Kennewick School DistrictDaily Report: Eastgate Elementary

Specializing in Projects that Make a Difference®

PROJECT TEAM

Kennewick School District 1000 4th Ave.

Kennewick, WA 99336 (509) 222-7667

www.ksd.org Doug Carl

Director of Capital Projects

Madsen Mitchell Evenson and Conrad, PLLC

8905 West Gage, Ste 200 Kennewick, WA 99336

(509) 396-7278 www.madmitch.com

Doug Mitchell, AIA, LEED AP Project Architect

Joe Hampton Project Manager

Leone & Kebble Contractor

108 West Boone Spokane, WA 99201

(509) 327-4451 www.leone-keeble.com

Tom Mercer Project Manager

Carl Clausen Superintendent

Strategic Construction Management, Inc.

3601 North 20th Pasco, WA 99301 (509) 737-0072

www.strategic-cm.com David L. Robison, CCM, LEED AP

Owner’s Representative

CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01

JUNE 4, 2014 VOL. 1 n ISSUE 12

Kennewick Elementary Improvement ProgramPrepared By: V. Guzman

Weather: 84° SunnyWind Speed: 7 mph

Humidity: 20%Precipitation: 0.00 in.

The recently completed utility trench has now been back filled with soil and is being compacted as required.

Installation of the remaining structural steel in preparation for concrete continues at all recently installed footings and stem walls.

Doug Mitchell, Principal, MMEC Architects, walks the site before the construction meeting with Leone & Keeble contractors.

Doug Carl, Capital Projects Director, discusses the relocation and removal schedule for the existing portables prior to demolition.