C ontractor’s Z one weekly newspaper April 8 2013 Vol. 7, No. 14 Placer County Contractors Association & Builders Exchange Get Connected at the GC Expo, April 17 Offered by the Capital City Chapter of the American Subcontractors Association Details inside AMERICAN SUBCONTRACTORS ASSOCIATION CAPITAL CITY CHAPTER Event to be held at the Elks Tower Ballroom (pictured), 921 11th Street, Sacramento

Upload: placer-county-contractors-association

Post on 23-Mar-2016

220 views

Category:

Documents


1 download

DESCRIPTION

Weekly publication for contractors to find bidding projects, education, networking opportunities and group discounts.

TRANSCRIPT

Page 1: PCCA Weekly Newsletter and Project Information

Contractor’s Zone

Contractor’s Zoneweekly newspaper

April 8 2013Vol. 7, No. 14Placer County Contractors Association & Builders Exchange

Get Connectedat the GC Expo, April 17

Offered by the Capital City Chapter of the

American Subcontractors Association

Details inside

AMERICAN SUBCONTRACTORS ASSOCIATIONCAPITAL CITY CHAPTER

Event to be held at the Elks Tower Ballroom(pictured), 921 11th Street, Sacramento

Page 2: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

Page 3: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Inside This Issue

This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

InspirationfortheWeek Page2

YourWeeklySmile Page2

IndustryLinks Page2

TheWeek’sWeatherForecast Page3

PCCACalendarofEvents Pages4-5

ContractorYellowPages Page6

NewsBriefs Pages7-9

IndustryNews Pages12-26

ClassifiedAds Page16

WeeklySafetyMeeting Page27

NewPlans Pages28-29

WeekAtAGlance Pages30-31

CalTrans Pages32-35

PlansOnFile Pages36-71

BidResults Pages72-73

LegalAds Pages74-77

BottomlineLawyers Page26 WebsiteDiamondPacific Page8 WebsiteInlandBusinesSystems Page36 WebsiteJensenMasonry Page42 WebsitePhiladelphiaInsurance Page14Q&AInsurance Page29 WebsiteStateFundInsurance Page6 Website

SUPPORT OUR ADVERTISERS!They support the PCCA

and deserve your business!

Don’t let the money ship

sail without you!A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!

Page 4: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

Association Links CSLB Contractor’s State License Board OSHA Occupational Safety & Health Administration GSBE Golden State Builders Exchange AIA American Institute of Architects AGC Associated general Contractors BIA Building Industry Association SCIF State Compensation Insurance Fund Employers Guardian Human Resources American Subcontractors Association

Projects Online DGS Contracts DOT DOT District 3 SMUD CSI Code List Fed Biz Opps

Safety OSHA Hazard Communication OSHA Safety & Health Topics Click SafetyOnline OSHA Safety Classes Employer Records of Occupational Injury & Illness Governor’s Office of Emergency Services Injury & Illness Prevention Program Risk Management – IIPP

State & Federal Links California Building Standards California Prevailing Wage Rates Federal Prevailing Wage Rates California Dept. of Industrial Relations California Environmental Protection Agency Mechanics Lien Law Information Mechanics Lien Guide

Local Government Links California Chamber of Commerce City of Auburn City of Rocklin City of Roseville City of Lincoln County of Placer

Construction Industry Links

The grand essentials of life are something to do, something to love, something to hope for.

— Thomas Chalmers

The Meaning of Life

Duct tape is like the Force. It has a light side, a dark side, and it holds the universe together.

Yes!We’ve saved advertising space for you!

Call us at 916-729-5432

Page 5: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

PCCA:

PresidentPatrick RemingtonRemington Construction

Vice PresidentChris HarrisJames L. Harris Painting, Inc.

DirectorCheryl GibsonVon-Jac Development

DirectorCyndi CookCook Design Company

DirectorAdam NooraniHomewood Lumber

DirectorEdward JohnsonWarren G. Bender Co.

DirectorMaggie MarfiaMoule’s Foothill Glass

VP Public RelationsTim BuskHeritage Painting

VP Governmental AffairsJack RemingtonAndregg Geomatics

PBX:PresidentJohn BrunJohn Brun Masonry

Vice PresidentChad TwardusTwardus Construction

DirectorNick ForestiereGurnee & Daniels LLP

DirectorMike BennettBennett Tile

Staff:Chae Gale-Director of [email protected]

Jeff Henry-Director of Business [email protected]

Kellie Russell-Auburn Planroom [email protected]

Vickie Guthrie - Roseville Planroom [email protected]

Jim Couk - Scan Technician

Placer County Contractors Association10656 Industrial Ave., Ste.160, Roseville, CA 95678 - 916-771-7229

231 Cherry Ave., Ste.101, Auburn, CA 95603 - 530-889-3953Open Monday-Friday: 8am-5pm

www.placerbx.com

Board of Directors

RosevilleToday64oCloudy64o-44o

76o

42o

Tuesday Wednesday Thursday Friday

80o

48o80o

56o72o

45o

AuburnToday58oRain58o-46o

72o

51o

Tuesday Wednesday Thursday Friday

74o

51o76o

56o69o

45o

Page 6: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 4 Contractor’s Zone• .Contractor’s Zone

A p r i l 2 0 1 3

2 PlansOnlineMarketingand PlanTakeoffClass.

8 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

9 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

10 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

11 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

16 AmvicPacificICFTrainingClass. ContactRandyBunnell (530)265-9085forclass scheduleandfees.

M a y 2 0 1 39 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

14 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

15 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

16 QSP/QSDTrainingSeminar hostedbyBTConsulting8:30am to4:30pmRoseville

23 PG&EResidentialEnergy EfficiencyTrainingCourse atRoseville

27 PCCAOfficesinRosevilleand AuburnareCLOSEDfor MemorialDay

31 PCCASpringGolfTournament atTimberCreek!

Page 7: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

AprilSUNDAY MONDAY TUESDAY WED. THURSDAY FRIDAY SAT.

2 8 3 0

23

1 7 18

26

13

29

24 25

3 4

14

A p r i l 7

2

2 1

10

2722

11

2015 16

9

19

12

QSP/QSDTrainingSeminarhostedByBTConsulting8:30amto4:30pmRoseville

CPRClassRosevillePCCAClassroom

AmvicPacificICFTrainingClass

Getconnectedatthisoneofakindnetworkingevent.

Click Here

GCExpo!

ConstructionSeminarClick Here

8

M a y 1

Page 8: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 6 Contractor’s Zone• .Contractor’s Zone

Contractor Yellow Pages

MasonryJensen

Full Service Masonry ContractorLicense # 804650

Mark Jensen916.663.3429

[email protected]

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com985LincolnWay,Auburn,CA95603

Page 9: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Elk Grove Seeking Proposals By May 1

For Affordable Housing

The city of Elk Grove is looking forsomeonetobuildaffordablehousing,andhas$2millioninloanstogettheball rolling.Cityofficialshavepostedarequestforproposalsforsuchproj-ects,withproposalsduebyMay1.

By providing $2million in loans, thecity expects a builder to seek addi-tionalmoney fromother governmentagencies,private investorsorbanks.Anyprojectproposedmustbe readyfor development and construction,rather than conceptual, according totherequestforproposals.

The request does not specify thenumberofhousingunitstobebuiltoralocation,butdoesstatethehousingmustbesomewhereitcanqualifyfora9percenttaxcredit,typicallyaloca-tionnearservices,shoppingandtran-sit. There also are requirements fortheprojecttohaveincomerestrictionsatthreedifferentlevelsofaffordability,allapercentageofthemedianincomeinthearea.

Apple’s Billion Dollar Headquarters Project To

Begin This Summer

Constructionworkwasoriginallyslat-edtobreakgroundin2012.NowAp-pleexpectstostart initialdemoworkonthesiteinJune.

The reason for the delay? The com-pany is attempting to pare down thecost.Appleisworkingwithleadarchi-tectFoster+Partnerstoshave$1bil-lionoff thecurrent$5billionpricetagbeforeworkstarts.Andwhilethecom-pany has named its general contrac-tors (DPRConstruction andSkanskaUSABuilding),ithasn’tflushedoutallitssubcontractors.Someofthosesubswillbesubmittingbidsnextmonth.

News Briefs

Continued on next page

Cost overruns aren’t surprising onmassiveprojects,andApple’shead-quarters has widened in scope toincludedoubletheemployeesorigi-nallyprojected.

54-Story Tower To Begin Immediate Construction

A San Francisco developer’s planto build a 54-story office and resi-dential tower in the city’s South ofMarketneighborhoodwillcostabout$375million,accordingtoapersonfamiliarwithdetailsoftheproposal.The building’s cost works out to$540per square foot and includes$75millionforthesiteandapprov-alsfromthecity.

Builder Jay Paul Co. plans to “im-mediately commence construction”ofan800-foot(244-meter)highrisenearthesiteofthecity’snewTrans-bay bus and rail terminal, theSanFrancisco-based real-estate firmsaidyesterday inastatement.Thebuildingwill also be near an officetowerplannedbyBostonPropertiesInc. andHines that’s set to be thecity’stallest.

$1.85 Million For Five Safety Projects

Fivecrossing zonesalongCaltraintracks on thePeninsula are slatedfor infrastructure improvements aspartofaneffort to increasesafety.The intersections — where thetracks cross Brewster Avenue inRedwoodCity,atChurchillandEastMeadowavenues inPaloAlto,andat Rengstorff Avenue and CastroStreetinMountainView—willeachhaveadditional timeadded to theirgate-down intervals, meaning carswill have to wait a little longer fortrainstopassthrough.Additionally,traffic signals at the intersectionswillbeextended tocoordinatewiththelongergate-downtimes.

These measures were studied bythe California Public Utilities Com-mission, a state regulator, anddeemedtobethebestsolutionstoincreasing safety at the sites, ac-cording to Caltrain spokeswomanChristine Dunn. The CPUC is ex-pectedtocompletelyfundthe$1.85millionsafetyimprovementproject.

Caltrain anticipates starting con-struction on the intersection im-provementsthissummer.

$10 Million For New Construction Work

HancockCollegewill receiveanes-timated$10millionbequestfromtheestateofthelatePatriciaJeanBoyd,awell-knownpianoteacheratthecol-legewhodied last summer,accord-ingtoPatriciaRice,anestatetrustee.Thebequest,whichwaslefttotheAl-lanHancockCollegeFoundation,thecollege’s fundraising arm, will go tosupport construction thatwill benefitthecollegemusicdepartment.

It is one of the largest donationsever for a community college inCalifornia, according an attorneyfortheestate.Hancockofficialsareunwillingtogivespecificsabouthowthecollegeplanstousethebequestother than to say: “She was very,veryexplicit that themoneyhad togotobuilding,”Ricesaid.

Walnut Creek To Renovate Golf Course Clubhouse

TheWalnutCreekCityCouncilhastaken the first step toward clean-ingupabuildingthathasseende-ferred maintenance for decades.Thecouncil allocated$353,000 forthedesignphaseofremodeling.Allof themoneycomes from revenuegeneratedbythecourseitself,andnonefromthegeneralfund.

Page 10: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 8 Contractor’s Zone• .Contractor’s Zone

Thenextstepwillbe for thecity toissue$5.8million inrevenuebondsto pay for the renovation.The loanwould be paid back through userfees.Thecouncilwillmake its finaldecision on issuing the bonds inthe next fewmonths. If the councilissuesthebondthisyear thencon-structioncouldbeginin2014.

Walker Ridge Wind Project

Afterashortbreak,developersoftheWalker Ridge Wind Park are againmoving forward with the project. Al-taGas— a Calgary-based business—hasfiledanewplanwith theUSBureauofLandManagementinUkiahtoconstructawindparksaddlingLakeandColusacountiesonWalkerRidge.

Theplan includes29turbines,roadimprovements, cement pads forthe turbines, a collector system, asubstation and a transmission linefromtheturbinestothepre-existingPG&Etransmissionlines.

Thecompanyhadgottenthroughini-tial hearings for thenecessaryper-mits fromBLM,buthalted theproj-ect in2011duetoacombinationofstaffchangesinthecompanyandaneed to rewrite theplan to cater tothequicklydevelopingtechnologies.

Totransportlargeconstructionequip-mentandturbinesonlongtrucks,thecompanywillhavetoexpandWalkerRidgeRoadand ina fewcasesre-movesectionsofthehillsadjacenttotheroad.Theprojectisexpectedtoemployee 150 workers during con-struction.

Whole Foods Will Build In San Jose

Whole Foods has acknowledgedplans to start construction on a33,000-square-footstoreatthecor-ner of The Alameda and StocktonAvenue inSanJose inMay,withaprojectedopeningofsummer2014.WholeFoodsfirstannounceditsin-tention tobuildon thesite in2005,

projecting a 2007 opening. All thebuildings on the site were demol-ished in 2007, and the parcel hasremainedvacant.

Additional change is coming to thethree buildings between theWholeFoods site and theArenaHotel onThe Alameda. The building at 785TheAlamedahousestheThreeMar-keteers,buttheadjacentwarehouseand International Hun-I-Nut Deli at795TheAlamedaarebothempty.

Threepermitsforthe1.037-acresitewere filed with the San Jose plan-ningdepartmentinlateMarch.Theyareforbothaplanneddevelopmentpermit andzoning for transit-orient-ed,mixed-useresidentialonthesiteand a general plan amendment re-quest to change it from mixed-usecommercialtourbanresidential.

Doing Business With Sacramento Workshops

Scheduled

TheCountyofSacramentoContractand Purchasing Services DivisionandtheCitrusHeightsBusinessIn-formationCenterpresent:

Doing Business with the County ofSacramentoWorkshop(InformationandAssistance)Tuesday,April23,20139:00am-12noon

ThinkingaboutdoingbusinesswithSacramento County? Proposal de-velopment and responding to bidrequestscanbecomplexandoftenconfusing.CometotheWorkshoptoheardirectlyfromtheCountyofSac-ramento Contract and PurchasingServices Division staff. Assistancewithon-lineregistrationofyourbusi-nesswillbeprovided.PublicPurchaseWorkshop

News BriefsContinued from last page

http://designcenters.paccoast.com

Page 11: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

(InformationandAssistance)Wednesday,May29,20139:00am-12noonPrerequisite:DoingBusinesswithCountyofSacramentoWorkshop

This isa follow-upworkshop to theDoingBusinesswithCountyofSac-ramento workshop. This two-hourworkshopwill focus on how to usethe County’s third party eProcure-mentsystemwhenrespondingtobidsolicitations and for bid opportunityregistration.AQ&Asessionwill fol-low.

Both workshops are located at theCitrus Heights Business InformationCenter, 7011SylvanRoad, SuiteA,CitrusHeights,CA95610.916-242-4116

Seating is limited, so register: di-ane@crossroadsdiversified.comFormoreinformationaboutcontract-ingwith theCountyofSacramento,pleasevisitwww.saccountybids.net

Teichert Wins $30.5 Million Highway Project

Teichert Construction is scheduledtostartworkinearlyMayonanotherstoplight-to-interchange project onHighway 99 north of Sacramento.Withaprojected$30.5millionpricetag,theinterchangeat99andRiegoRoad,afewmilesnorthoftheSac-ramento/Suttercountyline,istenta-tivelysettobecompletedbytheendof2014.

The fundingbreakdownfor theproj-ect has $19.3 million coming fromstate Proposition 1B transportationmoney,$3.9millioninfederalmoneyand$7.9millionfromSutterCounty.

Developers for Sutter Pointe, aplanned community to be centeredaround the intersection, are payingmuchofthecounty’sshare.

Those developers have previouslysaid the project wouldn’t proceed

until market conditions were right,buttheinterchangewasavitalinfra-structurecomponentaswell.

$1.25 Million In New School Projects In Chico Will Go Out To Bid

The Chico Unified School Districtboard of trustees have voted to un-dertake four construction projects,allconsideredmattersofhealthandsafety. The approved work includesthe replacement of a kindergartenwalkwaycanopyatRosedaleSchoolthat is buckling; all of the walkwaycanopiesatChicoJuniorHighSchoolthatleakseverelyandsufferfromdryrot; replacing a 36-year-old heatingandairconditioningunitontheroofoftheChicoHighSchoollibrary,andtheremovalandreplacementofthefloorandthebleachersintheVarleyGymon the Pleasant Valley High Schoolcampus.

MikeWeissenborn,CUSDdirectoroffacilitiesandconstruction,explainedwaterhadbeenseepingthroughthegym’sconcretefoundationanddam-agedtheflooringsoseverelythattheregionalbasketballrefereeorganiza-tionhadruledittoounsafetopermitleaguegamesinthefacility.

Will Jail Replace Tehama County Library?

TehamaCountyleadersareconsid-eringbulldozingthecountylibrarytomakeroomfora64-bed jailexpan-sion. The new plan was presentedtoTehamaCountySupervisors lastweekasawaytoeasepressureonthe36-year-oldbuildingthatwaslastrenovatedinthe90s.

Theexpansionwouldcomewithoutany costs to the county, becausethereisaround$20millionavailablefor the expansion through the SB1022constructiongrant.

The Community Corrections Part-nership is still working to completethe jail needs assessment study

that’s required for the grant. Theyare already scouting new locationsforthelibrary.

Menlo Park “Likes” Facebook Project

Facebook has obtained MenloPark’spermissiontobuildasecondcampus west of Bayfront Express-way, near its headquarters on theothersideoftheroad.

“Congratulations,” Mayor PeterOhtaki told Facebook officials lastweekwhenthecitycouncilvotedtoallowthesocialnetworkcompanytoproceedwithitsplans.“Where’sthe‘Like’button?”

Thecouncilapprovedapackageofland use entitlements and agree-ments related to theWestCampusprojectandauthorizedrezoning thesite so the building could exceed35feetandcover55percentoftheproperty instead of a maximum of50 percent. In addition, the councilapproved an environmental impactreportandanofficialstatementthatsays the development’s benefitswould outweigh negative conse-quencessuchasincreasedtrafficatsomeintersectionsandconstructionnoise.

Thecompanyintendstoconstructanexceptionally long 433,555-square-footbuildingdesignedbyrenownedarchitect FrankGehry that featuresa rooftop park. The 22-acre WestCampus site is located at 312 and313ConstitutionDrive.

With offices built above a surface-level parking lot, the complex willriseto73feetinsomespots,thoughmostofitwillbeabout45feethigh,saidRachelGrossman,anassociatecityplanner.

Click on the blue underline to go to the Online Planroom

Page 12: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 10 Contractor’s Zone• .Contractor’s Zone

Page 13: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Page 14: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 12 Contractor’s Zone• .Contractor’s Zone

With the legislative and economicuncertainties influencing the con-structionindustry,it’snosecretthatconstructionbusinessownershavestruggled to keep their companiesprofitable.Versatilityandjobdiver-sificationhavebecomethegoalofmanycontractors.

According to Jamie Wright, prod-uctmanagerofTerexConstructionAmericas, contractors’ go-to toolsduring these times are the onesthat help them perform their jobsmoreefficiently.

Becauseof this,manyhavecometorelyonthesmallerequipmentintheir fleets, particularly skid steerloadersandcompacttrackloaders,as these machines are designedforversatilityandeaseofuse.

Increasing Versatility

Skid steer loaders and compacttrackloadersarevaluabletoolsforcontractors because of their abil-itytomaneuverintightplacesandto use a variety of attachments.Wright says, “A skid steer loaderor compact track loader coupledwith a variety of attachments cantotally revolutionize a constructionbusiness,enabling them tobidonmore projects and to work in allweather and ground conditions.Because skid steer loaders and

Industry News

Choosing Between Skid Steers And Compact Track Loaders

compact track loaders can utilizethe same attachments—buckets,dozer blades, mulchers, augers,trenchers, levelers, box rakes,snow blowers, etc.—and performinmanyofthesameapplications—construction, landscaping, rental,forestry and agricultural—the typeof surface you will be working onsignificantlyimpactstheproductiv-ityandcycletimesoftheloader.”

Savvy owners and operatorshave learned to determine whenitmakes sense to use a compacttrackloaderoraskidsteerloader.Experiencehastaughtthemthattoimproveprofitability, it is importanttomatchtherighttasktotheload-er. Applications in certain groundconditions, such as hard surfaceslikeconcreteorrock,canbedoneatareducedcostwhenusingaskidsteerloader.Puttingcompacttrackloaders into applications like de-molitionandroadbuildingcancostacustomerupto25-percentmoreper hour than a skid steer loaderbecauseofexcessivetrackwearintheseoperatingenvironments.

“It is generally acknowledged thatskid steer loaders perform beston firmer ground conditions, suchas rock, asphalt and concrete aswell as in developed areas,” saysWright. “Skid steer loaders aredesigned to travel quickly and to

Understand how these machines perform to make the right choice

completetightspinturnsinspace-restrictedareas.”

Compact track loadersarebuilt tohandleslopesandwet,soft,snowy,sensitiveandmuddygroundcondi-tions,suchasthosefoundinunde-velopedareas.These loadersdis-tributethemachine’sweightevenlyover the length and width of thetracks, allowing them to traverseuneventerrainmoreefficiently.

Increasing Productivity

Contractors have many utilizationopportunities with these smallerloaders.Mainapplications forskidsteer and compact track loaderscontinue to be tasks related toloading,pickingandcarrying,backdragging and material-removaljobs.

Wright says, “Compact loadersare also hard to beat for gradingwork,aswellasforworkingonandaround existing landscapes, be-causeoftheirlowgroundpressure.These loaders are also extremelystableonslopesorunevengroundandhaveexcellenttractioninmanytypes of ground conditions.” Be-cause these types of loaders arebuilt to work in extreme tempera-tures,theyenableownersandop-erators to remainproductiveyear-round.

Page 15: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Choosing Between Skid Steers And Compact Track LoadersUnderstand how these machines perform to make the right choice

Increasing Capabilities

According to Wright, the trendforskidsteersandcompact trackloaders in the last decade hasbeen the increasing popularity oflarger units with more capacity,faster speeds and longer, widerwheelbases. Owners and opera-tors demand production, higherbucket capacities and improvedlifting capabilities because thesecapabilities are directly related tohowmuchtheycangetdone inaday.

Aloader’sabilitiestolifthigherandreach farther are someof the keychanges in the past five to sevenyears,addsWright.Tocompensateforadditionalreachandliftcapaci-ties, wheelbases on loaders havealsoincreased.Alongerwheelbasehelps to give the operator amorestableplatformwhen liftingweighttofullheight.

Increasing Asset Utilization

Whetheraconstructionbusinessisusingaskidsteerloader,acompacttrack loader or both, equipmentmanagementisthekeytosuccess.Thebasicsarealwaysimportantforgettingthemostoutofanypieceofequipment. “Proper maintenance,as outlined by the manufacturer’srecommended guidelines,” Wright

says, “will significantly extend thelife and increase the productivityofskidsteer loadersandcompacttrackloaders.Ascontractorsoptto

domorewith theircompactequip-ment fleets, performing routinemaintenance can save them a lotofmoney.”

Page 16: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 14 Contractor’s Zone• .Contractor’s Zone

Page 17: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

By Shauna Krause and David KalbCapitol Services, Inc.

Like The Professor and Shermanfrom those old cartoon reruns, wefire up the ‘way back’ machine foracontractor’squestion.Acoupleofcontractors who’ve reached their‘boiling point’ on bids need a shortanswer, anda longone.AGeneraldiscoverstheycanplay,butnotgetinthe‘pool’alone…

Q: You helpedme getmy licenseway back when and I have beenthe Responsible Managing Officer(RMO) formany,manyyears. As Iget closer to retiring, I am becom-ing less involved in the day-to-dayoperations of the company. I amreadytopasstheRMOtorchtooneofmyemployeesandhavehimbethenewqualifying individual. I stillhaveownership in the company somyquestionisifIremovemyselfastheRMO, how does that affectmyinterestinthecompany?Iwon’tbefullyretiredforanotheryearortwo.

A:It’sgreattohearfromyouagain.ChangingtheQualifieronthelicensedoesnotaffecttheownershipstruc-tureofthecompany.YoucanevenremainasanOfficeronthelicense.Goaheadandpassthetorchandofcourse contact us if you’d like helpwiththeprocess!

Q:Mycompanyhasa“C-20”(HVAC)licenseandwedoenergyupgradeson homes. Part of thiswork some-timesinvolvesreplacingtheboilers.RecentlyanothercontractortoldmeI couldn’tdo theboilerworkunlesswehelda“C-4”Boilerclassification.Canyoutellmeifthat’scorrect?

A:A“C-20”HVACcontractorcanre-placeboilersaslongasit’spartofa

Capitol Connection Q&A Resource For ContractorsKalb Q & A

Shauna KrauseDavid Kalb

heatingsystem.Theycannotdojustboilerreplacementalone.

Q:Iama“C-35”Plasteringcontrac-tor and I’m losing work to anothercontractor in the area who is a “C-4”Drywall contractor. He is biddingon and signing contracts for drywallandplasterjobsandthensubbingouttheplasteringtoanother“C-35”con-tractor.CanadrywallcontractorsignacontractforPlasterlicensework?

A: Italldependsontheproject. Insome cases the CSLB has deter-mined that a specialty contractorcan sign contracts involving tradesoutside of their specialty, and sub-contract the work to a properly li-censedcontractor if thework tobedoneisincidentalandsupplementalto thework being performedwithintheirspecialtytrade. Inthiscase,iftheplasteringworkisnecessaryinordertocompletethedrywallprojectthen it isacceptable to takethe jobandthensubouttheplasterpartoftheproject. However, if thedrywallandplasterworkaretwodistinctjobswhichcanbeperformedseparately(such as drywall inside a residen-tialhomeandplasteroutsideofthe

home), then the drywall contractorshouldnotbeincludingthatworkinhis/hercontract.

Q: I have a “B” General Buildinglicense and one of my customerswould likeme toputapool in theirbackyard. Since building a poolinvolves more than two unrelatedtrades,amIallowedtodothisproj-ectforthem?

A:Althoughbuildingapoolinvolvestwoormoreunrelatedtrades,aGen-eralBuildingcontractorcannotbuildapoolsinceit’snotastructure.Youcanhowevertakethecontractforthepool if you hire a “C-53” SwimmingPoolcontractortoperformthework.A General Building contractor canalsobuildapoolifitispartofanover-all building project, such as a newhomeoralargerenovationproject.

Knowingwheretogofortheanswersis half the battle. Get expert assis-tanceimmediatelywhenyoucall866-443-0657, email [email protected],orwriteusatCapitolServices,Inc., 1225 8th St. Ste. 580, Sacra-mento, CA 95814. Research pastcolumnsatwww.cutredtape.com.

Page 18: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 16 Contractor’s Zone• .Contractor’s Zone

Classified AdsFor Sale:CommercialGeneralContractorRETIRINGsellingeverythingfromofficefurnituretohandtools, includingplantablewithdigitizerandportabledigitizer.Toomuchtolist,callifinterested.Rick916-870-9637

For Sale:StainlessSteelThermadorDoubleOvenModel#PODC302JNewInBox$5,500.00BobHilton916-508-0723

“Surplus” Sale: GHHisdoingsomeSpringcleaning!Wehaveavarietyofconstructionmaterialsandtoolsrangingfrompipefittingstocompressorsandgenerators.Stopby,seewhatwehaveandmakeusanoffer!

