CHALLENGES ALONG ALL TRANSPORT ASSETS • 5% of total freight.

• Average speed: 15km/hour.

FREIGHT RAILROADS

• 40% of the national road network is now in bad conditions with safety issues.

• More than 90% of cargo transported in roads.

• Low domestic flight connectivity.

• Only 9M passengers annually.• Room for improvement in safety and

air traffic control.

AIR SECTOR

• Only 12M people use public transport.

• Lack of public transport in the country.

• Poor quality of rail transport.

URBAN MOBILITY PORTS

• Infrastructure limitations to operate with large vessels.

• Ports lack proper access infrastructure.• High tariffs.

STRATEGIC PILLARS

QUALITY AND SUSTENTABILITY

CONNECTIVITY AND SAFETY

INFRAESTRUCTURE • Transform, modernize and develop current infrastructure.

• Improve competitiveness of regional economies.

• Enhance, extend the freight matrix and logistic to reduce cost.

• Include the private sector in investment partnerships.

• Optimize safety in all possible ways and in all forms of transport.

• Improve national connectivity.

• Improve service quality and users well being.

• Promotion of more environmental friendly modes.

• Increase of energy efficiency and operational effectiveness.

• Promote private initiative rewarding innovation.

OUR MOST RELEVANT ACHIEVEMENTS IN 9 MONTHS

¿HOW ARE WE DOING THIS?

TRANSPARENCY

EMPLOYMENT

A MODERN AND HIGH PERFORMING TEAM

• Experienced sector professionals.• Organization restructuring by

specialty.

• Constant training of workers and employees.• Creation of new positions.• Encourage and support indirect labour creation.

• Secure transparency in purchasing and contracting.

• 100% digital tender processes, open to international companies.

• Open access to all bidding documents.

• Anticipated publishing of general rules before bid call up.

¿WHAT DO WE NEED?CONSTRUCTION COMPANIES• Undergrounding works.• Tunneling.• Dredging of rivers.

EQUIPMENT PROVIDERS • Railway equipment, automatic

signalization installations.• Port machinery.• Airport utilities and equipment.

FISCALIZATION COMPANIES• Control of executive project.• Fiscalization of works execution.• Provisional and final work reception.

GEOTECHNICAL, HYDRAULIC AND OTHER STUDIES• Civil engineering.• Detail/design engineering.• Work support.

Investment opportunities

• Total investment 2016-2019: US$ 12,500 M

►2,800 km new motorways

►4,000 km safe roads

►13,000 km paving

►1,030 works

►250 new projects

• On-going tender processes:

►Long term construction plan (US$ 28 Bn until 2028).

►New Highways.

►National Road 3 US$ 261 M (Sep/Dec '16).

►National Road 40 US$ 266 M (Oct/Nov '16).

►National Road 34 US$ 106 M (Oct/Nov '16).

►National Road 5 US$ 110 M (Nov '16).

►National Road 9 US$ 173 M (Nov '16).

►National Road 19 US$ 500 M (Sep´16).

►National Road 7 US$ 180 M (Oct´16).

ROADS

Investment opportunities

• Access Network to Bahía Blanca: US$ 1,110 M.

► Oct. 2016 – 2023.

►Highway National Road 3: Dorrego – National Road 22.

►Highway National Road 22: National Road 3 – Médanos.

►Highway National Road 33: El Cholo – Pigüe.

►Highway National Road 252: Puerto White – Galván.

►Dual carriageway National Road 229: Bahía Blanca – Punta Alta.

• Bridge Resistencia - Corrientes: US$ 850 M (Civil Works only)

►350 meters long and 35 meters high

►2 lanes in each direction

►3 access to the City of Resistencia, 1 to Fontana and 2 access to the City of

Corrientes.

►To be launched June 2018. End of works Oct. 2020.

• Bridge Santa Fe - Paraná: US$ 900 M (Civil Works only)

►To be launched 4th Q 2017. End of works 1st Q 2020.

