In Reply Refer To: MS 5421 OCS-G 10102 September 18, 1992 ACTION Brooklyn Union Exploration Company, Inc. RELINQUISHMENT OF RIGHT-OF-WAY GRANT ABANDONMENT OF PIPELINE Right-of-way On July 27, 1988, Brooklyn Union Exloration Company, Inc. filed an application for a right-of-way two hundred feet (2 00') in width for the construction, maintenance, and operation of a 6 5/8-inch natural gas and condensate pipeline, 1.57 miles in length, from Brooklyn Union Exploration Company, Inc.'s Platform A in Block 280, South Marsh Island Area, North Addition, across Block 269, South Marsh Island Area, North Addition, to Placid Oil Company's Platform A in Block 268, South Marsh Island Area, North Addition. By letter dated September 6, 1988, the application was approved and the right-of-way granted. Proof of construction was subseguently accepted on December 13, 1988, on 1.55 miles of pipeline. On May 29, 1992, Brooklyn Union Exploration Company, Inc. reguested relinguishment of the aforementioned right-of-way in its entirety. Additionally, grantee reguested approval to abandon in place the above-described pipeline in accordance with 3 0 CFR 250, Subpart J. Inasmuch as grantee has agreed to comply with 30 CFR 250, Subpart J, removal of the 1.55 miles of line pipe is hereby waived. However, in the future, should i t be determined that this pipeline constitutes a hazard to navigation or commercial fishing operations or unduly interferes with other uses of the OCS, Brooklyn Union Exploration Company, Inc. shall be reguired to remove it. Therefore, the pipeline right-of-way grant is relinguished effective as of May 29, 1992, the date the reguest for relinguishment was filed in this office. Notify this office in writing within 30 days after completion of the pipeline abandonment. (Orig. Sgd.) J. ROGERS PEARCY J. Rogers Pearcy Regional Director cc: Case File MHHOLMES/ 1

Upload: others

Post on 28-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

I n Reply Refer To: MS 5421 OCS-G 10102

September 18, 1992

ACTION

Brooklyn Union E x p l o r a t i o n Company, Inc.

RELINQUISHMENT OF RIGHT-OF-WAY GRANT ABANDONMENT OF PIPELINE

Right-of-way

On J u l y 27, 1988, Brooklyn Union E x l o r a t i o n Company, Inc. f i l e d an a p p l i c a t i o n f o r a right-of-way two hundred f e e t (2 00') i n w i d t h f o r the c o n s t r u c t i o n , maintenance, and operation of a 6 5/8-inch n a t u r a l gas and condensate p i p e l i n e , 1.57 miles i n l e n g t h , from Brooklyn Union E x p l o r a t i o n Company, Inc.'s Platform A i n Block 280, South Marsh I s l a n d Area, North A d d i t i o n , across Block 269, South Marsh I s l a n d Area, North A d d i t i o n , t o P l a c i d O i l Company's Platform A i n Block 268, South Marsh I s l a n d Area, North A d d i t i o n . By l e t t e r dated September 6, 1988, the a p p l i c a t i o n was approved and the right-of-way granted. Proof of c o n s t r u c t i o n was subseguently accepted on December 13, 1988, on 1.55 miles of p i p e l i n e .

On May 29, 1992, Brooklyn Union E x p l o r a t i o n Company, Inc. reguested relinguishment of the aforementioned r i g h t - o f - w a y i n i t s e n t i r e t y . A d d i t i o n a l l y , grantee reguested approval t o abandon i n place the above-described p i p e l i n e i n accordance w i t h 3 0 CFR 250, Subpart J.

Inasmuch as grantee has agreed t o comply w i t h 30 CFR 250, Subpart J, removal of the 1.55 miles of l i n e pipe i s hereby waived. However, i n the f u t u r e , should i t be determined t h a t t h i s p i p e l i n e c o n s t i t u t e s a hazard t o n a v i g a t i o n or commercial f i s h i n g operations or unduly i n t e r f e r e s w i t h other uses of the OCS, Brooklyn Union E x p l o r a t i o n Company, Inc. s h a l l be reguired t o remove i t .

Therefore, the p i p e l i n e right-of-way grant i s r e l i n g u i s h e d e f f e c t i v e as of May 29, 1992, the date the reguest f o r relinguishment was f i l e d i n t h i s o f f i c e .

N o t i f y t h i s o f f i c e i n w r i t i n g w i t h i n 30 days a f t e r completion of the p i p e l i n e abandonment.

(Orig. Sgd.) J. ROGERS PEARCY

J. Rogers Pearcy Regional D i r e c t o r

cc: Case F i l e MHHOLMES/

1

Page 2: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

United States Department of the Interior MINERALS MANAGEMENT SERVICE " • • " S U B " ™

GULF OF MEXICO OCS REGION m

1201 ELMWOOD PARK BOULEVARD NEW ORLEANS, LOUISIANA 70123-2394

In Reply Refer To: MS 5421 September 18, 1992 OCS-G 10102

ACTION

Brooklyn Union Exploration Company, Inc. Right-of- way

RELINQUISHMENT OF RIGHT-OF-WAY GRANT ABANDONMENT OF PIPELINE

On July 27, 1988, Brooklyn Union Exloration Company, Inc. fi l e d an application for a right-of-way two hundred feet (200') in width for the construction, maintenance, and operation of a 6 5/8-inch natural gas and condensate pipeline, 1.57 miles in length, from Brooklyn Union Exploration Company, Inc.'s Platform A in Block 280, South Marsh Island Area, North Addition, across Block 269, South Marsh Island Area, North Addition, to Placid Oil Company's Platform A in Block 268, South Marsh Island Area, North Addition. By letter dated September 6, 1988, the application was approved and the right-of-way granted. Proof of construction was subsequently accepted on December 13, 1988, on 1.55 miles of pipeline.

On May 29, 1992, Brooklyn Union Exploration Company, Inc. requested relinquishment of the aforementioned right-of-way in i t s entirety. Additionally, grantee requested approval to abandon in place the above-described pipeline in accordance with 30 CFR 250, Subpart J .

Inasmuch as grantee has agreed to comply with 30 CFR 250, Subpart J, removal of the 1.55 miles of line pipe i s hereby waived. However, in the future, should i t be determined that this pipeline constitutes a hazard to navigation or commercial fishing operations or unduly interferes with other uses of the OCS, Brooklyn Union Exploration Company, Inc. shall be required to remove i t .

Therefore, the pipeline right-of-way grant i s relinquished effective as of May 29, 1992, the date the request for relinquishment was filed in this office.

Notify this office in writing within 30 days after completion of the pipeline abandonment.

J. Rogers Pearcy Regional Director

cc: Case F i l e

Page 3: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

F o r m 1-1181 (July UJI)

BILLING DATE

Proof of Construction Accepted 12/15/88 BILLING INDEX

Bond Fund symbol (Acq. lands only) : „ Serial No. ...™!l!Z^L.™?l?fi_ -

No bond Expiration date

Total rmtol rtue

Type. P /L R/W

Efftctim Jot* Uatt Uniu f s f w W , asiignmeni (Acrri, miles.

Giumy diitri' bution of

total rental rale

C o u n t y d i t t r v k u -l i o n ( C o u n t y M M * )

9/6/88 .l;0!ir..>.y.... $15.00 $30..C)0 W&S&SSJS&UJ&Q l iSSjSj and g68y Soiith

tesh.IsjUfld... ^.ea,..Nor.th.

,_^AY.4JU892U,

BILLS ISSUED Y . . r ol

I M M Dau ii

9/6/88 1988

Y H r o f • M M Dau i

. 6th.

U . B J V & L £ ^ 7th. ^ 12/1/89 pd .

8th.

12/1/90 pd . i t h 9th.

5th 12/ l /91. .p .d t Hhh.

No. AJdrm,

Principal

l.m..Lam ,...Sui.t.e...l.0.65.. Ho ton,..Texas.....7.7010....

A—tinam of undivided Inter—t

Operator

10102 Brooklyn Union Exploration Conpany, Inc.

Page 4: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

To: Adjudication Unit (MS 5421)

From: Pipeline Unit, Field Operations (MS 5232)

Subjeot: Right-of-Way Relinquishment/Abandonment

Company: ^ t d / L L f A / ^//U/oio Qfl/b/Z/iT'/D/Lj IbmP/tAtt, JJOC ,

Right-of-Way Number: 0 / O / D 2 ^

The subject abandonment has been reviewed and has been found to be in compliance with 30 CFR 250.157(c).

A. Pipeline abandoned in place

Pipeline abandoned by removal

Pipeline never constructed

Enclosure

MINERALS M M ^ ^ ^ L C M T ^ ^ LEASING & ENVIRONMENT.

