog- Julian, Claudio, Clifton, Silvio, and Clinton.... Well done!!

Page 13: TW@ESI 24th January 2016

Team ESI

• Lets all work to get the work done on time, on budget and to the required quality

• We need to communicate, pull the rope in the same direction to make our projects a success and profitable

• Have a good week