ROADS

• Total investment 2016-2019: US$ 4,400 M

►Core network: 1,711 km

►Secondary network: 564 km

►Lightweight improvement: 1,385 km

• On-going tender processes:

►Complete renewal of the Belgrano Cargas line, comprising 1,500 km of

new tracks and accessory infrastructure US$ 920 M (Sept 2016, March

2017).

•Stage 1: 573 km in Santa Fe and Santiago del Estero. US$ 572 M (on

going)

•Stage 2: 445 km in Santa Fe, Salta and Jujuy. US$476 M. To be tendered

4th Q 2016.

•Stage 3: 575 km in Tucumán, Salta and Jujuy. US$ 615 M. To be tendered

2nd Q 2017.

►Renewal Mitre line, comprising 400km of new tracks U$S 300 M

► Development of two Technical Centers of Excellence (rolling stock and

rail infrastructure) Tafi Viejo and Alta Córdoba. US$ 60 M. (2017)

Investment opportunitiesFREIGHT RAIL

Urquiza line (medium gauge)

Belgrano line (narrow gauge)

Mitre line (wide gauge)

San Martín line (wide gauge)

Roca line (wide gauge)

• Complete Renewal of San Martin freight line

US$ 1,600 M (2017).

► Renewal of principal network: 1,297 Km .

► Improving the secondary network: 1,277 Km.

► 4-5 years of construction plan.

• Complete Renewal of Urquiza freight line

US$ 950 M (2017).

► Renewal of principal network: 995 Km.

► Rail/Road Bridge Chaco - Corrientes.

► 4 years of construction plan.

• “Vaca Muerta project”. Complete Renewal of General Roca freight line.

US$ 1,200 M (2017).

► Renewal the network: 1,300 Km.

► 4-5 years of construction plan

• Trasandino Norte TAC Corridor - Ferronor. US$ 40 M (2017).

► Renewal the network: 102 Km.

► To be launched 1st Q 2017.

► Period of execution: 200 days.

► The C14 Line connects Argentina with Chile.

Investment opportunitiesFREIGHT RAIL

• Total investment 2016-2019: US$ 10,325 M

• RER - Regional Express Rail:

► Constitución Underground Station: US$ 260 M (2016)

► Obelisco Central Station: US$ 960 M (2017).

• Electrifications:

► San Martin line : US$ 500 M

► Belgrano Norte line: US$ 500 M

► Belgrano Sur line: US$ 700 M

► Mitre line re-electrification: US$ 550 M

• Undergrounding of the Sarmiento line US$ 3,000 M (Oct. 2016)

• On-going tender processes:

► New rolling stock for the Metropolitan Area of Buenos Aires

US$ 4,100 M (Oct/Nov '16).

► 3 new rail viaducts in the city of Buenos Aires

US$ 500 M (Sep/Oct '16).

► 3 new BRTs US$ 66 M (Morón, 3 de Febrero y Neuquén)

Investment opportunitiesURBAN MOBILITY

• Total investment 2016-2019: US$ 1,200 M

► 17 airports renovated for 2019.

► Double de number of domestic passengers: 10 M in 2014 to 20 M by

2019.

► More safety and security.

► More routes and frequencies.

• On going tender processes:

► Ezeiza: New passenger terminal. US$400 M. 28 months. April 2017.

► Ezeiza: New taxiway to head 35. US$ 33 M. 6 months.

► Santa Fe/Paraná New Airport. US$ 200 M. 3 years.

► Aeroparque: Outworks, sidewalks, landscaping and filled coastal. US$ 66

M. 2 years. June 2017.

► Iguazú: Parking, trading platform extension and repaving landing track.

US$20 M. 6 months.

► Resistencia: New passenger terminal. 14 months. February 2018.

► San Fernando: New passenger terminal and new multilevel parking. US$

40 M. 18 months in 2017.

► Catamarca: Airport modernization. US$ 100 M. 24 months. June 2017.