Page 5: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

1331 LAMAR. SUITE 1065

HOUSTON. TEXAS 77010

(713 ) 6 5 2 - 2 8 4 7

May 26,1992

Mr. Daniel J. Bourgeois Regional Supervisor Office of Field Operations U. S. Department of the Interior Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394

Attention: Mr. Mike Connor FO 2-2

RE: Application to Abandon Pipeline and Relinquish Right-of-Way Grant OCS-G 10102, 6.625" Right-of-Way Pipeline Installed In and/or Through Blocks 280, 269 and 268, South Marsh Island Area, OCS Waters, Gulf of Mexico, Offshore, Louisiana

Gentlemen:

Pursuant to regulations contained in Title 30 CFR, Part 250.156(a)(1), Brooklyn Union Exploration Company, Inc. (Brooklyn Union) hereby submits an application, in triplicate, to relinquish and abandon in-place an existing 6.625" Right-of-Way Pipeline (8,207' in length) originating at Brooklyn Union's Platform A in South Marsh Island Block 280 and terminating at Torch Operating Company's Platform A iii South Marsh Island Block 268, Offshore, Louisiana.

As a result of reservoir depletion, Brooklyn Union has elected to plug and abandon existing Lease OCS-G 5197, Well No. A-l and remove Platform A on South Marsh Island Block 280. Brooklyn Union has detennined that no further service will be required of the 6.625"Right-of-Way Pipeline.

Subject to approval of this application, pipeline abandonment operations are scheduled to commence on approximately July 15,1992 with an anticipated project duration of 7 to 10 days.

Brooklyn Union will utilize an onshore support base located in Berwick, Louisiana.

ACCEPIED

Director Effective Date_

m 2 9 1992

Page 6: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Minerals Management Service Abandon Pipeline and Relinquish Right-of-Way OCS-G 10102, South Marsh Island Block 280 May 26,1992

Page Two

In support of this request, enclosed please find the following information:

1. Detailed abandonment procedure

2. As-Built Pipeline Route Map

3. Pipeline Riser Drawing

Should you have any questions or requests for additional information, please contact the undersigned, Jack Shelledy or our regulatory agent, J. Connor Consulting, Inc., Attention: Susan Wilson at (713) 558-0607.

Sincerely,

BROOKLYN UNION EXPLORATION COMPANY, INC.

'James G. Floyd President

JGF:SEW Enclosures

Page 7: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BROOKLYN UNION EXPLORATION COMPANY, INC.

SOUTH MARSH ISLAND BLOCK 280

PROPOSED ABANDONMENT IN-PLACE PROCEDURE

1. Move jack-up boat into location at South Marsh Island Block 268, Platform B and rig up.

2. Rig up pumping equipment at 6.625" pipeline connection at South Marsh Island Block 280, Platform A.

3. Connect a line from 6.625"pipeline connection at the South Marsh Island Block 268, Platform B to the jack-up boat to catch the pipeline flush returns.

4. Pump approximately 360 barrels of seawater into the pipeline at the South Marsh Island Block 280, Platform A to flush any remaining fluids out of the pipeline into a holding tank on the jack-up boat.

5. Once the returns are clean, stop pumping and release pressure on the pipeline.

6. Remove the 6.625"riser attached to the South Marsh Island Block 268, Platform B. Cut, cap and bury the end of the pipeline at least 3* below the mudline.

7. Disconnect pumping equipment.

8. Remove the 6.625"riser attached to the South Marsh Island Block 280, Platform A. Cut, cap and bury the end of the pipeline at least 3' below the mudline.

9. Conduct a bottom search of and debris removal for the entire pipeline right-of-way.

Page 8: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

6" GAS/CONDENSATE P/L (AS-P r OATA)

POINT X Y RL -

1 1.828.128 163.937 RISER 268 "B" 2 1.827,837 163.838 3 1.827.714 163.758 4 1.827.429 163.350 5 1.827.198 162.931 6 1.826.962 162,492 7 1.826.526 161.654 8 1.826.241 161.200 9 1.825.984 160.768

10 1.825.932 160.668 11 1.825.744 160,329 12 1.825.251 159,457 13 1.824.995 159.042 14 1.824.752 158.616 15 1.824.462 158.097

' 16 1.824.287 157.761 17 1.824.124 157.505 TAP 18. 1.823.882 157.024 RISER WELL NO. 2

PLACID 268

TOTAL LENGTH 8,207'

269

6" GAS/CONDENSATE P/L (AS-BUILT) /

X > 1.824.186

UELL NO. 2

•Y « 158,127

Y ' 157,601.69

BEST AVAILABLE COPY

NOTES:

X, Y COORDINATES ARE BASED ON THE LOUISIANA STATE PLANE COORDINATE SYSTEM (LAMBERT). SOUTH ZONE.

DEPTH OF COVER AT WELL 5' FOR 300'.

DEPTH OF COVER AT TAP 3'.

DEPTH OF COVER ALONG ROUTE 3*.

THIS MAP HAS BCCN CARCFULLY PHEPABEO USING INFORMATION OBTAINED FROM VARIOUS SOURCES ANO ALL OATA OTHER THAN THAT SPECIFICALLY CERTIFIED CORRECT SHOULD 8E CONSIDERED FOR REFERENCE ONLY.

"' MICHAEL J . KINSELLA REG. No. 20087

."xGiSTCRED \ PrJCf ESSiCKAL EnllNEERj

SCALE 1:12,000

CERTIFIED CORRECT AS TO HORIZONTAL LOCATION OF AS.BUILT PIPELINE

AS-BUILT SURVEY

6-INCH BROOKLYN UNION PIPELINE

BLOCKS 268-280 SOUTH MARSH ISLAND AREA

NORTH ADDITION

OFFSHORE LOUISIANA

PRODUCTION MANAGEMENT INDUSTRIES

HNSELLA, COOK 4 ASSOCIATES, WC.

••at mat• law* 4 Mtaa aooal « l e w u a u 4 taaw

ORN. J F L PREP. TAO CAL. TAO APP J / V o FILE NO. 2 6 - 8 - 0 6 2 - O I A

CHK CHK / I S OATC i i -01-ee FIO MO |

Page 9: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

AVAILABLE COPY

A14+ aVEft NWfU? L I K E — —,'

f V n MMEPilAU

. t. ,' "

gfeu ws'-g' / ra - i

E O F B t - W i ^ '

AS' i CAISSON

Tf

* PiUNO *Mlf1EP Ftfh

*,-*5r*MJ.wiH Fw.<'/4<.B«)E-/mteUt. wrr laufftJED BV OTHERS)

HI1

^_ TT^S •S ^>_ci:_(-) \t>- 6>

! I

—1* I

i , ;

y g TTPS -•2 ^£L (-) &g-g

I

I

^2

I O

1 I

1 * 6 6 *HT * l ^ f t Wft KELP

t o R I H * t f -SWIM Rfc.

3 SEC SHT S101 TOR fcENT.RAL NOTTS • PAINT SPECIFICATIONS

e^Aue V - I'-O"

MA'

L f t i , . i ^ *UUUI« lg I 7-24 nev NORTH AWgw vr

PRODUCTION MANAGEMENT INDUSTRIES, INC. A nooucnoN ^

C0NSVIIM6 mGWOBNC

M A I V I T . lOUI t lAKA

rAUXUION AND COMSnWCDON

NOUtlOM THAI

BROOKLYN UNION EXPLORATION

S M I 2 8 0

RISER ORIENTATION & CLAMP LOCATIONS

A

Page 10: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

In Reply Refer To: FO-2-2 DEC 13 1988

BEST AVAILABLE COPY Brooklyn Union Exploration Company, Ino. Attention: Hr. G. Ross Frassier 1331 Lamar Street, Suite 1065 Houston, Texas 77010

Gentlemen:

In accordance with 30 CFR 250.158(b), your l e t t e r dated November 14, 1988, transmitted a pipeline construction report for the following right-of-way pipeline:

Pipeline Right-of-way Number

Size (inches)

6 5/8

Length (feet)

8,207

Service

Gas and Condensate

From

Platform A Block 280 South Marsh Island Area, North Addition

To

Platform A Block 268 South Marsh Island Area, North Addition

The data which you provided indicates the following test information and establishes the assigned maximum allowable operating pressure (MAOP) for this pipeline:

Pipeline Right-of-way Number

Test Pressure Duration MAOP MAOP (hours) (psig) Determination

OCS-G 10102 2,200 8 1,200 Connecting pipeline

The tot a l length of the "as-built" pipeline right-of-way i s 1.55 miles.

In future correspondence, please refer to the above pipeline by i t s assigned right-of-way number.

Sincerely yours,

{Orig. Sgd.) A. DonaM Giroir D. J. Bourgeois Regional Supervisor Field Operations

bcc: 11502-01 OCS-G 10102 (w/orig report) (FO-2-2) (K. Faust) 1502-01 OCS-G 10102 (FO-2-2) LE-3-1

0PS-6 (w/cy of location plat)

ABritton:ds:12/8/88:LEXITyPE Disk 4

1V

Page 11: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

1331 LAMAR, SUITE 1065 HOUSTON, TEXAS 77010

(713 ) 6 5 2 - 2 8 4 7

November 14, 1988

Mr. Daniel J. Bourgeois Regional Supervisor Office of Field Operations U. S. Department of the Interior Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394

Attention: Mr. Autry Britton FO-2-2

RE: 6-5/8" Natural Gas and Condensate Right-of-Way Pipeline (OCS-G 10102) Blocks 280, 269 and 268, South Marsh Island Area, Offshore, Louisiana

Gentlemen:

Reference is made to that certain application dated July 21, 1988 approved by your office on September 6, 1988, pertaining to the installation of a 6-5/8" right-of-way natural gas and condensate pipeline to transport production from Brooklyn Union's Platform "A" in South Marsh Island Block 280 to Apache's Platform "A" in South Marsh Island Block 268.

