VOLUME PEKERJAAN INTERGRAL WATERPROOFING No. URAIAN LOKASI 1 Integral Waterproofing Pile Cap PONDASI 2 Integral Waterproofing Tie Beam LT SB 3 Integral Waterproofing Plat Lantai Include Plat GWT LT SB 4 Integral Waterproofing Retaining Wall LT SB 5 Integral Waterproofing Shear Wall dan Pit Lift LT SB 6 Integral Waterproofing GWT Dinding LT SB 7 Integral Waterproofing Sewage Pit (Prov Sum) LT SB TOTAL

Upload: indra-rizky-efendy

Post on 21-Jan-2016

23 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Volume SARI

VOLUME PEKERJAAN INTERGRAL WATERPROOFING

No. URAIAN LOKASI

1 Integral Waterproofing Pile Cap PONDASI

2 Integral Waterproofing Tie Beam LT SB

3 Integral Waterproofing Plat Lantai Include Plat GWT LT SB

4 Integral Waterproofing Retaining Wall LT SB

5 Integral Waterproofing Shear Wall dan Pit Lift LT SB

6 Integral Waterproofing GWT Dinding LT SB

7 Integral Waterproofing Sewage Pit (Prov Sum) LT SB TOTAL

Page 2: Volume SARI

GRIDLINE SAT VOLUME RAB BQ SARI SELISIH

m3 264.28 479.19 (214.91)

m3 178.94 190.06 (11.12)

m3 986.17 850.05 136.12

m3 365.01 304.62 60.39

m3 94.69 62.67 32.02

m3 135.72 112.70 23.02

m3 51.86 51.86 - TOTAL m3 2,076.67 2,051.16 25.52

147,683,253.23

Page 3: Volume SARI

VOLUME PEKERJAAN CAR STOPER

No. URAIAN LOKASI

1 LT 1

2 LT 1A

3 LT 2

4 LT 2A

TOTAL

Pekerjaan Car Stoper, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Pekerjaan Car Stoper, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Pekerjaan Car Stoper, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Pekerjaan Car Stoper, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Page 4: Volume SARI

GRIDLINE SAT VOLUME RAB BQ SARI SELISIH

2-10/L-N Unit 34.00 34.00 -

2-10/I-M Unit 43.00 40.00 3.00

2-10/I-M Unit 43.00 33.00 10.00

2-10/I-M Unit - 34.00 (34.00)

TOTAL Unit 120.00 141.00 (21.00)

Page 5: Volume SARI

VOLUME PEKERJAAN CORNER GUARD

No. URAIAN LOKASI

1 LT SB

2 LT 1

3 LT 2

Pekerjaan Corner Guard, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Pekerjaan Corner Guard, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Pekerjaan Corner Guard, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Page 6: Volume SARI

GRIDLINE SAT VOLUME RAB BQ SARI +/-

2-5/J-N bh 200.00 86.00

2-9/L-N bh 200.00 126.00

2-10/I-M bh 200.00 117.00

Page 7: Volume SARI

VOLUME PEKERJAAN JAMB LIFT

No. URAIAN LOKASI

1 LT SB

2 LT 1

3 LT 2

4 LT 3

5 LT 4

6 LT 5

7 LT 6

8 LT 7

9 LT 8

10 LT 9

11 LT 10

12 LT 11

13 LT 12

14 LT 13

15 LT 14

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Page 8: Volume SARI

16 LT 15

17 LT 16

18 LT 17

19 LT 18

20 LT 19

21 LT 20

22 LT 21

23 LT 22

24 LT 23

25 LT 24

26 LT 25

27 LT 26

28 LT 27

29 LT 28

30 LT 29

31 LT 30

32 LT 31

33 LT 32

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Pekerjaan Jamb Lift dilaksanakan secara full system sesuai gambar dan spesifikasi teknis.

Page 9: Volume SARI

GRIDLINE SAT VOLUME +/-

6-7/G-I ls 1.00 4-5/G-I2-3/I-J

6-7/G-I ls 1.00 4-5/G-I2-3/I-J

6-7/G-I ls 1.00 4-5/G-I2-3/I-J

6-7/G-I ls 1.00 4-5/G-I2-3/I-J

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

Page 10: Volume SARI

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

6-7/G-I ls 1.00 4-5/G-I

Page 11: Volume SARI

VOLUME PEKERJAAN GRILL BESI SIKU 50 x 50 x 5 dia. 16 mm

No. URAIAN LOKASI

1 LT SB

2 LT 1

3 LT 1A

4 LT 2

5 LT 2A

Pekerjaan pembuatan grill penutup gutter besi siku 50.50.5, berikut besi

diameter 16 mm, yang terpasang sesuai gambar dan spesifikasi teknis.