Investment opportunitiesAIR SECTOR

• Total investment 2016-2019: US$ 425 M

• Buenos Aires Port: the most important container terminals of Argentina can

handle in total 1.5 million TEUs.

• Risk reduction of accidents, stranding and delays in the waterway.

• On-going tender processes:

► Modernization of the container terminal in Buenos Aires. US$ 1,500 M.

(2016-2024)

► New Itá Ibaté port in the province of Corrientes

US$ 18 M (Sep/Oct '16).

► Rosario port access infrastructure US$ 300 M (2017).

► Modernization of Ushuaia port US$ 18 M (Sep/Oct '16).

► Extension of docking infrastructure in Puerto Madryn, Chubut US$ 35 M

(2017).

Investment opportunitiesPORTS

ROADS 95 future tenders: 7772 M USD

Contact: Javier Iguacel (President, DNV) [email protected]

Category Description ProvinceBudget (Million

USD)Tender

Highways RN 3 Puereto Madryn - Trelew Chubut 97,4 September 2016

Paving Ruta Nacional 157 Catamarca 24,0 September 2017

Paving Repav RN 152 La Pampa 24,0 September 2018

Highways RN 5 Mercedes - Suipacha Buenos Aires 58,4 October 2016

Highways RN 117 Paso de los Libres Corrientes 6,6 October 2017

Paving RN 3 San Sebastian Tierra del Fuego 33,3 October 2018

Highways RN 33 Rufino - Rosario Santa Fe 151,4 October 2019

Highways RN 34 Rosario - Sunchales (A12 - San Genaro) Santa Fe 57,0 October 2020

Roadway duplication AU 40 Mendoza - San Juan Mendoza 178,0 October 2021

Roadway duplication AU 12 Acceso Sur Paraná Misiones 9,3 October 2022

Roadway duplication AU 33 Rufino - Venado Santa Fe 184,7 October 2023

Roadway duplication Pav RP 40 Corrientes Corrientes 22,5 October 2024

Roadway duplication AU 9 Acceso Norte Tucumán Tucumán 13,3 November 2016

Roadway duplication AU 9 Acceso Sur Tucumán Tucumán 31,7 November 2017

Roadway duplication AU 34 Jujuy - San Pedro Jujuy 57,0 November 2018

Highways RN 9 Córdoba - Villa Totoral Córdoba 128,0 November 2019

Roadway duplication AU 3 Bypass S. M. del Monte Buenos Aires 47,4 November 2020

ROADS 95 future tenders: 7772 M USD

Contact: Javier Iguacel (President, DNV) [email protected]

Category Description ProvinceBudget (Million

USD)Tender

Safe road AU 158 Villa María - Río Cuarto (Etapa 1) Córdoba 79,7 Dicember 2016

Paving Ruta Provincial 126 Corrientes 93,0 Dicember 2016

Roadway Duplication Circunvalación RN A012 Santa Fe 74,7 Junery 2017

Roadway Duplication Accesos a Puertos de Rosario Norte Santa Fe 26,7 March 2017

Roadway Duplication AU 3 Travesía por Bahía Blanca Buenos Aires 45,5 April 2017

Roadway Duplication Circunvalación RN A012 Santa Fe 111,8 April 2017

Roadway Duplication AU 3 Travesía por Bahía Blanca Buenos Aires 66,7 May 2017

ROADS 95 future tenders: 7772 M USD

Contact: Javier Iguacel (President, DNV) [email protected]