In accordance with regulations contained in Title 30 CFR 250.158(b), please be advised that installation of the subject pipeline was completed on October 31, 1988; with an actual first operations commencing on November 9, 1988.

Enclosed are copies each of the "as-built" location plat and hydrostatic test pressure data.

Should you have any questions or requests concerning this matter, please contact the undersigned at your convenience.

Sincerely,

BROOKLYN UNION EXPLORATION COMPANY, INC.

G. Ross Frazer Operations Engineer

GRF:JAC:CJG Enclosures

Page 12: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

1 0 / 3 6 / 8 7121 S 17136336727 / .

V

ei

BEST AVAILABLE COPY

HYDROSTATIC TEST PRESSURE LOG Sheet Of

Company:

Project: KSM TTJLAff-A-Tested By: DA^/O fkueTT

Test Section:

Deadweight Gauge: MFG D,C«&/KJ>Pe*/A&//S< Serial NO.: /y^??

Date Calibrated: tf-Z-J-frf?

DATE TIME PRESSURE (PSIG) PIPE TEMP. ( 0 F) AMBIENT TEMP.(0F REMARKS

9'3/-tt 3.00 A-u 37°

35° Jo-oo Per 33° Jloo P5Z~ 33° 2?-oo PST 3*6

tPzoo prr 3/° 3/° 3/°

cPWo PSS 3?° 3?° 35°

REMARKS:

WI TNESS: COMPANY /)£f<4oA<f!/>pfr«*rZ^..

rONTRAPTOR

DATE /£/?//??

DATE

Page 13: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

i e ' 3 i / e e i45

Ov*f 35 Yetrt

S 17136536727 ei

BEST AVAILABLE COPY

Oil & Gas Specialties Company

INSTRUMENT CALIBRATION

DATE OF CALIBRATION: 9-23-88

TYPE OF INSTRUMENT: Dead Weight Tester

PRESSURE RANGE: 0-5000 PSI

Calibrated to Dead Weight Tester traceable to National Bureau of Standards. Serial No: 17499 »

DEAD WEIGHT INSTRUMENT

0 0

.1000 1000

2000 2000

4000 v 4000

5000 5000

4000 4000

2000 2000

1000 1000

0 0

'7 CALIBRATED BY

Q0ALITY CONTROL MANAGER

Page 14: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

le/sir ieM6 S 17136336727' e i

Ovtr 35 Yeaw

BEST AVAILABLE COPY

Oil & Gas Specialties Company 11321 Todd 81. a BOxBSSM • MOullon, T M M 77269 • (713) 0064444 • Tclax 29-3366 • F»* (713) 686-0162

PLEASE REPLY TO

INSTRUMENT CALIBRATION

DATE OF CALIBRATION: 9-23-88

TYPE OF INSTRUMENT: Pressure Recorder

TEMPERATURE RANGE: 0-150°?

Calibrated to Sand Bath Tester traceable to National Bureau of Standard. Serial No.

8 8

74 . 74

150 150

74 74

8 8

fBRA^ED BY

QUALITY CONTROL

-n i t? / - - /•inrmo. RM 51424 OCS. P.O. BOX 6157

Page 15: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

18/31 " 10145

Over 35 Ytert

S 1713655672- 02

BEST AVAILABLE COPY

Oil & Gas Specialties Company

INSTRUMENT CALIBRATION

DATE OF CALIBRATION:

TYPE OF INSTRUMENT: Pressure Reoorder

PRESSURE RANGE: 0-5000 PSI

Calibrated to Dead Weight Tester traceable to National Bureau of Standards. Serial No: 17499 DPIR 316 »

DEAD WEIGHT INSTRUMENT

0 0

1500 1500

2500 2500

3500 * 3500

5000 5000

3500 3500

2500 2500

1500 1500

0 0

CALIBRATED BY ,

UALITY CONTROL MANAGER

Page 16: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

-cbi AVAILABLE COPY

to

Page 17: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BEST AVAILABLE COPY

of.' 0

... '-.^

\

Page 18: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

e'lteAS/CONOENSATE P/L (AS-BUI OATA)

POINT X Y REMARKS

1 - 1,828,128 163,937 ^ RISER 268 "B" 2 1,827,837 163,838 / 3 1.827,714 163,758 ^ 4 1,827.429 163,350-/

162,931 y 5 1,827.198 163,350-/ 162,931 y

6 1,826,962 162,492 ^ 7 1,826,526 161,654 / 8 1,826,241 161,200 ^

160,768/ 9 1,825,984 161,200 ^ 160,768/

10 1,825,932 160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /

11 1,825,744 160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /

12 1.825,251

160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /

13 1.824,995

160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /

14 1.824,752

160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 / 15 1,824,462

160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /

• 16 1,824,287 157,761 - / 157,505 - / 157,024 /

17 1,824,124 157,761 - / 157,505 - / 157,024 /

TAP 18, 1,823,882

157,761 - / 157,505 - / 157,024 / RISER WELL NO. 2

TOTAL LENGTH 8,207'

BEST AVAILABLE COPY

X, Y COORDINATES ARE BASED ON THE LOUISIANA STATE PLANE COORDINATE SYSTEM (LAMBERT). SOUTH ZONE.

DEPTH OF COVER AT WELL 5' FOR 300'.

DEPTH OF COVER AT TAP 3'.

DEPTH OF COVER ALONG ROUTE 3'.

THIS MAP HAS BEEN CAREFULLY PREPARED USING INFORMATION OBTAINED FROM VARIOUS SOURCES AND ALL DATA OTHER THAN THAT SPECIFICALLY CERTIFIED CORRECT SHOULD BE CONSIDERED FOR REFERENCE ONLY.

WELL NO.

~ MICHAEL J. KINSELLA REG. No. 20087

REGISTERED

.PROFESSIONAL mm

SCALE 1:12,000

u

m 7 T*

CERTIFIEd CORRECT AS TO HORIZONTAL LOCATION OF AS'BUILT PIPELINE

AS-BUILT SURVEY

6-INCH BROOKLYN UNION PIPELINE

BLOCKS 268-280 SOUTH MARSH ISLAND AREA

NORTH ADDITION

OFFSHORE LOUISIANA

PRODUCTION MANAGEMENT INDUSTRIES

KINSELLA, COOK & ASSOOATES, INC. OFFSHORE orrsMORi simverma • t i l • I I O I N I A N I 4 iATOH KOUOi 4 l O U I t l A * * 4 » • • • •

DRN JFL PRt'P. TAO CAL. TAO APP. J ^ - O FILE NO. 2 6 - 8 - 0 6 2 - O I A

CHK CHK '""/If/-, OATF 11-01-88 FIO NO |

Page 19: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Date of Inspection: / / - r • g Lessee/Operator:

PIPELINE INSPECTION CHECK LIST BEST AVAILABLE COPY

Company Contact:

MMS Inspector:

Segment No.: G tO io^l

From: SM

Contractor: Barge ID

Barge or Platform: < M 2f tQfcObJ 26>8 A Location

A DOT/DOI:

To: 5M2MA

Size:

Grade:

Seamless:.

Coating:

PIPELINE CONSTRUCTION/SPECIFICATIONS

Wall Thickness:

Anodes:

Type:

No.:

Pipeline Crossing & Clearance:.

Existing Pipel1ne(s) Bouyed:

Length:

Weight:

Spacing:

Burial Depth:

Valves/Taps Cover:

HTP DATA

(Medium) Water or Product

Duration Time

Pressure (PSI)

MINIMUM RATING OF VALVES. FLANGES, FITTINGS AND PRESSURE DATA

Rating: /j>Dt) Approved MAOP:

Service: " G /C

Source: SgPAft f rT&rt

IF Well(s). SITP: N

Pipeline Flowing Pressure: A)OT PlOtOtA/fr

Range Setting

High Sensor(s): \

Low Sensor(s): ^

PSV:

Is low sensor Installed where it could not be Isolated?.

Bumper Guard: iES >|T 2^S Splash Guard: y-"^^ Coating:.

Water Depth:.

