liu-abt systems: sps b.balhan, j.borburgh, h.day 20 th november 2015
TRANSCRIPT
ZS improvements
LIU-ABT systems: SPS
B.Balhan, J.Borburgh, H.Day
20th November 2015
SPS ZS improvement LIU SPS 3
Outline
20/11/2015
• ZSTF • 1st upgraded ZS • Impedance Measurement results• Design and construction strategy• New Itrap Box dedicated talk G.Raffaele• Design• Budget• Planning • Conclusion
ZSTF Solenoid for e-cloud suppression
Promising, need more tests to confirm before propose to use as a base line for LSS2 extraction line.
420/11/2015 SPS ZS improvement LIU SPS
MD note : https://edms.cern.ch/document/1519435/1
The ZS solenoid appear effective at the ZSTF, with the scrubbing beam in the SPS. Effects can be observed with currents up to 25 A, corresponding to a solenoidal field of approx. 0.65 mT. The vacuum activity wasn’t fully suppressed, and the need to maintain a field in the main gap to see the effect still isn’t understood.
1st upgraded ZS
520/11/2015 SPS ZS improvement LIU SPS
ready to be installed in LSS2 to replace ZS 4 during YETSSince we have to install it between existing MPs, extra cables are required if we like to profit from the additional pumping. DIC in preparation by VSC.Need to decide strategy with RF screen and solenoid.
Hybrid solution, need no move BLM as well !!!
6
ZS and Pumping Module (actual, no screen)
20/11/2015 SPS ZS improvement LIU SPS
7
ZS and Pumping Module with screen
20/11/2015 SPS ZS improvement LIU SPS
ZS with new interconnect
820/11/2015 SPS ZS improvement LIU SPS
Remaining Cavities
ZS with new interconnect and updated screen
920/11/2015 SPS ZS improvement LIU SPS
ZS Impedance Measurements
1020/11/2015 SPS ZS improvement LIU SPS
Beam Impedance Measurement done by Hugo using wire installed on a spare ZS with simplified elliptical beam pipes (both ends).
Insert and new elliptical beam pipe effectively suppress any longitudinal modes below 1.2GHz. Much better impedance performance longitudinally
Need some feedback from Beam Impedance Team to validate the concept and use it as a base line.
1120/11/2015 SPS ZS improvement LIU SPS
Design and construction strategy
• EN/MME Job created to start August, postponed for LIU priorities (started in November).
• Weekly meeting planned to monitor follow up
• BI part for interconnect still to organise• Tank modifications being finalised at
main workshop still this year (all 10 tanks modified)• VSC qualification of first tank done.• Construction of interconnects to be
subcontracted via EN/MME• Updated RF screen design still to be
validated by impedance team.
EVM
Description ZS improvement activities
Budget codes
99249
20/11/2015 SPS ZS improvement LIU SPS
Year 2013 2014 2015 2016 2017 2018 2019
PV 80 38 192 403 210 100 77EV 80 38 171AC 80 38 158
Metrics per year in kCHF Cumulative metrics per year in kCHF
Year 2013 2014 2015 2016 2017 2018 2019
PV 80 118 310 713 923 1023 1100EV 80 118 189AC 80 118 277
13
Planning• 1/yr tank to be assembled; by LS2 5 tanks ready• 1st tank may already be installed during this YETS• Interconnects to be designed 2016, built in 2017• Purchase of vacuum equipment during continues
for 2 tanks/yr (spares)• Resources available:
• 0.5 FTE cp B (2015 – 2017)• 0.25 FTE cp C (2015 – 2019)• 0.25 FTE cp D (2015 – 2018)• Missing: cp B/C 0.5 (2018 – 2019)
20/11/2015 SPS ZS improvement LIU SPS
14
Conclusions• Concept design finished.• Impedance approach validated with lab
tests. To be endorsed by SPS study group.• First upgraded tank successfully tested
(HV as well as vacuum). • Budget looks reasonable so far.• Lacking technician from 2018 onwards.
20/11/2015 SPS ZS improvement LIU SPS
THANK YOU FOR YOUR ATTENTION!