Pekerjaan pembuatan grill penutup gutter besi siku 50.50.5, berikut besi

diameter 16 mm, yang terpasang sesuai gambar dan spesifikasi teknis.

Pekerjaan pembuatan grill penutup gutter besi siku 50.50.5, berikut besi

diameter 16 mm, yang terpasang sesuai gambar dan spesifikasi teknis.

Pekerjaan pembuatan grill penutup gutter besi siku 50.50.5, berikut besi

diameter 16 mm, yang terpasang sesuai gambar dan spesifikasi teknis.

Pekerjaan pembuatan grill penutup gutter besi siku 50.50.5, berikut besi

diameter 16 mm, yang terpasang sesuai gambar dan spesifikasi teknis.

Page 12: Volume SARI

GRIDLINE SAT VOLUME RAB BQ SARI +/-

1-5/N m' 26.30 3-4/N m' 6.03

7-10/N m' 18.13 10/L-N m' 17.13 8-10/L m' 10.81

7-10/L-M m' 18.35 7-8/J-N m' 14.37 7-10/J-K m' 18.33

2-4/J m' 21.51 m' 16.00 150.96 (134.96)

2-8/N m' 42.53 3-8/L m' 31.05

m' 73.58

4-8/L m' 31.28 4-8/L m' 33.00 2-3/L m' 16.00 8-10/I m' 11.78 2-7/I m' 36.75

m' 83.60 275.95 (192.35)

4-8/L m' 31.25 4-8/L m' 33.00 2-3/L m' 9.27 2-3/L m' 9.78 8-10/I m' 11.78 3-7/I m' 42.14

4-8/L m' 42.74 4-8/L m' 31.65 2-3/L m' 9.71 2-3/L m' 9.18 7-10/I m' 11.80 5-7/I m' 17.00

356.00 259.30 96.70

Page 13: Volume SARI

VOLUME PEKERJAAN GRILL BESI SIKU 50 x 50 x 5 dia. 16 mm

No. URAIAN LOKASI

1 Gutter Ramp LT SB

2 Gutter Ramp LT 1

Page 14: Volume SARI

GRIDLINE SAT VOLUME +/-

3-4/A-B m' 2.98

3-4/A m' 3.00 m' 4.02 m' 4.02 m' 4.05 m' 4.05

3-4/J-K m' 3.00 m' 3.00

4/K m' 3.00 8.9/J-K m' 3.50

m' 3.50 8/M-N m' 3.50

m' 38.63

Page 15: Volume SARI

No. URAIAN LOKASI

1 Pekerjaan Bobok Tiang Pancang PONDASI

2 Pekerjaan Bobok Square Pile

3 Pekerjaan Bobok Sheet Pile

Page 16: Volume SARI

GRIDLINE SAT VOLUME +/-

Titik 634

Titik 104

Titik 463

Page 17: Volume SARI

VOLUME TANGGULAN T = 150 mm dan H = 1200 mm

No. URAIAN LOKASI

1 Volume Tanggulan T = 150 mm dan H = 1200 mm LT 5

TOTAL

Page 18: Volume SARI

GRIDLINE SAT VOLUME SELISIH

3-10/N m 50.50 10/J-N m 25.00 7-10/N m 17.60 10/J-N m 24.48 9-10/J m 4.03 8-9/I-J m 4.43 4-9/I-J m 42.38 7/J-N m 26.80 3-4/J m 7.15

8-9/M m 9.93 10/K-M m 9.63 8-9/K m 9.93 8/K-M m 7.13

7-8/L-M m 9.39 7-8/K-L m 9.39 6-7/L-M m 4.00 6-7/J-L m 12.30 6-7/M-N m 2.80 6-7/J-M m 18.80

TOTAL m 145.09 295.64 150.55

Page 19: Volume SARI

VOLUME RABAT BETON CAPPING BEAM HINGGA DINDING TETANGGA

No. URAIAN LOKASI

1 Rabat beton capping beam hingga dinding tetangga (t = 50 mm) LT 1

TOTAL

Page 20: Volume SARI

GRIDLINE SAT VOLUME RAB BQ SARI SELISIH

m2 104.71 m2 106.74 m2 67.43 m2 52.70 m2 31.57 m2 79.64 m2 94.41

TOTAL m2 547.67 537.21 10.46

Page 21: Volume SARI

REKAP VOLUME PEKERJAAN BETON K-400

No. URAIAN LOKASI

1 Lantai 12 LT 12a. Pekerjaan Kolom b. Pekerjaan Shear Wall

2 Lantai 13 LT 13a. Pekerjaan Kolom b. Pekerjaan Shear Wall

3 Lantai 14 LT 14a. Pekerjaan Kolom b. Pekerjaan Shear Wall

4 Lantai 15 LT 15a. Pekerjaan Kolom b. Pekerjaan Shear Wall

5 Lantai 16 LT 16a. Pekerjaan Kolom b. Pekerjaan Shear Wall

6 Lantai 17 LT 17a. Pekerjaan Kolom b. Pekerjaan Shear Wall

7 Lantai 18 LT 18a. Pekerjaan Kolom b. Pekerjaan Shear Wall

TOTAL

Page 22: Volume SARI

SAT VOLUME RAB BQ SARI SELISIH

m3 50.60 55.84 (5.23)m3 58.37 61.91 (3.54)