Remarks: P j f f C^t J j i M ^ f c ^ J U A J I ^QMOU^ ^ I U M O flUofl CWLM^/)

C5UAA A^L th a t >aA tjL LCM^ ^

Disk 9 -WuX\ >J1A^XI^JX^\ .p^^TJUW^C^o ^JU^A^

Page 20: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

PLATFORM

ILE COPY

SOUTH MARSH ISLAND BLOCK 268

1. A a BALL VALVES, CHECK VALVES & FLGD. FITTTNCS TO BE 600/ ANSI RTJ FLCO. EXCEPT AS NOTED

2. NEEDLE VALVES TO BE 1" S.S. 6000# W.P.

Risgr Pipe;

6.625 O.D. x .432 W.T. API 5L Grade B Seamless (Bare Weight = 28.58 # / f t . ) g

Line Pipe:

6.625 x .280 W.T. API 5L Grade B Seamless (Bare Weight - 18.98 # / f t . )

o o to

CM

GENERAL NOTES

BROOKLYN UNION'S GAS SALESLINE COMPLIES IMTH DOT TITLE 49. PART 192 & 30 CFR 250 SUBPART J

i t 5 2. BROOKLYN UNION'S PROPOSED PLATFORM FACILITIES COMPLY WITH 30 CFR SUBPART H

3. HIGH PRESSURE SENSOR WILL BE SET AT 1200 PSIG

4. LOW PRESSURE SENSOR WILL BE SET AT 945 PSIG.

5. DESIGN PRESSURE OF THE PIPE LINE IS 1440 PSIG. MAOP IS 1200 PSIG

A= SACRIFICIAL ZINC ANODE. 80# EACH, SPACING TO BE A MAXIMUM OF 500 FEET.n,

—rn— ! NOTE: ALL VALVES IN ! SALES METERING i FACILITIES ARE ANSI

s! 600 lb. ~r-

jjj! WV (d tf) L-

t^s r A MAXIMUM OF 5 0 0 1 - t t T . f i ,

(0

O l Q I .1 •

P

PROD.-i

!

(LJ) C7

SEPARATOR 1440 PSIG

COND^ METER

GAS SALES

J CMETER

GAS CONTACTOR 1440 PSI

o

s o Q O cn a.

Application b y BROOKLYN UNION EXPL COMPANY

BROOKLYN UNION EXPLORATION COMPANY PRODUCTION PLATFORM

SOUTH MARSH ISLAND BLK. 280

REV DATC OESCRP. BY

SCHEMATIC FOR 6.625" O.D. NAT. GAS & COND.SALESUNE

S.M.I. BLK. 280 TO S.M.I. BLK. 268 - GULF OF MEXICO

JOB NO: NE-1234 DATE: 7/20/88

DWG. NO.: SKETCH f l

Page 21: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

- jffia&j -•.

"BEST AVAILABLE COPY

ID;

. NOTIFICATION OF PIPELINE INSTALLATION/HTP

REPORT RECEIVED BY

Name:

Date! / b ^ (

REPORT GIVEN BY

Name; "g Q w ^ - ^ A ^

CoinDany:^T> L^-^O-^^M^^^'

PIPELINE INSTALUATION

Date of Installations; '/ft ~ ( ftj^J. -?\rC ' ^ tXr^U^-*)

Contractor and Barge No;/^U^i»A/ y^^^^Helloort Location; Q-^-

Slze of Pipeline; foYf

G/c~ To: Structure/SSTI

Block

Service:.

. From: Structure.

fey- ^ Jlhere Construction beglits: cP^T A*

Length of time barge will be on Job: &^Uu*-i-*Jn>

District Notified Date:

Time:

Person Contacted:

Date of Inspection: Date Inspection Report Received:.

PIPELINE HTP

Date of Test:

Location of Recorder:,

Location of Heliport:.

District Notified Date:.

" Time:.

Person Contacted:, i

Date of Inspection: Date Inspection Report Received:. i .

Remarks:

. . . J

Page 22: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

dEST AVAILABLE COPY

SEP 6 1988 In Reply Refer To: FO-2-2 (OCS-O 10102)

Brooklyn Union Exploration Conpany, Ino. Attention: Mr. G. Boss Frazer 1331 Laiaar Street, Suite 1065 Houston, Texas 77010

Gentlement

Pursuant to the authority granted by i»3 U.S.C. 1334(e) and 30 CFR 250.150(d), your applloation dated July 21, 1988, for a pipeline right-of-way two-hundred feet (200*) in width for the installation, operation, and mlntenanoo of a 6 5/8-lnoh pipeline, 1.57 olles in length, is hereby approved, as proposed.

The proposed pipeline will transport natural gas and condensate from Brooklyn Union Exploration Company, Inc.'s Platfona A in Blook 280, South Marsh Island Area, North Addition, aorosa Blook 269, Smith Marsh Island Area, North Addition, to Placid Oil Company's Platform A in Blook 268, South Marsh Island Area, North Addition.

This approval is subject to the following conditions:

1. There are pipelines located within 500 feet of the proposed aotivities* Precautions as outlined in Notice to Lessees and Operators (NTL) No. 83-3. Section IV.B.l. shall be taken prior to conducting the proposed operations.

2. The unidentified magnetic anomalies listed below may represent archaeological resources. In accordance with (NTL) No. 75-3 (Revision No. 1, Enclosure No. 3). you shall either determine that the potential archaeological resources do not have historic significance, or avoid them when conducting proposed activities as indicated by the avoidance criteria below:

Blocks

268 268 268 268

Line No,

2 2

5

Shot Point

17.«» 15.2 7.9 8.6

Avoidance Criteria (feet)

250 250 250 250

i f

7*

Page 23: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

gEST AVAILABLE CUPY

Baaed on our analysis of your applloation, the BBXIOUS allowable operat pressure for this pipeline will be 1,200 psig.

Sinoerely yours,

'"tfriginal signed" - 0. J. Bourgeois

D. J. Bourgeois Regional Supervisor Field Operations

oo: Department of Transportation 2320 La Branch, Room 2116 Houston, Texas 77004 (w/enclosure)

bcc: 11502-01 (P/L OCS-G 10102) (K. Faust) (FO-2-2) TB02-01 (P/L OCS-G 10102) (FO-2-2) F0-5 LE-5 LE-3-1 (w/attch) 0PS-6 (W/cy of plat)

ABritton:ds:8/30/88:LEXITIPE

Page 24: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

UNITED STATES GOVERNMENT MEMORANDUM

FIELD -OPERATIONS

^ 0 t « R e g i o n . ^ '

August 26, 1988

To: Regional Supervisor* Field Operations, GOM OCS Region (FO)

From: Regional Supervisor, Leasing and Environment, GOM XS Region (LE)

Subject: National Environmental Policy Act Review for Pipeline

Right-of-Way Application XS-G 1 0 1 0 2

Our National Environmental Policy Act (NEPA) review of the subject action is

complete. Environmental protective measure(s), if any, identified to avoid or

mitigate potential impacts associated with the action were included as part of

the NEPA analysis and are shown on the attached Categorical Exclusion Review

(CER).

H. P. Sieverding

Attachment

cc: Pipeline File XS-G 10102 (LE-5)

Page 25: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Action No. OCS-G 10102

United States Department of the Interior Minerals Management Service Gulf of Mexico OCS Region

NEPA CATEGORICAL EXCLUSION REVIEW

The Categorical Exclusion Review (CER) evaluated the proposed action and determined that it meets the categorical exclusion criteria as defined by 516 DM 2.3A(1) which states "(a) The action or group of actions would have no significant effect on the quality of the human environment, and (b) The action or group of actions would not involve unresolved conflicts concerning alternative uses of available resources." The analysis of potential impacts by environmental and resource specialists was based on the assumption that the following mitigative measure(s) will be imposed.

Environmental Protective Measures

The following measure(s) was/were identified in the plan/application by the lessee/operator submitting the proposal: None.

The measures identified by MMS during the plan/application review or in the lease stipulation were:

1. There are pipelines located within 150 meters (490 feet) of the proposed activities. Precautions in accordance with NTL No. 83-3, Section IV.B, will be taken prior to conducting the proposed operations.

2. The unidentified magnetic anomalies or side-scan sonar contacts listed below may represent archaeological resources. In accordance with NTL No. 75-3 (Revision No. 1, Enclosure No. 3), the applicant will either determine that the potential archaeological resources do not have historic significance, or they will avoid them when conducting proposed activities as indicated by the avoidance criteria below:

PlocKs Line No. Shot Point Avoidance Criteria

268 268 268 *268

2 2 4 5

17.4 15.2 7.9 8.6

76 m 76 m 76 m 76 m

*See attached Archaeological Report dated August 23, 1988

Page 26: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Exclusion Peterminatlon

The proposed action was evaluated and reviewed against the CER exception criteria defined by 516 DM 2.3.A(3). With inclusion of the above mitigation, it does not represent an exception to the categorical exclusions. Therefore, preparation of an EA is not required.

Date Preparer

I concur.

Regional Supervisor, Leasing and Environment

Page 27: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

" ' ^ ' d£ST AVAILABLE COPY Date:

4b To: Right-of-Way Pifelir.v File OCS-G / 0 / 0 ^ (gg)

Through: Supervisor, Platferr ipel 1ne Unit, Plans, Platform and Pipeline Section, Field Opercxions, Gulf of Mexico OCS Region (FO-2-2)

From: Petroleum Engineer, Platform/Pipeline Unit, Plans, Platform and

Pipeline Section, Field Operations, Gulf of Mexico OCS Region (FO-2-2)

Subject: Pipeline Right-of-Way Application, Technical Review, 73ruc>)c<-^

^JL^ CLA^. %«L . xs-G /C/02-

Size Length (inches) (feet) SgrviCe From

I ^ L flM£~ 4-

Recommendations:

1. The technical aspects of the proposed pipeline are acceptable 1n accordance with appropriate Regulations and Standards.