Date:February15,2013Time: 9:00am-3:00pmLocation:11960HeritageOakPlace,Ste.2BAuburn,California95603Questions:(530)886-3100

Welder/Fabricator (Newcastle)ANewcastlecompanyislookingforanexperiencedwelder/fabricatortoleadourwelding/fabricationdepartment.

ApplicantmustbeproficientinWeldingwithmultipleprocessesinALLpositions:Stick,Mig,AirArc

Experience: •Relevantworkexperienceinfabrication,partsmanufacturingordirectlyrelatedfields.*4yearsexperienceinwelding/fabricationorrelatedfield.

Skills, Knowledge, & Abilities: *Musthaveleadershipskills•Mustbeabletocomprehendbasicbusinessmathcalculations.•MustbeabletocommunicateeffectivelybothinwritingandverballyinEnglish.*Musthaveknowledgeofshoptoolsandsafeusage.*Mustbeabletoworksafelyinateamenvironment*Selfstarterandhardworker*OrganizationskillsaMust*Applicantmustbecleanshavenandneatinappearance

Ifyoufeelyoufittheabovecriteriapleasesendyourresumealongwithtwo(2)workreferences.Pleasemakesuretoinclude“JobApplication”intheSubjectline.

ThankYou.“Pleasevisitouronlinecatalog”ChrisFerreiraGeneralManagerP.916-663-2026/F.916-663-1858D.V.B.E./[email protected]

Page 19: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Page 20: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 18 Contractor’s Zone• .Contractor’s Zone

Page 21: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Page 22: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 20 Contractor’s Zone• .Contractor’s Zone

Page 23: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Page 24: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 22 Contractor’s Zone• .Contractor’s Zone

Page 25: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Page 26: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 24 Contractor’s Zone• .Contractor’s Zone

Page 27: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Page 28: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 26 Contractor’s Zone• .Contractor’s Zone

Thursday April 11th from 9:00 am to NoonCPR 2 Year Certification Class

CPR 2 Year Certification Class

Roseville PCCA Classroom10656 Industrial Ave, Suite 160, Roseville, CA 95678

CourseandCertificateis$70.00PerStudent.Youcanpayatthedoor.AlloftheclassesofferedbySimplyCPRarebasedontheAmericanHeartAssociationstandards.StudentscompletingtherequirementsoftheSimplyCPRcourseswillreceiveaCPRorfirstaidcard.

MonthlyTrainingProgramtohavethecertificationclassesavailableonaregularbasis,thesecondThursdayofeachmonthatthePCCARosevilleClassroom.

Calltoscheduleatrainingsessionforlargergroupsinyourownofficeifyouwouldpreferanonsiteclass.

RegisterNow!CallJeffat916-771-7229orfaxthisbackto916-771-0556

Register Now! Call Jeff at 916-771-7229 or fax this back to 916-771-0556

Name

Name

Name

Name

INFO CENTER

CONTACT

WEB SITE

ABOUT

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Page 29: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Amessyjobsitecanbeanunsafejobsiteandit hurts our reputation as professional roofers.Pour housekeeping presents hazards to work-ers,thegeneralpublic,andtothebuilding.Slip,trip, falls and puncturewounds are only a fewoftheinjurieswhichcanbecausedbyamessysite.Trashcancloguproofdrainsduringase-vererainstormandcausefloodingorevenaroofcollapse to thebuilding. Trashanddebriscanalsoblowoff the roofandcausepersonal inju-riesorpropertydamage.Asolventsoakedragcancauseafireifnotproperlydisposedofinacontainer.

Storematerialsandequipmentat leastsix feetfromanyroofedgeandawayfromanyentryorexitwaysandpublic foot traffic. Allflammableliquids,rags,etc.shouldbestoredinapprovedsafetycans.Toolsandequipmentshouldbeput

Roof Housekeeping

Company Name: Job Name: Date:

Special topics for your project:

Employee Safety Recommendations:

Reviewed MSDS # Subject

Meeting attended by:

Supervisor’s Signature: Date:

Weekly Safety Meeting

awayafteruseanddebrisfromtheroofingworkshouldbedisposedofatregularintervals.

If the roof is less than 20 feet high, trash anddebriscanbetossedoffifaguardrailsystemisinplace.Asaferwayandonewhichisrequiredonroofshigherthantwentyfeethighistouseatrashchute. Aguardrailsystemisstill requiredaroundandbehindthechutetopreventfallsandachainshouldbeusedacrosstheopeningtothetrashchutewhenitisnotbeingused.Thechuteshouldbesecuredtothebuildingandextendintoatrashcontainer.A2X4pieceoflumbercanbeattachedtotheroofinfrontofthechuteopeningtoprovideastopforthewheelbarrowmakingiteasiertotipanddumpaloadofdebris.Remem-bernottooverloadwheelbarrows.Useaheavydutydumpcartorpowerequipmentwithtrailersforlargerloads.

Page 30: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 28 Contractor’s Zone• .Contractor’s Zone

All published entries in this report are obtained from sources deemed reliable. Placer County Contractors Association and Builders Exchange assumes no responsibility for any inaccuracies listed in this report. It is up to the individual to verify all information.

New Plans

Elk Grove 2013 FENCING @ JOHN EHRHARDT ELEMENTARY SCHOOL 2020Elk Grove ELK GROVE 2013 ARBOR DAY NATIVE TREE PLANTING SERVICES 37016Martinez HOB IMPROVEMENTS - NETWORK UPGRADES 128071Nevada AIRPORT FUEL SECONDARY CONTAINMENT 1026Alameda EXTERIOR BUILDING PAINTING OF FIRE STATION NO.4 128071Irvine CLEANING OF SEPTIC TANKS AT MARINE WAY 137066Santa Rosa FINLEY CENTER SENIOR WING PHASE 3 138064Dublin 2012-2013 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM & CURB RAMP 100082Ripon TOGO’S 107092Mono Co. RFQ GEOTECHNICAL ENGINEERING AND QUALITY ASSURANCE TESTING 133070Mono Co. ENGINEERING, SURVEYING, AND/OR TOPOGRAPHIC MAPPING SSRVICES ON AN 137066Nevada PRELIMINARY ENGINEERING STUDY FOR DONNER PASS ROAD PAVEMENT 22015Elk Grove TREE AND VEGETATION REMOVAL ON THE LAGUNA WEST LEVEES EAST OF 29015Turlock PAINTING OF FIRE STATION NO. 4 106096Nevada ARCHITECTURAL SERVICES FOR DISTRICT ATTORNEY TENANT IMPROVEMENTS 20008Roseville UPS MAINTENANCE SERVICES 2021Napa FIRE ALARM REPLACEMENT SYSTEM & FIRE PROTECTION SYSTEM 30025Perris SOLAR PHOTOVOLTAIC RENEWABLE ENERGY DESIGN/BUILD 120074Sacramento K STREET 700 BLOCK 23023Sacramento JANITORIAL SERVICES - SHELTERED MARKETS 37016Chico CHICO HIGH SCHOOL PORTABLE 2013 - NO GC OPENINGS 111087Modesto EISENHUT ELEMENTARY SCHOOL FASCIA REPAIR 131070Anaheim ELECTRICAL MATERIALS FOR PUBLIC UTILITIES (SY1301410) 0Napa PARKING GARAGE PAINTING PROJECT-CLAY STREET & PEARL STREET 16026Sacramento AC OVERLAY PROJECT 2013 21021Sacramento MIRA LOMA HIGH SCHOOL 30025Citrus Heights AREA 5 TRAFFIC, SAFETY & WALKABILITY PROJECT - PHASE 1A 57005Vallejo ADMIRAL CALLAGHAN PAVEMENT REHABILITATION PROJECT MEASURE B - FY 125087West Sacto WESTFIELD TOT LOT INSTALLATION 5022Fresno DICKEY PLAYGROUND; FORMER RECREATION BUILDING DEMOLITION 7024Sacramento RFQ WATER, WASTEWATER AND STORM DRAINAGE RATE STRUCTURE STUDY 13026Sacramento RFQ DRAINAGE MASTER PLANNING, DESIGN REVIEW AND HYDRAULIC 12012San Leandro MADISON ELEMENTARY SCHOOL RESTROOM CONVERSION 39020Modesto RESTROOM UPGRADES AT STANISLAUS ELEMENTARY SCHOOL 133070Sacramento RFP MANAGEMENT AND OPERATION OF THE SACRAMENTO SOFTBALL COMPLEX 14019Sacramento ARCADE MIDDLE SCHOOL, LANDSCAPE & IRRIGATION 3020Shasta SWEDE CREEK ROAD WIDENING 54010Fairfield RFP OLIVER ROAD PARK AND RIDE IMPROVEMENT PROJECT 90086Merced WASTEWATER TREATMENT PLANT HEAD DITCH IMPROVEMENTS 110087Placer PLACER COUNTY JOB ORDER CONTRACT 116082Fresno LARGE DIAMETER WATER TRANSMISSION MAINS IN SOUTHWEST FRESNO 151065Shasta WHITMORE ROAD WIDENING 218099Elk Grove TO PROVIDE ON - SITE HAZARDOUS WASTE MANAGEMENT SERVICES 3020Elk Grove TO PROVIDE TRASPORTATION AND DIPOSAL SERVICES IN SUPPORT OF THE 28022Elk Grove TO PROVIDE TRANSPORTATION AND DIPOSAL SERVICES FOR TIRES 34015Sacramento VARIOUS ON CALL CONTRACTORS SERVICES 46096

Page 31: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net Or Give Us A Call 916-729-5432

Sacramento RFP FOR MEDICAL AND PSYCHOLOGICAL SERVICES 11021Elk Grove RFP SEASONAL ICE RINK 39020Fairfield EAST WEST WATER TRANSMISSION PIPELINE SEGMENT 3, 36 INCH 94069San Jose DEMOLITION AND RECONFIGURATION OF THE CERONE BLDG F 116082Lafayette LAFAYETTE WATER TREATMENT PLANT CLEARWELL AND WASHWATER PIPELINE 12011Grass Valley GRASS VALLEY NON CHEMICAL LANDSCAPE MAINTENANCE SERVICES 20009Galt STATE ROUTE 99 / STATE ROUTE 104 PROJECT 38025San Joaquin LEVEE MAINTENANCE PROJECT HOMELESS ENCAMPMENT EROSION REPAIRS 102094Marin 2013 ROAD RESURFACING PROJECT, SOUTHERN REGION 58016Redding CHURN CREEK ROAD AND SR 299 INTERSECTION IMPROVEMENTS 108090Vallejo MISCELLANEOUS STORM DRAIN IMPROVEMENTS PROJECT 108090Redding N. MARKET ST. BRIDGE WATER MAIN REHABILITATION PRJ 110087Vallejo 2013 MISCELLANEOUS SANITARY SEWER REHABILITATION PROJECTS 187076Visalia PROFESSIONAL SERVICES TO REWRITE VISALIA’S MUNICIPAL/INDUSTRIAL 123086El Paso de STREET REHABILITATION RAMBOUILLET ROAD 106096

Page 32: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 30 Contractor’s Zone• .Contractor’s Zone

Monday, April 08, 2013

AIRPORT FUEL SECONDARY CONTAINMENT Nevada Plan # 1026WAYNE BROWN CORRECTIONAL FACILITY CONCRETE CAR WASH AREA Nevada Plan # 3019FORD F550 TRUCK EQUIPPED WITH A CRANE Sacramento Plan # 30024FLORIN ELEMENTARY SCHOOL HVAC REPLACEMENT Elk Grove Plan # 50003LEE VINING STREETS REHABILITATION PROJECT Bridegeport Plan # 127066EXTERIOR BUILDING PAINTING OF FIRE STATION NO.4 Alameda Plan # 128071COST PLUS WORLD MARKET Roseville Plan # 191085PREFABRICATED STEEL SHADE STRUCTURE INSTALLATION AT SABRE CITY Roseville Plan # 207095PARKCONSTRUCTION INSPECTION AND MATERIALS TESTING FOR OLD Sierra Co. Plan # 281052FIBERBOARD ROAD BRIDGE REPLACEMENT AT THE LITTLE TRUCKEE

Tuesday, April 09, 2013

WAYNE BROWN CORRECTIONAL FACILITY STEEL STRUCTURE PAINTING Nevada Plan # 6037H IT NORTH SOUTH BCMA WIRELESS UPGRADE Sacramento Plan # 220142013 FENCING @ VALLEY & FLORING HIGH SCHOOLS Elk Grove Plan # 27022PEABODY ROAD WATER AND SEWER LINE RELOCATION PROJECT Fairfield Plan # 39019PARKING CITATION HEARING OFFICER SERVICES Sacramento Plan # 51097MISSION CANYON LANDFILL DRAINAGE IMPROVEMENTS-2013 Los Angeles Plan # 88067JOHN MUIR MIDDLE SCHOOL, TRACK AND ATHLETIC FIELDS BANCROFT San Leandro Plan # 95066MIDDLE SCHOOL, PAR COURSEALHAMBRA TERRACE RAILING REPAIR Martinez Plan # 123085CLEANING OF SEPTIC TANKS AT MARINE WAY Irvine Plan # 137066TEMPERANCE AVENUE IMPROVEMENTS Clovis Plan # 152061WATER SYSTEM CORROSION PROTECTION-PROJECT 2013-12 Livermore Plan # 156088PROBATION CARPET REPLACEMENT Nevada Plan # 2050132013 STATE STREETS WATERLINE PROJECT South Lake Tahoe Plan # 285048PALO ALTO MAIN LIBRARY Palo Alto Plan # 317016

Wednesday, April 10, 2013

COTTAGE ELEMENTARY SCHOOL RESTROOM UPGRADES Scramento Plan # 170142013 ASPHALT RUBBER CAPE SEAL PROJECT, VARIOUS STREETS Lodi Plan # 25023BRIDGE REPLACEMENT PROJECT BREWER ROAD OVER BRANCH OF Placer Plan # 43039CURRY CREEK2013 PAVEMENT PRESERVATION PROGRAM Sonoma Plan # 650012012-13 SANITARY SEWER MAIN REPLACEMENT PHASE 2 Sunnyvale Plan # 83073FURNISHING AIR BRAKE PARTS Redding Plan # 91067FAIR OAKS ELEMENTARY SCHOOL SYNTHETIC TURF REPLACEMENT Redwood City Plan # 113073PROCURE AND REPLACE HVAC UNITS Los angeles Plan # 121080SAFE ROUTES TO SCHOOL COLLEGE AVE & GLENN STREET WEST AVE & Santa Rosa Plan # 125086DELPORT AVE KAWANA SPRINGS ROAD $ MEADOW WAYFINLEY CENTER SENIOR WING PHASE 3 Santa Rosa Plan # 138064MOBILE HOME PARK TREE REMOVAL Yuba City Plan # 180004REPAIRS/REHABILITATION OF WELLS 402 & 403 Chowchilla Plan # 208082

Week At A Glance

Page 33: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

ATHERTON DRIVE WATER STORAGE TANK AND BOOSTER PUMP STATION Manteca Plan # 275050DESIGN BUILD PROJECTSANTA TERESA WATER TREATMENT PLANT INCOMPATIBLE MATERIALS San Jose Plan # 307013PROJECT STAGE II

Thursday, April 11, 2013

2013 CRACK SEAL PROJECT Napa Plan # 36013MOUNT DIABLO SP, LOWER SUMMIT ADA IMPROVEMENTS Clayton Plan # 38024ROCKLIN ROAD AT MEYERS ST. ROUNDABOUT PROJECT Rocklin Plan # 550992012-2013 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM & CURB RAMP Dublin Plan # 100082INSTALLTIONNEW ARMIJO HIGH SCHOOL ADMINISTRATION, COUNSELING BUILDING & Fairfield Plan # 104089ASSOCIATED SITEWORKGENERATOR MAINTENANCE Merced Plan # 107091TOGO’S Ripon Plan # 107092RFQ GEOTECHNICAL ENGINEERING AND QUALITY ASSURANCE TESTING Mono Co. Plan # 133070SERVICES ON AN AS NEEDED BASISRUTHERFORD DUST RESTORATION PROJECT, REACH 8 B/C, PW 13-29 Napa Co. Plan # 134061ENGINEERING, SURVEYING, AND/OR TOPOGRAPHIC MAPPING SSRVICES Mono Co. Plan # 137066ON AN AS NEEDED BASIS2013 ROAD RESURFACING PROJECT CENTRAL REGION Marin Co. Plan # 15506416TH / 21ST / 24TH / 25TH AVENUES AND CABRILLO / CALIFORNIA STREETS San Francisco Plan # 164075SEWER REPLACEMENT AND PAVEMENT RENOVATIONAS-NEEDED SPOT SEWER REPAIR San Francisco Plan # 166074E STREET LIFT STATION IMPROVEMENTS Galt Plan # 172008NAPA COUNTY HALL OF JUSTICE HVAC REPAIRS Napa Plan # 299049ACQUISTAPACE ELEMENTARY SCHOOL CONSTRUCTION PROJECT Santa Maria Plan # 308013CONSTRUCTION TO REMODEL RESTROOMS AT PACIFIC STATION AND Santa Cruz Plan # 310010RELATED SITE WORKMAINTENANCE OF TRAFFIC SIGNALS DPW MAINTENANCE PROJECT El Paso de Robles Plan # 312010BARNEY SCHWARTZ PARK SLURRY SEAL AND STRIPE El Paso De Robles Plan # 316010MAINTENANCE OF AUTOMATED ROLL-UP DOORS El Paso de Robles Plan # 319007

Friday, April 12, 2013

SUNRIDGE PARK LANDSCAPE CORRIDORS Sacramento Plan # 11020SPMUD MAINTENANCE YARD PAVEMENT REPAIRS South Placer Plan # 13025PERIMETER FENCING - HURLEY Sacramento Plan # 14018PRELIMINARY ENGINEERING STUDY FOR DONNER PASS ROAD PAVEMENT Nevada Plan # 22015REHABILITATIONTREE AND VEGETATION REMOVAL ON THE LAGUNA WEST LEVEES EAST OF Elk Grove Plan # 29015INTERSTATE 5 AND SOUTH OF ELK GROVE BOULEVARD PROJECTNAPA RIVER DEBRIS REMOVAL Napa Plan # 350182012 ASPHALT OVERLAY PROGRAN Sonoma Plan # 82075ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE FOR DISTRICT E Visalia Plan # 97068PAINTING OF FIRE STATION NO. 4 Turlock Plan # 106096NORTH MATHER BLVD EXTENSION PROJECT Rancho Cordova Plan # 144065CAMELLIA CENTER PETCO & SHELL REMODEL & TENANT IMPROVEMENTS Sacramento Plan # 193094LIGHTING RETROFIT EQUIPMENT AND SERVICES San Jose Plan # 212084

Page 34: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 32 Contractor’s Zone• .Contractor’s Zone

CDOT 30

CDOT 30

CDOT 23

CDOT 23

CDOT 23

CDOT 16

CDOT 16

CDOT 15

CDOT 23

CDOT 23

CDOT 23

CDOT 23

CDOT 23

CDOT 16

CDOT 15

CDOT 15

CDOT 15

CDOT 15

04/09/2013

04/09/2013

04/09/2013

04/09/2013

04/09/2013

04/09/2013

04/09/2013

04/09/2013

04/10/2013

04/10/2013

04/10/2013

04/10/2013

04/10/2013

04/10/2013

04/10/2013

04/10/2013

04/10/2013

04/11/2013

1

1

1

1

0

0 0

0 0

0

0

0

0 0

1

0

1

0

SHASTA AND SISKIYOU COUNTIES

ALAMEDA COUNTY

TEHAMA COUNTY

KERN COUNTY

INYO COUNTY PLACER, SACTO, SUTTER,AND YUBA COUNTIES SAN MATEO COUNTY

TULARE COUNTY

LASSEN COUNTY

KERN COUNTY

KERN COUNTY

FRESNO, KERN AND TULARE COUNTIES

MONO COUNTY

CONTRA COSTA COUNTY

ALAMEDA COUNTY

INYO AND KERN COUNTIES

SAN JOAQUIN COUNTY

VENTURA COUNTY

RIVERSIDE COUNTY

CalTransDOT 02-4E5404 BRIDGE MAINTENANCE - POLYESTER CONCRETE OVERLAY

DOT 04-2G3614 REPLACEMENT HIGHWAY PLANTING.

DOT 02-2E7304 CURVE IMPROVEMENT AND SHOULDER WIDENING

DOT 06-0Q3604 COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING.

DOT 09-354704 PLACE HOT MIX ASPHALT OVERLAY ON EXISTING PAVEMENT.

DOT 03-4M7704 REPLACE CRASH CUSHION ATTENUATORS

DOT 04-3E3804 PLACE MICRO-SURFACING

DOT 06-0P6504 REPLACE CULVERTS, END TREATMENTS AND INSTALL PIPE LINERS.

DOT 02-4E3404 ROADWAY REHABILITATION

DOT 06-0P6304 INSTALL CURED-IN-PLACE PIPE LINERS AND REPLACE CULVERTS.

DOT 06-0Q0704 COLD IN-PLACE RECYCLING AND OVERLAY WITH HMA (TYPE A).

DOT 06-0Q3504 INSTALL SMART AND COM-PRESSOR ATTENUATOR CRASH CUSHIONS.

DOT 09-357404 THIN BLANKET HOT MIX AS-PHALT OVERLAY.

DOT 04-3E2004 PCCP REPLACEMENT.

DOT 04-3E5904 HOT MIX ASPHALT (OPEN GRADED) SURFACING.

DOT 09-352904 BRIDGE DECK MAINTE-NANCE.

DOT 10-0T7904 INSTALL SHOULDER RUM-BLE STRIP.

DOT 07-1W5304 REPAIR DRAINAGE BOX CULVERTS AND REPLACE CORRUGATED STEEL PIPES.

Page 35: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

CDOT 15

CDOT 15

CDOT 71

CDOT 16

CDOT 16

CDOT 15

CDOT 15

CDOT 9

CDOT 9

CDOT 9

CDOT 16

CDOT 15

CDOT 15

CDOT 9

CDOT 9

CDOT 9

CDOT 9

04/11/2013

04/11/2013

04/16/2013

04/16/2013

04/16/2013

04/16/2013

04/16/2013

04/16/2013

04/16/2013

04/16/2013

04/17/2013

04/17/2013

04/17/2013

04/17/2013

04/17/2013

04/17/2013

04/17/2013

DOT 08-1C1204 COLD PLANE AND HMA OVERLAY WITH DIGOUTS

DOT 11-2M5204 CLEAN AND TREAT BRIDGE DECK WITH METHACRYLATE AND RE-PLACE JOINT SEAL.

DOT 02-4E9704 ASPHALT RUBBER SEAL COAT

DOT 04-3E2904 COLD PLANE ASPHALT CON-CRETE PAVEMENT AND PLACE HOT MIX AS-PHALT.

DOT 04-3E4304 COLD PLANE EXISTING AS-PHALT CONCRETE PAVEMENT AND PLACE HMA-O

DOT 06-0N2704 PLACE HMA (BONDED WEARING COURSE - GAP GRADED ON EX-ISTING PAVEMENT.

DOT 09-356504 REPLACE AND REHABILI-TATE CULVERTS.

DOT 01-0B8004 RHMA OVERLAY

DOT 03-4M5504 REPLACE AC SURFACING, APPLY MOD EMULSION SEAL COAT & TRAF-FIC STRIPES

DOT 06-0P9304 OVERLAY ROADWAY AND REPAIR FAILED AREAS.

DOT 04-3E3204 COLD PLANE ASPHALT CON-CRETE PAVEMENT AND PLACE HOT MIX AS-PHALT (A).

DOT 06-0M6204 REMOVE DECK SURFACE, PLACE DECK SEALS, APPROACH SLAB AND JOINT SEALS.

DOT 09-356204 REMOVE AND REPLACE CUL-VERTS.

DOT 01-0B8604 REPAIR SIDEWALK

DOT 01-491214 BONDED WEARING COURSE

DOT 03-4M4904 METHACRYLATE AND POLY-ESTER DECKS

DOT 06-0P6004 PLACE HMA (BONDED WEAR-ING COURSE) ON EXISTING PAVEMENT.

SAN DIEGO COUNTY

TEHAMA COUNTY

SANTA CLARA COUNTY

CONTRA COSTA COUNTY

KERN COUNTY

INYO COUNTY

MENDOCINO COUNTY

GLENN COUNTY

FRESNO COUNTY

SONOMA COUNTY

KERN AND KINGS COUNTIES

INYO COUNTY

HUMBOLDT COUNTY

LAKE COUNTY SUTTER AND YOLO COUNTIES

KERN COUNTY

LOS ANGELES COUNTY

0

0

3

0

0

0

0 0

0

0

0

0

0 0 0

0

0

Page 36: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 34 Contractor’s Zone• .Contractor’s Zone

CDOT 23

CDOT 15

CDOT 9

CDOT 9

CDOT 9

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 9

CDOT 2

CDOT 2

CDOT 2

04/18/2013

04/18/2013

04/18/2013

04/23/2013

04/23/2013

04/23/2013

04/23/2013

04/23/2013

04/23/2013

04/23/2013

04/23/2013

04/23/2013

04/24/2013

04/24/2013

04/24/2013

04/24/2013

DOT 07-252004 REPLACE CONC PAVEMENT WITH PRECAST PRESTRESSED CONC PAVE-MENT.

DOT 08-1C4404 COLD PLANE AND PAVE HMA (TYPE A) 0.10’ AND REPLACE AC SURFACING

DOT 07-1W2504 REPLACE JOINT SEALS

DOT 01-0A1504 RUBBERIZED HOT MIX AS-PHALT

DOT 06-0P9204 PLACE RHMA (GAP GRADED) AND RHMA (BWC-GAP GRADED) OVERLAY.

DOT 01-412214 REPAIR CULVERT AND PLACE SCOUR PROTECTION

DOT 02-3C0724 COLD PLANE AC, DIGOUTS, RUBBERIZED HMA, MBGR, STRIPING

DOT 03-3F2404 REPLACE AND INSTALL NEW SIGNS

DOT 03-4M5704 REPLACE AC AND HMA OVERLAY

DOT 04-4G4104 RESURFACE ASPHALT CON-CRETE PAVEMENT.

DOT 05-1C3204 PLACE CENTERLINE AND SHOULDER RUMBLE STRIP.

DOT 10-0W7004 TREAT BRIDGE DECKS, RE-PLACE JOINT SEALS.

DOT 04-3E6104 COLD PLANE ASPHALT CON-CRETE PAVEMENT AND OVERLAY WITH RHMA (BWC-G).