Category Description ProvinceBudget (Million

USD)Tender

Roadway Duplication AU 3 Travesía por Bahía Blanca Buenos Aires 45,5 April 2017

Roadway Duplication AU 3 Travesía por Bahía Blanca Buenos Aires 66,7 May 2017

Specific works Accesos a Puertos de Rosario Norte Santa Fe 28 May 2017

Specific works AU 252 Accesos a Puertos BB Buenos Aires 84 June 2017

Roadway Duplication AU 3 Monte - Las Flores Buenos Aires 92,6 June 2017

Roadway Duplication AU 3 Monte - Las Flores Buenos Aires 60,4 July 2017

Roadway Duplication Makallé - La Escondida Chaco 32 July 2017

Roadway Duplication La Escondida - Presidencia de la Plaza Chaco 83,6 July 2017

Roadway Duplication Presidencia de la Plaza - Sáenz Peña Chaco 129,3 July 2017

Safe road Cobertizos, Guido y Uspallata Mendoza 115 July 2017

Safe road Cobertizos, Soberanía Mendoza 150 July 2017

Safe road AU 11 Santa Fe - San Justo (Etapa 1) Santa Fe 60 July 2017

Safe road RS 237 Collón Curá - V. La Angostura Neuquén 61,6 July 2017

Safe road AU 22 Travesía Cipolletti y 4to puente Río Negro 93,3 August 2017

Safe road AU 33 Venado - Firmat Santa Fe 150,4 August 2017

New road AU 12 Variante Corrientes Corrientes 47,8 September 2017

Roadway Duplication AU 3 Las Flores - Azul Buenos Aires 102,7 October 2017

Duplicación AU 3 Las Flores - Azul Buenos Aires 131 Octubre 2017

ROADS 95 future tenders: 7772 M USD

Contact: Javier Iguacel (President, DNV) [email protected]

Categoría Descripción Provincia Presupuesto (en

millones U$)Fecha de licitación

Road Duplication AU 5 Anguil - Santa Rosa La Pampa 72 October 2017

Road Duplication AU 34 San Genaro - RN 19 Santa Fe 241,6 October 2017

Road Duplication AU 34 Taboada - La Banda (SE) Santiago del Estero 169,2 October 2017

Road Duplication AU 25 Cañuelas - Lobos Buenos Aires 86 October 2017

Road Duplication AU 5 Suipacha - Chivilcoy Buenos Aires 58 October 2017

Road Duplication AU 12 Corrientes - Paso de la Patria Corrientes 68 October 2017

Road Duplication AU 33 Firmat - Rosario Santa Fe 155 November 2017

Road Duplication AU 33 Firmat - Rosario Santa Fe 164,6 November 2017

Paving Pav RN 40 Barrancas - Malargüe (Sec. 1 y 2) Mendoza 64,4 November 2017

Safe road RS 34 Sunchales - Taboada (SE) Santa Fe - Santiago del Estero 36 December 2017

Safe road RS 34 Sunchales - Taboada (SE) Santa Fe - Santiago del Estero 85 December 2017

Safe road RS 34 La Banda (SE) - Ros. Frontera Santiago del Estero - Salta 53 December 2017

Safe road RS 34 La Banda (SE) - Ros. Frontera Santiago del Estero - Salta 20 December 2017

Safe road RS 123 Corrientes - RN 14 Corrientes 15 December 2017

Safe road Repav RN 127 Paraná - RN 14 Entre Ríos - Corrientes 35 December 2017

Ruta Segura RS 22 Bahía Blanca - Chichinales Río Negro 3,1 2018

ROADS 95 future tenders: 7772 M USD

Contact: Javier Iguacel (President, DNV) [email protected]

New road RN 8 Bypass Venado Tuerto* Santa Fe 40 Dicember 2017

Safe road RS 11 San Justo - Resistencia Santa Fe 69,8 Dicember 2017

Safe road RS 11 San Justo - Resistencia Santa Fe 46 Dicember 2017

Safe road RS 11 San Justo - Resistencia Chaco 15,9 Dicember 2017

Safe road AU 14 Paso de los Libres - Posadas Corrientes 55,6 Dicember 2017

Safe road AU 14 Paso de los Libres - Posadas Corrientes - Misiones 36,2 Dicember 2017

