Industrial Controls Engineering Department ICE-PLAN for LS1 Ph. Gayet (EN/ICE) Where are we?? User requested activities Environment induced activities Self generated activities and their impact Issues

Upload: draco

Post on 22-Feb-2016

63 views

Category:

Documents


0 download

DESCRIPTION

ICE-PLAN for LS1. W here are we?? U ser requested activities Environment induced activities Self generated activities and their impact Issues. ICE Components in Accelerators. Enterprise computers. WEB server. GPN. LabVIEW. UNICOS/JCOP. WTS. OWS. EWS. RADE/LISA. FESA (BE-CO). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ICE-PLAN for LS1

Industrial ControlsEngineering Department

Ph. Gayet (EN/ICE)

ICE-PLAN for LS1

• Where are we??• User requested activities• Environment induced activities• Self generated activities and their impact• Issues

Page 2: ICE-PLAN for LS1

Industrial ControlsEngineering Department

UNICOS/JCOP

TN

GPN

WTS

WEBserver

Enterprise computers

EWS

Profibus

Local Touch panel

SCADA Servers

PLCs

I&0 and devices

ICE Components in Accelerators

OWS

PXI

LabVIEW

RADE/LISA

FESA (BE-CO)

FEC

WorldFIP

Page 3: ICE-PLAN for LS1

Industrial ControlsEngineering Department

UNICOS/JCOP

TN/EN

GPN

WTS

WEBserver

Enterprise computers

EWS

Profibus

PLCs

I&0 and devices

ICE Components in Experiments

GCS/MCS

JCOP

SCADA Servers

CAEN/Wiener/ISEG

DCS/DSS

DSS

EN

SCADA Servers

OPC

ELMB

CAN

OPC

Page 4: ICE-PLAN for LS1

Industrial ControlsEngineering DepartmentModification of applications under ICE

responsibility Accelerators

Existing applications Cryogenic for accelerator refrigerators : control logic evolution ie : addition of spare compressors CIET: New instruments to deploy Machine protection (QPS, WIC, PIC, LHC CIRCUITS) : modification and deployment of new units or new devices Survey: New load sensors consolidation LHC Collimator (Environmental Temperatures): 18 Collimators relocated (R2E) and possibly 10 new

collimators Post Mortem applications for Hardware commissioning

New applications Cooling and Ventilation : New systems and revamping of existing. EL Supervision : developement of a new supervision based on WinCC-OA EL : new Oscilloperturbography systems TIM 30/30 : RP and survey measurments cryo compressors Vibration monitoring system PS kicker : Hardware and timing for systems upgrade

Experiments Gas control systems & Cloud logic modification and new modules attached NA62 DCS and RUN control DSS improvment

Page 5: ICE-PLAN for LS1

Industrial ControlsEngineering Department

Support to applications under equipment groups responsibility

Accelerators CIS revamping of SPS magnet interlock system Vacuum systems for Isolde, REX ,Hie Isolde, Linac4 Cryogenics for LHC tunnel

Infrastructure Ramses support migration to WINCC-OA

Experiments Cryogenics for LHC experiments Magnet control system and vacuum of experimental areas Vacuum systems for Na62 Detector cooling systems

Page 6: ICE-PLAN for LS1

Industrial ControlsEngineering Department

Environment induced activities

Operating system Evolution Windows 7/Server 2008, SLC5/6, 64-bits migration

Commercial software version follow-up WINCC-OA (PVSS) Version 3.11 and maybe 3.12 OPC-UA to replace OPC-DA LabVIEW 64-bit (Linux and Windows) Front-end software and drivers 64-bit (Linux)

NI-NETV communication library NI-Hypervisor NI-SCOPE + 4 scope card drivers NI-488 (GPIB)