DOT 03-3F3204 PLACE THIN HIGH-FRICTION SURFACE TREATMENT AND OPEN-GRADED ASPHALT

DOT 03-4M1604 COLD IN-PLACE RECYCLING WITH HMA OVERLAY, REPLACE AC SURFAC-ING,

DOT 06-0N4014 CONSTRUCT STEEL SHEET PILING AND ROCK SLOPE PROTECTION.

RIVERSIDE COUNTY

LOS ANGELES

HUMBOLDT COUNTY

KERN COUNTY

MENDOCINO COUNTY

LASSEN COUNTY

PLACER COUNTY

PLACER COUNTY

SAN MATEO COUNTY

SAN LUIS OBISPO COUNTY

VARIOUS LOCATIONS

SONOMA COUNTY

SACRAMENTO AND EL DORADO COUNTIES

BUTTE COUNTY

KERN COUNTY

TUOLUMNE COUNTY

0

0 0

0

0

0

0

0

0

0

0

0

0

0

0

0

CalTrans

Page 37: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

DOT 10-0K1504 COLD PLANE AND RESUR-FACE ROADWAY.

DOT 10-0W7104 REPLACE APPROACH SLABS, TREAT BRIDGE DECKS, AND REPLACE JOINT SEALS.

DOT 07-1W5704 REPLACE ASPHALT CON-CRETE SURFACING

DOT 11-2M4104 PLACE SLURRY SEAL, COLD PLANE AND HMA OVERLAY.

DOT 07-1W0804 COLD IN-PLACE RECYCLE ASPHALT CONCRETE PAVEMENT

DOT 07-1W3404 TREAT BRIDGE DECK WITH METHACRYLATE AND REPLACE JOINT SEALS.

DOT 08-0R5804 INSTALL MEDIAN BARRIER GATE SYSTEM

DOT 08-1C3604 COLD PLANE, OVERLAY WITH RHMA-G, REPLACE ASPHALT CON-CRETE DIGOUTS

DOT 08-1C8304 COLD IN-PLACE RECYCLING AND COLD PLANE AND PAVE WITH HMA (TYPE C)

DOT 11-410004 REMOVE AC STRUCTURAL SECTION AND OVERLAY WITH HMA (TYPE C) AND MBGR.

DOT 01-0A4404 REHABILITATE BRIDGES - MEN. CO.

DOT 03-4M5104 METHACRYLATE AND POLY-ESTER BRIDGE DECKS AT 15 LOCATIONS

DOT 04-3E3004 COLD PLANE ASPHALT CONCRETE AND OVERLAY WITH BONDED WEARING COURSE.

DOT 07-1W3304 SEAL JOINTS AND TREAT BRIDGE DECKS WITH METHACRYLATE.

DOT 06-0H1804 BRIDGE REMOVAL AND BRIDGE CONSTRUCTION.

DOT 01-0A4204 REHABILITATE BRIDGES

DOT 03-4M2804 PAVEMENT REHABILITATION

0

0

0

0

0

0 0

0

0

0

0

0

0

0

0 0 0

CDOT 2

CDOT 2

CDOT 9

CDOT 9

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 2

CDOT 9

CDOT 9

CDOT 9

CDOT 9

CDOT 9

CDOT 2

CDOT 2

04/24/2013

04/24/2013

04/25/2013

04/25/2013

04/25/2013

04/25/2013

04/25/2013

04/25/2013

04/25/2013

04/25/2013

04/26/2013

04/26/2013

04/26/2013

04/26/2013

04/30/2013

04/30/2013

04/30/2013

SAN JOAQUIN COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

VENTURA COUNTY

LOS ANGELES COUNTY

RIVERSIDE COUNTY

RIVERSIDE COUNTY

RIVERSIDE COUNTY

IMPERIAL COUNTY

MENDOCINO COUNTY

EL DORADO, SACRAMENTO, AND YOLO COUNTIES

SAN MATEO COUNTY

LOS ANGELES COUNTY

KERN COUNTY

MENDOCINO COUNTY

SACRAMENTO COUNTY

HUMBOLDT COUNTY

Page 38: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 36 Contractor’s Zone• .Contractor’s Zone

Plans On FileMonday, April 08, 2013

AIRPORT FUEL SECONDARY CONTAINMENTPLAN #: 1026 Bid Date: 4/8/2013

Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Nevada Online & Print On DemandPREBID: 4/1 @ 1:00pm PREBID: 13059 John Bauer Ave OWNER: County Of Nevada Ph: 530-265-1766 DESCR: Contact, Mike Quintana- [email protected] of a 2 foot wide x6 inch high concrete curb on three sides of the existing concrete refueling pad. Installation of new drop inlet, shut off valve with valve box, and apprx 110 feet of drain pipe to outfall location per plans and specs provided by Holdredge and Kull dated December 2010.

WAYNE BROWN CORRECTIONAL FACILITY CONCRETE CAR WASH AREAPLAN #: 3019 Bid Date: 4/8/2013 Bid Time: 2:30 PM PLANS AT: Location: NevadaOnline and Planroom PREBID: 4/1 @ 9am

PREBID: 925 Maidu AveOWNER: County Of Nevada Ph: 530-265-1766 DESCR: Contact, Mike Quintana - [email protected] of asphalt and base, installation of underslab gravel, placement and finish of concrete, asphalt fill per project plan and specs. BIDDERS LIST:Supplier: Hansen Brothers 530-273-3381 530-272-5401

FORD F550 TRUCK EQUIPPED WITH A CRANEPLAN #: 30024 Bid Date: 4/8/2013 Bid Time: 3:00 PM PLANS AT: Location: SacramentoOnline and Planroom OWNER: City of Roseville DESCR: Contact, Joanna Oakrop, [email protected] axel, cab, crane body, Street side compartments, curb side compartments, rear work platform/bumper, tailgate, electrical, crane, suspension, paint.

FLORIN ELEMENTARY SCHOOL HVACPLAN #: 50003 Bid Date: 4/8/2013 Bid Time: 2:00 PM PLANS AT: Location: Elk Grove Online and Planroom

1500 North Market Boulevard, Sacramento, CA 95834Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing needs and develop an individualized plan of products and services that will serve your company best.

&Dealer

Your Authorizedwww.igoinland.com

PCCA member since 2004

Page 39: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

PREBID: MAND 4/2 @ 1:00 PM PREBID: Front office of Florin, Elementary, 7300 Kara Drive OWNER: Elk Grove Unified School District Ph: 916-686-7711 DESCR: Contact, Elk Grove USD (916) 454-0800 This project includes replacement of six (6) outdoor condensing units, and one (1) indoor fan coil. This project requires a Class C-20 license. BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881

LEE VINING STREETS REHABILITATION PROJECTPLAN #: 127066 Bid Date: 4/8/2013 Bid Time: 4:30 PM PLANS AT: Print OnDemand Location: Bridegeport Online and PlanroomPREBID: 3/25@11am PREBID: 74 North School Street OWNER: County of Mono FAX: 760-932-5441DESCR: Contact, Mono, County of - Public Works (760) 932-5440 Rehabilitation of local streets, removal of existing sidewalk, curb, gutter, asphalt and placement of new sidewalk, curb and gutter, pedestrian ramps, and drainage facilities. .BIDDERS LIST:General Contractor: Herback General Engin 775-267-6800 775-786-7595Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

COST PLUS WORLD MARKETPLAN #: 191085 Bid Date: 4/8/2013 Bid Time: 2:00 PM PLANS AT: Location: RosevilleOnline and PlanroomG.C.: CSI Construction Ph: 949-380-3900 FAX: 949-380-3930DESCR: Contact, CSI Construction - 949-380-3900Work Includes, covert existing building space into a cost Plus Worl Market, including demolition and complete tenant improvements. BIDDERS LIST:Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851

PREFABRICATED STEEL SHADE STRUCTURE INSTALLATION AT SABRE CITY PARKPLAN #: 207095 Bid Date: 4/8/2013Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Roseville Online and Planroom Est Cost: $32,084.00 # OF ADDENDA: 3PREBID: 3/13@ 10AM OWNER: County of Placer DESCR: Contact, Bob Bigney, email- [email protected], phone (530) 889-4255, fax (530) 889-4274Construction of footings, furnishing and installing a prefabricated steel shade

structure with multi-rib metal roofing and tongue-and-groove wood decking beneath the metal roofing, and construction of an integrated 4” concrete slab of slightly smaller dimensions than the new shade structure at Sabre City Park, CA. BIDDERS LIST:General Contractor: Pbm Construction Inc. 916-315-2614 916-315-2619 Division 5-15, Inc. 916-638-1520 916-638-1521

CONSTRUCTION INSPECTION AND MATERIALS TESTING FOR OLD FIBERBOARD ROAD BRIDGE REPLACEMENT AT THE LITTLE TRUCKEE RIVERPLAN #: 281052 Bid Date: 4/8/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Sierra Co. Online & Print On # OF ADDENDA: 1 DemandOWNER: County of Sierra Ph: 530-289-3201 FAX: 530-289-2828DESCR: Contact, Bryan Davey, (530) 289-3201The project provides for the removal and replacement of the Old Fibreboard Bridge at the Little Truckee River, located in Sierra County west of SR89, between Truckee and Sierraville, CA. Work consists of installation of a single-lane temporary detour bridge, removal and salvage of the existing rail car bridge, earthwork, construction of a single span, cast-in-Place, pre-stressed reinforced concrete box girder bridge on CIDH pile foundations, grading, roadway construction, detour removal

Tuesday, April 09, 2013

WAYNE BROWN CORRECTIONAL FACILITY STEEL STRUCTURE PAINTINGPLAN #: 6037 Bid Date: 4/9/2013 Bid Time: 2:30 PM PLANS AT: Location: NevadaOnline and Planroom PREBID: 4/2 @ 8:30 Am PREBID: Recommended OWNER: County Of Nevada Ph: 530-265-1766 DESCR: Contact, Sandy Blazer - 530-265-1747Preperation, spot priming, two coat satin DTM finish to the existing steel structures in four recreation yards and Sally Port, caulking or sealing will be required where steel is attached to CMU walls, some minor interior wall repair and painting in section N.

Continued on next page

Run your DVBE/DBE/MBE/SBE/UDBEadvertisements in this State Certified paper

CLICK HERE to place your ad online

Page 40: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 38 Contractor’s Zone• .Contractor’s Zone

Plans On File

Tuesday, April 09, 2013

H IT NORTH SOUTH BCMA WIRELESS UPGRADEPLAN #: 22014 Bid Date: 4/9/2013 Bid Time: 10:00 AM PLANS AT: Print OnDemand Location: Sacramento Online & Print On Est Cost: $190,000.00 Demand# OF ADDENDA: 1PREBID: MAND 3/26 @ 10am PREBID: 4800 2nd Ave Ste 1100 OWNER: County of Sacramento DESCR: Contact, Facilities Design and Construction-916-734-7024Install university furnished wireless access points and provide raceway, data cabling systems and supports as shown in the Construction

2013 FENCING @ VALLEY & FLORING HIGHPLAN #: 27022 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: Location: Elk Grove Online and Planroom PREBID: MAND 4/2 @ 9AM PREBID: Office of Valley High and will proceed to Florin H DESCR: Contact, Elk Grove USD (916) 454-0800 Installation of new fencing.

PEABODY ROAD WATER AND SEWER LINE RELOCATION PROJECTPLAN #: 39019 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fairfield Online & Print On # OF ADDENDA: 2 DemandPREBID: MAND 3/11 @ 10am OWNER: City of Fairfield DESCR: Contact, Thanh Vuong, 707-428-7017. Installing 16-inch diameter buried potable water transmission piping; buried butterfly isolation valves; combination air-vacuum release valves; blow off assemblies and covers, fire hydrants; bore and jack / microtunnel steel casing; 12-, 15-, 21- and 27-inch buried sanitary sewer piping; sanitary sewer manholes, appurtenances; connections to existing potable water transmission and sanitary sewer pipelines and restoration necessary to provide complete operating water transmission and sanitary sewer lines in preparation for the Fairfield Vacaville Train Station. All equipment shall be installed in accordance with the manufacturer’s requirements and recommendations. The Contract includes any other work as shown on the Project Plans, as specified in the Contract Documents, and as directed by the City Engineer. Specifically, a portion of the trenching and de-

watering operations will involve the handling and disposal of hydrocarbon contaminated soils and water.BIDDERS LIST:General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Ghilotti Construction Co 707-585-1221 707-585-1601 Argonaut Constructors 707-542-4862 707-542-4897 Division 5-15, Inc. 916-638-1520 916-638-1521Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

PARKING CITATION HEARING OFFICER SERVICESPLAN #: 51097 Bid Date: 4/9/2013 Bid Time: 5:00 PM PLANS AT: Print OnDemand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento FAX: 916-808-8266DESCR: Contact, Walker Black - 916-808-5833To provide parking citation hearing officer services for the City.

MISSION CANYON LANDFILL DRAINAGE IMPROVEMENTS-2013PLAN #: 88067 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: Los AngelesPlans on Disk Est Cost: $225,000.00# OF ADDENDA: 1PREBID: MAND 3/21 @10 am PREBID: 2501 N. Sepulveda Boulevard, Los Angeles ( @Missio OWNER: County of Los Angeles DESCR: Contacts, Don Drorbaugh (562) 908-4288 ext 2176Furnishing all materials, equipment and tools. The performance of all necessary labor and the construction complete, including all work appurtenant thereto, for the construction of the Mission Canyon Landfill, 2501 N. Sepulveda Boulevard, Los Angeles, CA 90049. Replacement of existing corrugated metal half round channel with concrete trapezoidal channel, relocation and replacement of an existing corrugated metal pips culvert with a high density polyethylene pipe culvert, grading work and all other appurtenant work as shown on drawing No. 73R-g-0124 and in provisions (X-1749)

JOHN MUIR MIDDLE SCHOOL, TRACK AND ATHLETIC FIELDS BANCROFT MIDDLE SCHOOL, PAR COURSEPLAN #: 95066 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: San LeandroOnline and Planroom Est Cost: $2,300,000.00

Continued from last page

Page 41: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

# OF ADDENDA: 4OWNER: San Leandro Unified School District DESCR: Contact, Harris and Associates - (510) 895-4675 Renovation of existing athletic field at John Muir Middle School: Work consists of but is not limited to New Synthetic athletic field for soccer and other sports, New Synthetic three lane track, new baseball in field and backstop, new underground storm water holding tank and pump lift station. BANCROFT: Addition of Par-Course equipment and fall protection mats at various perimeter locations on an existing asphalt play area.

ALHAMBRA TERRACE RAILING REPAIRPLAN #: 123085 Bid Date: 4/9/2013Bid Time: 2:00 PM PLANS AT: Location: MartinezOnline and PlanroomOWNER: Housing Authority of the County of Contra Costa Ph: 925-957-8012 DESCR: Contact, Robert Moore - 925-957-8025Repair of steel railings located at the unit exteriors in the Alhambra Terrace development. The railings are constructed of square-stock steel tubing, welded assembly, and set in concrete.

CLEANING OF SEPTIC TANKS AT MARINE WAY

PLAN #: 137066 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: Location: IrvineOnline and PlanroomDESCR: Contact, Southern CA Regional Rail Authority - The liquid, solid and semi solid material in a treatment tank is to be removed by a vacuum or centrifugal pump fitted with a hose which delivers the material to a truck mounted, sealed tank, cleaning procedures should include agitating solids, but only after lowering the

TEMPERANCE AVENUE IMPROVEMENTSPLAN #: 152061 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: Location: ClovisOnline and Planroom Est Cost: $2,525,000.00 # OF ADDENDA: 4OWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact,City of Clovis (559) 324-2394 Removal of existing asphalt paving and aggregate base, grinding, concrete work, adjust existing facilities to grade, installing traffic signal loop detectors, installing accessible pedestrian facilities, storm drain, sewer and water facilities, trees and irrigation and stripingand signing .

WATER SYSTEM CORROSION PROTECTION- PROJECT 2013-12PLAN #: 156088 Bid Date: 4/9/2013 Bid Time: 2:30 PM PLANS AT: Location: LivermoreDESCR: Contact, Joel Waxdeck - 925-580-8276Install deep

well anode along edge of South Vasco Road, replace impressed current cathodic protection systems in two above-groound steel water tanks, repair center column, roof rafters, corroded steel, and damaged welds on water tank, install sample station, hose connection and replace vent on water tank, recoat interior of water tank. BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 Sierra Trench Protection 530-887-9413 530-887-9112

PROBATION CARPET REPLACEMENTPLAN #: 205013 Bid Date: 4/9/2013 Bid Time: 3:00 PM PLANS AT: Location: NevadaOnline and Planroom Est Cost: $55,000.00PREBID: 4/2 @ 10 AM PREBID: At the project site OWNER: County of Nevada Purchasing Division Ph: 530-265-1238 FAX: 530-265-7112DESCR: Contact, Mary Ross - 530-265-1238Replace +/- 1,200 SY of glue down carpet and rubber base with Shaw carpet squares J0111 Change in Attitude #12608 “Chill Out” and Johnsonite #76 “Cinnamon” rubber base.

2013 STATE STREETS WATERLINE PROJECTPLAN #: 285048 Bid Date: 4/9/2013 Bid Time: 2:00 PM PLANS AT: Location: South Lake Online and Planroom # OF ADDENDA: 3PREBID: MAND 3/14 @ 1pm PREBID: 1275 Meadow Crest, Drive, South Lake Tahoe OWNER: South Tahoe Public Utility District Ph: 530-544-6474 FAX: 530-541-0614DESCR: Contact, [email protected] approx 18,000 linear feet of water main with new 12 inch and 6 inch water main and associated water services, water meters, fire hydrants, water main connections, site restoration including landscaping, paving replacement and appurtenances. BIDDERS LIST:General Contractor: Herback General Engin 775-267-6800 775-786-7595Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

Continued on next page

Don’t get thrown out on your way home!

DVBE/UDBE Good Faith ads are

often required. This newspaper is

state-certified. Email your ad to:

[email protected]

Page 42: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 40 Contractor’s Zone• .Contractor’s Zone

Tuesday, April 09, 2013

PALO ALTO MAIN LIBRARYPLAN #: 317016 Bid Date: 4/9/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: Palo Alto PREBID: 3-14 @ 10am G.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact: Midstate Construction, Ben Honsvick, [email protected] Project involves renovation of the existing Main Library for the City of Palo Alto, with a small addition of new construction. There will be some minor demolition and removal of hazardous materials prior to renovation of the existing structure for structural upgrades and updating of interior uses and finishes. The new construction will add a Program Room, Toilets, support facilities for the entire library and a secondary entrance. The Project is being designed to meet LEED (Leadership in Energy and Environmental Design) “Certified” level based. BIDDERS LIST:Sub Contractor: H.a. Bowen Electric, Inc. 510-483-0500 510-483-7210Supplier: Universal Precast Concre 408-799-8888 408-291-8888

PALO ALTO MAIN LIBRARYPLAN #: 317016 Bid Date: 4/9/2013 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Palo Alto PREBID: 3-14 @ 10am G.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact: Midstate Construction, Ben Honsvick, [email protected] Project involves renovation of the existing Main Library for the City of Palo Alto, with a small addition of new construction. There will be some minor demolition and removal of hazardous materials prior to renovation of the existing structure for structural upgrades and updating of interior uses and finishes. The new construction will add a Program Room, Toilets, support facilities for the entire library and a secondary entrance. The Project is being designed to meet LEED (Leadership in Energy and Environmental Design) “Certified” level based. BIDDERS LIST:Sub Contractor: H.a. Bowen Electric, Inc. 510-483-0500 510-483-7210Supplier: Universal Precast Concre 408-799-8888 408-291-8888

Wednesday, April 10, 2013

COTTAGE ELEMENTARY SCHOOL RESTROOM UPGRADESPLAN #: 17014 Bid Date: 4/10/2013 Bid Time: 2:00 PM PLANS AT: Location: ScramentoOnline and Planroom PREBID: 3/27 @ 10:30AM PREBID: 2221 Morse Ave 95825 OWNER: San Juan Unified School District DESCR: Contact, Vanir CM Jeff Scruggs, 916-979-8628Modernize and bring to ADA compliance three sets of restrooms, including replacement of all water closets, urinals, lavatories, toilet accessories and mirrors; installation of ceramic tile on restroom walls and epoxy floors over existing floors; providing new door signage; removal of abandoned surface mounted conduit and j-boxes; patching / repairing finishes; patching / repairs / painting gypsum wallboard, ceiling surfaces and doors; new lighting; replacement / repairs to damaged vent-thru-wall louvers; new door hardware and repalcement of drinking BIDDERS LIST:General Contractor:Hometown 916-991-2486 916-991-2881 Bobo Construction, Inc. 916-685-2285 916-714-4850 Seward L. Schreder 530-229-0001 530-229-0070 S W Allen Construction 916-344-2098 916-344-0307Sub Contractor: Sko Plumbing 916-663-2703 916-663-2704

BRIDGE REPLACEMENT PROJECT BREWER ROAD OVER BRANCH OF CURRY CREEKPLAN #: 43039 Bid Date: 4/10/2013 Bid Time: 3:30 PM PLANS AT: Print On Demand Location: Placer Online & Print On Est Cost: $815,000.00 # OF ADDENDA: 1DemandOWNER: County of Placer DESCR: Contact, County Of Placer _ (530) 889-7776Includes construction of a new bridge and road approaches, removal of existing bridge, grading, paving, applying signing / striping, erosion BIDDERS LIST:General Contractor: Andrew L. Lee, Inc. 209-369-8077 209-368-2435 Westcon Construction 916-663-2425 916-663-2448

2013 PAVEMENT PRESERVATION PROGRAMPLAN #: 65001 Bid Date: 4/10/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonoma Planroom

Continued from last page

Plans On File

Page 43: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

MOBILE HOME PARK TREE REMOVALPLAN #: 180004 Bid Date: 4/10/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Yuba City Online and Planroom # OF ADDENDA: 3 PREBID: 2/26 @ 10am OWNER: Regional Housing Authority of Sutter & Nevada County DESCR: Contact, Regional Housing Authority of Sutter & Nevada County Larry Tinker ([email protected]) (x 130) (530) 671-0220 Includes tree removal, stump grinding and debris removal.

REPAIRS/REHABILITATION OF WELLS 402 & 403PLAN #: 208082 Bid Date: 4/10/2013 Bid Time: 2:30 PM PLANS AT: Print OnDemand Location: Chowchilla Online & Print On # OF ADDENDA: 6 DemandPREBID: MAND 2/13 @ 9am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Bruce Hubble 559-665-5531x5128. Contractor shall provide all parts, labor, materials, supplies, tools, equipment, permits and licenses, bonds, transportation, including travel and per diem, and every other item of expense necessary to repair/rehabilitate two (2) wells 402 & 403. All services provided will be for the California Department of Corrections and Rehabilitation (CDCR), Central California Women’s Facility (CCWF), located at 23370 Road 22, Chowchilla, California, 93610.Wells 402 and 403 are currently pumping at bowl depths of approximately 410’ and 372’ respectively. All water produced by the well pumps is pumped into a common horizontal underground supply line and flows into a 2.2 million gallon storage tank with a three (3) foot vertical rise at the tank entrance. Supply line pressure ranges between 10-15 PSIG. At a pumping depth of 520’, total vertical rise for the supply line, from pump bowls to storage tank entrance, will be approximately 525’.

OWNER: County of Sonoma DESCR: Contact, County of Sonoma Janice Thompson (fax #) (707) 565-2620 Placement of a bonded wearing course (Gap graded 3/8” maximum aggregate), on various county roads together with associated flagging, traffic control and preparation required to construct the work, along with BIDDERS LIST:General Contractor: Ghilotti Construction Co 707-585-1221 707-585-1601

2012-13 SANITARY SEWER MAIN REPLACEMENTPLAN #: 83073 Bid Date: 4/10/2013 Bid Time: 3:00 PM PLANS AT: Location: SunnyvaleOnline and Planroom # OF ADDENDA: 1OWNER: County of Santa Clara DESCR: Contact, David Gakle, Principal Buyer, 408-730-7403Work consists of of furnishing all labor, materials, equipment, tools and services necessary to replace approximately 5,776 feet of existing sanitary sewer (4,466 feet base bid and 1,310 feet additive alternative bids) by both pipe bursting and open cut excavation at 8 different locations (6 base bid and 2 additive alternative bids) within the City of BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

SAFE ROUTES TO SCHOOL COLLEGE AVE & GLENN STREET WEST AVE & DELPORT AVE KAWANA SPRINGS ROAD $ MEADOW WAYPLAN #: 125086 Bid Date: 4/10/2013 Bid Time: 2:00 PM PLANS AT: Location: Santa RosaOnline and Planroom Est Cost: $247,377.00PREBID: 4/3 @ 10 AM OWNER: City of Santa Rosa DESCR: Contact, Stephen Dittmer - 707-543-3847Traffic control, pedestrian traffic control, remove tree/stump grind, roadway excavation, soil stabilization, asphalt concerete base, install street sign, relocate street sign, remove street sign, Pcc curb and gutter, PCC sidewalk, bicycle cage, bicycle rack, painting, raised pavement marker, pedestrian crossing flasherm pull box.

FINLEY CENTER SENIOR WING PHASE 3PLAN #: 138064 Bid Date: 4/10/2013

Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Santa Rosa Online & Print On # OF ADDENDA: 1 DemandPREBID: 3/27 @ 10 AM PREBID: 2060 West College Avenue OWNER: City of Santa Rosa DESCR: Contact, Wayne Bossier (707) 284-2787 Construct a new 24,408 SF two-story Senior Wing building on the site of an existing community center, including 77 new parking spaces, an exterior fountain in an existing courtyard, underground utilities, paving, landscaping, building shell, partial sitework, a portion of the plumbing / Continued on next page

C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts, and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors?