Roadway Duplication AU RN A05 Circunv. Ría Cuarto Córdoba 51,6 January 2018

Roadway Duplication AU 7 Variante Palmira Mendoza 104,6 July 2018

Safe road RS 34 San Pedro - Pichanal Jujuy 65,8 July 2018

Safe road RS 34 San Pedro - Pichanal Jujuy 56 July 2018

Safe road RS 34 San Pedro - Pichanal Salta 60,2 July 2018

Safe road RS 35 Int. RN 188 - Int. RN 7 Córdoba 35 July 2018

Specific works Puente Paraná - Santa Fe Santa Fe - Entre Ríos 653,3 July 2018

Safe road RS 174 Rosario - Victoria Entre Ríos 16,2 July 2018

Safe road RS 188 Pergamino - Junín Buenos Aires 23,2 July 2018

Specific works Segundo Puente Resistencia - Corrientes Chacho - Corrientes 560 Dicember 2018

Safe road RS 3 Azul - Dorrego Buenos Aires 52,1 2018

Safe road RS 3 Azul - Dorrego Buenos Aires 31,7 2018

Categoría Descripción Provincia Presupuesto (en

millones U$)Fecha de licitación

ROADS 95 future tenders: 7772 M USD

Contact: Javier Iguacel (President, DNV) [email protected]

Safe road RS 5 Carlos Casares - Anguil Buenos Aires 57,7 2018

Safe road RS 5 Carlos Casares - Anguil La Pampa 14,8 2018

Safe road AU 8 Holmberg - V. Mercedes Córdoba 21 2018

Safe road AU 8 Holmberg - V. Mercedes San Luis 8,4 2018

Safe road RS Tucumán - Ros. Frontera Tucumán 15,4 2018

Safe road RS Tucumán - Ros. Frontera Salta 16,8 2018

Safe road Ruta Segura Caucete - Int. RN 141 San Juan 8,5 2018

Safe road RS 22 Bahía Blanca - Chichinales Buenos Aires 20,4 2018

Safe road RS 22 Bahía Blanca - Chichinales La Pampa 17,4 2018

Safe road RS 22 Bahía Blanca - Chichinales Río Negro 9 2018

Safe road RS 22 Bahía Blanca - Chichinales Río Negro 3,1 2018

Safe road RS 22 Bahía Blanca - Chichinales Río Negro 33 2018

Safe road RS 12 Corrientes - Int. RN 123 Corrientes 48,9 2018

Safe road Pergamino - Rosario Buenos Aires 11,5 2018

Safe road Pergamino - Rosario Santa Fe 18,8 2018

Safe road RS 33 Pigüé - Rufino Buenos Aires 51,8 2018

Safe road RS 33 Pigüé - Rufino Buenos Aires 33,6 2018

Safe road RS 33 Pigüé - Rufino Buenos Aires 28 2018

Total USD 7772

Categoría Descripción Provincia Presupuesto (en

millones U$)Fecha de licitación

Category Description Province Budget

(Million USD) Tender

TRACKS Belgrano Cargas C y F1 Total Track Renewal

83,800 a Km 53,400 y km 9,400 a km 48,31Santa Fe 112 September 2016

CIVIL WORKS Belgrano Norte - Platform Improvement Metropolitan Area Buenos Aires 58 September 2016

RAILWAYS 20 future tenders 530 M USD

Contact: Guillermo Fiad (President, ADIF) [email protected]

Category Description Province Budget

(Million USD) Tender

SIGNAL& TELECOMNew Signalling for Roca, San Martin, Urquiza,

Belgrano Sur Lines Metropolitan Area Buenos Aires 22 August 2016

TRACKS Belgrano Cargas C and F1 Total Track Renewal - Km

83,800 - Km 53,400 and km 9,400 - km 48,311Santa Fe 112 September 2016

SIGNAL& TELECOM Control Center for Roca line Metropolitan Area Buenos Aires 10 September 2016