m3 50.60 54.86 (4.26)m3 58.37 61.91 (3.54)

m3 50.60 54.86 (4.26)m3 58.37 61.91 (3.54)

m3 50.60 54.86 (4.26)m3 58.37 61.91 (3.54)

m3 50.60 54.86 (4.26)m3 58.37 61.91 (3.54)

m3 50.60 54.86 (4.26)m3 58.37 61.91 (3.54)

m3 50.60 54.86 (4.26)m3 58.37 61.91 (3.54)m3 762.82 818.38 (55.56)

Page 23: Volume SARI

REKAP VOLUME PEKERJAAN BETON K-450

No. URAIAN LOKASI

1 Lantai Semi Basement LT SB a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

2 Lantai 1 LT 1a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

3 Lantai 2 LT 2a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

4 Lantai 3 LT 3a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

5 Lantai 4 LT 4a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

6 Lantai 5 LT 5a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

7 Lantai 6 LT 6a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

8 Lantai 7 LT 7a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

9 Lantai 8 LT 8a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

10 Lantai 9 LT 9a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

11 Lantai 10 LT 10a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

12 Lantai 11 LT 11a. Pekerjaan Kolom b. Pekerjaan Shear Wall dan Core Wall

TOTAL

Page 24: Volume SARI

SAT VOLUME RAB BQ SARI SELISIH

m3 140.95 180.29 (39.34)m3 94.69 62.67 32.02

- -

m3 280.35 286.72 (6.36)m3 123.64 135.79 (12.15)

- -

m3 270.15 212.00 58.16 m3 115.86 94.01 21.86

- -

m3 191.38 230.69 (39.30)m3 89.18 94.01 (4.83)

- -

m3 206.90 239.13 (32.23)m3 129.90 135.79 (5.89)

- -

m3 127.99 114.70 13.28 m3 89.18 85.73 3.45

- -

m3 116.45 104.09 12.37 m3 81.69 85.73 (4.04)

- -

m3 58.93 55.84 3.09 m3 59.47 61.91 (2.44)

- -

m3 50.60 55.84 (5.23)m3 58.37 61.91 (3.54)

- -

m3 50.60 55.84 (5.23)m3 58.37 61.91 (3.54)

- -

m3 50.60 55.84 (5.23)m3 58.37 61.91 (3.54)

- -

m3 77.98 56.42 21.56 m3 58.37 61.91 (3.54)m3 2,639.99 2,650.63 (10.64)

Page 25: Volume SARI

REKAP VOLUME SERSAN RAMP BESI SIKU 30 x 30 x 3 mm

No. URAIAN LOKASI SAT

1 Pekerjaan pembuatan sersan ramp dengan besi siku 30.30.3 mm LT. SB m'

2 Pekerjaan pembuatan sersan ramp dengan besi siku 30.30.3 mm LT.1 m'

3 Pekerjaan pembuatan sersan ramp dengan besi siku 30.30.3 mm LT.2 m'

Page 26: Volume SARI

VOLUME RAB BQ SARI SELISIH

93.13 63.24 29.89

430.20 916.31 (486.11)

356.00 667.42 (311.42)

Page 27: Volume SARI

No. URAIAN SAT VOLUME +/-

1 Waterproofing Integral m3 1,857.15

2m2 -

3 m2 5,078.31

4 Waterproofing Coating m2 1,249.45

5 Waterstop m' 4,878.00

Floor Hardener 3 kg/m2 + Step nozing di Groove 3 line, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Floor Hardener 5 kg/m2, yang dilaksanakan sesuai gambar dan spesifikasi teknis.

