subsystem mgrs f2f meeting calorimeter subsystem
DESCRIPTION
Subsystem Mgrs F2F Meeting Calorimeter Subsystem. 15 June 2005 J. Eric Grove Naval Research Lab [email protected]. CAL Status. Completed final CPTs and calibrations on FM 111 – FM 118 Completed ATDPs and PreShip Reviews on FM 111 – FM 118. Shipped to SLAC FM 108 – FM 114 - PowerPoint PPT PresentationTRANSCRIPT
J Eric Grove 1
GLAST Calorimeter
LAT F2F Meeting15 June 2005
Naval Research LabWashington DC
Subsystem Mgrs F2F MeetingSubsystem Mgrs F2F MeetingCalorimeter SubsystemCalorimeter Subsystem
15 June 2005
J. Eric Grove
Naval Research Lab
J Eric Grove 2
GLAST Calorimeter
LAT F2F Meeting15 June 2005
Naval Research LabWashington DC
CAL StatusCAL Status
Completed final CPTs and calibrations on FM 111 – FM 118 Completed ATDPs and PreShip Reviews on FM 111 – FM 118. Shipped to SLAC FM 108 – FM 114
Post-ship testing in progress for FM 111 – FM 114 Preparing FM 115 – FM 118 for shipment on 23 June. Assembly and Test of Module 119
PEM assembled and tested AFEE boards installed and soldered TEM/TPS safe-to-mate in progress
J Eric Grove 3
GLAST Calorimeter
LAT F2F Meeting15 June 2005
Naval Research LabWashington DC
Assembly and TestAssembly and Test
Completion Started
This month
Previously
Mo
du
le S
/N
PE
M
As
se
mb
ly
AF
EE
Ins
talla
tio
n
TE
M/T
PS
Sa
fe-t
o-M
ate
TE
M/T
PS
Ins
talla
tio
n
Co
nfo
rma
l
Co
at
Init
ial C
PT
EM
I/E
MC
Vib
rati
on
TV
AC
Ma
ss
Pro
pe
rtie
s
Fin
al C
PT
Ca
lib
rati
on
Da
ta
Re
vie
w
Sh
ip
Po
st
Sh
ip
Te
st
101 ] ] ] ] ] ] ] ] ] ] ] ] ] ]102 ] ] ] ] ] ] ] ] ] ] ] ] ] ]103 ] ] ] ] ] ] ] ] ] ] ] ] ] ]104 ] ] ] ] ] ] ] ] ] ] ] ] ] ]105 ] ] ] ] ] ] ] ] ] ] ] ] ] ]106 ] ] ] ] ] ] ] ] ] ] ] ] ] ]107 ] ] ] ] ] ] ] ] ] ] ] ] ] ]108 ] ] ] ] ] ] ] ] ] ] ] ] ] ]109 ] ] ] ] ] ] ] ] ] ] ] ] ] ]110 ] ] ] ] ] ] ] ] ] ] ] ] ] ]111 ] ] ] ] ] ] ] ] ] ] ] ] ] 112 ] ] ] ] ] ] ] ] ] ] ] ] ] 113 ] ] ] ] ] ] ] ] ] ] ] ] ] 114 ] ] ] ] ] ] ] ] ] ] ] ] ] 115 ] ] ] ] ] ] ] ] ] ] ] ]116 ] ] ] ] ] ] ] ] ] ] ] ]117 ] ] ] ] ] ] ] ] ] ] ] ]118 ] ] ] ] ] ] ] ] ] ] ] ]
J Eric Grove 4
GLAST Calorimeter
LAT F2F Meeting15 June 2005
Naval Research LabWashington DC
CAL Module MilestonesCAL Module Milestones
December ’04 FM 101
January ’05 FM 102 – 105
February ’05 FM 106 – 107
March ’05 - - -
April ’05 FM 108 – 110
May ’05 FM 111 – 114
June ’05 FM 115 – 118
Deliveries or Ready to Ship
Shipped 6/6/05
Shipped 6/13/05
Ship 6/23/05