ELECTRIFICATION Third Rail Improvement for Mitre line Metropolitan Area Buenos Aires 8 September 2016

TRACKS Switches and Crossings provision for Belgrano Cargas Buenos Aires province 14 September- 2016

SIGNAL& TELECOMOn board ATS implementation San Martin, Belgrano

and Urquiza linesMetropolitan Area Buenos Aires 10 October- 2016

SIGNAL& TELECOM Signalling equipment Metropolitan Area Buenos Aires 11 December 2016

TRACKS Track Renewal Branch Maldonado - J. L. Suárez Metropolitan Area Buenos Aires 2 feb-17

TRACKSRailway Grid Retiro - Maldonado. Track Renewal and

SignalingMetropolitan Area Buenos Aires 113 mar-17

TRACKS Track Renewal Branch Bosques - V. Elisa Metropolitan Area Buenos Aires 28 abr-17

TRACKS Double Track - Tapiales - Bonzi Metropolitan Area Buenos Aires 3 abr-17

TRACKS Tacks Renewal Branch Constitucion Temperley Metropolitan Area Buenos Aires 60 abr-17

RAILWAYS 20 future tenders 530 M USD

Contact: Guillermo Fiad (President, ADIF) [email protected]

Category Description Province Budget

(Million USD) Tender

TRACKS Track Renewal - Branches G y M - Belgrano SUR Metropolitan Area Buenos Aires 42 may-17

TRACKSTrack expansion Lavallol railway warehouse Gral.

Roca LineMetropolitan Area Buenos Aires 1 may-17

ELECTRIFICATION Electrification Claypole - Bosques Metropolitan Area Buenos Aires 10 jul-17

TRACKSTrack Renewal Branch Sáenz - Tapiales - Ramal

"G"Line Belgrano SurMetropolitan Area Buenos Aires 9 ago-17

TRACKS Railway Crossing LBS / Roca Metropolitan Area Buenos Aires 19 oct-17

TRACKSTrack Renewal Branch Sáenz - Tapiales - Ramal "G".

Belgrano SurMetropolitan Area Buenos Aires 11 oct-17

Civil Works Stations Modules Line Belgrano Sur Metropolitan Area Buenos Aires 7 nov-17

Civil Works New Station Ezeiza Metropolitan Area Buenos Aires 2 nov-17

Total USD 530 M

RAILWAYS 20 future tenders 530 M USD

Contact: Guillermo Fiad (President, ADIF) [email protected]

Total USD 37 M

PORTS 3 future tenders: 37 M USD

Contact: Manuela López Menéndez (Secretary of Public Transport Works) [email protected]

Category Description Province Budget

(million USD) Tender

Concepción del Uruguay Adequacy of pier structure 3-4 and accesses to the port Entre Rios 1 USD August 2016

Itá Ibaté Construction of the new port Corrientes 18 USD September 2016

Ushuaia Ushuaia bay port expansion Tierra del Fuego 18 USD Septiembre 2016

AIRPORTS 34 future tenders: 339,2 M USD

Contact: Patricio Di Stéfano (President, ORSNA) [email protected]

Felisa Blaquier (Communication Area, ORSNA) [email protected]

Category (by airport) Description Province Budget (Million

USD) Tender

Ezeiza SEVERAL PROJECTS IN NEW TERMINAL B Buenos Aires 14,0 April - September 2016

Ezeiza OTHERS COMPLEMENTARY PROJECTS Buenos Aires 3,5 May - September 2016

Ezeiza REPAVING SERVICE STREET ALFA, COMPLETION OF CENTER LINE, LIGHTING SYSTEM Buenos Aires 4,3 June - September 2016

Ezeiza MAIN RENOVATIONS AND NEW BEACON SYSTEM ON RUNWAY 17-35 Buenos Aires 8,6 June - September 2016

Ezeiza RENOVATIONS ON ARRIVALS AREA TERMINAL A Buenos Aires 3,3 June - September 2016