2. Advise applicant of Notice to Lessees and Operators No. 83-3.

3. Valve protection cover shall not protrude above the level of the mud line.

4. Subsea valves and taps associated with this pipeline shall be provided with a minimum of three feet of cover, either through burial, with sandoags, or other acceptable method.

A. Britton

cc: 1502-01 XS-G I & I ^ ^ (w/orig appln) (Seg. 5 3 ) (FO-2-2) (o

OPS-© (w/cy of p l a t )

ABritton:jj:LEXITYPE Disk 6

Page 28: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BEST AVAILABLE COPY

HPEUNE RIGHT-OF-WAY AFPUCATION TNGINEERINC CSECKUSr'

60M «e&to»M- OFF ice

A. Dwctiption of pipeline and location of propowd roate (UL, rite of pipe, prodnet to be tnnsported, from where Jo where, platfonn auntar aime, Vjockjn^ng^gea^g ^ ^ ^ ^

B. Safety Flow Schematic - Verify that the infonnation riiown ra the afety flow achematk diagram contains the foOowing:

1. Fresuie source is drawn into the schematic with the foDowiqg:

a. ~ ~ -. — - » S l / ^ t ^

b. designworfcingpmsure f^f^

c. high ow preoure sensor settings

2. "ANSr ratings of aD vaKes, flanges, and fittinp between the aoorce aad the connecting pipeline are shown.

3. Presnre relief vaKes, where applicable, are shown with the letting eel no higher than the maxfanum working presnre (MWP) of dw vessel,

4. If the maxfanum input aource presnre is greater than the maxfamnn allowable operating presnre (MAOP) of the pipeline, redundant safety equipment is required.

5. MAOP of proposed pipeline does aot exceed MAOP of connecting pipeline.

6. The pipeline leaving the platfonn receiving production from the platfonn is equipped with higMow presnre sensors to dirtctiy or indirectly shut-in the weD or weDs on the platform.

7. The pipeline delKering production to the production facilities on the platform is equipped with an automatic faD-close vaKe tied into the automatic and remote iut-in system.

Hie pipeline crossing the platform which does not delKer production to the pbt­form, but which may or may not receKe production from the platfonn, is tquipped with high-low presnre senson connected to an automatic faD-close vaKe located in the upstream portion of the pipeline at the platform. In ad­dition, the aenson are tied info either the platform't automatic and remote shut-in system or an independent remote shut-in system.

Page 29: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BEST AVAILABLE COPY

9. Ibc rtpeBne boarding Ac phtfonnfripcBnt k oqaipped witb a chodc vahe

JO. Ibe pipeline leaving tbe platfonn b equipped wift a check vahe

J l . Ibe hfeMow preaaue aemon on Ihe depv qg pipeBne b located die check vahe.

12. Where appBeabk, higMow aemon are located downstream of Oe back pleasure legulator.

J ^ X 3 . If there b Bquid injection into tbe Une, are pumps asaodated with the Mection? (Yes or No) £42

.14. Direction of flow tndirated.

-15. Pipe specifications (Le size, gnde, weight, and waS thickaen).

J6. Total length of propoeed pipeBne (feet and mfles).

.17. MAOPofconnecdngpipdine.

.18. Statement that design meets or exceeds DOT Regulations 192 or 195, as appli­cable, and/or applicable OCS orders, registered engineer's seal, registntion aumber, date, and signature.

J 9. Area and block aumber of proposed pipeline platform.

JO. Cathodic protection specifications.

C Design Infonnation • Verify dial die pipeline design infonnation ghen in die application and/or on the dau sheet is complete and correct:

— \. Product to be transported: 71 ffi^ j-GuxL

2. Pipeline, riser, and subsea vahe assembly spedfkatiom:

(1) Sise WaO Thickness Grade _S—Weight tMg.lbs/ft.

(2) Size WaD Thickness Gnde Weight Ibs/ft.

(3) Size WaO Thickness Gnde Weight lbs/ft.

b. Riser:

(1) Size £±i£WaD Thickness ' ^ ' o n d c ^ Weight ££^®.Ibs/ft.

(2) Size WaD Thickness Gnde Weight Ibs/ft.

(3) Size WaO Thkkness Gnde Weight Ibs/ft.

c. Subsea vahe assembly:

(I) Size WaD Thkkness Gnde Weight Ibs/ft.

(2l Size WaO Thkkness Gnde Wright Ibs/ft.

Page 30: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

•JEST MAILABLE COPY f i

3 b IffefcrnM. - 3 ^ 3. Water tfepft: Mufanffl ^ ^ MiatenB

.4. Type of corroskm protection:

au bnpiened cuneut lystco)

•i^^b. SurifkiaJ anode lystem

(1) Type of anode ^ • / A ^ C

(2) Spadns i n t m i J _ ^ l £ .

(3) Weight of onit anode gKen by applicant. % O

— c. If platform anodes are used, art fliey considered adequate?

Yes No

d. If pipdine anodes art oaed:

Where: W0 - Weight of Anode unit (lbs) D •Dia. of pipe (inches) I •> Separation between anodes (ft.) R * the foOowing Ibs/amp/year (Rate of Consumption) Aluminum or CaKahim • 7.6

^—Zinc~ _ ^r~r^ Magnesium • 17.5

Does the calculated life expectancy equal or exceed 20 years?

Yes — No

5. Description of protective coating:

a. Pipeline ^C^teJo*'*- /^-/^^ o^^Ma^^r </«*y ^

b. Riser —^ r r f < '' " ' f " " " ^

c. Subsea vaKe assembly

6. Description of weighted coating:

a. Preconcrete coating

b. Density of concrete PCF

c. Thickness of concrete

d. Thickness of asphalt _ _ _

7. Calculate the specific gravity (one of the foDowing formulae may he used)

Page 31: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BEST AVAILABLE COPY

^ T a . For epoxy MMdm: I G - U t t W / D 3 ^ P-.$<b£~ A ' S - ? ^ / / ? - ? 4 ? - / ' ^ ^

— b. Deadly coraparboa witii flnid materU: S G * W+F A E

c. Lines whh a specific thkknes of concrete:

SG«RC+ K, /W+P-RC R a - K , ) 2 ^ R

— d. lines haffag two coatings «f caamd and a felt wnp, or only asphahmastk coating:

SG-W+P

^3

Where: S G * specific gmity RC • density of concrete (Ib/cn. ft) K,,K,,K3-coefficients T • thickness of concnte coating (Indies) W • weight of ban pipe (Ib/f t) P* weight of coating R * density of fluid material (lb/cu. ft); Lc^ aea water • 64 Ibs/cu. ft. D • diameter of pipe (inches) A * cross^ectional area

S. GKen specific gravity

a.-^fL-b. -1 ^ 9 . G m i t y o r d e n r i t y o f p r o d u c t ( . ) ^ ^ ^ ^ ^ ^

J ^ } 0 . D e r i g n c a p a c i t y o f p i p e l i n e ^ ^ ^ ^ ^ ^ ^ ' 1 ^

.11. Given Hydrostatic Test Pressure: line P i p e i Z ^ . Hold Time ^ bn.

Pninstallation Test R i s e r ^ £ ^ l d Tfane L h n .

Recommended maximum hydrostatic body test for ANSI vaKes, flanges, and fittings an as follows:

ANSI 300-1.100 psig ANSI 400 • 1,450 psig ANSI 600-2.175 psig ANSI 900-3.250 psig ANSI 1400 -5.400 pdg

Page 32: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BEST AVAILABLE COPY

Note: MinfanDm hold

line Pipe-8 hn. 4 hn€ 125% of MOP C M - Riser» 4 hn. (pretest) liquid- Phis 4 hn.€ 110% If leak tepee-

or DOT 192.S07(c) Hon is aot visabk during lest

12. Maximum ADowabie Operating Pressure (MAOP) of Une pipe: .

MAOP-2ttxFxExT Note: F-.72;E-1;T-1

Z^5

b. MAOP-

cMAOP-

.13. MAOP of riser pipe. Note: F • .50 for risen on nstunl ps transmission Unes. Note: F-.60 for risen on liquid pipelines. ^ A n <

.MAOP- > ^ ^ J ^ ! L ) C ^ O = 4 ^ ^ b. MAOP-

_^__14. MAOP of flanges, fittings, and valves:

15. MAOP of proposed pipeline as determined fat accordance with Titk 49 CFR Part 195 or 192. as applicabk. is / ^ r Q r««|

___16. Items 12. 13, and 14 above an equal to or mon than the maxfanum aDowabk working pnssun (MAWP) of source.

17. Verify: 1:25 maximum source pnssun (MSP) < hydrostatic test pnssun (HTP) < .95 (smaDer IP 6 SMYS of Hems 12 or 13 above)

Note: The ncommended Hmit of test as a percentage of internal pressure £ specificed minimum ykld stnngth is equal to 95'*:

I P * S M Y S - 2 x s x t -D V

.18. Verify MAOP does nof exceed the lowest of the following:

a. Suomerged componenu: HTP/1.25- Z ^ 0

b.Riser: HTP/1.5- ((/({OP*?^

Page 33: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

BEST AVAILABLE COPY

VaKefiunlioKd: Yes No.

