rpt on maxmin ii em and mag sur - tully a-11/12/13 prop · 42allnewa4 2 .3335 tully 010 report o n...

12
Q. ...^ , AK.JV; SECTION 42AllNEWa4 2 .3335 TULLY 010 REPORT O N MAXMIN II ELECTROMAGNETIC AND MAGNETOMETER SURVEYS TULLY A - 11, 12, 13 TULLY TOWNSHIP PORCUPINE MINING DIVISION TIMMINS AREA, ONTARIO for NORCEN ENERGY RESOURCES LIMITED Toronto, Ontario, Canada April, 1980 W. E. Brereton, P.Eng. .M P H CONSULTING LIMITED

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

Q.

...^ , AK.JV; SECTION

42AllNEWa4 2 .3335 TULLY 010

REPORT

O N

MAXMIN II ELECTROMAGNETIC AND MAGNETOMETER SURVEYS

TULLY A - 11, 12, 13

TULLY TOWNSHIP

PORCUPINE MINING DIVISION TIMMINS AREA, ONTARIO

for

NORCEN ENERGY RESOURCES LIMITED

Toronto, Ontario, Canada April, 1980

W. E. Brereton, P.Eng. .M P H CONSULTING LIMITED

Page 2: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

INTRODUCTION

This report outlines the results of ground geophysical sur

veys completed on Tully A-ll, 12, 13.

Page 3: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

l. LOCATION

The property consists of 8 contiguous unpatented mining

claims straddling the Buskegau River in the southwest

portion of the township. The claims are numbered P512687

to P512694 inclusive and occupy the N 1/2 of Concession 11

Lots 8 and 9 of Tully township (see Figure 1).

2. ACCESS

Access to the west side of the property is afforded via

a bush road which extends from Feldman Lake on highway

665 north of Timmins northeastward into the southwest

corner of Tully township. A network of old logging

roads facilitates access to various portions of the

grid.

3. LINE CUTTING

An east-west baseline was established on the property ex

tending 1.6 km west from a point 400m south of Lot 7-8,

Con.11. Crosslines were cut at 125m intervals. The

baseline and all crosslines were chained and picketed at

Page 4: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

25m intervals. A total of approximately 14 km of line

was cut, chained and picketed.

4. TOPOGRAPHY

The property is covered mainly by black spruce and al

der. There is no appreciable relief.

5. GEOPHYSICAL SURVEYS

5.1 Electromagnetic Survey

Electromagnetic surveying was carried out with

a MaxMin II E.M. unit. A 200m cable was used

for routine coverage at operating frequencies of

444 Hz and 1777 Hz. Technical and operational

details of the MaxMin II are presented in Appen

dix I.

The results of the E.M. surveying are shown in

the prints accompanying this report. Map I pre

sents the low frequency data and Map 2 the high

frequency results.

Two east-west striking, conductors ("A" and "B"),

Page 5: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

were located; "A" extends from line 1625W to line

1250W in the north portion of claim P512687. A

second, discontinuous zone, "B", is present on claim

P512692-693. Both conductors dip approximately

vertically and are indicated to lie beneath 60m to

90m of glacial overburden. Inphase to quadrature

ratios at 444 Hz indicate moderate conductivity.

There is no direct magnetic correlation with either

conductor.

The indefinite conductive response on Conductor "B"

at 1777 Hz on line 750E was subsequently checked with

a 250m cable. The presence of a bonafide bedrock con

ductor was verified.

Electromagnetic readings on the grid were often ex

tremely noisy due to highly conductive overburden

conditions.

5.2 Magnetic Survey

A Geometrics G-816 proton precession magnetometer was

employed for the magnetic survey. Correction for diur

nal variation was made using a Geometrics Barringer Re

search BM-123 base station magnetometer. Details of

the magnetic method and technical specifications of

the instruments employed are presented in Appendix I.

Page 6: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

The magnetic pattern is dominated by an approxi

mately 500 gammas magnetic high centred on claim

P512692 (Map 3).

Magnetic gradients indicate a steeply dipping body

beneath a substantial overburden cover. The north-

south magnetic trends in the area of lines 750W to

1375W are a reflection of the above anomaly. These

do not reflect bedrock strikes which are indicated

to be approximately east-west considering the E.M.

results.

