ICE-PLAN for LS1. W here are we?? U ser requested activities Environment induced activities Self generated activities and their impact Issues. ICE Components in Accelerators. Enterprise computers. WEB server. GPN. LabVIEW. UNICOS/JCOP. WTS. OWS. EWS. RADE/LISA. FESA (BE-CO). - PowerPoint PPT PresentationTRANSCRIPT
Industrial ControlsEngineering Department
Ph. Gayet (EN/ICE)
ICE-PLAN for LS1
• Where are we??• User requested activities• Environment induced activities• Self generated activities and their impact• Issues
Industrial ControlsEngineering Department
UNICOS/JCOP
TN
GPN
WTS
WEBserver
Enterprise computers
EWS
Profibus
Local Touch panel
SCADA Servers
PLCs
I&0 and devices
ICE Components in Accelerators
OWS
PXI
LabVIEW
RADE/LISA
FESA (BE-CO)
FEC
WorldFIP
Industrial ControlsEngineering Department
UNICOS/JCOP
TN/EN
GPN
WTS
WEBserver
Enterprise computers
EWS
Profibus
PLCs
I&0 and devices
ICE Components in Experiments
GCS/MCS
JCOP
SCADA Servers
CAEN/Wiener/ISEG
DCS/DSS
DSS
EN
SCADA Servers
OPC
ELMB
CAN
OPC
Industrial ControlsEngineering DepartmentModification of applications under ICE
responsibility Accelerators
Existing applications Cryogenic for accelerator refrigerators : control logic evolution ie : addition of spare compressors CIET: New instruments to deploy Machine protection (QPS, WIC, PIC, LHC CIRCUITS) : modification and deployment of new units or new devices Survey: New load sensors consolidation LHC Collimator (Environmental Temperatures): 18 Collimators relocated (R2E) and possibly 10 new
collimators Post Mortem applications for Hardware commissioning
New applications Cooling and Ventilation : New systems and revamping of existing. EL Supervision : developement of a new supervision based on WinCC-OA EL : new Oscilloperturbography systems TIM 30/30 : RP and survey measurments cryo compressors Vibration monitoring system PS kicker : Hardware and timing for systems upgrade
Experiments Gas control systems & Cloud logic modification and new modules attached NA62 DCS and RUN control DSS improvment
Industrial ControlsEngineering Department
Support to applications under equipment groups responsibility
Accelerators CIS revamping of SPS magnet interlock system Vacuum systems for Isolde, REX ,Hie Isolde, Linac4 Cryogenics for LHC tunnel
Infrastructure Ramses support migration to WINCC-OA
Experiments Cryogenics for LHC experiments Magnet control system and vacuum of experimental areas Vacuum systems for Na62 Detector cooling systems
Industrial ControlsEngineering Department
Environment induced activities
Operating system Evolution Windows 7/Server 2008, SLC5/6, 64-bits migration
Commercial software version follow-up WINCC-OA (PVSS) Version 3.11 and maybe 3.12 OPC-UA to replace OPC-DA LabVIEW 64-bit (Linux and Windows) Front-end software and drivers 64-bit (Linux)
NI-NETV communication library NI-Hypervisor NI-SCOPE + 4 scope card drivers NI-488 (GPIB)
Siemens : TIA Portal to Replace STEP7
BE-CO standard Follow-up FESA 3 CMW JAPC - InCA FEC upgrade
Industrial ControlsEngineering Department
ICE-SELF GENERATED ACTIVITIES
JCOP, UNICOS Introduction of new common
functionalities Introduce redundancy WINCC-OA History in ORACLE for
accelerator application CPC-6 package
Complete redesign of the PLC/SCADA control package to face CV needs and to be ready for new clients
Brand NEW Application generator
RADE/LISA Project generator and multiple communication
channels for Labview applications Templates for real-time DAQ and analysis programs LabVIEW project generator SVN integration Automate compile and deploy Integrated testingDevelopment and validation in 2012 in order to be ready preferably before LS1
Industrial ControlsEngineering Department
Ph. Gayet (EN/ICE)
First evaluation of users applications requests & migration combined activities
Group
Activity Estimated Workload FTE
TE-CRG CIETmigration to FESA3 and WINCC-OA/UNICOS 0.5TE-CRG Refrigerator logic modification requests WINCC-OA/UNICOS/CPC6 1.3TE-ATB Survey migration to FESA 3 and WINCC-OA/UNICOS 0.3ISOLDE cooling migration to FESA3 and WINCC-OA/UNICOS 0.1EN-CV 42 projects 91 PLC 6.5EN-EL New supervision (development only) 1EN-STI Isolde Robot supervision 0.2EN-ICE MOON monitoring 0.1PH-DT GCS logic modification requests WINCC-OA/UNICOS/CPC6 1.5PH-DT Cloud logic modification requests WINCC-OA/UNICOS/CPC6 0.12PH-DT Mixer logic modification requests WINCC-OA/UNICOS/CPC6 0.12PH TOTEM/ALPhA migration FESA3 0.2PH NA62 DCS 1PH DSS upgrade 0.3PH NA62 Run control 1Colim Collimators logic modification requests WINCC-OA/UNICOS/CPC6 0.11TE-MPE PIC relocation of PLC and migration to WINCC-OA/UNICOS 0.02
TE-MPEQPS new devices modification of WorldFIP migration to FESA3 and WINCC-OA/UNICOS 1
TE-MPE WIC remote reset and migration WINCC-OA/UNICOS 0.05TE-MPE WIC Booster LINAC3 LINAC4,REX Isolde, SPS new supervision version + new PLC added 0.5AB-OP Post Mortem Labview applications 3EN-MME winding machine 0.1various small projects migrationWINCC-OA/UNICOS/CPC6 0.1
19.12
Industrial ControlsEngineering Department
Ph. Gayet (EN/ICE)
ISSUES
Redundant PLC for cryogenic are not (yet?) in the planning No failure occurrence this and last year (SEU exepted) justifying the
installation We will include commissioning activities in PLAN for all
systems affected by ICE Upgrades Commissioning and software validations will have to be
distributed during LS1 to avoid control peak activities in summer 2014
We are expecting a large additional workload to support all migrations done by framework users both in accelerator and experiments
This plan will have to be revisited if the environmental conditions change
Industrial ControlsEngineering Department
Ph. Gayet (EN/ICE)
This is the LAST SLIDE of the day
Happy LS1
Industrial ControlsEngineering DepartmentExemple : WINCC-OA Reference Configuration Plan
UNICOS6.0.0
JCOP5.0
WINCC-OA3.11
Q1 2013
Migration to
ReferencePlatform
W7 SLC5/6
UNICOS5.3.0
JCOP4.3.1
WINCC-OA3.8
Present
XP SLC5
UNICOS6.1.0
JCOP5.1
WINCC-OA3.11
Q3 2013
Full use of
New WINCC-OAFunctionnalities
W7 SLC5/6
UNICOSx.z
JCOPx.y
WINCC-OA3.12
2014 ???
Notaproved
W8 SLC6