kennewick school district · kennewick school district 1000 4th ave. kennewick, wa 99336 (509)...
TRANSCRIPT
Kennewick School DistrictDaily Report: Eastgate Elementary
Specializing in Projects that Make a Difference®
PROJECT TEAM
Kennewick School District 1000 4th Ave.
Kennewick, WA 99336 (509) 222-7667
www.ksd.org Doug Carl
Director of Capital Projects
Madsen Mitchell Evenson and Conrad, PLLC
8905 West Gage, Ste 200 Kennewick, WA 99336
(509) 396-7278 www.madmitch.com
Doug Mitchell, AIA, LEED AP Project Architect
Joe Hampton Project Manager
Leone & Kebble Contractor
108 West Boone Spokane, WA 99201
(509) 327-4451 www.leone-keeble.com
Tom Mercer Project Manager
Carl Clausen Superintendent
Strategic Construction Management, Inc.
3601 North 20th Pasco, WA 99301 (509) 737-0072
www.strategic-cm.com David L. Robison, CCM, LEED AP
Owner’s Representative
CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01
JUNE 4, 2014 VOL. 1 n ISSUE 12
Kennewick Elementary Improvement ProgramPrepared By: V. Guzman
Weather: 84° SunnyWind Speed: 7 mph
Humidity: 20%Precipitation: 0.00 in.
The recently completed utility trench has now been back filled with soil and is being compacted as required.
Installation of the remaining structural steel in preparation for concrete continues at all recently installed footings and stem walls.
Doug Mitchell, Principal, MMEC Architects, walks the site before the construction meeting with Leone & Keeble contractors.
Doug Carl, Capital Projects Director, discusses the relocation and removal schedule for the existing portables prior to demolition.