La Rioja NEW BEACON SYSTEM ON RUNWAY La Rioja 2,0 June - September 2016

Malargüe REPAIRS ON RUNWAY Mendoza 1,2 June - September 2016

Córdoba MAIN ENTRANCE AND PARKING RENOVATIONS CÓRDOBA 2,6 June - September 2016

Rio grande ALS AND OTHER RUNWAY RENOVATIONS TIERRA DEL FUEGO 1,6 June - october 2016

Salta REPAVING RUNWAY AND SERVICE STREET SALTA 10,0 August - november 2016

San Juan NEW PASSENGER TERMINAL SAN JUAN 17,3 August - november 2016

Aeroparque Jorge Newbery EXPANSION OF MAIN CHECK-IN AREAS Buenos Aires City 12,0 September - October 2016

Ezeiza NEW DEPARTING AREA IN TERMINAL B Buenos Aires 73,3 Semptember - November 2016

Iguazú NEW PASSENGER TERMINAL MISIONES 26,6 September - November 2016

Malargue EXPANSION OF EXISTING TERMINAL MENDOZA 2,0 September - December 2016

Córdoba RENOVATIONS ON RUNWAY 18-36 AND NEW BEACON SYSTEM CORDOBA 8,4 October - december 2016

Esquel PASSENGER TERMINAL REMODELATIONS CHUBUT 5,6 October - december 2016

Ezeiza RENOVATIONS AND ILUMINATION ON ZULU POST PLATFORM Buenos Aires 3,3 October - december 2016

Formosa MAIN RENOVATIONS ON TERMINAL FORMOSA 6,0 November - January 2016

La Rioja RENOVATIONS ON PASSENGER TERMINAL LA RIOJA 4,3 November - January 2017

Category (by airport) Description Province Budget (Million

USD) Tender

San Juan NEW PASSENGER TERMINAL SAN JUAN 17,3 August - november 2016

Aeroparque Jorge Newbery EXPANSION OF MAIN CHECK-IN AREAS Buenos Aires City 12,0 September - October 2016

Ezeiza NEW DEPARTING AREA IN TERMINAL B Buenos Aires 73,3 Semptember - November 2016

Iguazú NEW PASSENGER TERMINAL MISIONES 26,6 September - November 2016

Malargue EXPANSION OF EXISTING TERMINAL MENDOZA 2,0 September - December 2016

Córdoba RENOVATIONS ON RUNWAY 18-36 AND NEW BEACON SYSTEM CORDOBA 8,4 October - december 2016

Esquel PASSENGER TERMINAL REMODELATIONS CHUBUT 5,6 October - december 2016

Ezeiza RENOVATIONS AND ILUMINATION ON ZULU POST PLATFORM Buenos Aires 3,3 October - december 2016

Formosa MAIN RENOVATIONS ON TERMINAL FORMOSA 6,0 November - January 2016

La Rioja RENOVATIONS ON PASSENGER TERMINAL LA RIOJA 4,3 November - January 2017

Jujuy NEW PASSENGER TERMINAL JUJUY 20,0 November - Febrary 2016

Aeroparque Jorge Newbery NEW POST PAMPA/CHARLIE, ENERGY & BEACON SYSTEM Buenos Aires City 3,0 2017

Aeroparque Jorge Newbery NEW COMMERCIAL PLATFORM (NORTH) Buenos Aires City 10,0 2017

Comodoro Rivadavia EQUIPMENT FOR NEW TERMINAL CHUBUT 3,3 2017

Comodoro Rivadavia RENOVATIONS ON RUNWAY AND PLATFORM, BEACON SYSTEM CHUBUT 9,3 2017

Ezeiza ELECTRIC REPOWERING. Buenos Aires 1,3 2017

Ezeiza EXTERNAL WORK ON NEW AND EXISTING TERMINALS Buenos Aires 26,6 2017

Ezeiza MAIN RENOVATIONS AND NEW BEACON SYSTEM ON RUNWAY 11,29 Buenos Aires 10,0 2017