D. hsflbtioa Rtqulieimim:

1. AO pipelines wO be fatstdled or bid to • minJnnun of three feet below the lerd of the modline ont to and faichidins the 300 foot water depth, except at pdpeUne crossings. Any devbtion mast bejustified at the time of application.

AD valves and taps arast be provided with a minhnum of Aree feet of actaal cover either with sofl or sandbags or Jetted to a minimum of three feet below the mudline. VJUms approved vahe protection covers are nsed, the valves aad taps are NOT required to have a minimum of three feet of actual cover or Jetted three feet below the mudline. However, the top of die vaKe protection cover shaU not protrude above the kvd of die mudline. Aay devbtion must bejusti-fied at the time of application.

£. Pipeline Crossings:

AJffry 0 pipdine crossings fai water depths ap to and including 300 feet riiafl be cement'bagged with a minimum of 18 inches between the lines with die upper­most line having a minimum of 3 feet of cover in the form of cement bags bi* stalled so as to provide a three foot horizontd to a one foot verded (3:1) dope with a crown width that is one and one-half (IK) times die pipe diameter. Any devbtion must bejustified at the tfane of application.

AO pipeline crossings in water depths greater dian 300 feet shaU be cement bagged with a minimum of 18 inches between die lines and installed so as to provide a three foot horizontd to a one foot verticd (3:1) slope. Any devbtion must bejustified at die tfane of application.

F. Construction Infonnation:

_ 1. Proposed coastniction commencement date — fy^^v^f ^ ^

_ 2. Method of constniction

3. Method of burial

^^4. Tfane required to by pipe S'^Y1—

5. Time required to compkte project

C. Applicant complies with current OCS pipeline guidelines:

Yes ^ No

Page 34: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

1331 LAMAR. SUITE 1065 HOUSTON. TEXAS 77010

(713 ) 6 5 2 - 2 8 4 7

July 21, 1988

Mr. Daniel J. Bourgeois Regional Supervisor Office of Field Operations U. S. Department of the Interior Minerals Management Service Gulf of Mexico OCS Region 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394

Attention: Mr. Autry Britton FO-2-2

RECEIVED \

JU12 71988 t

FIELD \ . . OPERATIONS

Region. ^ 5 *

RE: Application for a 6.625-Inch O.D. Natural Gas Pipeline to be Installed In and/or through Blocks 280, 269 and 268, South Marsh Island Area, Gulf of Mexico, Federal Waters, Offshore Louisiana

Gentlemen:

Pursuant to the authority granted in Section 5(e) of the Outer Continental Shelf Lands Act (67 Stat. 462 (43 U.S.C. 1331), as amended (92 Sta. 629), and in compliance with the regulations contained in Title 30 CFR, Part 250.150(b), Brooklyn Union Exploration Company, Inc. (Brooklyn Union), hereby submits this application in quadruplicate (original ana three copies) for a right-of-way two hundred feet (200') in width for the construction, maintenance and operation of a 6.b25-inch O.D. natural gas pipeline in the South Marsh Island Area, Gulf of Mexico. Brooklyn Union agrees that said right-of-way, if approved, will be subject to the terms and conditions of said regulations.

This 6.625-inch O.D. pipeline will be used to transport gas and condensate from Brooklyn Union's proposed Platform "A" (Well No. 2) OCS-G 5197 in South Marsh Island Area Block 280 to Placid Oil Corporation's (Placid) existing Platform "A", OCS-G 2310 in South Marsh Island Block 268. The pipeline will depart Brooklyn Union's proposed Platform "A" in South Marsh Island Block 280 in a northeasterly direction and go approximately 8,285 feet (1.57 miles) to Placid's Platform "A" in South Marsh Island 268, all being in the Gulf of Mexico, Federal Waters, Offshore, Louisiana. The proposed construction commencement date is August 30, 1988, with the time reguired to lay the pipe being estimated at 5 days with an overall completion of project time being estimated at 21 days. The base of operations will be Grand Chenier, Louisiana.

Page 35: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

ffirtrohlytt Union Exttlnnttian Company, ha.

Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Two

This application (and any amendments made hereto) is made with our full knowledge and concurrence with the OCS Lands Act (43 U.S.C. 1331, et. seq.), as amended (P.L. 95-372), including the following: Sec. 5(e) addressing pipeline rights-of-way, requirements of the Federal Energy Regulatory Commis­sion relating to notice of hearing, transportation and purchase of oil and gas without discrimination; Sec. 5(f)(1) addressing operation of pipelines in accordance with competitive principles, including open and nondiscriminatory access to both owner and non-owner shippers; Sec. 5(f)(2) which may allow exemption of the requirements in Sec. 5(f) assuring of maximum environmental protect' for pipeline installation; and Sec. 5(f)( throughput capacity of any pipeline excep Barbara Channel.

(i); Sec. 5(e) addressing the on, including the safest practices )(B) which may require expansion of for the Gulf of Mexico or the Santa

In accordance with applicable regulations, we have delivered a copy of the application and attachments thereto by certified mail, return receipt requested, to each lessee or right-of-way or easement holder whose lease, right-of-way or easement is so affected. A list of such lessees or right-of-way or easement holders is attached (see Attachment "A") and copies of the return receipts showing date and signature as evidence of service upon such lessees or right-of-way or easement holders will be forwarded to your office when received. In order to expedite the permit process, we have requested a letter from the lessee, right-of-way or easement holder expressing no objec­tion to the proposed project. When obtained, these letters will be forwarded to your office. The proposed right-of-way does not adjoin or subsequently cross state submerged lands.

Applicant agrees to be bound by the foregoing regulations, and further agrees to comply with the applicable stipulations as set forth in the OCS Pipeline Procedures Guidebook dated March, 1984, revised September, 1984.

In support of our application and for your review and use, the following maps, drawings and documents have been enclosed herewith and made a part hereof:

1. Index or Vicinity Map, (four copies enclosed)

2. Route Map, (four copies enclosed)

3. Engineering and Hazard Survey (four copies enclosed)

4. Schematic, (four copies enclosed)

5. General Pipeline Information, (four copies enclosed)

Page 36: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Sirnohlyn Union Exttlnration (Bompant), inr.

Minerals Management Service Pipeline R-O-W Application South Marsh Island Blocks 280/269/268 July 21, 1988 Page Three

6. Originally signed copy of Nondiscrimination in Employment Stipulation is attached to each copy of the application.

7. A check in the amount of $ 1430.00 of which $1,400.00 covers the application fee and $30.00 covers the first year's rental on 1.57 miles of right-of-way.

Contact on technical points or other information:

G. Ross Frazer Brooklyn Union Exploration Company 1331 Lamar Street, Suite 1065 Houston, Texas 77010 (713) 652-2847

"Brooklyn Union Exploration Company, Inc. hereby certifies that the proposed activity described in this application complies with and will be conducted in a manner that is consistent with the Coastal Zone Management Program of the State of Louisiana."

Further, "Brooklyn Union Exploration Company, Inc. hereby agrees to keep open at all reasonable times for inspection by the Minerals Management Service, the area covered by this right-of-way and all improvements, structure, and fixtures, thereon and all records relative to the design, construction, operation, maintenance, and repairs, or investigations on or with regard to such area."

Please refer to your New Orleans Miscellaneous File No. 1046 for a copy of a resolution approved by the Board of Directors authorizing the undersigned to sign for and on behalf of Brooklyn Union Exploration Company, Inc.

If the above information meets with your approval, we would appreciate you issuing the necessary decision for tne right-of-way at your earliest conven­ience. Inquiries concerning this application should be directed to our regulatory agent at J. Connor Consulting, Attention: Ms. Jodie Connor. (713) 558-0§07.

