Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

Upload: jennifer-mosley

Post on 03-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

Former DuPont Barksdale Works Project Update

December 14, 2004

DuPont Corporate Remediation Group

Great Lakes Visitors Center

Page 2: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

2

Purpose of Presentation

Provide an update on alternative water supply work completed since early November.

Present a summary of other site work completed in 4Q2004.

Page 3: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

3

DuPont Company Representatives

Brad Nave– Project Director, DuPont Corporate Remediation

Group (CRG)

Cary Pooler– Project Manager, URS Corporation

Page 4: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

Alternative Water Supply Project

Page 5: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

5

Pipeline Construction UpdateAlternative Water Supply

Approximately 48,600 feet of main (ductile iron pipe and HDPE) and service lateral (copper line to homes) is specified in the current design.

To date, approximately 95% of the pipeline project (based on lineal footage) has been constructed.

– All pipeline mains have been completed (6.25 miles). Final section of main was hydro tested on October 29th.

– 86% of the laterals have been completed (~14,300 feet); 5 lateral installations remaining.

– 19% of eligible homes are using municipal water (9 current connections).

Page 6: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

6

Bjork R

d

On

dossago

n Rd

Main completed

Main to be completed

Barksdale Municipal Water Project Main Pipeline Completed as of October 29, 2004

Page 7: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

7

Page 8: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

8

Page 9: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

9

Page 10: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

10

Page 11: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

11

Pipeline Construction UpdateAlternative Water Supply

Majority of construction will be completed by the end of calendar year 2004, assuming:

– No regulatory delays.– Outstanding contractor performance (construction and safety).– Tolerable weather.– No unforeseen or unmanageable technical issues.

Anticipate completion of most of the remaining service lateral lines and final hook-ups during the next several weeks.

A few private properties will have to be fully restored (final grading and seeding) in 2005, due to weather issues. Also, the road restoration in Birch Grove will be completed in 2005 per Barksdale Township’s request.

Wetland issues at two properties have yet to be resolved; therefore, these lateral lines may be completed in 2005.

Page 12: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

12

&V&V &V

&V&V &V &V

&V&V &V

&V &V &V

&V

&V&V&V&V&V&V

&V&V

&V&V

&V

&V

&V

&V

&V &V&V

&V&V&V&V&V &V

&V&V

&V&V&V

&V&V

&V

&V

Bjo

rk Rd

29450N29600N 29890N

30900N30110N

73150BJ

30240N

30300N

30380N

30810N

30700N30490N

30600N

72480H72470H72450H

72420H72410H

72370H72330H

72520H

72920H72910H

72860H

72790H

72730H72700H

72040H

73500H

73300BC73280H73250H

&V Fire Call NumberParcel Boundary

Parcels Included in Municipal Water Supply AgreementRoads

LEGEND

Final Connection made

Lateral Connections Remaining

Page 13: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

Other Barksdale Site Work

Page 14: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

14

Residential Monitoring

A new detection of 2,6-DNT was reported as part of the August data set.– Result estimated by lab due to low concentration.– Result was below Wisconsin Enforcement

Standard.– Potentially affected home hooked-up to municipal

today. Carbon filters continue to be effective. Official report of results will be issued shortly.

Page 15: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

15

2004 Debris Removal

Inspected 275 acres, primarily along ditches and creeks, for debris remaining from plant activities.

Identified numerous items, which included drums, pipes, sheet metal, equipment parts.

Screened items found for explosive residues. None found.

About 45 items removed to off-site landfill. Additional recovery work will be conducted in 2005.

Page 16: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

16

2004 Debris Removal – typical items

Page 17: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

17

Site Investigation – Fall 2004

Field Activities (Sept. – Nov.):– 16 soil borings sampled.– 11 new wells installed.– 36 wells sampled (25 existing and 11 new).

Preliminary findings:– Groundwater conditions near site boundary and

burning ground appear stable.– No site related chemicals found below western

TNT refining buildings.– Two new groundwater contamination source areas

for east central plume identified; however, concentrations of site-related chemicals are low when compared to the Former Burning Grounds.

Page 18: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

18

Miscellaneous Site Work

Continuing work with Adventus to evaluate a new generation of soil amendments to reduce concentrations of nitroaromatic/nitramine compounds in soil.– Generation 3 product uses nano-scale zero valent

iron.– Preliminary results pending.

Continuing Georgia Tech research on destruction of DNT and TNT.

Page 19: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

19

Home Value Protection Program

Three homes purchased to date. Two have been resold. One home demolished.

Home Value Protection Program will remain in effect until six months after alternative water is available.– Property owners will be notified in early 2005.

Page 20: Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004 Former DuPont Barksdale Works Project Update

20

Questions or comments?