For rates, call Steve today at (916) 729.5432

Page 44: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 42 Contractor’s Zone• .Contractor’s Zone

does not include any additional volume needed for head space in the tank. The work shall include all site improvements and water distribution system improvements necessary for a fully functional tank and booster pump station and as described in the Project Manual. The Design Builder shall also design and construct the station to accommodate future site development including a new groundwater well (Well 26), groundwater treatment plant for arsenic reduction, expansion of the booster pump station. For the entire project scope, the Design/Builder shall furnish plans and design calculations prepared and stamped by a California Licensed Civil Engineer, Structural BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600Sub Contractor: Gehvac Company 209-204-0100 209-566-9995 Bennett Fencing 530-852-2618 000-000-0000 Bockmon & Woody Elect 209-993-2633 209-464-2615

SANTA TERESA WATER TREATMENT PLANT INCOMPATIBLE MATERIALS PROJECT STAGE IIPLAN #: 307013 Bid Date: 4/10/2013 Bid Time: 2:00 PM PLANS AT: Location: San JoseEst Cost: $3,500,000.00 # OF ADDENDA: 1PREBID: MAND 3/19/13 AT 9 AM OWNER: Santa Clara Valley Water District Ph: 408-265-2607 DESCR: Contact, SCVWD (408) 265-2607. The work to be completed under this Contract shall consist of furnishing all labor, equipment, materials & other items required to construct the Santa Teresa Water Treatment Plant Incompatible Materials Project Stage II. The work includes, but is not limited to, the following: Prepare & submit all permit applications & comply with all permitting requirements by the agencies having jurisdiction for the demolition & installation of all permanent & temporary hazardous materials systems. See Special Provisions Article 17.01 of the contract documents for permit application preparation requirements. Perform site survey & prepare piping shop drawings for the existing chemical trenches to meet hazardous permitting requirements. Provide engineering and design services for components of construction as described in the special provisions & technical specifications to include, but not be limited to: A. Professional Land Surveyor licensed in the State of California B. Professional Civil or Mechanical Engineer licensed in the State of California C. Professional Civil or Structural Engineer licensed in the State of California Repair existing aboveground temporary chemical piping system to meet plant operational requirements during construction. Remove all existing temporary chemical piping systems prior to

Wednesday, April 10, 2013

ATHERTON DRIVE WATER STORAGE TANK AND BOOSTER PUMP STATION DESIGN BUILD PROJECTPLAN #: 275050 Bid Date: 4/10/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand # OF ADDENDA: 1Location: Manteca Online & Print On DemandDESCR: Contact: City of Manteca (209) 456-8427.The project will result in the completion of a minimum 2.7 million gallon steel water storage tank with a dedicated booster pump station, piping and standby on-site electrical generation. The minimum 2.7 million gallons volume is the working water volume and

Continued from last page

Plans On File

[email protected]

www.Jensen-Masonry.com

Mark Jensen, Master Mason

• BBQ’s • Fireplaces • Brick • Rock • Etc.

JensenMasonry

916.663.3429

CCL#:804650

Page 45: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Continued on next page

completion of construction. Demolish approximately 8000 ft of existing single-walled and/or double-contained chemical piping & replace with single-walled and/or double-contained piping for liquid alum (aluminum sulfate)/ferric chloride, phosphoric acid, caustic soda, aqua ammonia (ammonium hydroxide), sodium hypochlorite & cationic polymer chemical systems. Install leak detection monitoring systems for new double-contained piping & secondary containment areas to include, but not be limited to sensors, control panels & alarms to SCADA. Remove existing chemical trench covers & replace with aluminum trench covers. Install chemical resistant coating for secondary containment areas. Install caustic soda heating system to include, but not be limited to, replacement of existing circulation pump, new circulation heater, insulation on the existing

Thursday, April 11, 2013

2013 CRACK SEAL PROJECTPLAN #: 36013 Bid Date: 4/11/2013 Bid Time: 3:00 PM PLANS AT: Location: Napa Online and Planroom Est Cost: $25,000.00OWNER: City of Napa DESCR: Contact, Mike Socorro - 707-257-9305Water pollution control, pre-construction meeting, cooperation, mobilizaion, construction area traffic control devices, construction area signs, maintain traffic, lane closure requirements and conditions, traffic control system for lane closure, construction water, finishing work, earthwork and streets, dust control, crack seal.

MOUNT DIABLO SP, LOWER SUMMIT ADA IMPROVEMENTSPLAN #: 38024 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Clayton Online & Print On Est Cost: $440,000.00 # OF ADDENDA: 2Demand PREBID: MAND 3/14 @ 10am OWNER: State of CA - Dept. of Parks and Rec. - DESCR: Contact, Christina Soares, Dept of Parks & Recreation (707) 769-5665.Furnish all labor, materials, tools & equipment necessary to perform ADA remedial work as described in the plans and specifications at Mount Diablo State Park in Contra Costa County, CA, complete & in accordance with the plans & specifications therefore & such addenda thereto as may be issued prior to bid opening date. BIDDERS LIST:General Contractor: Parc Services, Inc. 925-371-4610 925-606-8704

ROCKLIN ROAD AT MEYERS ST. ROUNDABOUTPLAN #: 55099 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Rocklin Online & Print On

Est Cost: $3,970,000.00 DemandPREBID: MAND 4/4 @ 10 AM PREBID: 4081 Alvis Court, 95677 OWNER: City of Rocklin DESCR: Contact, Project Manager - 916-625-5500Location #1: reconstruct the three legged intersection at Rocklin Road and Meyers Street into a four-legged roundabout and construct new sidewalk and bicycle lanes on remaining unimproved street, including new street lights, new striping / signage, asphalt pavement / bases, landscaping, drainage, replacement of water lines / sewer lines and related improvements; Location #2 reconstruct the three-legged signalized intersection at Rocklin Road / Grove Street into a three legged multilane roundabout and construct new sidewalks and bicycle lanes in remaining unimproved streets, includign new street lights, new striping / signage, asphalt pavement / bases, landscaping, drainage, replacement of water lines and related improvements.BIDDERS LIST:General Contractor: Westcon Construction. 916-663-2425 916-663-2448Supplier: Ferguson Enterprises, 916-381-6100 916-381-7445

2012-2013 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM & CURB RAMP INSTALLTION

PLAN #: 100082 Bid Date: 4/11/2013 Bid Time: 10:00 AM PLANS AT: Location: DublinOnline and Planroom OWNER: City of Dublin DESCR: Contact, Public Works - 925-833-6630furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the removal, construction and installation of the following: curb and gutter, sidewalk, asphalt concrete pavement, pedestrian curb ramps, and doing all appurtenant work in place and ready for use.

NEW ARMIJO HIGH SCHOOL ADMINISTRATION, COUNSELING BUILDING & ASSOCIATED SITEWORKPLAN #: 104089 Bid Date: 4/11/2013 Bid Time: 10:00 AM PLANS AT: Location: FairfieldOnline and Planroom PREBID: 3/28 @ 10am PREBID: 2490 Hilborn Road - Check in with receptionist OWNER: Fairfield-Suisun USD Ph: 707-399-5142 DESCR: Contact, Fairfield-Suisun School District Facilities Department (707) 399-5148 Construct a new administration building and perform associated sitework on an existing school campus in two phases: Phase 1: included administration building and associated sitework and Phase 2: includes BIDDERS LIST:General Contractor: Seward L. Schreder 530-229-0001 530-229-0070 S W Allen Construction 916-344-2098 916-344-0307

Page 46: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 44 Contractor’s Zone• .Contractor’s Zone

Thursday, April 11, 2013

GENERATOR MAINTENANCEPLAN #: 107091 Bid Date: 4/11/2013 Bid Time: 4:00 PM PLANS AT: Location: MercedOnline and Planroom # OF ADDENDA: 1OWNER: County of Merced FAX: 209-722-7690DESCR: Contact, Frank Rybka - 209-385-7331 Ext 436Provide routine semi annual inspection and testing, checking and filling of fluids, visual inspection, starting and monitioring and temps, provide written reports, provide annual routine maintenance;generator sets, fluid changes, air filter replacement, electrical components, switches, relays, genrator starting battery, battery charging system, coolant heaters.

TOGO’SPLAN #: 107092 Bid Date: 4/11/2013

Bid Time: 2:00 PM PLANS AT: Location: RiponOnline and PlanroomOWNER: Wells Construction Ph: 916-788-4485 FAX: (916) 788-4481DESCR: Contact, Jack Tucker - 916-788-4485construction of a new 1,100 SF Togo’s Restaurant located at 1340 W. Colony Road in Ripon, CA. Construction will begin around April 15, 2013 and be completed by June 7th, 2013. This is not a prevailing wage project.

RFQ GEOTECHNICAL ENGINEERING AND QUALITY ASSURANCE TESTING SERVICES ON AN AS NEEDED BASIS

PLAN #: 133070 Bid Date: 4/11/2013 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Mono Co. Online & Print On DemandOWNER: Mono County Dept. of Public Works Ph: 760-932-5440 FAX: 760-932-5441DESCR: Contact, Garrett Higerd - 760-932-5457Provide geotechnical engineering and quality assurance testing services for several road rehabilitation projects.

RUTHERFORD DUST RESTORATION PROJECT, REACH 8 B/C, PW 13-29PLAN #: 134061 Bid Date: 4/11/2013 Bid Time: 3:30 PM PLANS AT: Location: Napa Co.Plans on Disk Est Cost: $3,460,171.00 # OF ADDENDA: 1 PREBID: MAND 3/7 or 3/12 @

10:00 am OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact, John Vicencio, ( [email protected])Mobilization, clearing and grubbing, earthwork, rock structures, log structures, biotechnical structures, seeding, erosion control, irrigation. BIDDERS LIST:General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Argonaut Constructors 707-542-4862 707-542-4897

ENGINEERING, SURVEYING, AND/OR TOPOGRAPHIC MAPPING SSRVICES ON AN AS NEEDED BASIS

PLAN #: 137066 Bid Date: 4/11/2013Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Mono Co. Online & Print On Est Cost: $50,000.00 DemandOWNER: Mono County Dept. of Public Works Ph: 760-932-5440 FAX: 760-932-5441DESCR: Contact, Garrett Higerd - 760-932-5457Preperation of preliminary engineering studies and reports, preperation of grant applications, preperation of engineering plans, specifications and estimates, preperation of storm water pollution prevention plans, SWPPP inspections and reporting, topographic surveying for civil construction projects, right of way and property boundary surveys, including preperation of record of survey and lot line adjustment maps. Aerial photography and surveying, construction engineering and

2013 ROAD RESURFACING PROJECT CENTRALPLAN #: 155064 Bid Date: 4/11/2013 Bid Time: 1:30 PM PLANS AT: Location: Marin Co.Planroom Est Cost: $3,100,000.00# OF ADDENDA: 1 OWNER: County of Marin DESCR: Contact, Dig outs, grinding, asphalt pulverization, guardrail, resurfacing, installation of an ADA curb ramps, replacing curb, gutter, and sidewalk, traffic striping, repairing storm drainage facilities, clearing and grubbing, tree removal and related incidental work in Marin County. BIDDERS LIST:General Contractor: Ghilotti Construction C 707-585-1221 707-585-1601 Argonaut Constructors 707-542-4862 707-542-4897 Ghilotti Brothers Inc 415-454-7011 415-454-8376

Continued from last page

Plans On File

Page 47: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

16TH/21ST/24TH/25TH AVENUES AND CABRILLO/CALIFORNIA STREETS SEWER REPLACEMENT AND PAVEMENT RENOVATIONPLAN #: 164075 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: San FranciscoOnline and Planroom Est Cost: $3,500,000.00PREBID: 3/22 @ 10 AM OWNER: San Francisco Public Utilities Commission DESCR: Contact, The objective of the project is to provide contingency- based as-needed sewer repair on short notice at locations to be determined within wth City and Compnay of San Francisco.

AS-NEEDED SPOT SEWER REPAIRPLAN #: 166074 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: San FranciscoPlans on Disk Est Cost: $8,000,000.00PREBID: 3/22 @ 10am (15 points) if attend pre- bid PREBID: 1680 Mission Street, 2nd floor conference Room, Sa DESCR: Contact, San Francisco, City & County of (415) 551-4603 The objective of the project is to provide contingency- based as-needed sewer repair on short notice at locations to be determined within wth City and Compnay of San Francisco.BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

E STREET LIFT STATION IMPROVEMENTSPLAN #: 172008 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Galt Online and Planroom Est Cost: $230,000.00 PREBID: MAND 3/20 @10am PREBID: 105 E street, Galt, 95632 OWNER: City of Galt DESCR: Contact, Public Works Department, (209) 366-7260Phase 1 sewer bypass work and Phase 2 E Street sewer lift station improvement work. BIDDERS LIST:General Contractor: Division 5-15, Inc. 916-638-1520 916-638-1521Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

NAPA COUNTY HALL OF JUSTICE HVAC REPAIRSPLAN #: 299049 Bid Date: 4/11/2013 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Napa Plans on DiskPREBID: MAND 3/28 @ 10am OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact, in writing, ([email protected]) HVAC at the County of Napa Hall Of Justice.BIDDERS LIST:General Contractor:

Wickman Development 415-215-3473 415-341-0155 Bell Products, Inc. 707-255-1811 707-255-1908 A.e. Nelson Construction 707-636-1750 707-636-1755

ACQUISTAPACE ELEMENTARY SCHOOL CONSTRUCTION PROJECTPLAN #: 308013 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Santa Maria Online and PlanroomPREBID: MAND 3/22 @ 1 pm 708 South Miller Street, Santa Maria, CA OWNER: Santa Maria-Bonita School District Ph: 805-361-8175 ARCHITECT: PMSM Architects Ph: 805-476-0399 FAX: 805-594-1322DESCR: Contact: Mike Loree w/ PMSM Architects (805) 476-0399.The work consists of site work, grading and underground utilities and tie-ins, one multipurpose building with kitchen, administration building, kindergarten classroom building, and four classroom buildings.BIDDERS LIST:General Contractor:*Maino Construction 805-543-7411 805-543-0514 Colombo Construction 661-316-0100 661-316-0101 Wysong Construction 805-466-1038 805-466-5176*Lewis C. Nelson & Sons 559-896-1443 559-896-8609

CONSTRUCTION TO REMODEL RESTROOMS AT PACIFIC STATION AND RELATED SITE WORKPLAN #: 310010 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Santa Cruz PREBID: 3/21 1pm @ 110 Vernon Street OWNER: Santa Cruz Metro Transit District Ph: 831-426-0199 FAX: 831-426-1958DESCR: Contact: Santa Cruz METRO (831) 426-0199Remove all fixtures, partitions, tile and sheet rock, treat and install wood structure damaged by water, remove all old plumbing , including sewer lines, replace main sewer line connecting all plumbing with a larger 8” main line and remove all elbows creating a straight path of travel, install new plumbing, new electrical, hand dryers and LED lighting, Install new 6’ high walls inside restrooms where the partitions were located as well as between the urinals. Provide new 4’ privacy doors.

Continued on next page

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are

often required.This newspaper is state-certified.

Email your ad to: [email protected]

Page 48: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 46 Contractor’s Zone• .Contractor’s Zone

Thursday, April 11, 2013

MAINTENANCE OF TRAFFIC SIGNALS DPW MAINTENANCE PROJECTPLAN #: 312010 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: El Paso deOnline & Print On DemandOWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Maintenance of traffic signals at various locations within the city.

BARNEY SCHWARTZ PARK SLURRY SEAL AND STRIPEPLAN #: 316010 Bid Date: 4/11/2013 Bid Time: 2:30 PM PLANS AT: Print On DemandLocation: El Paso De Online & Print On DemandOWNER: City of El Paso de Robles DESCR: Contact, El Paso De Robles, 805-237-3861. City of Parking lot slurry seal and painting. Painting of stall lines and ADA required stencil to match existing and all incidental work necessary in order to complete work according to specifications prepared by the City of Paso Robles.

MAINTENANCE OF AUTOMATED ROLL-UP DOORSPLAN #: 319007 Bid Date: 4/11/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: El Paso de Online & Print On Demand PREBID: 3/28 @ 10am OWNER: City of El Paso de Robles DESCR: City of El Paso de Robles, 805-237-3861. Maintenance for automated roll up doors for the City of El Paso de Robles.

Friday, April 12, 2013

SUNRIDGE PARK LANDSCAPE CORRIDORSPLAN #: 11020 Bid Date: 4/12/2013 Bid Time: 2:00 PM PLANS AT: Location: SacramentoOnline and PlanroomOWNER: Sunridge Park, LLC Ph: 916-379-0955 FAX: 000-000-0000DESCR: Contact PM Ed Armstrong - 916-435-1202The furnishing of all labor, materials and equipment for clearing, grubbing, grading and drainage, construction and installation of concrete, irrigation system, plant materials and providing maintencance period.

Continued from last page

Plans On FileBIDDERS LIST:Sub Contractor: Lords Electric Inc 916-410-2386 916-244-0233

SPMUD MAINTENANCE YARD PAVEMENT REPAIRSPLAN #: 13025 Bid Date: 4/12/2013 Bid Time: 10:00 AM PLANS AT: Print OnDemand Location: South PlacerOnline and PlanroomOWNER: South Placer Municipal Utility District Ph: 916-786-5438 DESCR: Contact, South Placer Municiple District - 916-786-5438Removing apprx 11,800 sq ft of failed asphalt and base material in the SPMUD maintenance yard in the primary driving isles and replacing it with six inch thick reinforced portland cement concrete over compacted aggregated base. labor, equipment, materials and incidentals required ro construct and complete in a good warokmanlike manner.

PERIMETER FENCING - HURLEYPLAN #: 14018 Bid Date: 4/12/2013 Bid Time: 4:00 PM Location: SacramentoOnline and PlanroomPREBID: MAND 4/3 @ 1PM PREBID: 2101 Hurley Way OWNER: Sacramento Metropolitan Fire District Ph: 916-566-4317 DESCR: Contact, Mark Jones @ [email protected] and install all requirred materials to comply with the approved set of engineered plans and the specs as stipulated. All work to be in compliance with all codes and regulations of the permitting agencies. Furnish all materials neccessary , perform all labor associated with the project and insure removal of waste materials associated

PRELIMINARY ENGINEERING STUDY FOR DONNER PASS ROAD PAVEMENT REHABILITATION

PLAN #: 22015 Bid Date: 4/12/2013 Bid Time: 3:00 PM PLANS AT: Location: NevadaOnline and PlanroomOWNER: County of Nevada Purchasing Division Ph: 530-265-1238 FAX: 530-265-7112DESCR: Contact, Pamela Mowry ([email protected]) (530) 265-1692 Provide a preliminary engineering study for a Donner Pass Road pavement rehabiliation project.

TREE AND VEGETATION REMOVAL ON THE LAGUNA WEST LEVEES EAST OF INTERSTATE 5 AND SOUTHOF ELK GROVE BOULEVARD PROJECTPLAN #: 29015 Bid Date: 4/12/2013

Page 49: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE FOR DISTRICT EPLAN #: 97068 Bid Date: 4/12/2013 Bid Time: 11:00 AM PLANS AT: Print OnDemand Location: Visalia Online & Print On DemandPREBID: 3/26 @ 10am PREBID: 707 W. Acequia, 93291 OWNER: County of Tulare FAX: 559-730-2653DESCR: Contact, Purchasing Division @ 559-713-4334.pruning, shaping and traing of trees, shrubs and ground covers, fertilization, weed control, litter control, control of all plant diseases and pests, mowing, and all other duties required to keep areas in safe and attractive usable condition and maintain plant and turf condition with acceptable growth and color.

PAINTING OF FIRE STATION NO. 4PLAN #: 106096 Bid Date: 4/12/2013

Bid Time: 3:00 PM PLANS AT: Location: TurlockOnline and Planroom Est Cost: $9,000.00PREBID: 4/10 @ 1:30pm PREBID: Optional OWNER: City of Turlock DESCR: Contact, Jeff Haney - 209-668-5599Protect landscaping, protect/mask surfaces not to receive paint, pressure wash and clean all surfaces to receive paint, scrape loose paint, apply caulking as needed, apply primer to exposed surfaces, paint all surfaces and trim as identified during the on site inspection. Provide all materials, equipment and labor.

NORTH MATHER BLVD EXTENSION PROJECTPLAN #: 182003 Bid Date: 4/12/2013 Bid Time: 2:00 PM PLANS AT: Location: Rancho Online and Planroom Est Cost: $250,000.00OWNER: City of Rancho Cordova DESCR: Contact, Kathy Garcia - 916-851-8712Furnishing of all labor, materials, and equipment for the removal of existing asphalt pavement, for roadway excavation for the furnishing and placement of aggregated base material and new asphalt pavement connecting North Mather to Mather Blvd. BIDDERS LIST:General Contractor: Gabe Mendez 916-663-3372 916-663-1478Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925 Blain Stumpf Sand 916-933-1555 916-933-2925

Bid Time: 2:00 PM PLANS AT: Location: Elk GroveOnline and Planroom Est Cost: $25,000.00PREBID: MAND Mandatory 4/10@10AM PREBID: City Council, Chambers OWNER: City of Elk Grove DESCR: Contact, Danielle Dees - 916-627-3218Remove and dispose of existing vegetation, shrubs, and trees with a trunk size greater than one (1) inch in diameter, on the Laguna West Levees located adjacent to Interstate 5 and within City property. Tree and shrub removal shall include the stump and root ball and backfilling the remaining

NAPA RIVER DEBRIS REMOVALPLAN #: 35018 Bid Date: 4/12/2013 Bid Time: 3:00 PM PLANS AT: Location: Napa Online and Planroom OWNER: City of Napa DESCR: Contact, Mark Andrilla - 707-257-9423Water pollution control, pre construction meeting, cooperation, mobilization, maintenance traffic, construction water, debris removal,

2012 ASPHALT OVERLAY PROGRANPLAN #: 82075 Bid Date: 4/12/2013 Bid Time: 2:00 PM PLANS AT: Plans Online Only Location: Sonoma Online and Planroom# OF ADDENDA: 5 OWNER: County of Sonoma DESCR: Contact, County of Sonoma Kevin Howze ([email protected]) or by phone (707) 565-2231 Overlay various County roads, including rubberized asphalt concrete overlay, adjusting utility covers, adjusting guard rails, applying striping, installing delineators, repairing pavement structural section, cold planing, shoulder backing, asphalt dikes, parking bumpersBIDDERS LIST:General Contractor: Ghilotti Construction 707-585-1221 707-585-1601 Mck Services, Inc. 925-957-9200 925-957-9292 Ghilotti Brothers Inc 415-454-7011 415-454-8376

ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE FOR DISTRICT EPLAN #: 97068 Bid Date: 4/12/2013 Bid Time: 11:00 AM PLANS AT: Print OnDemand Location: Visalia Online & Print On Demand PREBID: 3/26 @ 10am PREBID: 707 W. Acequia, 93291 OWNER: County of Tulare FAX: 559-730-2653DESCR: Contact, Purchasing Division @ 559-713-4334.pruning, shaping and traing of trees, shrubs and ground covers, fertilization, weed control, litter control, control of all plant diseases and pests, mowing, and all other duties required to keep areas in safe and attractive usable condition and maintain plant and turf condition with acceptable growth and color. Continued on next page

Run your DVBE/DBE/MBE/SBE/UDBEadvertisements in this State Certified paper

CLICK HERE to place your ad online

Page 50: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 48 Contractor’s Zone• .Contractor’s Zone

Friday, April 12, 2013

CAMELLIA CENTER PETCO & SHELL REMODEL & TENANT IMPROVEMENTSPLAN #: 193094 Bid Date: 4/12/2013 Bid Time: 2:00 PM PLANS AT: Location: SacramentoOnline and PlanroomG.C.: Poelman Construction Ph: 916-484-4820 FAX: 916-484-4821G.C.: Stuart James Construction Ph: 916-608-4800 FAX: 916-608-4810G.C.: KDC Construction Ph: 916-362-5460 FAX: 000-000-0000DESCR: KDC Construction - 916-362-5460This project if the remodel of an existing shell building and the tenant improvements for a new Petco trades required include;surveying, demolition, paving, underground utilities, concrete, masonry, carpentry, insulation, roofing, sheet metal, caulking, doors, frames and hardware, overhead doors, tile, sprinklers, plumbing. BIDDERS LIST:General Contractor: Sd Deacon Corp. 916-969-0900 916-735-0800 Stuart James Construct 916-608-4800 916-608-4810 Poelman Construction 916-484-4820 916-484-4821Sub Contractor: Universal Security & Fire 916-563-1700 916-563-1755

LIGHTING RETROFIT EQUIPMENT AND SERVICESPLAN #: 212084 Bid Date: 4/12/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Demand PREBID: MAND 2/28 @ 10am OWNER: City of San Jose DESCR: Contact, Jamil Colemant, City of San Jose, ([email protected])The City of San José is soliciting bids from qualified contractors to provide all equipment, material and labor necessary to perform lighting retrofit services asspecified in Attachment 1, in support of the Public Works Department.2.1.2 Work will be performed at the following locations, and shall be done concurrently and require 2 crews: 2.1.2.1 Police Administration Building (PAB), 201 West Mission Street, San Jose, CA 95110 2.1.2.2 Police and Fire Communications Building (PAC), 855 N. San Pedro Street, San Jose,CA 95110 2.1.2.3 2.1.3 The estimated quantities provided by the City are not guaranteed. listed for information purposes only. The quantities may vary depending on the demands of the City. Any variations from to these estimated quantities shall not entitle the contractor to an adjustment in the unit price or to any additional compensation.

Monday, April 15, 2013

ARCHITECTURAL SERVICES FOR DISTRICT ATTORNEY TENANT IMPROVEMENTSPLAN #: 20008 Bid Date: 4/15/2013

Bid Time: 3:30 PM PLANS AT: Location: NevadaOnline and PlanroomPREBID: 4/3 @ 10am PREBID: 201 Commercial St. Not requiredOWNER: County of Nevada DESCR: Contact, Nevada, County of (530) 265-1747 Materials and products generally described in exhibit A.

HVAC CONTROLS UPGRADE AT ROSEMONT HIGH SCHOOLPLAN #: 69069 Bid Date: 4/15/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Locat ion: Sacramento Online & Print On Est Cost : $235,000 .00 DemandPREBID: MAND 3/27 @ 9am (Arrive on time or you wont be eligible ) PREBID: Rosemont High School- 9594 Kiefer Blvd. 95827 OWNER: County of Sacramento DESCR: Contact, John Borges - 916-264-4075 x 1022The Sacramento City Unified School District intends to expand the existing the Johnson Metasys Control System from 61 schools to 62 schools. The controls for Rosemont HS will communicate with the two (2) existing Johnson Controls Servers (Meta1 and Meta 2) located at the District IT Server Room. No substitutions or alternates will be accepted. Program Web Based Graphics for existing HVAC Systems. 2. New Package AC Units will be controlled by standalone MS-FEC 2611 Controllers networked via a new RS485 data bus to be installed in each school. The site will have a new MS-NAE5510-1 /NCE25 Master Controllers. Alternates or substitutions for these controllers will not be accepted. 3. The Johnson (ABCS) Factory Authorized - Facility Management System Contractor (FMSC) will install it as a complete package. The System will include all wiring, piping, installation supervision, calibration, adjustments, and checkout necessary for a complete and fully operational system. 4. The Johnson ABCS Contractor shall have a local office within a 30-mile radius of the job site. Emergency service shall be available with-in 2

DUCKS UNLIMITED INC. TWITCHELL ISLAND EAST END WETLAND PROJECTPLAN #: 183079 Bid Date: 4/15/2013 Bid Time: 2:30 PM PLANS AT: Print OnDemand Location: Sacramento Online and PlanroomPREBID: MAND 4/2 @ 10Am

Continued from last page

Plans On File

Page 51: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

PREBID: West Twitchell Island Road and intersection of Mai DESCR: Contact, Brett Williams - 916-851-5349Construction, planting, maintenance;planting 77 acres of upland drill seeding 500 acres of tule mix and plantings BIDDERS LIST:Sub Contractor: Rain For Rent 530-662-1024 530-662-1030

Tuesday, April 16, 2013

UPS MAINTENANCE SERVICESPLAN #: 2021 Bid Date: 4/16/2013

Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Roseville Online & Print On Demand OWNER: City of Roseville DESCR: Contact, Shannon Wiest - 916-774-5736To provide emergency services as needed.