Ezeiza UPDATING BEACON SYSTEM ON MOVEMENT AREAS Buenos Aires 10,0 2017

Jujuy NEW CONTROL TOWER JUJUY 2,6 2017

AIRPORTS 34 future tenders: 339,2 M USD

Contact: Patricio Di Stéfano (President, ORSNA) [email protected]

Felisa Blaquier (Communication Area, ORSNA) [email protected]

Category (by airport) Description Province Budget (Million

USD) Tender

Posadas RESURFACING RUNWAY, PLATFORM, SERVICE STREET, BEACON SYSTEM MISIONES 11,3 2017

Rio grande RESURFACING RUNWAY TIERRA DEL FUEGO 4,0 2017

Several OTHER SMALL AND MEDIUM SIZE PROJECTS SEVERAL 16,6

Total USD 339

AIRPORTS 34 future tenders: 339,2 M USD

Contact: Patricio Di Stéfano (President, ORSNA) [email protected]

Felisa Blaquier (Communication Area, ORSNA) [email protected]

Category Description Budget (Million

UDS) Tender

Network ATN Update the current network infrastructure USD 1,5 August 2016

Communication Develop new VHF stations and updating of existing USD 12,2 September 2016

Communication VCS (Voice Switching) , and recorder equipment upgrade USD 13,8 October 2016

Navegation Implementation of ATM (Air Traffic Management) USD 9 September 2016

Navegation Renew equipment ILS USD 31,5 September 2016

Air Traffic Service Installation of new systems - Tower Ezeiza USD 12 January 2017

Communication ACARS Data link USD 2 December 2017

Vigilance Implementation of ADS- B surveillance USD 5,5 September 2016

Vigilance Updating primary /secondary and surface radars at Ezeiza USD 16,5 February 2017

Vigilance Update secondary radar at Paraná USD 2,5 January 2017

Guidance Systems Acquisition System A- SMGCS (Advanced Surface Movement and Guidande Control System)

USD 4 March 2016

Navegation PBN (Performance Based Navigation) implementation USD 3 September 2016

Navegation Aircraft for navaids inspection USD 8 August 2016

Total UDS 121,5

AIR NAVEGATION 13 future tenders: 121,5 M USD

Contact: Agustín Rodríguez Grellet (President, EANA S.E.) [email protected]

Total 1412

URBAN MOBILITY 10 future tenders: 1412 M USD

Contact: Manuela López Menéndez (Secretary of Public Transport Works) [email protected]

Categoría Descripción Provincia Presupuesto (en

millones USD)Fecha de licitación

Metrobuses Línea Tres de Febrero Metropolitan Area of Buenos Aires 20 September 2016

Red de Expresos Regionales (RER) Extensión de la línea Belgrano Sur a Estación Constitución Metropolitan Area of Buenos Aires 100 October 2016

Metrobuses Línea Morón Metropolitan Area of Buenos Aires 15 Dicember 2016

Red de Expresos Regionales (RER) Conexión línea Roca en Retiro Metropolitan Area of Buenos Aires 60 January 2017

Red de Expresos Regionales (RER) Estación subterránea Constitución Metropolitan Area of Buenos Aires 200 March 2017

Modernización línea San Martín Electrificación de la línea Metropolitan Area of Buenos Aires 150 June 2017

Modernización línea San Martín Electrificación de estaciones Metropolitan Area of Buenos Aires 50 June 2017

Infraestructura Bici-sendas Ciudades a definir 17 January 2017

Red de Expresos Regionales (RER) Línea Sarmiento de Correo Centrol Metropolitan Area of Buenos Aires 500 2018

Red de Expresos Regionales (RER) Conexión línea Sarmiento con línea Mitre Metropolitan Area of Buenos Aires 300 2018