sps ls1 work - abt

Post on 06-Jan-2016

21 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

SPS LS1 work - ABT. Installation final shielded MKE in LSS4 Final kicker – should remove present limitation on duty cycle for 25 ns beams Addition of transition pieces for for MKDV2, and for MKDH (if lab measurements show utility), in LSS1. - PowerPoint PPT Presentation

TRANSCRIPT

SPS LS1 work - ABT

• Installation final shielded MKE in LSS4– Final kicker – should remove present limitation on duty cycle for

25 ns beams

• Addition of transition pieces for for MKDV2, and for MKDH (if lab measurements show utility), in LSS1

top related