Page 1: DuPont Barksdale and Chequamegon Projects Update

DuPont Barksdale and Chequamegon Projects Update

July 22, 2008

DuPont CRG

Page 2: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 2

Purpose of Meeting Barksdale:

Provide a status update on site priorities and public commitments.

Provide a summary of on-going 2008 site activities.

Chequamegon-Nicolet National Forest:

Provide a status update on site investigation activities at the Cabin Lake and Clover sites.

Page 3: DuPont Barksdale and Chequamegon Projects Update

Former DuPont Barksdale Works Project Update

Page 4: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 4

Project Priorities

Current Priorities: Identify priority source areas and take appropriate action. Evaluate for potential off-site surface water issues and take

appropriate action.

Priorities Addressed: Continue to provide drinking water that meets appropriate

Wisconsin regulatory standards for all site-related compounds to residents with impacted wells.

Develop plan for long-term drinking water supply and implement as appropriate.

Fulfill commitments on Home Value Protection Plan.

Page 5: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 5

Project Priorities

Other Commitments: Continue to work with WDNR in the investigation/cleanup of site-

related impacts. Continue to be available and communicate with neighbors.

Page 6: DuPont Barksdale and Chequamegon Projects Update

Summary of 2008 Barksdale Work

Page 7: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 7

Continue to fulfill water supply commitmentsSite Investigation

Site clearing. Grid sampling of 200 locations. Biased sampling at 300 plus locations. Geophysical work to determine subsurface anomalies. Using explosive detection device (FIDO).

Summary of 2008 Work

Page 8: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 8

map of 08 inv priorities.

Page 9: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 9

Recovery and Disposal of Residual Site Materials:

Removed approximately 800 pounds of DNT. TNT recovery and disposal planned.

Evaluation of Remedial Technologies: Field scale bio-pilot being conducted. Continued laboratory studies at GA Tech. University of Waterloo DNX studies.

Synthesis of DNX isomers: Completed in early 2008. Developing screening values.

Summary of 2008 Work

Page 10: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 10

Alternative Water Supply

Waterline Completed December 2005.Provides Municipal Drinking Water Access to:

47 Homes 8 Undeveloped Parcels

Over 6 million gallons of water delivered through the pipeline since installation.

Page 11: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 11

Clearing Work Sites

Page 12: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 12

Residual Product RemovalDNT Removal:

Discovered solid DNT below a floor slab during Bio Cell preparation at former Trivelene Sweating House.

Page 13: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 13

Screening with Geophysics (EM61)

Page 14: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 14

FIDO Analysis Equipment

Page 15: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 15

Screening with Vacuum Cartridges

MEVA SAMPLING PROCESS

• Clear brush and ground cover.

• Survey 1-acre grid corners and stake 1/16th acre sub-squares.

• Vacuum the surface of each sub-square and record conditions during collection.

• Return the cartridge to the testing office, incubate the cartridge and analyze with the FIDO detector.

Page 16: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 16

Sample MEVA results

Page 17: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 17

TNT Located by MEVA

TNT found by FIDO visible only after tall grass & sheet metal hiding it was removed.

Page 18: DuPont Barksdale and Chequamegon Projects Update

Evaluation of Remedial Technologies

Page 19: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 19

Barksdale Field DNT Bio-Pilot 2008

Page 20: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 20

2008 Bio-Pilot Work

Overview Reduction of DNT via biodegradation observed

by GA Tech in studies funded by DuPont. Small field-scale pilot conducted in 2007 at

Barksdale.• 2007 results promising, pilot scaled up in 2008.• Pilot locations chosen based on manufacturing

history (predominately DNT). Work started in June 2008 at four locations.

Page 21: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 21

2008 Pilot Locations Lydol House (4 cells from 2007) Trivilene No. 1 Sweating House TNT No. 4 Bi/Tri House TNT No. 2 Wash House

Page 22: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 22

map of 08 inv priorities.

SITES

Page 23: DuPont Barksdale and Chequamegon Projects Update

Sweating Ho

Trivilene #1 Sweating House

Page 24: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 24

#1 Trivilene Sweating House Cell

Page 25: DuPont Barksdale and Chequamegon Projects Update

TNT #4 Bi-Tri House

BiTri Ho

Page 26: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 26

TNT #4 Bi-Tri House Cell

Page 27: DuPont Barksdale and Chequamegon Projects Update

TNT #2 Wash House

Wash Ho

BiTri Ho

Neut. Ho

divert SW

Page 28: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 28

Barksdale Bio-Pilot June 2008TNT02 Wash House CellPrior to first tilling

Page 29: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 29

# 2 Wash House Cell

Page 30: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 30

Typical debris removed by raking

Page 31: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 31

Lydol House Cells

Page 32: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 32

Tractor with Howard Rotovator 700 DUT

Page 33: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 33

Tilling No. 2 Wash House

Page 34: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 34

Pilot Status All locations tilled approximately

once per month Periodic sampling for

Nitramine and nitroaromatic organic compounds

pH Nitrogen, Phosphorus, and Potassium

Adjust pH in cells as necessary

Page 35: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 35

Continue to investigate high priority areas on-site:• Focus on high priority areas, including

characterization and remediation.

Barksdale Path Forward

Page 36: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 36

Map of priority areas of investigation.

Use map from April 2

Page 37: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 37

Continue biodegradation studies. Continue to address DNX isomer and As/Pb

issues. Continue public interaction and water supply

commitments.

Barksdale Path Forward

Page 38: DuPont Barksdale and Chequamegon Projects Update

Chequamegon-Nicolet National Forest Update

Page 39: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 39

Page 40: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 40

Chequamegon-Nicolet National ForestProject Summary:

DuPont working in conjunction with the US Forest Service (USFS) to investigate two sites (Cabin Lake and Clover) in the Chequamegon-Nicolet National Forest.

Delineation of debris, via geophysical surveying, was the first investigation step:

• Delineation completed at Cabin Lake in late 2006, while debris delineation was completed at Clover in May 2007.

• Debris delineation report submitted to USFS on June 7, 2007.

Page 41: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 41

Chequamegon-Nicolet National ForestCompleted field portion of the Phase II Archaeological investigation in June 2008

Approximately 1,500 man hours of field work. Excavated 188 Shovel Test Pits (STPs) and 17 Test Units

(TUs).• Recovered artifacts that appear to be associated with past logging

activities.• Artifacts shipped to URS’ archaeology lab in Maryland for further

study and curation preparation. Report preparation underway.

• Expected submittal to agency before the end of the calendar year.• USFS and Wisconsin State Historical Preservation Office will

determine if the site is eligible for National Historic Register of Places.

Page 42: DuPont Barksdale and Chequamegon Projects Update

July 22, 2008 Former DuPont Barksdale Works 42

Chequamegon-Nicolet National ForestPath Forward:

Once the archaeological work is reported and a determination as to what extent, if any, the logging site will need to be addressed as part of planned environmental work at Cabin Lake, DuPont will submit the final work plan for environmental investigation of the Clover and Cabin Lake sites to USFS for review.

The environmental investigations at Clover and Cabin Lake are planned for 2009, pending USFS approval to proceed.