OpenInfra
Data model and IFC
for
Infrastructure
Christophe Castaing (EGIS)
OSLO
Process room March 20th 2012
OpenInfra
• Egis is an engineering and consulting group active in infrastructure and systems for transport, development, industry, water, environment and energy.
• Egis also works in project management and road and airport operation.
• 11 000 people
• Subsidiary of the Caisse des Dépôts
OpenInfra Keys figures 2010
OpenInfra
Decisions:
OpenInfra as the right name
a steering committee
To work under Workshops on :
1. definition and dictionary
2. Scope
3. levels of definition
To investigate deeper on several topics: IFC Bridge, INSPIRE, etc..
•First IFC Infra meeting in Paris -8 july 2011
OpenInfra
Christophe Castaing EGIS International
Pierre Benning Bouygues TP
Henk Schaap GOBAR
André Borrmann TUM University
Leif Granholm
Kim Inhan
Yang Ji
Mark Palmer NIST
Nick Nisbet AEC3
Steen Sunesen
Väino Tarandi University
Jean-Baptiste valette VINCI
Eric Lebegue CSTB
Nobuyoshi Yabuki Osaka University
•Steering committee
OpenInfra
• Ontology TO dictionary
• Process map
• experimentation
– Levels of definition and domains
– Inspire compliance
OpenInfra
• Ontology to dictionary
OpenInfra
Infra
chainage Faune/
flores works
Safety
equipements
Start end
Road Ownership
Level of services Kind
coordinates protected
Migration
Way point kind dimension fences
basement
dimension
exemple for fencing or works
OpenInfra
Not only where
But why
Animals Types
Protection
Way point
Works Animals works
kind
chainage
dimensions
Safety equipements fences
Type
Height
Basement
colors
coordonates
Route Name
Type
Owner
Chainage
OpenInfra
• The scope:
Objects are
there
Why is
there
Dimensioning is there
OpenInfra
• Process map:
– One view developed by Andre/ Chuck:
• infrastructure_process_map(only design)_V2_Draft.pdf
– Compared to Communic one:
• ..\WS2011_1114\Communic_documentationl.pdf
– On a project :
• NRL_ process map simplified
• NRL_ process map
OpenInfra
• The project
OpenInfra
• Process map:
– Out put and deliverables :
• Exchange Requirements and business Rules
• Exchange requirements model
• As a first step for a generic BIM guide for Infra
• Catalogue
– The goal:
• To be able to focalise on the object to be built
OpenInfra
• The experimentation:
– Levels of definition
– INSPIRE connection
OpenInfra
INFRA – Level 1
Functions
Building Building Motorway CH0-CH99
Building Building
Concerned Networks
Road
River
High Voltage
Connections with existing
Services (Rest area, Toll plaza…)
Operation syst. (Equipments)
Restoring
Project
FUN
CTI
ON
S
Including
Syst
ems
Building Building
DTM
Building Building
Underground
Analysis Simulations Schedule QTO …
Including
OpenInfra
INFRA – Level 1
Functions
Motorway CH0-CH99
Underground
Project
FUN
CTI
ON
S Sy
stem
s
DTM
Concerned
Networks
Analysis Simulations Schedule QTO …
Road
River
High Voltage
Syst
ems
TOLL PLAZA
INTERCHANGE
SERVICES AREA
OpenInfra Level 2
Disciplines/Domains
Buildin
g Buildin
g Function
Buildin
g Buildin
g Geometric
Model
Bridge
Tunnel
Earthworks
Hydraulic works
…
Project
DIS
CIP
LIN
ES
Syst
ems
Analysis Simulations Schedule QTO …
OpenInfra
INFRA – Level 2
Disciplines/Domains
Building Building
motorway
Buildin
g Buildin
g Geometric
Model
Project
DIS
CIP
LIN
ES
Syst
ems
Analysis Simulations Schedule QTO …
pavement
Toll system
Earthworks
Hydraulic works/drainage
OpenInfra Several way to display (1)
OpenInfra
1/100000
1/25000 to 1/5000 IN
SP
IR
E
1/1000 to 1/50
OpenInfra
INSPIRE
…
…
…
Hyd
ro
lo
gie
Ré
se
au
x d
e T
ra
nsp
ort
Ca
da
stre
…
…
…
Op
en
Infra
OpenInfra
• IFC Bridge/ tunnels:
– Andre borman experimentation
• ..\munich\IfcBridge2SOFiSTiK_TSCC.avi
– Pr Yabuki presentation
• ..\SC2012_02_14\OpneINFRA YABUKI Product Models for Civil Infrastructues.pdf
OpenInfra
• IFC Bridge/ tunnels /keys issues:
– Create group to review the ifc-bridge and ifc-tunnel models and create a synthesis.
– Invite buildingsmart MSG to review this synthesis and indicate a cost of integration.
– Seek sponsorship for the work.
OpenInfra
• INSPIRE and IFC key issues:
– A catalogue
– Objects, data and metadata
– Compliant with level1 and level2 COmmunic levels of definition
– A technical opportunity
– To investigate on IFC/INSPIRE compliance and quick experimentation
OpenInfra
• The key words:
•The full lifecycle management (PLM & PDM)
•The Information Modeling (BIM to Infra IM)
•Communication and sharing
•nD mock-up ( rather than 3D )
OpenInfra Open Information Environment
Coordination Management
Disciplines
Information Model
Exchange bridge
CO
MM
UN
IC
Op
en I
nfo
rmat
ion
En
viro
nm
ent
Collaborative Exchange Platform
OpenInfra OpenInfra
• Within:
•to develop the BIM concepts for infrastructures
•to gather the works already done on this topic
•to create an international professional community and network to
support the project on the long term.
OpenInfra A geometry as a result
OpenInfra