christophe castaing bimby egis project director building...

18
C. Castaing Christophe Castaing Bim by egis project Director Building Smart International Infrastructure room Chair information management (BIM, BAM, BOM …

Upload: hahanh

Post on 04-Feb-2018

232 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

C. Castaing

Christophe Castaing

Bim by egis project Director

Building Smart International

Infrastructure room Chair

information management(BIM, BAM, BOM …

Page 2: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

80 % ENGINEERING20 %ROAD & AIRPORT

OPERATION

€881 M TURNOVER

C. Castaing

Page 3: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

Building information

modelling to Construction

C. Castaing

modelling to Construction

information management(BIM, BAM, BOOM … P.Mc Leamy)

Page 4: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

From BIM to smart and sustainable construction

▏ BIM : processes and tools

▏ MINnD

Contents

C. Castaing

▏ MINnD

▏ From Building to Infrastructures

▏ BIM : from Operation to Planning

▏ BIM for smart construction and smart cities

Page 5: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

BIM : Tools or processes ?

Processes and/then tools

As part of the contract and the project management plan

Processes need to be defined

C. Castaing

Then tools need to be implemented, including workflow and data management

The BIM exploitation guide

( BS or ISO, etc…)

Page 6: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

From buildings to urban infrastructures

A - a technical requirement to measure resilience: the building needs to be developed in its context:

- the site

- the city

C. Castaing

- the systems

B- an economical reason :

the market of the next infrastructures is massively

urban

Page 7: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

CIM instead of BIM

For 100 pieces of information/exchange to be

managed during the full life cycle:

� 5 to be managed during the initial design phase ( BIM)

� 20 to be managed during the construction phase

C. Castaing

� 20 to be managed during the construction phase (BAM)

� 75 to be managed during the operation phase ( BOOM)

Construction Information Management ( JACIC from Japan) seems a relevant name for the process

Page 8: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

Smart construction and smart citiesTwo examples coming from a road/or a street

for the next 10 years

A - the pavement is not only

- a structure for vehicle traffic

- But a structure to embed the

smart city systems

C. Castaing

B - the pavement as a smart

construction:

the information related to the

maintenance, traffic, etc… are

embedded within structural objects

Sensor for

traffic

Measurement

Page 9: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

Impact on BIM: from operation to design

A- The construction ( asset) is a 3D

model of real objects storing its

own information (as a real data

bank)

C. Castaing

B- The BIM is a mirror (avatar) of the

asset to display and to manage the

information set at the design stageRoad memory

Dimensionning

MaterialPerformance to achieve

Page 10: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

The BIM approach for a smart and sustainable city

A- the City information modelling to interact on the urban morphology

B- the urban morphology proposes a model based on :

• Domains

• Systems

C. Castaing

• Systems

• components

C- the model provides tools to verify how the smart city is able to

react to the context ( ex: weather modifications):• facades can be modified with a remote control

• street lanes can be closed with a remote control

Page 11: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

A project BIM by EGIS

• based on business cases

• a project including programme and project management

A national research project : MINnD

• Usecases

• Based on Workpackages and usecases

The ambition

C. Castaing

• Based on Workpackages and usecases

An international collaboration in BuildingSmart International• Based on usecases• OpenInfra – Infrastructure Room

Page 12: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

De quoi je dispose ?

Modélisation des INformations INteropérables pour les INfrastructures Durables.

IFC-Bridge IFC

C. Castaing

Page 13: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

workpackages :

C. Castaing

Page 14: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

From Information Model…

• Meta Model/Dictionary/Ontology

• Modeling

• Levels of devellopment/levels of details

• Objects

• Meta data

• Model view definition

The ambition

C. Castaing

• Model view definition

… To standards

•IFC

• CityGml

• PLCS standard (iso step ISO 10303-239 )

• Specification for Infra

• Other standards (LandXML,…)

Page 15: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

SCOPE

Infrastructure engineering

HydrologyHydrology

C. Castaing

Road Bridges/tunnel Buildings

Page 16: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

C. Castaing

Page 17: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

Ontology 1

Ontology 2

System

…LOD 0

LOD 1

Dictionary

LOD – Level of decision

C. Castaing

LOD m

Level of decision C.CASTAING/C.E. TOLMERLevel of detail Level of devel.

17

Page 18: Christophe Castaing Bimby egis project Director Building ...geo-bim.org/europe/2014/pdf/ChristopheCastaing.pdf · C. Castaing Christophe Castaing Bimby egis project Director Building

Cycle de vie

C. Castaing

IFCCity GML PLCS ?