FIRE ALARM REPLACEMENT SYSTEM & FIRE PROTECTION SYSTEM IMPROVEMENTSPLAN #: 30025 Bid Date: 4/16/2013

Bid Time: 2:00 PM PLANS AT: Location: NapaOnline and Planroom Est Cost: $22,000,000.00PREBID: MAND Mandatory 3/19 @ 9 AM PREBID: 2100 Napa-Vallejo Highway OWNER: California Dept. of General Services DESCR: Contact, Don Hansen (916) 376-1663 Includes demolition, asbestos / lead removal, excavation, cast-in-place concrete, electrical raceway, wiring, cable, smoke / heat detectors, manual pull stations, chimes, horns, strobes, magnetic doo hold opens, fire alarm panels, automated fire sprinkler systems, fire caulking, painting, seismic bracing, plastering, acoustical ceiling tile, fire caulking BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

TENNIS COURTS PAVING PROJECTPLAN #: 31018 Bid Date: 4/16/2013 Bid Time: 3:00 PM PLANS AT: Location: SacramentoOnline and Planroom PREBID: MAND 3/26 @ 3PM PREBID: 3111 Center Court Lane OWNER: Center Unified School District Ph: 916-338-6411 :DESCR: Contact, Stan Rutledge - 916-454-0800//Center Joint Unified Schhol District (916) 338-6400 (916) 338-6411 Work consists of: Tennis Courts Paving on the Center High School. Please refer to Specifications for additional information.

PARKING LOTS PAVING REPAIR PROJECTPLAN #: 42011 Bid Date: 4/16/2013 Bid Time: 2:00 PM PLANS AT: Location: AntelopeOnline and Planroom

PREBID: MAND 3/26 @ 1:30 PM PREBID: 3901 Little Rock DriveOWNER: Center Unified School District Ph: 916-338-6411 DESCR: Contact Center Joint Unified Schhol District (916) 338-6400 (916) 338-6411 Repair the parking lot paving at two locations, including demolition. ON -CALL FENCING SERVICES CONTRACT FOR VARIOUS ROAD, FLOOD CONTROL, AND FACILITIES MAINTENANCE WORKPLAN #: 86066 Bid Date: 4/16/2013 Bid Time: 2:00 PM PLANS AT: Location: MartinezOnline and Planroom PREBID: 4/8 @ 10 AM PREBID: 255 Glacier Drive, Martinez , 94553 OWNER: County of Contra Costa FAX: 925-313-2333DESCR: Contact, Ed Turner - 925-313-7003On call contract for various road, flood control and facility maintenance work to provide fencing services including installation, repair, replacement, or removal of fences and gates.

SOLAR PHOTOVOLTAIC RENEWABLE ENERGY DESIGN/BUILDPLAN #: 120074 Bid Date: 4/16/2013

Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Perris Online & Print On Est Cost: $2,500,000.00 DemandPREBID: MAND 4/02/2013 @ 9AM PREBID: 2270 Trumble Road OWNER: Eastern Municipal Water District Ph: 951-928-3777 FAX: 951-928-6111DESCR: Contact, Penny McElvain [email protected] work comprises detailed design, construction, via the Design-Build (DB) delivery method, testing and startup of a 529-kilowatt (kW) (approximate) solar photovoltaic (PV) renewable energy generating system. The DISTRICT intends to make a direct purchase and own the proposed solar system. In addition, the DISTRICT has a conditionally approved application from Southern California Edison (SCE) under the California Solar Initiative (CSI) Program to subsidize a part of the project

Continued on next page

C&S Publishing’s exclusive Delivery Manager

software will deliver this newspaper to you every

week automatically!Click this button for more information

Page 52: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 50 Contractor’s Zone• .Contractor’s Zone

Tuesday, April 16, 2013

2012-13 PAVEMENT MANAGEMENT PROJECTPLAN #: 215084 Bid Date: 4/16/2013

Bid Time: 2:00 PM PLANS AT: San RamonOnline and Planroom Est Cost: $634,500.00OWNER: City of San Ramon DESCR: Contact, Peter Phoon (925) 973-2675 Pavement rehabilitation of Blanco Court, Burns Court, Kilpatrick Drive, Kilpatrick Court, Lynn Court and Santa Cruz Place, and placement of an asphalt concrete slurry on designated areas of Camino Ramon and Montevideo Drive as shown on the contract plans. Related items of work include, but are not limited to: public notifications; temporary traffic controls; cold planning; installation of subdrain system; installation of asphalt concrete overlay; adjustment of existing survey monuments and utility structures to grade; pavement striping; pavement markings; raised pavement markers; and installation of traffic signal detector loops.

Wednesday, April 17, 2013

SAN FRANCISCO COUNTY JAILPLAN #: 4015 Bid Date: 4/17/2013 Bid Time: 2:30 PM PLANS AT: Print OnDemand Location: San Francisco Online and PlanroomEst Cost: $2,000,000.00 # OF ADDENDA: 1PREBID: 3/12 @ 1:30pm PREBID: One Moreland Drive, San Bruno DESCR: Contact, Will Kwan (415) 557-4688The work to be done under this contract is located at San Francisco County Jail, One Moreland Drive, San Bruno, CA. Demolition work includes removal of pavement, fencing, existing utilities and site furnishings; drainage work, sewer work and relocation of existing deputy station. Improvement work includes grading and drainage; construction of new deputy station and restroom building: utility work; security fencing; new visitor drop off area; BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437 Kck Builders 415-459-8698 415-453-9250 Romkon Inc. 415-525-4432 415-529-2073

CONTRACT 33 TRAFFIC SIGNAL MODIFICATIONSPLAN #: 21020 Bid Date: 4/17/2013

Bid Time: 2:30 PM PLANS AT: Print OnDemand Location: San Francisco Online and Planroom Est Cost: $1,000,000.00# OF ADDENDA: PREBID:3/14 @ 1:30pm 30 Van Ness Ave, 5th floorDESCR: Contact, Steven lee (415) 558-5226The work is traffic signal modifications, curb ramps, traffic routing and all related and incidental work at various intersection locations.

K STREET 700 BLOCKPLAN #: 23023 Bid Date: 4/17/2013

Bid Time: 1:00 PM PLANS AT: Location: SacramentoOnline and PlanroomOWNER: TRICORP HEARN CONSTRUCTION, INC. Ph: (916) 779-8010 FAX: (916) 779-8011DESCR: Contact, Brooklyn Erickson - [email protected] demolition of adjacent structures and partial demolition ofexisting historical structures to remain for the construction of a new/retrofit 6-Story 222,649 SF Building and new a 28,834 SF 2-Level 77 space Parking Garage including all associated site improvements, landscaping, and site utilities. The 6-story 222,649 SF building consists of 137 residential apartments over garage podium and 57,525 SF of retail space. This IS a prevailing wage project based on Federal Prevailing

JANITORIAL SERVICES - SHELTERED MARKETS

PLAN #: 37016 Bid Date: 4/17/2013Bid Time: 2:00 PM PLANS AT: Location: SacramentoOnline and PlanroomPREBID: 4/3 @ 9am PREBID: 2127 Front Street OWNER: City of Sacramento DESCR: Contact, Gary O’Neill - 916-808-7432Furnishing to the City of Sacramento Janitorial services and supplies for three City departments, Animal Control, Information technology, Old Sacramento Management offices. Provide personnel, equipment, supplies, materials and other items necessary to perform janitorial

PORT OF STOCKTON KLEIN PROPERTYPLAN #: 44024 Bid Date: 4/17/2013 Bid Time: 3:00 PM PLANS AT: Location: StocktonOnline and PlanroomPREBID: MAND 4/3 @ 10am PREBID: 2201 W. Washington Street OWNER: Port of Stockton

Continued from last page

Plans On File

Page 53: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

DESCR: Contact, Juan Vi;;anueva - 209-946-0246 site improvements to an existing warehousing facility. The work consists of but is not limited to clearing and grubbing, sawcutting pavement, excavation, grading and compaction, installation of base rock, asphalt concrete pavement and miscellaneous concrete, utility relocation,installation of storm drain facilities, storm water pollution control, and other incidental work.

RAILROAD AVENUE AND OAK STREET PARKING IMPROVEMENTSPLAN #: 61082 Bid Date: 4/17/2013 Bid Time: 11:00 AM PLANS AT: Location: RocklinOnline and PlanroomPREBID: MAND 4/11 @ 1:00PM PREBID: 4081 Alvis Court OWNER: City of Rocklin DESCR: Contact, Project Manager - 916-625-5500Furnishing of all labor, materials, equipment, transportation. BIDDERS LIST:General Contractor: Sierra National Const 916-481-6792 916-482-2207

RAILROAD TUBULAR STEEL FENCEPLAN #: 62004 Bid Date: 4/17/2013 Bid Time: 10:30 AM PLANS AT: Location: RockinOnline and PlanroomPREBID: MAND 4/11 @ 11 AM PREBID: 4081 Alvis Court OWNER: City of Rocklin DESCR: Contact, Project manager - 916-625-5500Furnishing all labor, materials, equipment and transportatrion.

NORTH LAGUNA CREEK PARK PLAYGROUND RENOVATIONPLAN #: 70079 Bid Date: 4/17/2013 Bid Time: 2:00 PM PLANS AT: Location: SacramentoOnline and Planroom Est Cost: $25,000.00 # OF ADDENDA: 2 OWNER: County of Sacramento DESCR: Contact, Tim Hopper- 916-808-8173Clearing and grubbing, demolition, grading, drainage, concrete walkways and curbs, irrigation system modifications and turf reseeding. BIDDERS LIST:General Contractor: Ap Land Developments 916-357-5263 916-357-5263

TRASH & DEBRIS SERVICESPLAN #: 67081 Bid Date: 4/17/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On # OF ADDENDA: 1 DemandPREBID: MAND 3/27 @ 10AM PREBID: Call Elise Gumm for address OWNER: City of Sacramento

DESCR: Contact, Elise Gumm - 916-808-2023Provide trash and debris removal from public and private property on an as needed basis, conractor shall furnish all labor, materials, equipment, tools, transportation and incidentals neccessary for the purpose othe the work performed, Contractor will remove all excess trash and debris, including but not limited to; trash, vehicles, scrap metal, appliances, brush, dead trees, wood piles, from the exterior of the property, All items removed should be placed in containers for disposal at the approved licensed facility. Contracror may not salvage any items from the premises for personal use and will not recieve and salvage value for any items

ROCKLIN EVENT CENTER ROOF AND HVACPLAN #: 77069 Bid Date: 4/17/2013 Bid Time: 10:00 AM PLANS AT: Location: RocklinOnline and PlanroomPREBID: MAND 4/10 @ 1:00 PM PREBID: 2650 Sunset Blvd OWNER: City of Rocklin DESCR: Contact, Project manager - 916-625-5500Furnishing all labor, materials, equipment, and transportation. BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881

SUMMIT SOUTH RESERVOIR REHABILITATIONPLAN #: 93074 Bid Date: 4/17/2013 Bid Time: 1:30 PM PLANS AT: Location: OaklandOnline and Planroom Est Cost: $500,000.00PREBID: 3/28/@10am PREBID: 102 Hiller Drive OWNER: County of Alameda DESCR: Contact, William Hossfeld -510-287-1131Removing and disposing of heel water from the Summit South Reservoir and removing sediment, removing and replacing the reservoir joint sealant (hazardous material) replacing the tar and gravel roofing, rehabilitating the existing valve pit and related piping, installing security and site improvements and performing related work as shown on

FURNISH 5 KV SWITCHGEAR - CITRUS, CRAFTON HILLS AND CHERRY VALLEY PUMP STATIONS/EAST BRANCH EXTENSION-PHASE IIPLAN #: 158063 Bid Date: 4/17/2013Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Planroom # OF ADDENDA: 4 PREBID: 10/3 @ 10am OWNER: State of California, Dept of Water Resources DESCR: Contact, Department of General Services, 916-375-4940, Jim Veres telephone (916) 653-4867, fax (916) 653-6166, or by e-mail at [email protected]. See specifications for details.

Continued on next page

Page 54: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 52 Contractor’s Zone• .Contractor’s Zone

Wednesday, April 17, 2013

CONTRACT 33 TRAFFIC SIGNAL MODIFICATIONSPLAN #: 21020 Bid Date: 4/17/2013 Bid Time: 2:30 PM PLANS AT: Print OnDemand Location: San Francisco Online and Planroom Est Cost: $1,000,000.00 # OF ADDENDA: 1PREBID: 3/14 @ 1:30pm PREBID: 30 Van Ness Ave, 5th floor. DESCR: Contact, Steven lee (415) 558-5226The work is traffic signal modifications, curb ramps, traffic routing and all related and incidental work at various intersection locations .

NORTH LAGUNA CREEK PARK PLAYGROUND RENOVATIONPLAN #: 66086 Bid Date: 4/17/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Tim Hopper 916-808-8529Clearing and grubbing, demolition, grading, drainage, concrete walkways and curbs, irrigation system modifications and turf reseeding. BIDDERS LIST:General Contractor: Ap Land Developments 916-357-5263 916-357-5263

SUMMIT SOUTH RESERVOIR REHABILITATIONPLAN #: 93074 Bid Date: 4/17/2013 Bid Time: 1:30 PM PLANS AT: Location: OaklandOnline and Planroom Est Cost: $500,000.00PREBID: 3/28/@10am PREBID: 102 Hiller DriveOWNER: County of Alameda DESCR: Contact, William Hossfeld -510-287-1131Removing and disposing of heel water from the Summit South Reservoir and removing sediment, removing and replacing the reservoir joint sealant (hazardous material) replacing the tar and gravel roofing, rehabilitating the existing valve pit and related piping, installing security and site improvements and performing related work as shown on

CHICO HIGH SCHOOL PORTABLE 2013 - NO GC OPENINGSPLAN #: 111087 Bid Date: 4/17/2013

Bid Time: 2:00 PM PLANS AT: Location: ChicoOnline and Planroom

OWNER: Chico Unified School District Ph: 530-891-3095 FAX: 530-891-3190DESCR: Contact, Mike Kelly ([email protected]) (530) 891-4533 site grading / paving, underground utilities, concrete, site electrical, site plumbing and miscellaneous metals for the installation of seven BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

EISENHUT ELEMENTARY SCHOOL FASCIA REPAIR

PLAN #: 131070 Bid Date: 4/17/2013 Bid Time: 3:30 PM PLANS AT: Print On DemandLocation: Modesto Online and PlanroomPREBID: MAND 4/9 @ 3:30 pm PREBID: 1809 Sheldon Drive OWNER: Stanislaus Union School District DESCR: Contact, Timothy Huff - 209-571-2232Eisenhut Elementary School Fascia Repair BIDDERS LIST:General Contractor: Alameda Construction 209-667-4864 209-664-1588

FURNISH 5 KV SWITCHGEAR - CITRUS, CRAFTON HILLS AND CHERRY VALLEY PUMP STATIONS/EAST BRANCH EXTENSION-PHASE IIPLAN #: 158063 Bid Date: 4/17/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Planroom # OF ADDENDA: 4 PREBID: 10/3 @ 10am OWNER: State of California, Dept of Water Resources DESCR: Contact, Department of General Services, 916-375-4940, Jim Veres telephone (916) 653-4867, fax (916) 653-6166, or by e-mail at [email protected]. See specifications for details.

2013 WATER MAIN FREEWAY CROSSINGSPLAN #: 181004 Bid Date: 4/17/2013 Bid Time: 3:00 PM PLANS AT: Location: NapaOnline and Planroom Est Cost: $3,100,000.00PREBID: MAND 4/10 @ 9AM PREBID: Jamieson Canyon Water, Treatment Plant 270 Kirkland OWNER: City of Napa DESCR: Contact, Megan Thomas - 707-257-9341Pavement markers permanent type, retrorefelction resistant surface, non reflective 4inch round, pavemnt markers temporary type, striping and pavement marking material, performed thermoplastic,

Continued from last page

Plans On File

Page 55: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

ceramic surfacing laminate, one piece driveable flexible type, special use type, surface mount type, lane seperation system, conical delineators 42 inch, impactable type, non impactable type, metal beam guard rail post markers, concrete barrier, gurad rail delineator, wood post, steel post, channelizers, traffic cones, drums., signs,. BIDDERS LIST:General Contractor: Argonaut Constructors 707-542-4862 707-542-4897Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 Sierra Trench Protection 530-887-9413 530-887-9112

SACRAMENTO MUNICIPAL UTILITY DISTRICT (SMUD)PLAN #: 249064 Bid Date: 4/17/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Rio Vista Online & Print On Est Cost: $500,000.00 DemandPREBID: 3/26 @ 11am OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Kiauna Norman ([email protected]) (916) 732-7443 Design, procure, install, commission, test, operate, maintain and warranty an emergency backup power supply for both the O & M Building and the warehouse building.

Thursday, April 18, 2013

ELECTRICAL MATERIALS FOR PUBLIC UTILITIES (SY1301410)

PLAN #: 0 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Location: AnaheimOnline and Planroom OWNER: City of Anaheim DESCR: Contact, James Aguila - 714-765-5219Electrical materials for Public Utilities. For more details, please see specifications.

COTATI INTERMODAL FACILITY PHASE IPLAN #: 8013 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Location: SonomaOnline and Planroom PREBID: 3/28 @ 10:30 AM PREBID: 355 West Robles Ave, Santa Rosa OWNER: County of Sonoma DESCR: Contact, County of Sonoma Bryan Albee ([email protected]) Demolition of a building with some asbestos, utility work, grading, drainage, concrete work, asphalt and rigid paving slurry seal coating, masonry stone work, landscaping, irrigation, traffic signal installation, BIDDERS LIST:General Contractor: Ghilotti Construction C 707-585-1221 707-585-1601 Romkon Inc. 415-525-4432 415-529-2073

Argonaut Constructors 707-542-4862 707-542-4897 Ghilotti Brothers Inc 415-454-7011 415-454-8376

PARKING GARAGE PAINTING PROJECT-CLAY STREET & PEARL STREET GARAGESPLAN #: 16026 Bid Date: 4/18/2013

Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Napa Online and Planroom Est Cost: $102,000.00 PREBID: 4/9 @ 3 pm OWNER: City of Napa DESCR: Contact, Eric Vanderbugt - 707-257-9645Mobilization, Control of work, traffic control, water pollution control, paints and coatings-clay street garage, paints and coating-pearl street garage.

SOUTH BROADWAY BRIDGE APPROACH SLABPLAN #: 42011 Bid Date: 4/18/2013 Bid Time: 3:00 PM PLANS AT: Location: Redding Online and Planroom Est Cost: $352,800.00OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, Corri Vandiver 530-245-7120Removing and reconstructing bridge approach slabs and bridge railings at both ends of the eastbound South Bonnyview Bridge over the sacramento river. The work alos involves reconstructing chain link railing, resetting a metal beam guard rail end post and terminal section, repairing concrete spalls at the west abutment, traffic control,

NFWRF DISINFECTION REPLACEMENT PROJECTPLAN #: 18029 Bid Date: 4/18/2013 id Time: 3:00 PM PLANS AT: Location: FresnoOnline and Planroom Est Cost: $1,026,000.00PREBID: 4/9 @ 10 Am PREBID: 1660 E Copper Ave OWNER: City of Fresno DESCR: Contact Kevin Norgaard - 559-621-1332Labor, materials, appurtenances, equipment and services neccessary to do all work shown on drawings. BIDDERS LIST:General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435

AC OVERLAY PROJECT 2013PLAN #: 21021 Bid Date: 4/18/2013

Bid Time: 2:00 PM PLANS AT: Location: Sacramento Online and Planroom Est Cost: $5,600,000.00OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, Ken Wick - 916-875-5336Placing rubberized or conventional asphalt concrete pavement overlay, placing paving fabric, repairing failed pavement, grinding pavement, adjusting manholes to grade, installing sidewalk accessibility ramp, replacing signal detectors.

Continued on next page

Page 56: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 54 Contractor’s Zone• .Contractor’s Zone

Thursday, April 18, 2013

NEW MANHOLE ACCESS SEWER STRUCTURESPLAN #: 24013 Bid Date: 4/18/2013

Bid Time: 3:00 PM PLANS AT: Location: FresnoOnline and Planroom Est Cost: $280,000.00OWNER: City of Fresno DESCR: Contact, Kevin Norgaard -559-621-1332Installation of ten new manhole structures on the Wastewater Collection System throughout the City of Fresno.

MIRA LOMA HIGH SCHOOLPLAN #: 30025 Bid Date: 4/18/2013

Bid Time: 2:00 PM PLANS AT: Location: SacramentoOnline and Planroom PREBID: MAND 4/3 @ 1 pm PREBID: 4000 Edison Ave OWNER: San Juan Unified School District DESCR: Contact, Jeff Scruggs - 916-979-8628Landscape and Irrigation for Mira Loma High School.

EASTRIDGE TRANSIT CENTER AND BUSPLAN #: 117074 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom # OF ADDENDA: 8 PREBID: 8/10 @ 10 am. OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 321-7189 .The work generally includes clearing and grubbing, demolition, excavation, street improvements, AC paving, addition of curb and gutter and sidewalk, multiuse path, street and pedestrian lighting, landscaping new utilities, conduits, service connections, signing and striping and misc other work. BIDDERS LIST:General Contractor: Robert Bothman, Inc. 408-279-2277 408-279-2286Sub Contractor: Gehvac Co. 209-204-0100 209-566-9995 Pacific Underground 408-977-1655 408-977-1659 Parc Services, Inc. 925-371-4610 925-606-8704 Stormwater Specialists 707-280-2510 916-405-4180 Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Construc 925-820-9245 925-831-3093 Monterey Bay Rebar 831-724-3013 831-724-3151Supplier: Reed & Graham Inc 916-381-9900 916-388-1486

WINDSOR POINT PARK IMPROVEMENTSPLAN #: 32018 Bid Date: 4/18/2013 Bid Time: 10:00 AM PLANS AT: Location: El Dorado Online and Planroom Est Cost: $389,982.00OWNER: El Dorado Hills Community Service District Ph: 916-933-6624DESCR: Contact, Mindy Douglas - 916-614-3224Construction of a public neighborhood park consisting of a turf field area, a basketball court and ball wall, walking paths, fencing, retaining walls, a drinking fountain and a picnic area. BIDDERS LIST:General Contractor: Ap Land Developments 916-357-5263 916-357-5263 Pbm Construction Inc. 916-315-2614 916-315-2619Sub Contractor: Creekmore Recreation 916-612-3871 916-404-4968

LRCCD SCC STUDENT SERVICES BUILDINGPLAN #: 40015 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Location: SacramentoOnline and Planroom Est Cost: $8,487,600.00PREBID: 4/2 @ 2:00PM PREBID: 3835 Freeport Ave (Strongly Recommended) OWNER: Los Rios Community College District Ph: 916-856-3441 FAX: 916-856-3448DESCR: Contact, Jennifer Alford - 916-568-3077Demolition and removal of an existing single story building, apprx 12,000 sf landscape and hardscape, improvements to existing parking with associated underground utility infrastructure and the new construction of a two story building apprx 27,100 sf including landscape, hardscape and site improvements.

WILSON RILES MIDDLE SCHOOL PAINTING PROJECTPLAN #: 45002 Bid Date: 4/18/2013 Bid Time: 4:00 PM PLANS AT: Location: RosevilleOnline and PlanroomPREBID: MAND Mandatory 3/28 @ 11 AM PREBID: 4747 PFE Road OWNER: Center Unified School District Ph: 916-338-6411 DESCR: Contact, Capital Program Management, Inc. (916) 553-4400 Paint all previously painted “accent” colors, including doors, door frames, window frames, trim, miscellaneous flashings, gutters, downspouts, brackets, fascia, rake boards, gravel stops, handrails and guardrails.

CENTER HIGH SCHOOL PAINTING PROJECTPLAN #: 47015 Bid Date: 4/18/2013

Continued from last page

Plans On File

Page 57: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Bid Time: 1:00 PM PLANS AT: Location: AntelopeOnline and PlanroomPREBID: Wednesday, March 27@ 9am PREBID: 3111 Center Court Lane OWNER: Center Unified School District Ph: 916-338-6411 DESCR: Contact, Center Joint Unified Schhol District (916) 338-6400 Center High School Painting Project, joint sealers.

OLD JUNIOR HIGH AND MCCLELLAN HIGH SCHOOLS PAINTING PROJECTPLAN #: 48013 Bid Date: 4/18/2013Bid Time: 3:00 PM PLANS AT: Location: AntelopeOnline and PlanroomPREBID: MAND March 28, 2013@ 9am PREBID: 3243 Center Court Lane OWNER: Center Unified School District Ph: 916-338-6411 DESCR: Contact, Center Joint Unified Schhol District (916) 338-6400 Old Junior High and McClellan High Schools Painting Project

SPINELLI, NORTH COUNTRY & OAK HILL ELEMENTARY SCHOOLS PAINTING PROJECTPLAN #: 53099 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Location: AntelopeOnline and PlanroomPREBID: MAND March 27, 2013@11am PREBID: 3401 Scotland Drive OWNER: Center Unified School District Ph: 916-338-6411DESCR: Contact, Center Joint Unified Schhol District (916) 338-6400 Spinelli, North Country & Oak Hill Elementary Schools Painting Project

AREA 5 TRAFFIC, SAFETY & WALKABILITY PROJECT - PHASE 1APLAN #: 57005 Bid Date: 4/18/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Citrus Heights Online & Print On DemandPREBID: MAND 4/9 @ 9am PREBID: Trellis Hall conference Room OWNER: City of Citrus Heights DESCR: Contact, Stuart Hodgkins - 916-727-4770Includes reconstruction of curb ramps and sidewalk to meet accessibility standards and installation of pedestrian enhancements at the existing traffic signal.