The magnetic high appears to be truncated to the

west, in the area of line 750W, possibly by a

north-south fault.

6. CONCLUSIONS AND RECOMMENDATIONS

Conductors "A" and "B" are probably due to graphitic

units, possibly with some associated sulphides. The

magnetic anomaly appears to represent an ultrabasic

intrusive. Neither conductor appears to have been

drilled although an attempt was made to drill Conduc

tor "A" by Questmont Mines Ltd. in 1974. The hole

was abandoned due to drilling problems before the

conductor was intersected.

Page 7: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

tBoth conductors should be drill tested as follows:

Conductor Collar Dip Azimuth Length

A 1375W, 250N -6QO 360O 170m

B 750W, 137.5N -50O 180O 220m

Consideration should be given to testing the magnetic

anomaly on line 625W at 75S in a 200m hole drilled grid

south (ISO0 ) at -550 .

Further work will be contingent on the results of the

above.

Respectfully submitted,

WEB:g W. E/Brereton, P.Eng/

Page 8: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

r On

Ministry bf Natural Resources1 V

GEOPHYSICAL.- GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

l

File.

TO BE ATTACHED AS AN APPENDIX T( FACTS SHOWN HERE NEED NOT BE R

TECHNICAL REPORT MUST CONTAIN INTERPI42AMNEM24 Z . 3335 TULLY 900

f

Type of Survey(s)

Township or Area

Claim Holder(s)

Survey CompanyAuthor of Report , ,

MAGNETIC AND ELECTROMAGNETIC

TULLY TOWNSHIP

NORCEN ENERGY RESOURCES LTD.

715-5th AVE. S. W., CALGARY

M P H CONSULTING LIMITED

W. E. BRERETON, P.ENG.

Arlnrrw of Author 706, 141 ADELAIDE ST. WEST i TORONTO

Covering Dates of Sun

Total Miles of Line Cu

,py Feb. 28 - March 25, Apr.15,' (linecutting to office) 1980

9\

SPECIAL PROVISIONS riAvpCREDITS REQUESTED r.^,.^1 P" ̂

ENTER 40 days (inc line cutting) for first survey.

ENTER 20 days for additional survey usi same grid.

•y H Electromagnetic.,. ,u

ludes A f\ Magnet ornctrr _ ..., ,.. Ra^iomrtrir, ,

each -Other

nR Geological _ . .,- ,.

GpT-hrmirsl.........,.,,.

AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)

Magnetometer. F.)prtrnrr)agnrtir Rartiorn''trir(enter days per claim)

p'ATF.f Apr. 1^,1 Q 8fi STHNATIIRF,: (U /J LXlMX-Lu^.

Res. Geol.

Previous SurveysFile No. Type

Author of Report or Agent

Qualifications *^' f 5 f ̂

Date Claim Holder

W^)* -

MINING CLAIMS TRAVERSED List numerically

(prefix) (number). . P .512687

P 512688

P 512689

P 512690

P 512691

P 512692

P 512693

P - 51.2694

TOTAL CLAIMS 8 ,., ...

Page 9: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

GEOPHYSICAL TECHNICAL DATA.-1 - ' ' ' '

GROUND SURVEYS — If more than one survey, specify data for each type of survey

W . 450' {E. M.) Number of Stations — _____ ̂ i? ————————————. Number of Readings 725 (Maq. J ———.

Station interval ________ ̂5m —-.————^—.—..— Line spacing _____________ ; ——.-™.Profile sralp 'i cm "3^ (444 Hz); l cm r 203; (1777 Hz)hnntnnr interval ' 5 0 -- 100 gammas

Instrument Geometrics G-816 proton magnetometerw

2 C

Accuracy ~ Scale constant l gamma

Diurnal correction method base station recorderBase Station check-in interval (hniirs)Base Station location and value _____N/A

Instrument Apex Parametrics MaxMin II -

W Coil configurati^2 Coil separation•gg Accuracyp Method: ^ FrequencyfO

Parameters meas

^n Horizontal Loop200m

fl.R?; TnpnapA andCD Fixed transmitter

444 Hz, 1777 H*

.

