Initial Points

Projects and Deadlines

Design

Installation Panel Build

Mater Dei Hospital PPM

Business Development

A new part time student , Patrick Brejza has joined the Tridium team – CVA/CCI please ensure he joins our Linkedin group

Drinks after work!!! Next scheduled for 27/1/17- keep the afternoon free and may as many of you join this social event

Welcome back to all from their Holidays and welcome back to the

Fenech’s who will be back tomorrow 9/1/2017

Some Points Before Starting

Unfortunately I have to advise that Shawn Agius will be resigning and is

presently on notice... We wish Shawn luck in his next job and thank him for

the 5 years of service given to ESI

Projects and Deadlines

16_051_Baxter_AHU

We have nearly put this project to sleep!

We have performed well and I feel overall it was a success

Some snags pending – the remote access of the system and installation and commissioning of the valve actuator

16_041_RSM_Security

We need to complete all works by End of January 2017- All materials have been ordered and we have started Panel building.

Installation on site need to be commenced

Next would be programming , Testing and commissioning

16_025_DeLaRue_OFX

Design will be ready this week , materials have been delivered and training by overseas specialists will be on 18 and 19/1/17

14_069_OTM Additions

Q019 AS410 – We are proceeding with works here in conjunction with Gruppo Sett in Italy

Q021_TF4- Panel is on site and installed- still issues to be resolved with regards to the FOC terminations

16_007_LeMeridien

We have started working on phase 1 panels – phase 1 which has to be completed by Feb 2017-

By the Jan 2017 we should do the change over for the roof panels with the programmed logic and some basic graphics only

Projects and Deadlines

16_023_GGY

we have some snags pending (Savant with Android TV, integration with Acs, under floor heating functionality) - we also have to transfer the old GGY system to the new platform

15_011- Sliema apartments

We have done most terminations and panel build is completed too. We are trying to finalise the installation and then testing and commissioning would be next... This week we should have more light shed on a completion date

16_015_RSM_Lighting

this lighting control project is to be completed soon

As soon as the main contractor collects the field devices we must ensure he tests the DALI loops and then we can commission and program

15_023_FM panels

We have a new 2 panels for FM environmental (D5M-110) ... The delivery date is not know – design is completed

16_058_Methode

Another fast tack project Jace Based AHU control system here – we will kick it off in this week – Target is to finish it by end of February 2017- we have started ordering the long lead items here – the plan is to start Panel design ASAP and start panel build on 3 or 4th week of Jan 2017.

Projects and Deadlines

12_043_LSP

We have an important and urgent snag to be rectified ASAP – treating the rust on enclosures

There are some points on the tenant billing application which we are tackling

13_031_CCA

We have a number of snags here .. We will be going through the snags this week and listing them with a completion date

12_027- Parliament

We are finalizing the documentation and eventually need to integrate ProWatch.

15_038_new_HA_Ovt and 15_026_Apap

Residence

are two home automation projects scheduled for Q1 2017 – we have built all panels for these projects and we are awaiting others to complete their installation

14_083_Interconti

We have commissioned the system with snags - we will return to site when snags are done by others- After 16/1

HMI will be installed next week

we also have to deliver the pool panel

Projects and Deadlines

14_081_Siggiewi School-

there are some snags pending here due to louvres

12_025

The last issues on the DAC for SCM PH2- IT IS NOW A PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION- SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this

13_070- SCM Lagoona Plant room

We need to conclude all pending installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue

13_075_Bosch_ProWatch_Genetec_Interface

The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission

01 02 03 04

DesignFor the Past week we have been working on the following

Methode SMT – Started & Completed Points List, P&IDs, submitted P&IDsStarted Panel Design sketching

De la Rue – Completed 1st Typical Panel Drawing for CFH (we’ll split into different Drawings according to his site feedback)

RSM Security – met Stefan re: Intruder Panel

Design

Design

01 02 03 04

DesignAnd next week… we will work on

Methode SMT – Continue Panel Design sketching, start draughting.get quote for ancillaries after Panel Design sketching

Meridien – Site Visit with DSH re: Mech & Elec Additions Installations requiredchase Gas Line details from client

RSM Security – gather Intruder & DAC Panel Design from Stefan, draught accordingly

Design

This is what the Installation team have been working on last week

Installed DAC and BMS panels at Graham on levels 1, 2 and 3.

PPM (bolt tightening) at Sterling.

Dismantling at RSM

Installation on changing room at Baxter

Paint work on one panel at Lifesciences.

Installation

….. And this is what is planned for next week

Continue with works at Mosta workshop

RSM install security field devices

Intercontinental , fitting of new HMI

OVT install field devices

This is a sample text. Insert your desired text here.

Installation

• RSM security panels (DAC/Intruder)• 16_058_Methode- 3rd or 4th week of Jan 2017

Panel Build

Panel Build

Week 48

Yearly Field devices checks, IR images & coordinated tests Nov--D07-CC1, D07-CC2, B01-CC1, BP1-CC1, B02-CC1, BP2-CC1, B03-CC1

Quarterly panel checks Nov -- D00-CC1, D01-CC1, DP1-CC1, D02-CC1, DP2-CC1, D04-CC1, DP3-CC1, D04-CC2, D04-CC3, DO5-CC1, D02-CC2, D06-CC1, DP4-CC1, D06-CC2, D06-CC3, D07-CC1, D07-CC2, D08-CC1, DP5-CC1, D08-CC2, D08-CC3, D09-CC1, D09-CC2, D10-CC1, D10-CC2, D10-CC3, DP6-CC1, D11-CC1, D11-CC2, D12-CC1Weekly update of antivirus on all BMS stations

Mater Dei Maintenance

ReactiveHandling of reactive work orders

OthersParticipating in weekly fire drillsTackling software work orders New Angiography ProjectTraining of new team memberIntegration of Samoc into Master

Mater Dei Maintenance

Sterling Chemicals Line 2 PLC system

S5 PLC upgrade for Kordin Grain terminals

lighting control systems in Qatar.

And…. We may still have a chance to win a VERY large

BMS job

These are the quotes the business development

team have been working on

Business Development

\

LOADS OF BIRTHDAYS TO CELEBRATE

KAROLINAJURCZENIA TODAY 8TH JANPATRICK BREZJA 13TH JANDENNIS SMITH 15TH JAN

I await all your feedback on all the ESI discussions – without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment

Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for

I urge you all to follow this blog and keep up to

date with what is happening at ESI

Lets all work to get the work done on time, on

budget and to the required quality

We need to communicate, pull the rope in the

same direction to make our projects a success

and profitable

Some Last Thoughts

Some Last Thoughts

I remind you all .... I would like you take the opportunity and spend 15-30 minutes reflecting on 2016 and listing what went good for you on your job and what went bad... List your achievements and disappointments and set your major objectives for 2017!! I have done my exercise and published it .... Anyone wishing to share this exercise .. Please do so!!

I wish you all a good and productive

week