SOUTH AURORA STREET & BNSF RAILROAD CROSSING IMPROVEMENTSPLAN #: 59007 Bid Date: 4/18/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Stockton Online & Print On Est Cost: $100,000.00 DemandPREBID: MAND 3/28 @ 10AM PREBID: 425 N. El Dorado St. 2ND floor OWNER: City of Stockton DESCR: Contact, Sharla Hardy - 209-937-8374Install a median island in Aurora Street, north of the BNSF crossing. Additional improvements include: installation of sidewalk on west side of the street on both sides of the crossing, with truncated dome pads on both sides of the crossing, an ADA ramp south of the crossing, and a new storm drain inlet in the sidewalk on the south side of the crossing. BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

EASTRIDGE TRANSIT CENTER AND BUSPLAN #: 117074 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom # OF ADDENDA: 8 PREBID: 8/10 @ 10 am. OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 321-7189 .The work generally includes clearing and grubbing, demolition, excavation, street improvements, AC paving, addition of curb and gutter and sidewalk, multiuse path, street and pedestrian lighting, landscaping new utilities, conduits, service connections, signing and striping and misc other work. BIDDERS LIST:General Contractor: Robert Bothman, Inc. 408-279-2277 408-279-2286Sub Contractor: Gehvac Co. 209-204-0100 209-566-9995 Pacific Underground 408-977-1655 408-977-1659 Parc Services, Inc. 925-371-4610 925-606-8704 Stormwater Specialists 707-280-2510 916-405-4180 Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Constr 925-820-9245 925-831-309 Monterey Bay Rebar 831-724-3013 831-724-3151Supplier: Reed & Graham Inc 916-381-9900 916-388-1486

Continued on next page

To Run Your Legal Ad, Please Visit

www.thedailyreporter.netOr Give Us A Call 916-729-5432

Page 58: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 56 Contractor’s Zone• .Contractor’s Zone

Thursday, April 18, 2013

COLUMBIA AIRPORT SEWER PROJECTPLAN #: 118080 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Location: Tuolumne Online and Planroom # OF ADDENDA: 1PREBID: MAND 3/27 @ 10 AM PREBID: 10723 North Airport Rd 95370 OWNER: County of Tuolumne DESCR: Contact, Facilities Management Div - 209-533-5660Furnishing of all labor, materials, equipment, transportation and services for the completion of the project defined. BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

ADMIRAL CALLAGHAN PAVEMENT REHABILITATION PROJECT MEASURE B - FY 12/13 (FROM TURNER PKWY TO COLUMBUS

PKWY)PLAN #: 125087 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Location: VallejoOnline and Planroom Est Cost: $897,553.00PREBID: 4/11 @ 2pm PREBID: Public Works Conference Room 4’th floor OWNER: City of Vallejo DESCR: Contact, Joshua Sanchez - 707-648-5229Provide traffic control, cold milling removal of asphalt concrete, over excavation, aggregate base rock installation, hot mix asphalt paving, spreading and compacting hot mix asphalt, adjusting existing utility frames and covers to new grade, installing traffic signal detector loops, hand holes and conduit, installing temporary and permanent pavement striping and markings, removing and replacing Portland cement concrete handicap curb ramp and sidewalk.

CLOTHING, FOOTWEAR, BEDDING, AND PERSONAL HYGIENE PRODICTSPLAN #: 132070 Bid Date: 4/18/2013 Bid Time: 4:00 PM PLANS AT: Location: MercedOnline and PlanroomOWNER: County of Merced FAX: 209-722-7690DESCR: Contact, Robert Reed - 209-385-7331- Ext 4357T shirts, robes, crew sock, walking shorts, boxer shorts, panties, nightshirts, sports bra, pants work, shirt work, sweatshirts, jump suits, coverall, footwear, work boots, rubber boots, bedding,

thermal blanket, bedspread, economic bed spread, flat sheets, fitted sheets, mattresses,

911 COMMUNICATIONS CENTER RELOCATIONPLAN #: 161063 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Elk Grove Online & Print On Est Cost: $5,063,835.00 # OF ADDENDA: 2Demand PREBID: 3/5 @ 10am OWNER: County of Sacramento DESCR: Renovate the essential services Sacramento County Sheriff’s South Station facility to accomodate the Sheriff’s 911 Communication Center operations, including tenant improvements to the existing building, site improvements to fit the new use, enclosure of the existing electrical yard to convert it into an electrical room, removal / installation of existing roof membrane, seismic upgrades to the building structure, demolition of existing interior partitions, construction of new structural / non-structual demising walls, addition of access flooring, miscellaneous equipment, finishes for a complete and functional 911 facility, modifications to existing plumbing systems, additions / improvements to the building mechanical systems, improvements to the building’s fire protection systems / security systems, highly technical improvements to the buildings normal power / emergency back-up power systems, masonry block site walls, modifications to landscaping / paving, new ornamental iron fencing, modifications to existing fencing / vehicle and pedestrian access gates and new electrical yard to replace existing to fit new emergency generators and fuel tank. **Use ([email protected]) as email for questions. BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 Diede Construction 209-369-8255 209-368-0600 Swank Construction 707-446-8808 707-446-8303 Gwinn Construction, Inc. 530-889-1360 530-823-8092 C & C Construction 916-434-5280 916-434-5288 Ascent Builders, Inc. 916-383-7000 916-383-7001 Iomlan Construction, 209-664-9960 209-664-9979 American River Const 530-621-1785 530-621-0360 Seward L. Schreder 530-229-0001 530-229-0070 Roebbelen Contracting, . 916-939-1110 916-939-4027 Cal Electro 530-223-5937 530-221-7038 Simile Construction 209-545-6111 209-545-6113 F & H Construction 209-931-3738 209-931-4427 Broward Builders Inc. 530-666-5635 530-666-5723 United Building Cont 530-345-8455 530-345-8885 Clp Construction 916-344-6646 916-331-4335 D.g. Granade, Inc. 530-677-7484 530-677-7550

Continued from last page

Plans On File

Page 59: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Younger General Contra 916-631-8000 916-631-8293Sub Contractor: K&b 916-591-6524 916-652-6584 Culbert Installs Doors,. 916-675-4050 916-992-0133 Universal Security 916-563-1700 916-563-1755 Bockmon & Woody 209-993-2633 209-464-2615 Bob-leon Plastics, Inc. 916-452-4063 916-452-3759

48-INCH FORCE MAIN RELIABILITY IMPROVEMENT PROJECT UNIT 1 - MAPLE ST TO BAIR ISLANDPLAN #: 163073 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Auburn & Roseville Office Locat ion: Redwood Ci ty Online & Print On DemandPREBID: MAND 11/28 @ 10AM DESCR: Contact, Jill Chamberlain. Kennedy/Jenks Consultants, @ 650-852-2800. Div_02-environmental protection, decontamination, demolition, site preparation, earthwork, ground improvement, contact grouting, cellular grout backfill, microtunneling, shafts & near surface excavations, pilot tube, steel casing, carrier pipe installation in steel casing, secant pile shafts, geotechnical instrumentation, water system piping & accessories, sewer & storm drain piping & accessories, paving, resurfacing, pavement markings & appurtenances, concrete curb, gutters & sidewalk, site furnishings; Div_03-cast-in-place concrete; Div_05-metal & hardware; Div_06-carepentry; Div_09-painting; Div_10-signage; Div_13-prefabricated restroom building, fiber optic conduit system components; Div_16-site electrical system. SOUTH BONNYVIEW BRIDGE APPROACH SLABPLAN #: 184004 Bid Date: 4/18/2013 Bid Time: 3:00 PM PLANS AT: Location: Redding Online and Planroom Est Cost: $352,800.00OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, Corri Vandiver 530-245-7120Removing and reconstructing bridge approach slabs and bridge railings at both ends of the eastbound South Bonnyview Bridge over the sacramento river. The work alos involves reconstructing chain link railing, resetting a metal beam guard rail end post and terminal section, repairing concrete spalls at the west abutment, traffic control, and BIDDERS LIST:General Contractor: Timberworks 530-926-4093 530-926-2118

MODERNIZATION DEPARTMENT OF WATER RESOURCES DATA CENTERPLAN #: 271050 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $1,140,000.00 Demand

PREBID: MAND 2/19 @ 9:30am OWNER: State of CA - Dept of General Services DESCR: Contact, Eric Waddell, 916-376-1768. Install electrical infrastructure upgrade equipment and devices, including installation of four 200 kW motor-generated sets, Generator Control Gear with associated software package for control and monitoring system, a 12 kW switch gear and synchronizer, a 250 kW load bank, fabrication / installation of a support platform in addition to installation of an Owner-furnished 5 Breaker Bypass SB, associated electrical power cabling, low / high voltage wiring, controls wiring, connections, conduits, rigging, placement / hookups of Owner-furnished hardware modification to and BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 Division 5-15, Inc. 916-638-1520 916-638-1521 Perryman Mechanical, 916-371-8888 916-371-8990

Friday, April 19, 2013

WESTFIELD TOT LOT INSTALLATIONPLAN #: 5022 Bid Date: 4/19/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: West Online & Print On DemandPREBID: 4/10 @ 2pm PREBID: 508 Poplar Ave OWNER: City of West Sacramento DESCR: Contact, Christopher Surawski - 916-617-4717Clearing and grubbing area fop tot lot, ADA complaint sidewalk per City standard specs and details #202 and tot ramp. Sidewalk shall be 4 inches, and 6 feet wide by 200 feet long, tot lot ramp and tot lot curbing to be installed per attached detail.BIDDERS LIST:General Contractor: Ap Land Developments 916-357-5263 916-357-5263Sub Contractor: Creekmore Recreation 916-612-3871 916-404-4968

DICKEY PLAYGROUND; FORMER RECREATION BUILDING DEMOLITIONPLAN #: 7024 Bid Date: 4/19/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Fresno Online & Print On Demand OWNER: City of Fresno DESCR: Contact, Andy Vanderford - 559-621-1155Asbestos and lead paint removal and disposal. Demolition of an existing building. Demolition of concrete walkways, asphalt, landscaping, plumbing, fencing, etc. New chain link fence. New concrete walkways and drive approach to be bid as an add alternate bid item.

Continued on next page

Page 60: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 58 Contractor’s Zone• .Contractor’s Zone

Friday, April 19, 2013

ON-CALL CONSTRUCTION MANAGEMENT & INSPECTION SERVICESPLAN #: 136059 Bid Date: 4/19/2013 Bid Time: 5:00 PM PLANS AT: Location: RosevilleOnline and Planroom OWNER: City of Roseville DESCR: Contact, grading operations, stormwater BMP enforcement, drainage culverts, bridge crossinfg, all storm drain lines, water, waste water, roadway construction, all concrete work, bike trails, traffic signals, signage and striping, and park improvements, No;private improvements, electrical substations, transmission lines, and off site distribution line facilities.

ENGINEERING DESIGN SERVICES FOR MINERAL KING AVENUE SEWER TRUNK LINE PROJECTPLAN #: 142056 Bid Date: 4/19/2013 Bid Time: 1:00 PM PLANS AT: Location: VisaliaOnline and Planroom Est Cost: $3,000,000,000PREBID: 3/29 @ 10 AM PREBID: 707 W. Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Purchasing division @ 559-713-4334Provide Topographic survey and engineering design services needed to develope a set of construction plans for the stated project as specified.

Monday, April 22, 2013

ELK GROVE BOULEVARD SIDEWALK INFILL BETWEEN WATERMAN ROAD AND KENT STREETPLAN #: 184004 Bid Date: 4/19/2013 Bid Time: 2:00 PM PLANS AT: Location: Elk GroveOnline and PlanroomPREBID: Call Danielle Dees for pre bid info @ 916-627-3218 OWNER: City of Elk Grove DESCR: Contact, Dorothy Kam - 916-478-3604Construct Portland Cement Concrete (PCC) sidewalk, asphalt concrete path, curb and gutter on the southside of Elk Grove Boulevard between Waterman Road and Kent Street. Other items of Work include: drainage improvements and other improvements as described in this Contract. BIDDERS LIST:Sub Contractor: Concrete North 209-745-7400 209-745-7477

WEST B STREET PEDESTRIAN & BICYCLE UNDERCROSSINGPLAN #: 214096 Bid Date: 4/19/2013

Bid Time: 2:00 PM PLANS AT: Location: DixonOnline and Planroom Est Cost: $4,800,000.00PREBID:4/3@10 AM OWNER: Solano Transp Authority DESCR: Contact, -Solano Transportation Authority c/o Hill International: Stephen MacLennan (415) 757-2392 a pedestrian undercrossing under Union Pacific Railroad, including sidewalks, stairs, ramps, fences, illumination system, landscaping, irrigation and drainage system.BIDDERS LIST:General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Shasta Constructors 530-365-3930 530-365-5465Sub Contractor: Ap Land Developments 916-357-5263 916-357-5263

RFP FOR BANKING DEPOSITORY AND/OR CUSTODIAL SERVICESPLAN #: 109085 Bid Date: 4/22/2013 Bid Time: 4:30 PM PLANS AT: Location: OaklandOnline and Planroom PREBID: 3/20 @ 9:30 AM PREBID: One Frank H. Ogawa Plaza , 94612 OWNER: City of Oakland DESCR: Contact, City of Oakland - DPW (510) 238-3621

Monday, April 22, 2013

RFQ WATER, WASTEWATER AND STORM DRAINAGE RATE STRUCTURE STUDY

PLAN #: 13026 Bid Date: 4/22/2013 Bid Time: 3:00 PM PLANS AT: Location: SacramentoOnline and Planroom Est Cost: $150,000.00OWNER: City of Sacramento - Dept of Utilities DESCR: Robert Armijo -916-808-1411Wastewater rates and storm drainage rates, rate studies, metered water rates, fee studies.

RFP FOR BANKING DEPOSITORY AND/OR CUSTODIAL SERVICESPLAN #: 109085 Bid Date: 4/22/2013 Bid Time: 4:30 PM PLANS AT: Location: OaklandOnline and PlanroomPREBID: 3/20 @ 9:30 AM PREBID: One Frank H. Ogawa Plaza , 94612 OWNER: City of Oakland DESCR: Contact, City of Oakland - DPW (510) 238-3621

Continued from last page

Plans On File

Page 61: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Tuesday, April 23, 2013

RFQ DRAINAGE MASTER PLANNING, DESIGN REVIEWAND HYDRAULIC MODELINGPLAN #: 12012 Bid Date: 4/23/2013 Bid Time: 3:00 PM PLANS AT: Location: SacramentoOnline and Planroom Est Cost: $95,000.00OWNER: City of Sacramento - Dept of Utilities DESCR: Contact, Mark Elliott - 916-808-8894Review of drainage design and hydraulic models developed by city staff, design review, economic analysis, performance of field investigations.

ROOF REPLACEMENT OF THE MUEX HOMEPLAN #: 15025 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Location: FresnoOnline and Planroom # OF ADDENDA: 1PREBID: MAND 4/9 @ 10am PREBID: 1007 R Street, Fresno OWNER: City of Fresno DESCR: Contact, Fresno, City of (559) 621-1332 Removal of specified steep-slope roofing materials, underlayment, repairs, & related flashings where indicated on drawings, & installation of new wood shingle roofing system over existing space-sheathing wood at specified locations, & related components. Work is defined as all material, labor, equipment & services necessary to do all work shown on the Drawings & called for in the Specifications. Reroofing work performed by Contractor shall comply with all applicable building codes & statutes, including the 2010 California Historical Building Code (CCR Title 24, Part

FEATHER RIVER WEST LEVEE PROJECTPLAN #: 26094 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Yuba Online & Print On Est Cost: $40,000.00 DemandPREBID: MAND 4/3 @ 10AM to 12PM PREBID: Yuba City council chambers OWNER: City of Yuba City DESCR: Contact, Michael Bessette - [email protected] of all labor, materials, equipment, tools, incidentals and supervision for; cutoff wall installation, seepage and stability berm construction, levee reconstruction and utility relocation and modifications.

MADISON ELEMENTARY SCHOOL RESTROOM CONVERSIONPLAN #: 39020 Bid Date: 4/23/2013

Bid Time: 3:00 PM PLANS AT: San LeandroOnline and Planroom Est Cost: $85,000.00

OWNER: San Leandro Unified School District DESCR: Contact, Harris and Associates - 510-895-4675New walls, cubs and flashings, doors, interior finishes, ceiling repair

STEVENS CREEK CORRIDOR PARK & RESTORATION PHASE 2PLAN #: 75066 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Location: CupertinoOnline and PlanroomPREBID: 4/9 @ 2pm PREBID: 2210 Stevens Creek Blvd OWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, Public Works- 408-777-3354Restoration activities along of apprx 1/4 mile of the existing creek and widening of apprx 700 feet of the creek with creation of a new backwater area; installation of a new sanitary main, installation of prefabricated pedestrian bridge, new trail and amenities, modification of a street intersection, parking lot renovation and landscaping . BIDDERS LIST:General Contractor: Mcnabb Construction (dk 925-935-4200 925-952-4600Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

FENCING ADDITION @ ELK GROVE CHARTER SCHOOLPLAN #: 78076 Bid Date: 4/23/2013Bid Time: 2:00 PM PLANS AT: Location: Elk Grove Online and Planroom PREBID: MAND 4/17 @ 1pm PREBID: 10065 Atkins Drive OWNER: City of Elk Grove DESCR: Contact, Project Manager - 916-686-7711Installation of new fencing.

KINGS BEACH ELEMENTARY SCHOOL MULTI- PURPOSE ROOM ROOF STRENGTHENING PROJECTPLAN #: 81076 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Kings BeachOnline and Planroom PREBID: MAND 3/27 @ 3PM PREBID: 8125 Steelhead Ave OWNER: County of Placer FAX: 530-886-3540DESCR: Contact- Tahoe Truckee Unified School District (530) 582-2500 Installation of structural steel, some attached to the existing structural steel beams and columns, some placed under the roof deck, as well as the installation of footings and columns. Project includes removal and replacement of floors, ceilings, walls and other architectural, mechanical, plumbing and electrical components as required to access the structure. Sections of the existing roofing will be removed for the installation of a structural “over roof” and new roofing. The work also includes hazardous materials abatement, as more particularly set forth in the DSA approved BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850

Continued from last page

Page 62: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 60 Contractor’s Zone• .Contractor’s Zone

Tuesday, April 23, 2013

2013 KENSINGTON AREA MICRO - SURFACINGPLAN #: 85061 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Location: KensingtonOnline and Planroom Est Cost: $358,000.00# OF ADDENDA: 2DESCR: Contact, Applying micro Surface treatment to streets in the Kensington area as shown on plans. Surface preperation, crack seal, tree trimming, striping removal, placement of thermoplastic striping and pacvement markings. BIDDERS LIST:Sub Contractor: Sierra Striping, Inc./sierra 916-652-0430 916-652-9663

CAMINO TASSAJARA/SYCAMORE VALLEY ROAD SOUND WALL MAINTENANCEPLAN #: 105090 Bid Date: 4/23/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Danville Online & Print On Est Cost: $31,000.00 DemandOWNER: Town of Danville DESCR: Contact: Ron Allen (925) 314-3310. Removal and replacement of masonry block sound wall at the locations shown along Camino Tassajara and Sycamore Valley Road. Included in the work are demolition and removal of existing sound wall, construction of new sound wall and foundations, protection and restoration of existing landscaping and irrigation and other item that are required by the plans, standard specifications, or these Special Provisions.

RESTROOM UPGRADES AT STANISLAUS ELEMENTARY SCHOOLPLAN #: 133070 Bid Date: 4/23/2013

Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Modesto Online & Print On DemandPREBID: MAND 4/10 @ 3pm PREBID: 1931 Kiernan Ave OWNER: Stanislaus Union School District DESCR: Contact, Timothy Huff - 209-571-2232 Coordination, testing and inspections, cleaning, demoiltion, abatement, paving ,arking paint, detectable tactile warning surfaces, portland cement conrete paving, lead containg suface coating, concrete reinforcement, cast in place, miscellaneous metal, rough carpentry, insullation, sheet metal, sealants and caulking, door and windows, finishes, electrical, mechanical and wood

and plastics. BIDDERS LIST:General Contractor: Alameda Construction 209-667-4864 209-664-1588

BALD HILLS ROAD IMPROVEMENT PM 19.04 TO 22.19 FOR YUROK TRIBEPLAN #: 162066 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Location: HumblodtOnline and Planroom Est Cost: $2,120,000.00OWNER: County of Humboldt Ph: 707-445-7652 FAX: 707-445-7409DESCR: Dept of Public Works, -707-445-7652Traffic control, culture monitoring, clearing, detour and earthwork to construct mechanically stabilize embankments, grading, placing aggregated base and hot mix asphalt paving and dikes, houlder backing, replacing culverts, thermoplastic pavement striping, temp water pollution control, and installation of erosion control for perm soil stabilization.

EL MOLINO/ANALY HIGH SCHOOL RESTROOM IMPROVEMENT PROJECTPLAN #: 213074 Bid Date: 4/23/2013 Bid Time: 2:00 PM PLANS AT: Location: SebastopolOnline and PlanroomPREBID: MAND Mandatory 3/27/13 @ 3:00 PM G.C.: A.E. Nelson Construction Ph: 707-636-1750 FAX: 707-636-1755G.C.: Bay West Construction Ph: 707-579-4078 FAX: 707-579-4115DESCR: Contact, - Counterpoint Construction Services (707) 824-8440 Improvements to existing restroom finishes including, but not limited to: a. Patching and painting existing walls b. Installation of new plumbing and light fixtures, BIDDERS LIST:General Contractor: A.e. Nelson Construction 707-636-1750 707-636-1755

Wednesday, April 24, 2013

RFP MANAGEMENT AND OPERATION OF THE SACRAMENTO SOFTBALL COMPLEX CAFE

PLAN #: 14019 Bid Date: 4/24/2013 Bid Time: 3:00 PM PLANS AT: Location: SacramentoOnline and PlanroomPREBID: MAND 4/10 @ 11am PREBID: 3450 Longview Drive OWNER: City of Sacramento-Department Of Park &

Continued from last page

Plans On File

Page 63: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Recreation DESCR: Contact, Terri Matal - [email protected]é Kitchen, café lobby, dining area, outdoor patio, manage and operate the food and beverage concession at the softball complex café at 3450 Longview Drive.

ALLEY IMPROVEMENTS PROJECT - PHASE 4PLAN #: 19030 Bid Date: 4/24/2013 Bid Time: 11:00 AM PLANS AT: Location: LodiOnline and Planroom OWNER: City of Lodi DESCR: Contact, Sean Nathan - [email protected] Furnish all labor, materials and equipment neccessary to complete said work for this project. perform the work neccessary to reconstruct the Alleys North of Lodi Ave and West of Church Street and North of Elm Street from Central Ave to Garfield Street.

KIRK DIVERSION DAM REPLACEMENT AND FISH SCREEN PROJECTPLAN #: 130072 Bid Date: 4/24/2013 Bid Time: 2:00 PM PLANS AT: Plans Online OnlyLocation: Los Gatos Online and Planroom Est Cost: $700,000.00 PREBID: 4/2 @ 10am PREBID: Oka groundwater Recharge Facility at the end of Ok OWNER: County of Santa Clara DESCR: Contact, 1.Replacement of flashboard dam with a rubber dam and control system;2.Construction of a fish screen structure;3.installation of two cone fish screens and control system;4.construction of a control building;5.const of a weir gate and other miscellaneos construction workBIDDERS LIST:General Contractor: Valentine Corporation 415-453-3732 415-457-5820Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

B13-05 BUILDING 600 RENOVATIONPLAN #: 203004 Bid Date: 4/24/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand # OF ADDENDA: 1Location: Aptos Online & Print On Demand PREBID: MAND 3/28 @ 10 AM PREBID: Cabrillo College, Purchasing bldg 2030 OWNER: County of Santa Cruz FAX: 831-454-2710DESCR: Contact, Cabrillo Community College District (831) 477-5613 Class B. Reconstruction of a portion of bldg 600. Renovate approx 5,300 sq ft which includes the former Dental Hygiene Clinic, west end of bldg 600, to become 2 lecture rooms, one lab and storage spaceBIDDERS LIST:General Contractor: Tombleson Inc 831-422-9696 831-422-0566 Seward L. Schreder 530-229-0001 530-229-0070

SUMMER 2013 PAVING PROJECT - RINCON VALLEY UNION SCHOOL DISTRICTPLAN #: 210004 Bid Date: 4/24/2013 Bid Time: 2:00 PM PLANS AT: Location: Santa RosaOnline and PlanroomPREBID: 4/10 @ 2 pm PREBID: @ Binkley Elementary School, 4965 Canyon Drive G.C.: Counterpoint Construction Inc Ph: 707-824-8440 DESCR: Contact, Justin Walling (707) 824-8440 BINKLEY ELEMENTARY SCHOOL a. Base Bid: 4” Asphalt Replacement for drives and Failed Spots, %” Slurry Seal for Parking, Restripe & ADA Parking Spots i. Grind Existing Drive Lane Asphalt to a nominal depth of 4”” compact exposed grade in preparation for 4” of new asphalt. ii. Overlay “EVA” Traffic Lane to a depth of 4”. iii. Apply 1/4” rock slurry at existing parking stalls. iv. Restripe entire area/s to existing layout. v. Ensure existing ADA path of travels are in compliance. vi. Prior to completion, perform water test with District witness to confirm areas of ponding have been addressed. 2. MATANZAS ELEMENTARY SCHOOL a. Base Bid: Asphalt Maintenance- Seal, Restripe and update Existing ADA Parking stalls i. Thoroughly clean designated parking lot area with a power broom or power blower and re-surface with Slurry Surfacing Type II in accordance with CalTrans Specification 37-2. ii. Pre-Patch any ponding areas and repair any “failed iii. Steel wheel roll after slurry is laid down. iv. Furnish and place 2 coats of seal coat. v. Prior to completion, perform water test with District witness to confirm areas of pending have been addressed. vi. Ensure ADA paths of travel are maintained and in compliance.

Thursday, April 25, 2013

ARCADE MIDDLE SCHOOL, LANDSCAPE & IRRIGATIONPLAN #: 3020 Bid Date: 4/25/2013 Bid Time: 2:00 PM PLANS AT: SacramentoOnline and PlanroomPREBID: MAND 4/4 @ 2pm PREBID: 3500 Edison Ave OWNER: San Juan Unified School District DESCR: Contact, Jeff Scruggs - 916-979-8628Landscape and Irrigation for Arcade Middle School.

Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 64: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 62 Contractor’s Zone• .Contractor’s Zone

Thursday, April 25, 2013

LRCCD SECURITY UPGRADE PROJECTPLAN #: 9029 Bid Date: 4/25/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Sacramento Online & Print On Est Cost: $1,100,000.00 DemandPREBID: 3/26 @ 10am PREBID: 3753 Bradview Drive, 95827 OWNER: County of Sacramento DESCR: Contact, Los Rios Community College District (916) 568-3077 The work shall consist of, but not limited to provide labor and materials toBIDDERS LIST:General Contractor: Kaler/dobler Const. 916-631-7211 916-631-0936Sub Contractor: Sierra Building Systems. 530-637-5550 530-637-5551

PAINTING HANGAR ROWS AT BUCHANAN FIELDPLAN #: 41017 Bid Date: 4/25/2013 Bid Time: 2:00 PM PLANS AT: Location: ConcordOnline and Planroom Est Cost: $140,000.00PREBID: 3/28 @ 2PM PREBID: Mand- 4/9 @ 10 AM 550 Sally Ride Drive Concord OWNER: City of Concord DESCR: Contact: County of Contra Costa 925-313-2000The work includes lead paint abatement, and painting the exterior of certain existng hangar rows and other structures at an active aiport

SWEDE CREEK ROAD WIDENINGPLAN #: 54010 Bid Date: 4/25/2013

Bid Time: 11:00 AM PLANS AT: Location: ShastaOnline and Planroom Est Cost: $145,000.00OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, Joshua Cannan - 530-225-5151Widen Swede Creek Road from North Cow Creek School to 620’ east of the school and overlay from Deschutes Road through the end of the widened area - includes culvert installations / extensions.