Sincerely,

Barnes G. Floyd President

JGF:JAC:bna257 Attachment and enclosures

Page 37: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Four

CC: Lessees and Right-of-Way Holders as indicated on Attachment "A", all with Copy of Attachments and Enclosures

Placid Oil Corporation 3900 Thanksgiving Tower Dallas, Texas 75201 Attention: Mr. Jim McGowen (Certified Mail No. P 815 159 510)

Trunkline Gas Company P. 0. Box 1642 Houston, Texas 77001 Attention: D. N. Huebner (Certified Mail No. P 815 159 511)

Chevron Pipeline Company 3520 General DeGaulle Drive New Orleans, Louisiana 70114 Attention: Mr. R. L. Downie (Certified Mail No. P 815 159 512)

Hunt Oil Company 1401 Elm Street Dallas, Texas 75202 Attention: Mike Cook (Certified Mail No. P 815 159 513)

Hamilton Brothers Oil Company P. 0. Box 5870 Denver, Colorado 80217 Attention: David P. Oberbrockling (Certified Mail No. P 815 159 514)

Hunt Industries 2800 Thanksgiving Tower Dallas, Texas 75201 (Certified Mail No. P 815 159 515)

Hamilton Brothers Exploration Company 1560 Broadway, Suite 2000 Denver, Colorado 80202 Attention: David P. Oberbrockling (Certified Mail No. P 815 159 516)

Page 38: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Five

CC: Prosper Energy Corporation 2800 Thanksgiving Tower Dallas, Texas 75201 Attention: Mr. Jim McGowen (Certified Mail No. P 815 159 517)

Mobil Oil Exploration & Producing 1250 Poydras Street New Orleans, Louisiana 70113 Attention: R. L. Fajhowski (Certified Mail No. P 815 159 518)

Texaco Producing, Inc. P. 0. Box 60252 New Orleans, Louisiana 70160 Attention; Mr. J. C. Culp (Certified Mail No. P 815 159 519)

Hunt Petroleum Corporation 2800 Thanksgiving Tower Dallas, Texas 75201 Attention; Mr. Steve Brooks (Certified Mail No. P 815 159 520)

Rosewood Resources (P0C) Inc. 200 Crescent Court, Suite 300 Dallas, Texas 75201 Attention: Mr. Walter M. Lenamon (Certified Mail No. P 815 159 521)

Petro-Hunt Corporation 2800 Thanksgiving Tower Dallas, Texas 75201 Attention: Mr. Jim McGowen (Certified Mail No. P 815 159 522)

The George R. Brown Partnership 4700 First City Tower 1001 Fannin Street Houston, Texas 77002-6708 Attention: W. H. Heisler (Certified Mail No. P 815 159 523)

Samedan Oil Corporation 350 Glenborough, Suite 240 Houston, Texas 77067 Attention: Annalisa M. Taylor (Certified Mail No. P 815 159 524)

Page 39: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Six

CC: Kerr McGee Corporation P. 0. Box 39400 Lafayette, Louisiana 70593 Attention: Cary V. Bradford (Certified Mail No. P 815 159 525)

Kerr McGee Federal Limited Partnership 1-1981 P. 0. Box 25861 Oklahoma City, Oklahoma 73125 Attention: Barry N. Hill (Certified Mail No. P 815 159 526)

Exxon Pipeline Company Attn: Mr. Haskel T. Rogers P. 0. Box 2220 Houston, Texas 77252-2220 (Certified Mail No. P 815 159 527)

Columbia Gas Transmission Company Attn: Mr. H. D. Moy Post Office Box 683 Houston, Texas 77001 (Certified Mail No. P 815 159 528)

Page 40: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

ATTACHMENT "A"

The following Lessees and Rights-of-Way holders on even date with this appli­cation were furnished a copy of this application by Certified Mail, Return Receipt Requested (Note: Tne status of blocks listed below was current as of July 22,1988, per research of MMS records by Debbie Armond and Mary Holmes).

SOUTH MARSH ISLAND AREA

BLOCK 268

Hunt Oil Company OCS-G 2310 Oil & Gas Lease Placid Oil Corporation Hamilton Brothers Oil Company Hunt Industries Hamilton Brothers Exploration Co. Prosper Energy Corporation Mobil Oil Exploration & Producing Texaco Producing Inc. Hunt Petroleum Corporation Rosewood Resources, Inc. Petro-Hunt Corporation George R. Brown Partnership

Placid Oil Corporation OCS-G 2816 Right-of-Way Trunkline Gas Company OCS-G 2817 Right-of-Way Chevron Pipeline Company OCS-G 7553 Right-of-Way Columbia Gas Transmission OCS-G 3836 Right-of-Way

BLOCK 269

Hunt Oil Company OCS-G 2311 Oil & Gas Lease Placid Oil Corporation Hamilton Brothers Oil Company Hunt Industries Hamilton Brothers Exploration Co. Prosper Energy Corporation Mobil Oil Exploration & Producing Texaco Producing Inc. Hunt Petroleum Corporation Rosewood Resources, Inc. Petro-Hunt Corporation George R. Brown Partnership Chevron Oil Company

Trunkline Gas Company OCS-G 2817 Right-of-Way Exxon Pipeline Company OCS-G 1347 Right-of-Way

BLOCK 280

Kerr McGee Corporation OCS-G 5197 Oil & Gas Lease Samedan Oil Corporation Kerr McGee Federal Ltd. Partnership

None Pipeline R-O-W

Page 41: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE

NONDISCRIMINATION IN EMPLOYMENT

As a condition precedent to the approval of the granting of the subject pipeline right-of-way, the grantee, Brooklyn Union Exploration Company, Inc. hereby agrees and consents to the following stipulation which is to be incorporated into the application for said right-of-way.

During the performance of this grant, the grantee agrees as follows:

During the performance under this grant, the grantee shall fully comply with paragraphs (1) through (7) of section 202 of Executive Order 11246, as amended (reprinted in 41 CFR 60-1.4(a)), which are for the purpose of preventing discrimination against persons on the basis of race, color, religion, sex or national origin. Paragraphs (1) through (7) of section 202 of Executive Order 1124b, as amended, are incorporated in this grant by reference.

Page 42: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

GENERAL INFORMATION & CALCULATIONS

6.625" O.D. GAS & CONDENSATE SALESLINE

SOUTH MARSH ISLAND BLOCK 280 TO SOUTH MARSH ISLAND BLOCK 268

1. The water depth along the proposed pipeline route and in relationship to the natural bottom i s set forth on the attached PLAT. Water depth i s (-) 36' MSL at the proposed Platform South Marsh Island Block 280 and (-) 32' MSL at Placid's "A" Platform, South Marsh Island Block 268.

2. The description of the pipe and coating i s as follows:

a. Line Pipe: 6.625" O.D. x .280" W.T., API 5L Grade B seamless; bare weight = 18.98# per foot. Coated with 12-14 mils of Scotchkote 205 fusion bonded epoxy. Specific-gravity in seawater (empty) = 1.25. Welded joints w i l l be protected with heat shrinkable sleeves.

b. Riser Pipe: 6.625" O.D. x .432" W.T. API 5L Grade B seamless. Bare weight = 28.58# per foot. Coated with 12-14 mils Scotchkote 205 fusion bonded epoxy and 1/4 splash-tron at +/" 2 0 MSL.

c. Internal Coating. The analysis of transported products w i l l be monitored.

3. The proposed salesline i s approximately 8,285 feet long. This does not include the +/- 94' of r i s e r piping at the platform. The line w i l l transport natural gas and condensate.

4. Valves and flanges on the proposed platform w i l l be 600# ANSI.

5. The design of the proposed saleslines and r i s e r s i s in accordance with the DOT T i t l e 49, Part 192, API RP 14E and 30 CFR Part 250 Subpart J .

6. The cathodic protection system for the pipeline w i l l use zinc tapered semi-cylindrical bracelet anodes. Calculations are as follows:

a. Anticipated line l i f e i s 20 years.

b. Assumed maximum of 2% bare pipe.

c. Current 5 MA/sq. f t .

d. 26 #/amp year

Page 43: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

e. Anode spacing calculations:

Area/mile = 5280~ft:/iniT x 3.14 x i6i625)/12 f t .

= 9153 sq. f t . / m i .

Amps = 9153 sq. f t / mi. x .02 x .005 A/sq.ft.

= .9153 amps/mi.

Line l i f e = .9153 A/mi. x 20 = 18.31 amp yr./mi.

#/mile = 18.31 amp yr/mi. x 26 #/amp y r .

= 476.1 #/mile

Anode spacing = (476.1 #/mi.)/80# = 5.95/mi.f 887 f t .

Use one (1) 80# every 500 fe e t .

7. The design pressure f o r the l i n e pipe and r i s e r :

a. Riser:

t = PD/2S P = i n t e r n a l design

pressure = 1440 psig

= 1440 x 6.625 /(2 x 17,500) t = w a l l thickness, inches

= .273 + 1/16" C.A. S = SMYS X .5 = 17,500

= .335 D = nominal outside

diameter = 6.625"

Use 6.625" O.D. x .432" W.T. API 5L Grade B seamless

Hydrostatic t e s t pressure:

I n accordance with.API 14E

HTP = 1.5 x MAOP

= 1.5 X 1440 = 2160 PSIG

Page 44: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

b. Line Pipe:

t = PD/2S P = i n t e r n a l design

pressure = 1440 psig

= 1440 x 6.625 /(2 x 25,200) t = wa l l thickness, inches

= .189 + 1/16" C.A. S = SMYS X .72 = 25,200

= .252 D = nominal outside diameter = 6.625"

Use 6.625" O.D. x .280" W.T. API 5L Grade B seamless Hydrostatic t e s t pressures

In accordance w i t h DOT T i t l e 49, Part 192

HTP = 1.25 x MAOP + external pressure

= 1.25 X 1440 + 35 f t . X (1.02)/2.31 p s i / f t .

= 1815 PSIG (use 2160 PSIG - same as r i s e r )

8. The hydrostatic t e s t w i l l be conducted i n accordance w i t h applicable regulations. Test duration w i l l be eight hours. The t e s t pressure i s less than 90% of the hoop stress using the steel's SMYS.