QuadratureD Shoot back fp:In

(specify V.L.F. station),nrf, H inphase and quadrature components of

line G3 Parallel line

secondary E. M. field

Instrument.

Scale constantCorrections made.

Base station value and location.

Elevation accuracy.

Instrument ___i__________:^^^—^^^^^^^^^^.^^^^..^^^^^-^^—^^^^..^ Method D Time Domain D Frequency Domain

Parameters — On time ______:________________'. Frequency -———.

— Off time —_______________________ Range .——^..——— Delay time _________________:———-——™— Integration time —.-—-......-.—....—...———.—.—.^

Power __________________________________________________\Electrode array— Electrode spacing. Type of electrode .

Page 10: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

Mann Twp.

F i P 521868 .521867521826 521825-.t

u, 521866 ' 521865492092 492091

521869 '521870 521863,52)864521827 1521623*.)---1 -

P l P

521635 '521836P l P

521833 521834 52IB37 152183852IB30, 521829,; 521839 521840

P i p 521844 l 521843

P P

521848 '521847

P P 52I846 I 52I845521831 [521832V

521842 152184

P l Pl

4522561452255

P P 521661 . 52I8G2521849 l S2I85O517174 517176

494O43 ' 494044

P. ' PP j P

452257' 4522584-94047 i 494048 494049 494O50

P ' P.

521852 521851

P P 521853' 521854452260'452263

494055 ' 494056L _ — ^

P. IP-

494053 49405AP . f

452261 l 452262F P

l 52'860 1521859 494057 ' 494058 494059'494060

P i P

452236 452235515746 1515745P~ ~

i515747 1515744

515764 515/757 - - -L -\\.,

45^239|452240515763 '515 \ 758 515756 .51575 'S

P , P45Z242 1452241

S. R O5IG748 l 515743P IP~ ~~

515762 1515759

452245 J45224S

H515735 515716515761 '515760

P . P 521897 1521396 1522481*52247452250 '452249

515736 5I57;7P--ir-515750 515741

P ~ ~ HP P \ P

521750 1521751

'-P. , P

452253 '45225452t898 521899 515737 '515718

521901 , 521900 521755 1521754515752 .515739 515738 5IB7I9

P P 52I902 ! 521903

p , p

521881 . 5216825I7\242, 5I7S43

52I760 1 52I7T,|521758 1521759521883 , 521884

P l p

522364 522365

P t P

521763 1521762

P , P

52I905 1 521904 52 1765 '5217645I7245I5M7244

522367 522366

___ l___ ——

522173(521769516825 , 516820 4359791522172

?23025 152803 1 516827... . l... . .

516824 l 516821_ — -f- _ _ ~—

525797*525733

516823, 516822547342 '516837528026 "5ZECS525800 525799

P i P

544699 '544698528027 15280 528033 .528034

117919528028;'' I40IBJ

r52803l

52B029'S28030

rp : P522296 1522283

VI

V

IV

l12 10 8 7

Evelyn Twp.

42A1INEB324 2.3335 TULLY

OO o

III

II

aoo

THE TOWNSHIP OF

LITTLEDISTRICT OF COCHRANE

PORCUPINE MINING DIVISION

SCALE:HNCr^40 CHAINS

LEGENDPATENTED LANDCROWN LAND SALELEASESLOCATED LANDLICENSE OF OCCUPATIONROADS

IMPROVED ROADSRAILWAYS

POWER LINESMARSH OR MUSKEG

C.S.

H——t——l——I-

NOTESArea reserved to H.E.PC. for water p ower purposes shown thus: !

Flooding rights lands bordering the Frederick House River

400* Surface Rights Reservation arourta all Lakes and Rivers.

DATE OF ISSUE

JJN 11 icvi

SURVEYS AND MAPPING

PLAN NO.-M. 535ONTARIO

TRY OF NATURAL RFSOURCES

Page 11: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

I625

W15

00 W

1375

W12

50W

125

WIO

OO

W8

75 W

750

W62

5W500

W37

5 W

250

WI2

5WO

l SO

/OS

9 A

.

lso

ioe

s t

SZS

O9

t

p 5126

87

P 51 2

686

P 5126

90 .