PLACER COUNTY FACILITY SERVICESPLAN #: 60097 Bid Date: 4/25/2013 Bid Time: 3:30 PM PLANS AT: Location: Placer Co.Online and Planroom Est Cost: $50,000.00OWNER: Placer County Facilities Services DESCR: Contact, Doug Hawk - 530-889-6805Applicable

regulations concerning employment of labor, protection of public and employee safety and health, environmental protection, protection of natural resources, fire protection, burning and non burnning requirements, permits and fees.

2013 SURFACE SEAL PROJECTPLAN #: 84083 Bid Date: 4/25/2013Bid Time: 2:00 PM PLANS AT: Location: LafayetteOnline and Planroom Est Cost: $580,000.00OWNER: County of Contra Costa FAX: 925-313-2333DESCR: Contact, Matt Luttropp 925-299-3247Mobilization, traffic control, clearing, grubbing, traffic stripping, marking and marker removal, removal and replacement of concrete curb, gutter, sidewalk, driveway, construction of asphalt concrete pavement repairs, crack seal, rubberized chip seal, slurry seal, micro surfacing, traffic strips, markers and markings.

RFP OLIVER ROAD PARK AND RIDE IMPROVEMENT PROJECT

PLAN #: 90086 Bid Date: 4/25/2013Bid Time: 4:00 PM PLANS AT: Location: FairfieldOnline and PlanroomPREBID: MAND 4/2 @ 9:30 am PREBID: 1031 Oliver Road OWNER: City of Fernley, Dept of Public Works DESCR: Contact, Project Manager: Fred Beiner - 707-428-7431The Oliver Road Park and Ride Improvement Project will be used as a temporary auxiliary van and car pool lot to help relieve the current parking challenges at the FTC and reduce the impact of closing the existing surface lot in the future during the construction of the FTC expansion. Access to the temporary lot will be off of Oliver Road and Hartford Avenue. The following improvements are envisioned: 1) Pavement rehabilitation, striping, markings and signage 2) Parking for approximately 180 vehicles, inclusive of ADA spaces 3) Landscape and irrigation improvements to meet Fairfield Zoning Code 4) Improved site lighting 5) Video surveillance capability 6) Upgrade infrastructure to meet current code, inclusive of storm water quality

WARM SPRINGS 30-INCH FORCE MAINPLAN #: 103087 Bid Date: 4/25/2013Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Perris Online & Print On # OF ADDENDA: 1 Demand

Continued from last page

Plans On File

Page 65: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

PREBID: MAND 3/28 @ 9am PREBID: Warm Springs lift station located near the interse OWNER: Eastern Municipal Water District Ph: 951-928-3777 FAX: 951-928-6111DESCR: Contact, Siva Sivapalan @ [email protected]. Furnish and Install 30-inch C905, DR 25 PVC pipe along Diaz Road between Zevo Drive and Rio Nedo. 2. Furnish and Install 30-inch C905, DR 25 PVC pipe along Rio Nedo between Diaz Road and Aqua Vista Way 3. Furnish and Install 30-inch C905, DR 25 PVC pipe along Aqua Vista Way between Rio Nedo and Avenida Alvarado. 4. Furnish and Install 30-inch C905, DR 25 PVC pipe along Avenida Alvarado between Aqua Vista Way and right before the EMWD easement. The proposed 30-inch C905, DR 25 PVC pipe shall be connected to the existing 36-inch ductile iron pipe by removing blind flange as shown on the contract Drawings. 5. Furnish and install 30-inch ANSI/AWWA C150/A21.50 Min. CL 150 ductile iron pipe inside Temecula Valley Regional Water Reclamation Facilities (TVRWRF) by connecting the proposed 30-inch ductile iron force main to the existing 36-inch ductile iron pipe, as shown on the contract drawings. 6. Furnish and install 30-inch C905, DR 25 PVC pipe inside TVRWRF by connecting to the proposed 30-inch ANSI/AWWA C150/A21.50 Min. CL 150 ductile iron force main and also connecting to the existing 24-inch force main, as shown on the contract drawings. Furnish and install plug valves and utility structures at TVRWRF. 7. Furnish and Install 54-inch steel casing. The work includes, but is not limited to, excavation, backfilling, compaction and pavement resurfacing of jacking (bore) pits and receiving pits necessary to install 54-inch steel casing by Jack and Bore or Micro-tunneling. Also the work includes installation, operation and removal of all dewatering equipment required to install 54-inch casing and 30-inch PVC force main. 8. Furnish and install 18-inch Mag Meter in the existing vault at the Warm Springs Lift Station. 9. Remove and replace two (2) 24-inch RSGV at the Warm Springs Lift Station. Demolition and replacement of existing 24-inch and 36-inch ductile iron pipes at the Warm Springs Lift Station. Furnish and install a 3-inch combination sewage air valve at the Warm Springs Lift Station with drain connection to .wet

WASTEWATER TREATMENT PLANT HEAD DITCH IMPROVEMENTSPLAN #: 110087 Bid Date: 4/25/2013

Bid Time: 2:00 PM PLANS AT: Location: Merced Online and PlanroomPREBID: 4/9 @ 10am PREBID: 678 West 18’th Street OWNER: City of Merced DESCR: Contact, Scott Porter - 209-354*2851Demolition of a concrete irrigation ditch, earth berm, gate valves and piping, replacing the system with a new irrigation piping, alfalfa valves, valves, for a complete system as shown on drawings.

PLACER COUNTY JOB ORDER CONTRACTPLAN #: 116082 Bid Date: 4/25/2013

Bid Time: 3:30 PM PLANS AT: Location: Placer Online and Planroom Est Cost: $50,000.00PREBID: 4/11 @ 1:30 pm PREBID: 2952 Richardson Drive OWNER: County of Placer DESCR: Contact, Doug Hawk - 530-889-6805General construction, repair, remodel and other repetitive related work to be performed for the Placer County Department of Facilities Services.

LONG BEACH MAIN PUMPING PLANT FACILITY UPGRADESPLAN #: 119084 Bid Date: 4/25/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Long Beach Planroom # OF ADDENDA: 1 PREBID: MAND 3/12 @ 9am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Joe Smisko, 562-908-4288, ext 2105..Long Beach Main Pumping Plant Facility Upgrades: The project consists of construction of a new wastewater pumping plant and an adjacent twostory office and electrical building. The pumping plant includes a reinforced concrete below-grade wet well and drywell and a reinforced masonry above-grade structure with a freight elevator, cranes, dry-pit submersible pumps, and associated piping and valves. The two-story reinforced masonry office and electrical building includes a passenger elevator, variable frequency drives and associated medium and low voltage electrical power supply and distribution equipment, and electrical and instrumentation equipment for pumping plant monitoring and control. Yard piping includes construction of large diameter sewer junction structures and connecting concrete and fiberglass pipe and replacement of large diameter valves and fittings in a pressure manifold structure. Associated work includes demolition of existing buildings and installation of sheet pile shoring, precast concrete piles, jet grouting for soil improvement, HVAC systems, vibration monitoring, fencing, yard piping and duct banks, shoring, dewatering, grading, paving, and mechanical, electrical, and instrumentation systems.

Continued on next page

This newspaper has been certifiedby theState ofCalifornia as aTRADEPAPER?ThatmeansyoucanrunyourSBEandDVBEadsrighthere!It’seasyandinexpensivetopublishanad.

CLICKHEREforanonlineform

Page 66: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 64 Contractor’s Zone• .Contractor’s Zone

Continued from last page

Thursday, April 25, 2013

2013 ROAD AND DRAIN IMPROVEMENTSPLAN #: 124079 Bid Date: 4/25/2013 Bid Time: 2:30 PM PLANS AT: Location: LafayetteOnline and Planroom Est Cost: $1,050,000.00# OF ADDENDA: 1 OWNER: City of Lafayette DESCR: Contact, Mike Moran - 925-299-3245Mobilization, traffic control and construction signage, potholing utilities, clearing and grubbing including tree protection and trimming, removal and disposal of asphalt concrete pavement and subgrade, concrete and /or asphalt curb, gutter, driveway, brick pavers, pulverizing, mixing, excavating, grading compacting pavement subgrade and base materials, cement treatment of pulverized material, construction of storm drains, catch basins, manhole structures, concrete channels, concrete and / or asphalt curb, gutter, driveways, decorative pavers, asphalt concrete pavementmtraffic stripes, markers and markings, adjustment of utilty covers, installation of survey monuments and all other work as shown on the plans and as described in specifications to provide a complete project.

LARGE DIAMETER WATER TRANSMISSION MAINS IN SOUTHWEST FRESNOPLAN #: 151065 Bid Date: 4/25/2013 Bid Time: 3:00 PM PLANS AT: Location: FresnoOnline and Planroom Est Cost: $8,300,000.00PREBID: MAND 4/10 @ 10 am PREBID: Room 4017 A City Hall , 2600 Freno Street OWNER: City of Fresno DESCR: Contact, Purchasing Manager 559-621-1332Potholing, traffic control, dust control, water pollution control, excavation, bedding, backfill, piping, fittings, pipe casing, valves, manholes, air reducing valves, blow off valves, corrosion protection, turnouts, connections to the existing water system, underground vaults, pressure reducing valves, SCADA equipment, electric power, pavement restoration, re stripping, pressure testing, traffic signal loop replacement and disinfection for a complete functioning water transmission main.

CASA GRANDE HIGH SCOOL BUILDINGS E & H SIDING PROJECTPLAN #: 206096 Bid Date: 4/25/2013 Bid Time: 2:00 PM PLANS AT: Location: PetalumaOnline and Planroom PREBID: MAND 4/11 @ 1PM G.C.: A.E. Nelson Construction Ph: 707-636-1750 FAX: 707-636-1755

Plans On FileG.C.: The Perry Company Ph: 530-893-0711 FAX: 530-894-3739G.C.: Carrs Construction Services Ph: (707) 539-8650 FAX: (707) 537-1844G.C.: CF CONTRACTING Ph: (415) 721-7160 FAX: (415) 296-6437DESCR: Contact, Justin Walling - 707-824-8440Demolish / replace building -siding and battens, including removal / recycling of existing siding material, removal / reinstallation of existing sheet metal flashings, installation of new fiber-cement vertical siding with engineered wood batten and trim, reinstallation of existing flashings and BIDDERS LIST:General Contractor: A.e. Nelson Construction 707-636-1750 707-636-1755

WHITMORE ROAD WIDENINGPLAN #: 218099 Bid Date: 4/25/2013

Bid Time: 11:00 AM PLANS AT: Print On DemandLocation: Shasta Online & Print On Est Cost: $750,000.00 DemandOWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, Shawn Ankeny ([email protected])Excavation, removing existing asphalt, placing aggregate base material, placing new asphalt and widening existing roadway, extending existing culverts, replacing culverts, installing railing, installing new thermoplastic striping and pavement markings, and removing and resetting existing signs and mailboxes.

Friday, April 26, 2013

TO PROVIDE ON - SITE HAZARDOUS WASTE MANAGEMENT SERVICESPLAN #: 3020 Bid Date: 4/26/2013 Bid Time: 4:30 PM PLANS AT: Location: Elk Grove Online and Planroom PREBID: MAND 3/14 @ 1pm PREBID: 8400 Laguna Palms Way OWNER: City of Elk Grove DESCR: Contact, Cedar Kehoe - [email protected] of waste material from general public and qualified small quantity generators, storage and packing of waste materials including universal waste and other recyclable material.

TO PROVIDE TRASPORTATION AND DIPOSAL SERVICES IN SUPPORT OF THE SPECIAL WASTE COLLECTION CENTERPLAN #: 28022 Bid Date: 4/26/2013

Page 67: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Bid Time: 4:30 PM PLANS AT: Location: Elk Grove Online and Planroom PREBID: MAND 3/14 @ 1pm OWNER: City of Elk Grove DESCR: Contact, Cedar Kehoe - [email protected] loading of material and then transportation of waste in compliance with all California Department of transportation regulations, final disposition of waste materials accepted from the SWCC.

TO PROVIDE TRANSPORTATION AND DIPOSAL SERVICES FOR TIRES COLLECTED AT THE SPECIAL WASTE COLLECTION

CENTERPLAN #: 34015 Bid Date: 4/26/2013Bid Time: 4:30 PM PLANS AT: Location: Elk Grove Online and Planroom OWNER: City of Elk Grove DESCR: Contact, Cedar Kehoe - [email protected] transportation of waste tire in compliance with all California Departments of transportation regulations, final disposition of waste tire accepted at the SWCC in compliance with Federal State and local

TO PROVIDE ON SITE HAZARDOUS WASTE MANAGEMENT SERVICESPLAN #: 68067 Bid Date: 4/26/2013 Bid Time: 4:30 PM PLANS AT: Print On Demand Location: Elk Grove Online & Print On Demand PREBID: MAND 3/14 @ 1PM PREBID: 8400 Laguna Palms Way OWNER: City of Elk Grove DESCR: Contact, Cedar Kehoe - [email protected] to day operations and maintenance of the facility, collection of waste materials from the general public and qualified small quantity generators, storage and packing of waste materials including universal waste and other recyclable materials, tracking and documentation of waste streams and coordination with transportation and disposable contractors.

VARIOUS ON CALL CONTRACTORS SERVICESPLAN #: 46096 Bid Date: 4/26/2013

Bid Time: 1:00 PM PLANS AT: Location: SacramentoOnline and Planroom Est Cost: $1,000.00 # OF ADDENDA: 1PREBID: 4/10 @ 10 am PREBID: 915 I Street OWNER: City of Sacramento FAX: 916-808-8266DESCR: Contact, Tim Hopper - 5730 24’th StreetAcoustical ceiling services, boiler repair, building restoration, cabinet, counter, crane services, concrete cutting, concrete pouring, diving and salvage, door and lock, drywall and finishing services, electrical, fencing, fire system, fire sprinkler, flooring,

gas detection, general plumbing, glass, mirror, store front, HVAC, landscape, masonry, tile.

TO PROVIDE ON SITE HAZARDOUS WASTE MANAGEMENT SERVICESPLAN #: 68067 Bid Date: 4/26/2013 Bid Time: 4:30 PM PLANS AT: Print On DemandLocation: Elk Grove Online & Print On DemandPREBID: MAND 3/14 @ 1PM PREBID: 8400 Laguna Palms Way OWNER: City of Elk Grove DESCR: Contact, Cedar Kehoe - [email protected] to day operations and maintenance of the facility, collection of waste materials from the general public and qualified small quantity generators, storage and packing of waste materials including universal waste and other recyclable materials, tracking and documentation of waste streams and coordination with transportation and disposable contractors.

MARETA LANE ROAD IMPROVEMENT PROJECT ONLINE ONLYPLAN #: 92077 Bid Date: 4/26/2013 Bid Time: 3:00 PM PLANS AT: Location: Placer Co.Online and PlanroomOWNER: Town of Loomis Ph: 916-652-1840 FAX: 916-652-1847DESCR: Contact, Brian Fragiano - 916-652-1840Rubberized crack sealing, Paving reinforcing fabric, 2 inch Asphalt overlay, Edge grinding, Concrete Curb & Gutter, Driveway aprons, Repair & Replace Existing Damaged Landscaping and/or Irrigation, Replacing the existing Asphalt sidewalk with a concrete sidewalk.BIDDERS LIST:General Contractor: Lamon Construction . 530-671-1370 530-673-6501

SWETZER ROAD & KING ROAD TRAFFIC SIGNAL PROJECTPLAN #: 209007 Bid Date: 4/26/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Loomis Online and PlanroomOWNER: Town of Loomis Ph: 916-652-1840 FAX: 916-652-1847DESCR: Town of Loomis, 916-652-1840. Traffic Signal Project on Swetzer Rd., and King Rd., in the Town of Loomis.BIDDERS LIST:General Contractor: Studebaker Brown Electri 530-333-3423 530-823-1341Sub Contractor: Sierra Striping, Inc./sierr 916-652-0430 916-652-9663

Continued on next page

Page 68: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 66 Contractor’s Zone• .Contractor’s Zone

Monday, April 29, 2013

RFP FOR MEDICAL AND PSYCHOLOGICAL SERVICES

PLAN #: 11021 Bid Date: 4/29/2013 Bid Time: 3:00 PM PLANS AT: Location: SacramentoOnline and PlanroomOWNER: City of Sacramento DESCR: Contact, Barbara Brenner - 916-808-7785Provide assessment and treatment services as an independent contractor in accordance with the medical treatment utilization schedule mandated by the division of workers compensation, provide medical reports and invoices for payment, referral of injured workers to specialists, medical monitoring, first aid, return to work evaluation,

Tuesday, April 30, 2013

REQUIREMENTS CONTRACT FOR ELEVATOR MAINTENANCE AT VARIOUS CITY LOCATIONSPLAN #: 10023 Bid Date: 4/30/2013 Bid Time: 2:00 PM PLANS AT: Location: FresnoOnline and Planroom Est Cost: $50,000.00OWNER: City of Fresno DESCR: Contact, Purchasing Division - 559-621-1332Furnish, all, in strict accordance with said plans and/or specifications, materials, labor, and equipment neccessary to complete the project for the prices set forth.

2013 RODEO TERMINAL BLEND CAPE SEALPLAN #: 33019 Bid Date: 4/30/2013 Bid Time: 2:00 PM PLANS AT: Contra CostaOnline and Planroom Est Cost: $1,175,000.00PREBID: 4/15 @ 10am PREBID: At the Public Works Dept OWNER: Contra Costa County Public Works Department DESCR: Contact, Henry Hussey - 925-313-2338Applying a terminal blend rubber modified binder chip seal covered with a type 2 slurry seal on apprx 186,500 sq yards of roadway on selected streets in the viewpointe area of Rodeo in West Contra Costa Co.

RFP SEASONAL ICE RINKPLAN #: 39020 Bid Date: 4/30/2013

Bid Time: 4:00 PM PLANS AT: Print On DemandLocation: Elk Grove Online & Print On DemandOWNER: City of Elk Grove

Continued from last page

Plans On FileDESCR: Contact, Randy Starbuck [email protected] for skaters and spectators around the ice rink, ice resurfacing equipment that is cacable of maintaining a smooth sheet of ice on the rink, vendor must regularly resurface ice as needed to smooth sheet of ice on rink. Lockers, personnel to inspectg skayes, rubber mat areas for skaters. All lighting fixtures and related equipment for the ice rink.

EARTHQUAKE REPAIRS ON SPROWEL CREEK ROADPLAN #: 52096 Bid Date: 4/30/2013 Bid Time: 2:00 PM PLANS AT: Location: HumboldtOnline and Planroom Est Cost: $82,300.00OWNER: County of Humboldt Ph: 707-445-7652 FAX: 707-445-7409DESCR: Department of Public Works - 707-445-7652Traffic control, earthwork to construct a detour and stabilization trench with outlet trench and surfacing with aggregate base and hot mix asphalt, temp water pollution control as needed and installation of erosion control for permanent soil stabilization.

EAST WEST WATER TRANSMISSION PIPELINE SEGMENT 3, 36 INCHPLAN #: 94069 Bid Date: 4/30/2013 Bid Time: 2:00 PM PLANS AT: Location: Fairfield Online and PlanroomOWNER: City of Fairfield DESCR: Contact, Sharon Chan - 707-428-7484The Project is located along Illinois Street from its intersection with Pennsylvania Avenue, along Great Jones Street and Broadway Street to the intersection of Broadway Street and Union Avenue in the City of Fairfield. The work generally consists of, but is not limited to, the following: furnishing and installing the Segment 3, 36-inch diameter, buried potable water transmission piping, buried butterfly isolation valve, pipeline access manholes with 20-inch flanged manways, valves, appurtenances, cathodic protection/test stations, connections to existing potable water transmission pipelines, and restoration of the Project work sites, as necessary, to provide a complete operating water transmission pipeline to be placed into operation at a later date. All equipment shall be installed in accordance with the manufacturer’s requirements and recommendationBIDDERS LIST:Supplier: Ferguson Enterprises 916-381-6100 916-381-7445

HVAC UPGRADES FOR THE TRAIN CONTROL ROOMS AT L14, L18, A58, C20 AND C76PLAN #: 99075 Bid Date: 4/30/2013

Page 69: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Bid Time: 2:00 PM PLANS AT: San FranciscoOnline and Planroom Est Cost: $430,000.00PREBID: 4/9 @ 5pm to 7pm PREBID: 300 Lakeside Drive 18’th floor, 94612 OWNER: City of South San Francisco DESCR: Contact, John Thomas Quinn, 510-464-7534Material, labor, tools, equipment and hardware required to replace HVAC equipment, associated accessories, electrical components and specified control systems at four train control huts and one train control room and to construct a new office in the train control room.

DEMOLITION AND RECONFIGURATION OF THE CERONE BLDG FPLAN #: 116082 Bid Date: 4/30/2013

Bid Time: 1:30 PM PLANS AT: Roseville Office Location: San Jose Online & Print On DemandPREBID: 4/5 @ 10:30am PREBID: Site Inspection 4/5 @ 11:15amOWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact fax 408-955-9729. Removing indicated walls, ceilings, doors, and floor. Restore the floor to flat, insulate the ceiling with mechanically attached ridge insulation board, electrical, HVAC and

CLAYTON REGENCY MOBILE PARK EMERGENCY PIPELINE EXTENSION AND DISINFECTANT BOOSTER STATIONPLAN #: 168076 Bid Date: 4/30/2013 Bid Time: 10:00 AM PLANS AT: Contra CostaOnline and PlanroomPREBID: 4/2 @ 10 AM PREBID: 2411 Bisso Lane, 94520 DESCR: Contact, Traffic control,including providing pilot car and operator, flaggers, plating lighting, signage, maintaining private property access, connections, adaptors, valves, filling thrust box, and removal of temp paving. BIDDERS LIST:General Contractor: Ghilotti Construction 707-585-1221 707-585-1601

Wednesday, May 01, 2013

LAFAYETTE WATER TREATMENT PLANT CLEARWELL AND WASHWATER PIPELINE

IMPROVEMENTSPLAN #: 12011 Bid Date: 5/1/2013 Bid Time: 1:30 PM PLANS AT: Location: LafayetteOnline and Planroom Est Cost: $1,300,000.00OWNER: East Bay MUD Ph: 510-287-1040

DESCR: Contact, Bill Hossfeld - 510-287-1311Replace Clearwell with a bolted steel tankldemolish an existing 0.34 million gallon (MG) capacity concrete clearwell tank, furnish and install 0.38 capacity factory coated, bolted steel tank including concrete foundation, dome roof, inlet and outlet pipe connections, soldier pile and lagging retaining wall, drainage piping and perform related required work as shown on drawings. Slipline pipe, washwater pipeline, furnish and BIDDERS LIST:Sub Contractor: Parc Services, Inc. 925-371-4610 925-606-8704

GRASS VALLEY NON CHEMICAL LANDSCAPE MAINTENANCE SERVICES

PLAN #: 20009 Bid Date: 5/1/2013 Bid Time: 2:00 PM PLANS AT: Grass ValleyOnline and PlanroomPREBID: MAND 4/11@9AM PREBID: 890 Sutton Way OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Rose Dyan - 916-657-6977 Provide non-chemical landscape services. Lawn areas, ground cover areas, shrubs and trees, plant replacement, irrigation system and watering, cultivation and yearly services.

STATE ROUTE 99 / STATE ROUTE 104 PROJECTPLAN #: 38025 Bid Date: 5/1/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Galt Online & Print On Est Cost: $4,000,000.00 DemandPREBID: MAND 4/24 @ 10am OWNER: City of Galt DESCR: Contact Engineer 209-366-7260. Mobilization, temp fencing, SWPPP, water pollution control, erosion control, drainage inlet, traffic control, pavement marking, traffic stripe, signage, thermoplastic traffic stripe, abandon pipe, inlet and manhole, concrete, clearing and grubbing, landscaping, irrigation, plumbing, aggregate, asphalt, concrete, and

Continued on next page

ThisnewspaperhasbeencertifiedbytheStateofCaliforniaasaTRADEPAPER?ThatmeansyoucanrunyourSBEandDVBEadsrighthere! It’seasyandinexpensivetopublishanad.

CLICKHEREforanonlineform

Page 70: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 68 Contractor’s Zone• .Contractor’s Zone

Wednesday, May 01, 2013

LEVEE MAINTENANCE PROJECT HOMELESS ENCAMPMENT EROSION REPAIRS ALONG SMITHPLAN #: 102094 Bid Date: 5/1/2013 Bid Time: 2:30 PM PLANS AT: : San Joaquin Online and Planroom Est Cost: $75,000.00PREBID: MAND 4/17 @ 10 am PREBID: end of Fontana Ave OWNER: Kjeldsen, Sinnock & Neudeck, Inc Ph: 209-946-0568 FAX: 209-946-0296DESCR: Contact, Jeff Mueller - 209-946-0268Preparing and repairing the levee erosion area for slope protection by clearing and grubbing and removal of waterside extended tree limb, concrete slabs, shopping carts and other miscellaneous debris and disposal of all cleared materials off project site and by furnishing and placing apprx 350 tons of 3 inch minus levee seal embankment fill material and 600 ton of 18 inch minus quarry stone riprap.

Thursday, May 02, 2013

2013 ROAD RESURFACING PROJECT, SOUTHERN

PLAN #: 58016 Bid Date: 5/2/2013 id Time: 1:30 PM PLANS AT: Print On DemandLocation: Marin Online and Planroom Est Cost: $2,400,000.00 OWNER: County of Marin DESCR: Contact, Project Manager - 415-473-7877Resurfacing, minor concrete, guardrail, road pulverization, and minor drainage improvements. Project will take place in the daytime hours of traffic control, the following roads will be repaved;1. West California Ave -2. Calle Del Mar 3. Belvedere Ave 4. Avenida Farralone5. Buena Vista Ave 6. Marin Dr.7. Eastwood Way8. Nicasio VAlley Rd.9. Muir Woods Rd.BIDDERS LIST:General Contractor: Ghilotti Brothers Inc 415-454-7011 415-454-8376 Mck Services, Inc. 925-957-9200 925-957-9292 Argonaut Constructors 707-542-4862 707-542-4897

CHURN CREEK ROAD AND SR 299 INTERSECTION IMPROVEMENTSPLAN #: 108090 Bid Date: 5/2/2013

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Redding Online & Print On Demand OWNER: City of Redding DESCR: Contact Corri Vandiver 530-245-7120. Curb, gutter, sidewalk, ada ramps, and minor storm drain improvements.