9. The s p e c i f i c g r a v i t y of the l i n e pipe was calculated as follows:

The l i n e pipe weighs 18.98 Ibs/LF

The pipe displaces D /4 x 12/1728 x 62.4 x 1.02 = 15.23 lbs w a t e r / f t

Specific g r a v i t y f l o w l i n e = 18.98/15.23 =1.25

The weight of coatings, anodes, and other materials was not considered i n these c a l c u l a t i o n s .

10. The design capacity of the f l o w l i n e i s approximately 30 MMSCFD gas and 900 BCPD.

Specific g r a v i t y of condensate = 50 API and .65 f o r gas.

11. The proposed flowine w i l l t i e - i n at the 22" Trunkline Pipeline South Marsh Island Block 268. (Placid "A" Platform)

Page 45: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

12. Overpressuring of the salesline shall be prevented by the following method. The pipeline shall have both high and low limits. High limits-shall beset no higher than 10% above operating pressure and in no case above the maximum rated pipeline pressure. The low pressure shut-in shall activate no lower than 10% below the operating pressure. The effect of any pressure exceeding either limit wi l l be the automatic and orderly shutdown of a l l pressure sources on the platform.

Page 46: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

PIPELINE SUMMARY

1.

2.

3.

4.

Line Pipe Specifications;

Line O.D. W.T. Grade

6.625n .280" API 5L B

Riser Pipe Specifications;

Line O.D. W.T. Grade

6.625" .432"- API 5L B

Line Pipe;

Thin film epoxy.

Existing 22" TRUNKLINE PIPELINE

O.D. W.T. Grade

5.

6.

7.

22 .562

Name of Product:

X52

Length

8,285'

Length

94'

MAOP

MAOP

1200 PSI

MAOP

1200 PSI

MOP

1200 PSIG 1200 PSIG

Natural gas and condensate

Class Location:

Class I .

Governing Code:

30 CFR Part 250 Subpart J ; DOT T i t l e 49, Part 192; API RP 14E

Application by Brooklyn Union Exploration

Company

REV DATE DESCRIPTION

6.625" O.D. Gas & Condensate Salesline

South Marsh Island 280/South Marsh Island 268

Gulf of Mexico

Page 47: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

EXISTING 22" TRUNKLINE PIPELINE

NOTES;

1. ALL BALL VALVES. CHECK VALNCS It FLG'D. FITTINGS TO BE 6O0# ANSI RTJ FLG'D. EXCEPT AS NOTED

2. NEEDLE VALVES TO BE

r s.s. 6ooo# w.p.

Risgr Pip?;.

6.625 O.D. x .432 W.T. API 5L Grode B Seamless

Line Pipe:

6.625 x .280 W.T. API 5L Grode 8 Seamless (Bare Weight = 18.98 # / f t . )

BEST AVAILABLE COPY

PLACID. *A" PLATFORM SOUTH MARSH ISLAND BLOCK 268

o o

o m CM

<

J

o

"8 CM

i : F H

5 1

| NOTE: ALL VALVES IN j SALES METERING i FACILITIE5 ARE ANSI

600 lb.

C O N D N . M E T E R / O

O Q .1

00 I

PROD.-i r \ GAS j

SEPARATOR 1440 PSIG

GAS CONTACTOR 1440 PSI

I ' Application by

BROOKLYN UNION EXPL COMPANY

S o Q O OC CL

GENERAL NOTES

1. BROOKLYN UNION'S GAS SALESLINE COMPLIES WITH DOT TITLE 49, PART 192 & 30 CFR 250 SUBPART J

2. BROOKLYN UNION'S PROPOSED PLATFORM FACILITIES COMPLY WITH 30 CFR SUBPART H

3. HIGH PRESSURE SENSOR WILL BE SET AT 1200 PSIG

4. LOW PRESSURE SENSOR WILL BE SET AT 945 PSIG.

5. DESIGN PRESSURE OF THE PIPE LINE IS 1440 PSIG. MAOP IS 1200 PSIG "

SACRIFICIAL ZINC ANODE. 80# EACH, SPACING TO BE A MAXIMUM OF 500 FEET.

BROOKLYN UNION EXPLORATION COMPANY PRODUCTION PLATFORM

SOUTH MARSH ISLAND BLK. 280

REV- DATE DESCRP. BY

SCHEMATIC FOR 6.625" O.D. NAT. GAS & COND.SALESUNE

S.M.I. BLK. 280 TO S.M.I. BLK. 268 - GULF OF MEXICO

JOB NO- NC-12M DATE: 7/20/88

DWG. NO.: SKETCH #1

Page 48: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

LOUISIANA GULF COAST INDEX M.M.S. O.C.S. LEASING AREAS

BEST AVAILABLE COPY

NQ 15-2

GARDEN BANKS AREA

CHANDELEUR AR£fi

CHANDELEUR AREA E A S T A D D I T I O N

IDA

MAIN PASS AREA

SOUTH a ADDITIOI

NH 1 6 - 7 VIOSCA KNOLL

AREA

SOUTH PASS AREA —'SOUTH a EAST ADDITION

WEST DELTA AREA ^SOUTH ADDITION.

GRAND ISLE AREA SOUTH ADDITION

NG 16-10 M I S S I S S I P P I

CANTON AREA

N

AREA OF INTEREST

NG I S - S

GREEN CANYON AREA

S U t

AREA MAP

PROPOSED MINERAL DEVELOPMENT GULF OF MEXICO

SOUTH MARSH ISLAND AREA NORTH ADDITION

BROOKLYN UNION EXPLORATION CO.

P R E P A R E D BY K C OFFSHORE DATE-SHEET J _ _ OF 3

Page 49: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

RFST AVAILABLE COPY

246 oi 4B9oas* £ M,«a» t « i * J

245

247 49*1'»* H.ili 791'

2 6 0 . . / J 9 S > ° t ' M.TOJ JST"

261 4999 If* K.eoa s a l '

274

275 •on i ' * i s . c n « M -

S I 248

S 259

S 262

2 4 4 / / I

249

258

263

• i * « < - 243 :

250

t t t o i . a r a B I T '

257

T-HT.I IT 767

4 264

r u T j . j s s T i r '

242

251

256

265

241

252 C 253-iSO* 19*

ITtt lit'

255/ S

266 "S

PROPOSED 6" GAS/CONDENSATE P/L ? ' 273

£ 276

14.758 05

- • 2 7 2

277

286

M.73P 05'

271

T-157.601 SB7.'

278

Y.UJ.BIJSVT"

285

14.756 05

270

279

284

14,758 OS" Til2B,OB5 587

VICINITY MAP

••280.. S

283 S

287 S

14.758 OS

T. I I J .JJ73J7

" 240

9789 I0»'

254

267 :

9 5 6 8 292'

/ ^ 6 8

281

9 4 i « 424

282 j / f l t o * 9587 490'

288 sis*"* 9520 556'

N

PREPARED BY K C OFFSHORE

PROPOSED MINERAL DEVELOPMENT GULF OF MEXICO

SOUTH MARSH ISLAND AREA NORTH ADDITION

BROOKLYN UNION EXPLORATION CO.

DATE-' SHEET cZ OF 3

Page 50: (Orig. Sgd.) J. ROGERS PEARCY · * PiUNO *Mlf1EP Ftfh *,-*5r*MJ.wiH Fw

/PROPOSED 6" GAr 'DENSATE P/L

WELL NO. 2 STA. O+OO X - 1,823.874.16 . S V - 157,004.22 ^ LAT. - 29° 05' 50.06"N LONG. » 91° 53' 05.12"W>

TAP STA. 6+00 X - 1,824,169.97 Y » 157,526.23

\

R/W LIMITS

PROPOSED P/L

R/W LIMITS

tM

.

2 0 I 10 HI

§ 3 0 -§ 40-m 50^ ^ 6 0 -

STA. 6+86.73 X - 1,824,212.7 P.C.

STA. 71+07.15 X • 1,827.378.16 Y « 163,187.55

R - 750.00' L - 1,178.10V

N 29° 32' 22" E 7,107.15'

FLOW STA. 12+26.36 Y - 158,071.17

PLAN

1,000' 0 2 , 0 0 0 '

>LACID 268 "A" STA. 82+85.25 X •= 1,828,128.16 Y • 163,937.55 LAT. = 29e 06' 58.90"N LONG. = 91° 52' 17.54^

'WATER SURFACE

—TJ. **™y™>* s- M.H.^aC_ P R 0 P

COVXR P/L

T Y P I C A L D I T C H D E T A I L

. CL.

'—• s

o

y S ' MIN. COVER

K-300'

MUD LINE 3' MIN. COVER IL PROPOSED 6" GAS/CONDENSATE P/L

80* 0 SO'

PROFILE

1,006' 0 2 , 0 0 0 *

VERTICAL SCALE HORIZONTAL SCALE

PREPARED BV K C OFFSHORE

RFST AVAILABLE COPY PROPOSED MINERAL DEVELOPMENT B t d l HwnifciuM- GULF OF MEXICO

SOUTH MARSH ISLAND AREA NORTH ADDITION

BROOKLYN UNION EXPLORATION CO.

D A T E ; 3 OF 3 SHEET