Siemens : TIA Portal to Replace STEP7

BE-CO standard Follow-up FESA 3 CMW JAPC - InCA FEC upgrade

Page 7: ICE-PLAN for LS1

Industrial ControlsEngineering Department

ICE-SELF GENERATED ACTIVITIES

JCOP, UNICOS Introduction of new common

functionalities Introduce redundancy WINCC-OA History in ORACLE for

accelerator application CPC-6 package

Complete redesign of the PLC/SCADA control package to face CV needs and to be ready for new clients

Brand NEW Application generator

RADE/LISA Project generator and multiple communication

channels for Labview applications Templates for real-time DAQ and analysis programs LabVIEW project generator SVN integration Automate compile and deploy Integrated testingDevelopment and validation in 2012 in order to be ready preferably before LS1

Page 8: ICE-PLAN for LS1

Industrial ControlsEngineering Department

Ph. Gayet (EN/ICE)

First evaluation of users applications requests & migration combined activities

Group

Activity Estimated Workload FTE

TE-CRG CIETmigration to FESA3 and WINCC-OA/UNICOS 0.5TE-CRG Refrigerator logic modification requests WINCC-OA/UNICOS/CPC6 1.3TE-ATB Survey migration to FESA 3 and WINCC-OA/UNICOS 0.3ISOLDE cooling migration to FESA3 and WINCC-OA/UNICOS 0.1EN-CV 42 projects 91 PLC 6.5EN-EL New supervision (development only) 1EN-STI Isolde Robot supervision 0.2EN-ICE MOON monitoring 0.1PH-DT GCS logic modification requests WINCC-OA/UNICOS/CPC6 1.5PH-DT Cloud logic modification requests WINCC-OA/UNICOS/CPC6 0.12PH-DT Mixer logic modification requests WINCC-OA/UNICOS/CPC6 0.12PH TOTEM/ALPhA migration FESA3 0.2PH NA62 DCS 1PH DSS upgrade 0.3PH NA62 Run control 1Colim Collimators logic modification requests WINCC-OA/UNICOS/CPC6 0.11TE-MPE PIC relocation of PLC and migration to WINCC-OA/UNICOS 0.02

TE-MPEQPS new devices modification of WorldFIP migration to FESA3 and WINCC-OA/UNICOS 1

TE-MPE WIC remote reset and migration WINCC-OA/UNICOS 0.05TE-MPE WIC Booster LINAC3 LINAC4,REX Isolde, SPS new supervision version + new PLC added 0.5AB-OP Post Mortem Labview applications 3EN-MME winding machine 0.1various small projects migrationWINCC-OA/UNICOS/CPC6 0.1

19.12

Page 9: ICE-PLAN for LS1

Industrial ControlsEngineering Department

Ph. Gayet (EN/ICE)

ISSUES

Redundant PLC for cryogenic are not (yet?) in the planning No failure occurrence this and last year (SEU exepted) justifying the

installation We will include commissioning activities in PLAN for all

systems affected by ICE Upgrades Commissioning and software validations will have to be

distributed during LS1 to avoid control peak activities in summer 2014

We are expecting a large additional workload to support all migrations done by framework users both in accelerator and experiments

This plan will have to be revisited if the environmental conditions change

Page 10: ICE-PLAN for LS1

Industrial ControlsEngineering Department

Ph. Gayet (EN/ICE)

This is the LAST SLIDE of the day

Happy LS1

Page 11: ICE-PLAN for LS1

Industrial ControlsEngineering DepartmentExemple : WINCC-OA Reference Configuration Plan

UNICOS6.0.0

JCOP5.0

WINCC-OA3.11

Q1 2013

Migration to

ReferencePlatform

W7 SLC5/6

UNICOS5.3.0

JCOP4.3.1

WINCC-OA3.8

Present

XP SLC5

UNICOS6.1.0

JCOP5.1

WINCC-OA3.11

Q3 2013

Full use of

New WINCC-OAFunctionnalities

W7 SLC5/6

UNICOSx.z

JCOPx.y

WINCC-OA3.12

2014 ???

Notaproved

W8 SLC6