Page 28: Volume SARI

VOLUME CUBICAL TOILET

No. URAIAN LOKASI GRIDLINE POT

SAT

1 Pasangan Dinding Cubical Toilet TOILET LT 1 POT 2 m2POT 1 m2

m2POT 3 m2

m2

2 Pasangan Dinding Cubical Toilet LT 2 POT 1 m2m2m2

3 Pasangan Dinding Cubical Toilet LT 3 m2

4 Pasangan Dinding Cubical Toilet LT 4 POT 5 m2POT 6 m2

m2

5 Pasangan Dinding Cubical Toilet LT 6 POT 1 m2m2

POT 2 m2m2m2

6 Pasangan Dinding Cubical Toilet LT 28 POT 1 m2POT 2 m2POT 3 m2POT 4 m2

m2TOTAL m2

Page 29: Volume SARI

VOLUME RAB BQ SARI SELISIH

3.08 3.03 3.08 3.56

13.49 12.75 0.74

24.70 24.70

25.95 49.40 (23.45)

22.63 - 22.63

18.27 18.26

25.03 36.53 (11.50)

2.17 2.71 2.17

6.28 7.04 (0.76)

2.69 2.69 1.85 3.38

6.71 10.60 (3.89) 100.09 116.33 (16.23)

Page 30: Volume SARI

VOLUME RAILING TANGGA

No. URAIAN LOKASI SAT

1 Railing Tangga finish cat besi LT SB a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

2 Railing Tangga finish cat besi LT 1a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

3 Railing Tangga finish cat besi LT 1Aa. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

4 Railing Tangga finish cat besi LT 2a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

5 Railing Tangga finish cat besi LT 2Aa. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'

6 Railing Tangga finish cat besi LT 3a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

7 Railing Tangga finish cat besi LT 4a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

8 Railing Tangga finish cat besi LT 4Aa. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

9 Railing Tangga finish cat besi LT 5a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

10 Railing Tangga finish cat besi LT 6 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

11 Railing Tangga finish cat besi LT 7a. Handrail Pipa Besi Ø 50 mm m'

Page 31: Volume SARI

b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

12 Railing Tangga finish cat besi LT 8 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

13 Railing Tangga finish cat besi LT 9 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

14 Railing Tangga finish cat besi LT 10 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

15 Railing Tangga finish cat besi LT 11 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

16 Railing Tangga finish cat besi LT 12a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

17 Railing Tangga finish cat besi LT 13a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

18 Railing Tangga finish cat besi LT 14a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

19 Railing Tangga finish cat besi LT 15a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

20 Railing Tangga finish cat besi LT 16a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

21 Railing Tangga finish cat besi LT 17a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

22 Railing Tangga finish cat besi LT 18a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

Page 32: Volume SARI

23 Railing Tangga finish cat besi LT 19a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

24 Railing Tangga finish cat besi LT 20a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

24 Railing Tangga finish cat besi LT 21a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

25 Railing Tangga finish cat besi LT 22a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

26 Railing Tangga finish cat besi LT 23a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

27 Railing Tangga finish cat besi LT 24a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

28 Railing Tangga finish cat besi LT 25a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

29 Railing Tangga finish cat besi LT 26 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

30 Railing Tangga finish cat besi LT 27 a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

31 Railing Tangga finish cat besi LT 28a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

32 Railing Tangga finish cat besi LT 29a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

33 Railing Tangga finish cat besi LT 30

Page 33: Volume SARI

a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

34 Railing Tangga finish cat besi LT 31a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

35 Railing Tangga finish cat besi LT 32a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

36 Railing Tangga finish cat besi LT ATAP a. Handrail Pipa Besi Ø 50 mm m'b. Pipa Besi Ø 30 mm m'c. Tiang Railing Pipa Besi Ø 40 mm m'

Page 34: Volume SARI

VOLUME RAB BQ SARI SELISIH

17.15 50.42 15.85

26.71 81.72 18.33

31.24 97.24 24.53

31.13 96.91 19.01

6.04 22.38

25.73 68.84 12.60

22.68 71.84 12.96

23.12 73.10 12.88

25.91 69.41 12.52

11.91 28.14 4.20

10.17

Page 35: Volume SARI

24.33 4.56

9.67 22.85 4.56

9.70 22.92 4.56

9.70 22.93 4.56

9.70 22.93 4.56

9.70 22.93 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

Page 36: Volume SARI

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

9.70 22.92 4.56

Page 37: Volume SARI

9.70 22.92 4.56

9.70 22.92 4.56

10.45 23.47 4.56

8.05 24.16 3.15

Page 38: Volume SARI

VOLUME RAILING KACA

No. URAIAN LOKASI GRIDLINE SAT BQ SARI SELISIH

1 Railing kaca tinggi 1200 mm, kaca laminated 12 mm LT 2 m' 177.98 27.979 150.001

VOLUME RAB

Page 39: Volume SARI

VOLUME PEKERJAAN POTONG TIANG PANCANG

No. URAIAN LOKASI

1 Bobok kepala tiang pancang spun pile PONDASI

2 Bobok kepala tiang pancang sheet pile PONDASI

3 Bobok kepala tiang pancang square pile PONDASI

4 Bobok kepala tiang pancang mini pile PONDASI

Page 40: Volume SARI

GRIDLINE SAT BQ SARI SELISIH

titik 652 615 37

titik 337 370.00 (33)

titik 0 186 (186)

titik 323 327 (4)

VOLUME RAB