MISCELLANEOUS STORM DRAIN IMPROVEMENTS PROJECTPLAN #: 108090 Bid Date: 5/2/2013

Bid Time: 2:00 PM PLANS AT: Location: Vallejo Online and Planroom Est Cost: $390,060.00OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Gus Silva ([email protected]) (x 236)Storm Drain Replacement and restoration at various locationsMiller Street Ditch at Carolina Street - Project No. 133120 Work includes, but not limited to. Installing new grates, and property restoration complete and in place. Fernwood & Georgia - Project No. 133226 Work includes, but not limited to, replacing 110 LF of 18” SD, replacing 400 SF of curb, gutter, & sidewalk, and property restoration complete and in place. Solano & Mayo - Project No. 133322 Work includes, but not limited to, installing 120 LF of 18” SD, replace 2 - Type “B” SDCB,installing 2 - 48” SDMH, abandon buried SDCB, replacing 100 SF of curb, gutter, & sidewalk, and property restoration complete and in place. 1025 & 1031 Grant Street - Project No. 133426 Work includes, but not limited to, replacing 163 LF of 15” SD, install 24 LF of 12” SD, installing 2 - 3 ‘ x 2 ‘ SDCB, installing Type “C” SDCB, building 110 LF of swale, and property restoration complete and in place. 400 Mare Island Way - Project No. 133522 Work includes, but not limited to, replacing SDCB with Type “D” SDCB, replacing 40 SF of curb, gutter, & sidewalk, and property restoration complete and in place. 1 Kentucky - Project No. 133622 Work includes, but not limited to, installing 60 LF of 15” SD, and property restoration complete and in place. 1328 Carl Avenue - Project No. 133726 Work includes, but not limited to, replacing SD witti 32 LF of 12” SD, replacing SDCB with Type “D” SDCB, replacing 80 SF of curb, gutter, & sidewalk, and property restoration complete and in place. 303 Lincoln Road West - Project No. 133826 Work includes, but not limited to, replacing SD with 54 LF of 18” SD, replacing SDCB with Type “D” SDCB, replacing SDCB with Type “ C “ SDCB, r e p l a c i n g 40 SF of c u r b , gutter, & sidewalk, and property restoration complete and in place. 40

Continued from last page

Plans On File

Page 71: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Woodrow - Project No. 133926 Work includes, but not limited to, replacing SD with 32 LF of 12” SD, replacing SDCB with Type “D” SDCB, replacing 80 SF of curb, gutter, & sidewalk, and property restoration complete and in place. 2225 Alameda - Project No. 134022 Work includes, but not limited to, installing Type “D” SDCB, installing 74 LF of 12” SD, replacing 40 SF of curb, gutter, & sidewalk, and property restoration complete and in place. Florida between Contra Costa & Tuolumne - Project No. 134126 Work includes, but not limited to, abandoning 1,035 LF of 36” SD filling entire length with grout, abandoning 6 - SDMH, and property restoration complete and in place. Discovery Kingdom - Project No. 132916 Work includes, but not limited to, abandoning 389 LF of 27” SS filling entire length with grout, and property restoration complete and in place

2013 MISCELLANEOUS SANITARY SEWER REHABILITATION PROJECTSPLAN #: 187076 Bid Date: 5/2/2013 Bid Time: 2:30 PM PLANS AT: Print On DemandLocation: Vallejo Online and PlanroomEst Cost: $1,115,000.00OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949DESCR: Contact, Project Manager - 707-745-3593Lineal feet of pipe bursting of sewer main, lateral replacement and other miscellaneous work.

Friday, May 03, 2013

PROFESSIONAL SERVICES TO REWRITE VISALIA’S MUNICIPAL/INDUSTRIAL WASTEWATER PRETREATMENT PROGRAM

PER 10CFR 403.18PLAN #: 123086 Bid Date: 5/3/2013 Bid Time: 1:00 PM PLANS AT: Location: VisaliaOnline and PlanroomPREBID: 4/19 @ 11am PREBID: 707 W Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Division - 559-713-4334Provide consultants with surveys, maps and other documentation necessary for completion of consultants work, act as a coordinator between consultant and other city representative.

LONG RANGE TRANSIT PLAN (LRTP) ANALYSISPLAN #: 143059 Bid Date: 5/3/2013 Bid Time: 11:00 AM PLANS AT: Location: VisaliaOnline and Planroom PREBID: 4/17 @ 11 AM PREBID: 707 West Acequia Ave 93291 OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Analysis of the City of Visalia’s (preferred) General Plan and assessment of how this will impact public

transportation including but not limited to: 1. Particular attention to the circulation element of the plan 2. Identify arterials and transit friendly corridors, high and medium density neighborhoods, commercial, medical and employment areas that could benefit from transit service 3. Projection to what percentage of the anticipated population growth might be transit dependent 4. Projection of service level needed to meet projected population growth

Thursday, May 09, 2013

STREET REHABILITATION RAMBOUILLET ROADPLAN #: 106096 Bid Date: 5/9/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: El Paso de Online & Print On DemandOWNER: City of Paso Robles FAX: 805-237-6565DESCR: Contact Prj Mgr -Ditas Esperanza 805-237-3861. Pulverizing existing pavement, placing new pavement, removing existing curb, gutter and installing new curb, sidewalk and handicap ramps per ADA standards, minor grading, raising utilities to grade, restoration or

Thursday, May 23, 2013

MUIR WOODS ROAD MP 0.49 SLIDE REPAIRPLAN #: 74068 Bid Date: 5/23/2013 Bid Time: 2:30 PM PLANS AT: Print On DemandLocation: San Rafael Online and Planroom Est Cost: $400,000.00 # OF ADDENDA: 1OWNER: County of Marin DESCR: Contact, County Of Marin 415-473-7877Cast-in -drilled-holes (CIDH) retainingwall on Muir Woods Road at MP BIDDERS LIST:Sub Contractor: Sacramento Drilling, Inc. 916-638-1766 916-638-3725

Friday, June 28, 2013

BART 17TH STREET GATEWAYPLAN #: 6035 Bid Date: 6/28/2013 Bid Time: 12:00 PM PLANS AT: Location: OaklandEst Cost: $900,000.00 PREBID: 3/5 @ 10am OWNER: City of Oakland DESCR: Contact, Denise Louie, 510-238-3682. Demolition and construction of approximately 3,244 sf of plaza re-paving, vent modification, drainage, lighting, guardrail to stairs, Bart sign installation

Continued on next page

Page 72: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 70 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 31, 2013

LIST OF QUALIFIED CONTRACTORS/YUBA CITYPLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City PlanroomOWNER: City of Yuba City DESCR: Contact, ([email protected]) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 223091 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Placer Co. Online and PlanroomOWNER: Placer Office Education Ph: 916-415-4424 DESCR: In accordance with the State of California Uniform Public Construction Cost Accounting Commission, The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2013. You must resubmit to be included on the 2013 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Contact, Matt Shawver, 530-889-8020. Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2013 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board.BIDDERS LIST:Sub Contractor: Kitchen Art, Inc. 916-852-8111 916-852-7981 Oxford Fire Inc. 916-865-6146 916-987-0201

COUNTY OF TUOLUMNE - QUALIFIED BIDDERS LISTPLAN #: 247054 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Co. Online and PlanroomOWNER: County of Tuolumne

DESCR: County of Tuolumne, Sharon Mikesell, ([email protected]) Inviting all licensed contractors to submit the name of their firm for inclusion on the Agency’s list of qualified bidders for 2013.

SOLANO COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LISTPLAN #: 248050 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Solano Online and PlanroomOWNER: Solano County Water Agency DESCR: Contact, Sandra McLean, 707-451-6090. Inviting contractors to submit their company’s information to be placed on the Agency’s list of qualified bidders for the following year.

QUALIFIED BIDDERS - CITY OF CUPERTINOPLAN #: 253057 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Cupertino Online and PlanroomOWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, City of Cupertino, 408-777-3354. City of Cupertino is in the process of updating their Contractors List to establish and maintain a list of qualified contractors to receive future public projects.

APPLICATION - CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT/2013 CALENDAR YEARPLAN #: 256052 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Carmichael Online and PlanroomOWNER: San Juan Unified School District DESCR: Contact, Aida Gonzales, ([email protected]) Complete form and return to San Juan Unified School District Purchasing Department if you wish to be included in the 2013 Calendar year California Uniform Public Construction Cost Accounting Program for San

FOLSOM-CORDOVA USD BIDDERS LISTPLAN #: 274042 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Ranch Online and PlanroomOWNER: Folsom Cordova USD Ph: 916-355-1111 DESCR: Contact, Folsom Cordova Unified School District, 916-294-9000. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013. BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Continued from last page

Plans On File

Page 73: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

SUMMERVILLE UNION HIGH SCHOOL DISTRICTPLAN #: 291049 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Summerville Online and PlanroomOWNER: Summerville Union High School District Ph: 209-928-1955 FAX: 209-928-4454DESCR: Contact, ([email protected]) or 209-928-1955. Summerville Union H.S. District, Maintenance Dept. in Tuolumne Co., is requesting Contractors’s Pre-Qualification Applications for upcoming year.

TWIN RIVERS UNIFIED SCHOOL DISTRICT - QUALIFIED CONTRACTORSPLAN #: 301009 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: North Online and PlanroomOWNER: Twin River Unified School District Ph: 916-566-1600 FAX: 916-286-4959DESCR: Twin Rivers Unified School District, Facilities Planning & Construction. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.

SANTA CRUZ PORT DISTRICT’S/LIST OF QUALIFIED BIDDERSPLAN #: 304012 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Santa Cruz Online and PlanroomOWNER: Santa Cruz Port District DESCR: Contact, Santa Cruz Port District, (831) 475-6161. Santa Cruz Port District is inviting licensed contractors to submit the name of their firm for inclusion on the Port Districts list of potential bidders. Provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number, the type of work in which you are interested and are currently licensed to do, the class of contractor’s licenses held and the contractor license numbers. Mail information to Santa Cruz Port District at [email protected] and reference “Contractor List” in the subject line. CITY OF LINCOLN/CONTRACTOR’S PRE-PLAN #: 311007 Bid Date: 12/31/2013Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Lincoln Online and PlanroomOWNER: City of Lincoln DESCR: City of Lincoln, 916-434-2450. City of Lincoln inviting all qualified contractors to submit their name and company for inclusion on the qualified bidders list for the year 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 Kitchen Art, Inc. 916-852-8111 916-852-7981 Guardian Environmental, 916-997-1830 916-641-5690

SIERRA COLLEGE - LIST OF QUALIFIEDPLAN #: 314007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office

Location: Rocklin Online and PlanroomOWNER: Sierra Community College DESCR: Contact, Kerri Hester, 916-624-3333. Sierra Joint Community College District is updating its list of Qualified Contractors for the 2013 calendar year.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Wednesday, December 31, 2014

ARDEN PARK RECREATION AND PARK DISTRICT’S CONTRACT BID LISTPLAN #: 315005 Bid Date: 12/31/2014 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Sacramento Online and PlanroomOWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Colin Miller, ([email protected]) or 916-483-6069. Arden Park Recreation and Park District invite licensed contractors to submit their information to be included on their contract bid list.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Page 74: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 72 Contractor’s Zone• .Contractor’s Zone

Friday, March 01, 2013

NEWCASTLE FIRE STATION REPAIR PROJECT, Newcastle

Plan 11018 Number:

Killorn Construction $9,785 Thursday, March 21, 2013

FOLSOM LAKE COLLEGE SIGNAGE, Folsom

Plan 105088 Number:

Ellis & Ellis Sign Systems $69,537 CHLORINE CONVERSION RESERVOIR “A” WATER TREATMENT PLANT, Pollock Pines

Plan 123084 Number:

Koch & Koch, Inc. $1,382,000 Auburn Constructors, Inc. $1,564,300 SACRAMENTO CITY COLLEGE/G LOT & EAST ROAD TAP PHASE 3, Sacramento

Plan 168075 Number:

J D Pasquetti Engineering Inc. $591,000 Western Engineering Contractors, Inc. $645,000 Lamon Construction Co., Inc. $650,800 8-INCH DUCTILE IRON PIPE MAIN INSTALLATION IN JACKSON, WASHINGTON, SACRAMENTO & DAVIS STREETS, San Francisco

Plan 126073 Number:

Empire Engineering and Construction $2,139,389 LOWER SACRAMENTO ROAD SAFETY IMPROVEMENTS, San Joaquin Co.

Plan 34013 Number:

Robert Burns Construction $538,812 George Reed, Inc. $598,940

SPRECKLES SANITARY SEWER FORCE MAIN SUPPLEMENT AND PUMP STATION REHABILITATION, San Jose

Plan 60095 Number:

Sanco Pipelines $2,774,444

Wednesday, March 27, 2013

KENSINGTON ELEMENTARY SCHOOL RESTROOM RENOVATIONS, Kensington

Plan 144064 Number:

Am Woo Construction, Inc. $156,900 B Bros Contruction Inc. $216,370 HM Construction $242,051.28 1-680 AT SABERCAT ROAD SANITARY SEWER RELOCATION PROJECT, Union City

Plan 108089 Number:

Bay Pacific Pipeline, Inc $1,585,490 Thursday, March 28, 2013

MUNICIPAL SERVICE CENTER TRANSIT VEHICLE MAINTENANCE FACILITY SECURITY WALL AND SOLAR POWER PHASE 2, AND LODI STATION LIGHTING IMPROVEMENT PROJECT, Lodi

Plan 44023 Number:

Diede Construction $307,357 PLANADA PEDESTRIAN IMPROVEMENT PROJECT, Merced Co.

Plan 33018 Number:

Rolfe Construction $469,477 Taylor Backhoe Service, Inc. $479,314 George Reed, Inc. $508,296

Bid Results

Page 75: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Thisnewspaper hasbeen certifiedby theState of California as a TRADE PAPER?ThatmeansyoucanrunyourSBEandDVBEadsrighthere!It’seasyandinexpensivetopublishanad.Callusat916-729-5432

MAGNOLIA ROAD AT SUNSET RIDGE DRIVE CROSS WALK RRFB PROJECT, Nevada County

Plan 252045 Number:

Chrisp Company $24,860 Gray Electric $28,940 Studebaker Brown Electric $36,920 TRENCHLESS TECHNOLOGY SEWER REHABILITATION , Placer

Plan 3018 Number:

The Trenchless Co. $75,270 SAK Construction $76,200

SOLANO EMERGENCY BACKUP POWER, Rio Vista

Plan 202099 Number:

Day’s Generator $154,887 System 3, Inc. $175,198 FEMOYER STREET IMPROVEMENT PROJECTS, Sacramento

Plan 167069 Number:

DeSilva Gates Construction $3,364,182 Teichert Construction $3,398,810 OC Jones and Sons $3,585,821 Monday, April 01, 2013

CORE AREA DRAINAGE REHABILITATION PROJECT, Dixon

Plan 14017 Number:

Sanco Pipelines $566,700 Lamon Construction Co., Inc. $599,855 Atlas Peak Construction $640,880 2013 SLURRY SEALS PROJECT, Dixon

Plan 18028 Number:

Intermountain Slurry Seal, Inc. $234,366 Windsor Fuel Co. $240,613 Central Valley Engineering & Asphalt $242,207.50

Tuesday, April 02, 2013

THE HENRY GUNN HIGH SCHOOL GYMNASIUM MODERNIZATION, Palo Alto

Plan 146066 Number:

S & H Construction $795,000 Romkon Inc. $998,000 WAYSIDE FENCE REFURBISHMENT, R-LINE, Richmond Plan 277040 Number:

CRUSADER FENCE CO., INC. $988,744.78 Kenwood Fence Co $999,400

DOWNER ELEMENTARY SCHOOL RESTROOM RENOVATION, San Pablo

Plan 100081 Number:

Streamline Builders $192,000 ALBERT POWEL ROOF REPLACEMENT PROJECT, Yuba City

Plan 153067 Number:

Yancy Roofing $170,759 Legacy Roofing $179,933 Wednesday, April 03, 2013

INSTALLATION OF ELEPHANT SCULPTURE, West Sacramento

Plan 12010 Number:

F. Loduca Co. $12,659 Ascent Builders, Inc. $18,821 Unger Construction $19,865

Page 76: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 74 Contractor’s Zone• .Contractor’s Zone

Legal AdsINVITATION FOR BID

The Sacramento Housing and Redevelopment Agency on behalf of the County of Sacramento is soliciting sealed bids for In-vitation for Bid (IFB) No. 2013011-LGmp for Jean Harvie Community and Senior Center Wells 2 & 3, Installation of Two Wells, 14273 River Road, Walnut Grove, CA 95690. There will be no subcontracting opportunities on this job. The estimated bonding range is between $60,000 and $80,000.

Interested licensed C-57 Well Drilling Contractors should plan to attend one of the two Pre-Bid Conferences to be held at 801 12th Street, 2nd Floor, Sacramento, CA

• April 16, 2013 at 10:00 am, with a site visit following the Pre-Bid Conference.

• April 24, 2013 at 10:00 am, with a site visit following the Pre-Bid Conference.

All contractors are urged to attend one of the two Pre-Bid Conferences including the site inspection, and are encouraged to bring any subcontractors interested in the project. Although attendance is not mandatory, contractors will be required to verify that they are aware of the existing site conditions.

Bids will be received at the Procurement Services Division, 801 12th Street, 2nd Floor, Sacramento, California until 2:00 p.m. on May 7, 2013 at which time and place all bids received will be publicly opened and read aloud.

A bid package, plan holders list, and other contract documents relating to the project may be obtained beginning April 10, 2013 through:

Signature Reprographics620 Sunbeam Avenue

Sacramento, CA 95814916-454-0800

http://www.planroom.us/shra

A deposit of $50.00 check or money order only is required for the first set of plans and any additional plans may be purchased through Signature Reprographics. Deposits will be refunded if plans are returned in good condition, to Signature Reprographics, no later than three weeks after bid opening.

Please direct all general and contractual questions to Laurie Greenquist, Buyer – Procurement Services, at 916-440-1352. For any technical questions regarding the Technical Plans and Specifications, please contact Dan Maloney, Project Manager, at 916-449-6274. For information on other construction projects, visit our website at http://www.shra.org.

This contract is subject to State of California and Federal labor standards, affirmative action requirements, Section 3 Requirements of the HUD Act of 1968, Minority and Women Owned Business Enterprise standards. All bidders will be required to furnish and pay for a satisfactory Bid Bond in the amount of not less than 10% of the total bid price. The successful bidder will be required to furnish and pay for a satisfactory Performance Bond and Payment Bond in the amount of not less than 100% of the contract price. Pursuant to the California Public Contract Code Section 22300 the Contractor may request that the Agency substitute a security in the amount of the performance retention.

The Sacramento Housing and Redevelopment Agency reserves the right to reject any or all bids and waive any informalities in the bidding. The Agency is an Equal Opportunity Employment employer.

Page 77: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

INVITATION FOR BID

The Housing Authority of the City of Sacramento is soliciting sealed bids for Invitation for Bid (IFB) No. 2013012-MPst for Edge Water Rear Parking Structure Repair, located at 630 I Street, Sacramento, CA 95814. There will be no subcontracting opportunities on this job. The estimated bonding range is between $5,000 - $10,000.

Interested licensed “C-8” Concrete Contractors should plan to attend the Pre-Bid Conference to be held at 801 12th Street, 2nd Floor, Sacramento, CA:

• April 22, 2013 at 10:00 am, with a site visit following the Pre-Bid Conference.

All contractors are urged to attend the Pre-Bid Conference including the site inspection. Although attendance is not mandatory, contractors will be required to verify that they are aware of the existing site conditions.

Bids will be received at the Procurement Services Division, 801 12th Street, 2nd Floor, Sacramento, California until 2:00 p.m. on May 9, 2013 at which time and place all bids received will be publicly opened and read aloud.

A bid package, plan holders list, and other contract documents relating to the project may be obtained beginning April 18, 2013 through:

Signature Reprographics620 Sunbeam AvenueSacramento, CA 95814916-454-0800http://www.planroom.us/shra

A deposit of $50.00 check or money order only is required for the first set of plans and any additional plans may be purchased through Signature Reprographics. Deposits will be refunded if plans are returned in good condition, to Signature Reprographics, no later than three weeks after bid opening.

Please direct all general and contractual questions to Mike Peek, Buyer – Procurement Services, at 916-449-6277. For any techni-cal questions regarding the Technical Plans and Specifications, please contact Dan Maloney, Project Manager, at 449-6274. For information on other construction projects, visit our website at http://www.shra.org.

This contract is subject to Federal labor standards, affirmative action requirements, Section 3 Requirements of the HUD Act of 1968. All bidders will be required to furnish and pay for a satisfactory Bid Bond in the amount of not less than 10% of the total bid price.

The Sacramento Housing and Redevelopment Agency reserves the right to reject any or all bids and waive any informalities in the bidding. The Agency is an Equal Opportunity Employment employer.

Don’t get thrown out on your way home!DVBE/UDBE Good Faith ads are often required.

This newspaper is state-certified. Email your ad to:

[email protected]

Page 78: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 76 Contractor’s Zone• .Contractor’s Zone

AGRICULTURAL GREENHOUSEADVERTISEMENT FOR PROPOSAL

Subject to conditions prescribed by Material Management/Purchasing Services, University of California, Davis, sealed proposals for a lump-sum contract are invited for the following scope of product and services: Scope of product to include, but is not be limited to the following: furnish and construct a 50’ x 72’ greenhouse with corrugated plastic roof. Sill height of greenhouse shall be 16’. The details are indicated in the accompanying drawings titled, “Tall Corn Greenhouse (9571900) – Davis, California – Greenhouse Purchase Set,” dated 2/28/13, and the accompanying Performance Specifications, dated 3/21/13. Project design is based on Series 7500 product by Conley’s Manufacturing and Sales, 4344 Montclair, CA 91763. This standard shall set a basis for minimum prod-uct performance.

Estimates for the project shall be accepted from firms that both manufacture and install their own product as a single entity or from contractors with exceptional experience in constructing greenhouses. Independent contractors shall certify a minimum of five years of experience in greenhouse construction with the manufacturer whose product is submitted. Said certificate of experience shall be submitted with the bid. Non-compliance is grounds for rejection of the bid.

Procedures: Bidding documents will be available April 3, 2013 and will be issued at web site: http://purchasing.ucdavis.edu/4vendors/ Phone: 530-747-3880, fax: 530-757-8720.

Proposals will be received only at: University of California, Materiel Management/Purchasing Service, 3215 Apiary Dr., Davis, CA 95616-5270. Proposal Deadline: Sealed proposals must be received on or before 3:00 p.m., April 24, 2013.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the Univer-sity within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

The work described in the contract is a public work subject to section 1771 of the California Labor Code.

THE REGENTS OF THE UNIVERSITY OF CALIFORNIAUniversity of California, Materiel Management/Purchasing Services

Legal Ads

Stand out Stand TogetherStand With the PCCA

Join the PCCA Click Here

Page 79: PCCA Weekly Newsletter and Project Information

Contractor’s ZoneContractor’s Zone

Broward Builders, Inc. is requesting bid proposals for all trades from subcontractors,

suppliers and truckers for the following project:

Alhambra High SchoolPerforming Arts Center Expansion, Martinez

Las Juntas Elementary School, Site Improvements, MartinezLas Juntas Elem School, Kitchen Modernization, Martinez

Owner: Martinez Unified School DistrictBid Date: Tuesday, April 26, 2013 before 1:00 PM

Project Description: The projects include the construction of a 3,478 square foot addition to the existing Performing Arts Building and conversion of the existing music room into a drama classroom at Alhambra High School; the expansion and reconfiguration of the parking lot at Las Juntas Elementary School; and the modernization of the kitchen and other multi-use building improvements at Las Juntas Elementary School.

Specific Project Requirements: • Insurance — The District has elected to implement an Owner Controlled Insurance Program (OCIP) provided by the Statewide Educational Wrap Up Insurance Program Joint Powers Authority (SEWUP) on this Project. Subcontractors must meet minimum insurance requirements as noted in specifications.• DVBE — There is a participation goal for disabled veteran business enterprises (DVBE) of at least 3 percent of the overall contract amount.• Bonding — 100% payment and performance bonds in the amount of the subcontract price may be required. Bond premium will be reimbursed by Broward Builders, Inc up to 1.5%.• LCP — This project is subject to a Labor Compliance Program and requires payment of state prevailing wages.• Attachment G — Please note the Phasing/Milestone/Liquidated Damages Schedule. All bidders must include all costs in their bid to meet these time requirements.• Award — A ward of contract will be within (90) days. No bidder may withdraw its bid for ninety (90) days after the date of the bid opening.• Cost Escalations — All cost escalations are to be included in the bid and are for the duration of the project. No change orders for cost escalations of any kind will be issued by Broward Builders, Inc.

Soliciting Bids for the following Trades but not Limited to: Surveying, demolition, hazmat, earthwork, paving, underground utilities, seal coat, pavement markings, site concrete, fencing, irrigation, landscaping, concrete, reinforcing steel, structural steel, metal fabrications, metal railings, rough carpentry, glue-lam beams, finish carpentry, architectural wood casework, waterproofing, insulation, weather barriers, clay rooftiles, metal roofing, built-up roofing, flashing and sheet metal, roof accessories, firestopping, fireproofing, joint sealants, hollow metal doors & frames, flush wood doors, access doors, coiling counter doors, aluminum win-dows, steel windows, door hardware, glazing, louvers, drywall, tape & texture, plaster, ceramic tile, acoustic ceilings, resilient floor-ing, sports flooring, resinous flooring, carpeting, FRP, wall coverings, acoustical panels, painting, coatings, visual display surfaces, signage, wall and corner guards, toilet accessories, fire extinguishers, lockers, food service equipment, audio-visual systems, modu-lar instrument storage, countertops, site furnishings, fire sprinklers, plumbing, HV AC, electrical, communications, and electronic safety & security.

Bidding Information: Estimator, Chuck Klenzendorf; [email protected] Estimator, Dan Delorefice; [email protected] Bid Proposals in written form via fax to (530) 666-5723

Broward Builders, Inc. is signatory to the Carpenters Collective Bargaining Agreement.

Broward Builders, Inc1200 E. Kentucky Ave., Woodland, CA 95776

License No.: 602146(530) 666-5635 Fax: (530) 666-5723

Equal Opportunity Employer

Page 80: PCCA Weekly Newsletter and Project Information

April 8, 2013Page 78 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

Newspaper Rate Sheet

Ad Type Ad Size 1 run 6 runs 13 runs 26 runs 52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall $782 $639 $497 $355 $209

Full page (bleed) 8 5/8” wide by 11 1/4” tall $427 $355 $284 $213 $139

Full page (boxed) 8” wide by 9 3/4” tall $427 $355 $284 $213 $139

Half page 8” wide by 4 3/4” tall $229 $193 $158 $123 $87

One Third (V) 2 7/8” wide by 7 1/2” tall $171 $144 $118 $92 $63

One Third (H) 8” wide by 3 1/8” tall $171 $144 $118 $92 $63

Quarter Page 3 7/8” wide by 4 3/4” tall $97 $81 $64 $47

Contractor Yellow Pages (Business Card Sized Ad) $39 $32 $24 $19

Legal ads • 3 7/8” wide and up to 2 1/4” tall $50 • 3 7/8” wide and up to 3 1/2” tall $75

• 3 7/8” wide and up to 5” tall $95 • 3 7/8” wide and up to 6 1/2” tall $135

The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Upgraded format, larger ad sizes, lowered rates:

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected]. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: [email protected]. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members!

Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract.

For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected] See the news-paper onlne at www.PCCAe-Zone.com

Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.

Display Advertising Policy, Rates and InformationREVJULY2012

Our LOWEST rates