SPS LS1 work - ABT. Installation final shielded MKE in LSS4 Final kicker – should remove present limitation on duty cycle for 25 ns beams Addition of transition pieces for for MKDV2, and for MKDH (if lab measurements show utility), in LSS1. - PowerPoint PPT PresentationTRANSCRIPT
SPS LS1 work - ABT
• Installation final shielded MKE in LSS4– Final kicker – should remove present limitation on duty cycle for
25 ns beams
• Addition of transition pieces for for MKDV2, and for MKDH (if lab measurements show utility), in LSS1