P 5126

89

P 5126

91

1 PN0

5126

92 ^

P 51

26

94

P 5126

93

IO

I373

l\s

ze

\tS

3\s

et*

Ifs

i se

ns

r

INDE

X MA

Pl

Inch

±

1/E

rnll*

CO

NC

. Of

fGO

NG, n

BA

SE

LIN

E

CT)

CDCD

N 1/

2 C

ON

C.K

SI/

2

CO

NC

.IE

42

A1

1N

EW

24

2.3

335

TU

LL

Y2

10

m O t

i i

5010

0IS

O200

LE

GE

ND

Val

ue

of

Tot

al

Mag

netic

F

ield

Bas

e S

tatio

n

Lo

catio

n

Ma

gn

etic

C

onto

ur

Magnetic

D

epre

ssio

n

- 59

600

INS

TR

UM

EN

T

: G

eom

etric

s G

- 81

6 P

roto

n P

rece

ssio

n M

agne

tom

eter

CO

NT

OU

RS

:

5OO

go

mm

aa

100

gam

mas

50

gam

mas

10

gam

mas

Cla

im

Pos

tT

rail

Cre

ekBu

sh

Roa

d

Roc

k o

utc

robo

uld

ers

Hyd

ro L

ine

Bui

ldin

g -

- - -

-

Drill

Hol

e

250

m

NORC

EN E

NERG

Y RE

SOUR

CES

LIM

ITE

D

TIM

MIN

S

RR

OU

EC

T

MAGN

ETOM

ETER

SUR

VEY

GR

ID A

-II,A

-I2,A

-I3

TU

LJ-Y

T

WF

.P

rojtc

t No

t C

-28

7

Sol*

: 25

OO

Dra

win

g No

: 3

By:

W.E

. B

rere

ton

Dra

wn:

N

.F.

Dtt

ii

Febr

uory

, 19

80

MP

H

Con

sulti

ng L

imite

d

Page 12: RPT ON MAXMIN II EM AND MAG SUR - TULLY A-11/12/13 PROP · 42allnewa4 2 .3335 tully 010 report o n maxmin ii electromagnetic and magnetometer surveys tully a - 11, 12, 13 tully township

1625

I50O

1375

1250

1125

1000

875

750

625

500

375

250

125

1 '

J. t

!SQ

84O

e l

SO

IOS

3

l 5O

IOS

9 /\

SO

IOS

S l

82

6O

S

\

1004

39

tOl 3

73

INDE

X MA

Pl

inc

h

s 1

/20

)11

*

LE

GE

ND

Co

nd

uct

or

Axi

s -

- -

- -

- -

- -

* *

- -

Inph

ase

Pro

file

(

l cm

:

20

0X0)

^tr*

Ou

od

rofu

re

Pro

file

(

l cm

z

2O

0Xo)

-

* -

- -

*

Dep

th

Est

imate

(

metr

es

)XD

ip

Co

nd

uct

ivity

- T

hic

kness

(m

ho

s)

INS

TR

UM

EN

T:

Ape

x P

ara

me

fric

s M

ox

-min

ll

CA

BL

E:

2OO

M

etr

e*.

50m

750

0N

IO

^

Roc

k ou

fyxf

p^bo

ulde

rs

( )

x ..x

S 1/

2 CO

NC.T

I1/

2 C

ON

C.

IT

1/2

CO

NC

. H

\

Tra

il

Bus

h R

oad

Hyd

ro

Lin

e

Build

ing

- -

-

Drill

Hol

e -

O-

v-^

42A

11N

E00

24

2.3

335

TU

LLY

m O

iSO

too

ISO

200

250

mj

NORC

EN E

NERG

Y RE

SOUR

CES

LIM

ITE

D

TIM

MIN

S

PR

OJ

EC

T

HEM

SU

RVE

Y-17

77H

zG

RID

A-I

I,A

-I2,A

-I3

TU

LL

Y

"T

WP

.

Pro

jtct

Not

C-2

87

Sea

l*-

2500

Draw

ing

No.-

z

W.E

. B

rere

ton

Dra

wn:

N

.F

Oct

et

Febr

uary

, 19

80

MP

H

Con

sulti

ng L

imite

d