I n Reply Refer To: MS 5421 OCS-G 10102
September 18, 1992
ACTION
Brooklyn Union E x p l o r a t i o n Company, Inc.
RELINQUISHMENT OF RIGHT-OF-WAY GRANT ABANDONMENT OF PIPELINE
Right-of-way
On J u l y 27, 1988, Brooklyn Union E x l o r a t i o n Company, Inc. f i l e d an a p p l i c a t i o n f o r a right-of-way two hundred f e e t (2 00') i n w i d t h f o r the c o n s t r u c t i o n , maintenance, and operation of a 6 5/8-inch n a t u r a l gas and condensate p i p e l i n e , 1.57 miles i n l e n g t h , from Brooklyn Union E x p l o r a t i o n Company, Inc.'s Platform A i n Block 280, South Marsh I s l a n d Area, North A d d i t i o n , across Block 269, South Marsh I s l a n d Area, North A d d i t i o n , t o P l a c i d O i l Company's Platform A i n Block 268, South Marsh I s l a n d Area, North A d d i t i o n . By l e t t e r dated September 6, 1988, the a p p l i c a t i o n was approved and the right-of-way granted. Proof of c o n s t r u c t i o n was subseguently accepted on December 13, 1988, on 1.55 miles of p i p e l i n e .
On May 29, 1992, Brooklyn Union E x p l o r a t i o n Company, Inc. reguested relinguishment of the aforementioned r i g h t - o f - w a y i n i t s e n t i r e t y . A d d i t i o n a l l y , grantee reguested approval t o abandon i n place the above-described p i p e l i n e i n accordance w i t h 3 0 CFR 250, Subpart J.
Inasmuch as grantee has agreed t o comply w i t h 30 CFR 250, Subpart J, removal of the 1.55 miles of l i n e pipe i s hereby waived. However, i n the f u t u r e , should i t be determined t h a t t h i s p i p e l i n e c o n s t i t u t e s a hazard t o n a v i g a t i o n or commercial f i s h i n g operations or unduly i n t e r f e r e s w i t h other uses of the OCS, Brooklyn Union E x p l o r a t i o n Company, Inc. s h a l l be reguired t o remove i t .
Therefore, the p i p e l i n e right-of-way grant i s r e l i n g u i s h e d e f f e c t i v e as of May 29, 1992, the date the reguest f o r relinguishment was f i l e d i n t h i s o f f i c e .
N o t i f y t h i s o f f i c e i n w r i t i n g w i t h i n 30 days a f t e r completion of the p i p e l i n e abandonment.
(Orig. Sgd.) J. ROGERS PEARCY
J. Rogers Pearcy Regional D i r e c t o r
cc: Case F i l e MHHOLMES/
1
United States Department of the Interior MINERALS MANAGEMENT SERVICE " • • " S U B " ™
GULF OF MEXICO OCS REGION m
1201 ELMWOOD PARK BOULEVARD NEW ORLEANS, LOUISIANA 70123-2394
In Reply Refer To: MS 5421 September 18, 1992 OCS-G 10102
ACTION
Brooklyn Union Exploration Company, Inc. Right-of- way
RELINQUISHMENT OF RIGHT-OF-WAY GRANT ABANDONMENT OF PIPELINE
On July 27, 1988, Brooklyn Union Exloration Company, Inc. fi l e d an application for a right-of-way two hundred feet (200') in width for the construction, maintenance, and operation of a 6 5/8-inch natural gas and condensate pipeline, 1.57 miles in length, from Brooklyn Union Exploration Company, Inc.'s Platform A in Block 280, South Marsh Island Area, North Addition, across Block 269, South Marsh Island Area, North Addition, to Placid Oil Company's Platform A in Block 268, South Marsh Island Area, North Addition. By letter dated September 6, 1988, the application was approved and the right-of-way granted. Proof of construction was subsequently accepted on December 13, 1988, on 1.55 miles of pipeline.
On May 29, 1992, Brooklyn Union Exploration Company, Inc. requested relinquishment of the aforementioned right-of-way in i t s entirety. Additionally, grantee requested approval to abandon in place the above-described pipeline in accordance with 30 CFR 250, Subpart J .
Inasmuch as grantee has agreed to comply with 30 CFR 250, Subpart J, removal of the 1.55 miles of line pipe i s hereby waived. However, in the future, should i t be determined that this pipeline constitutes a hazard to navigation or commercial fishing operations or unduly interferes with other uses of the OCS, Brooklyn Union Exploration Company, Inc. shall be required to remove i t .
Therefore, the pipeline right-of-way grant i s relinquished effective as of May 29, 1992, the date the request for relinquishment was filed in this office.
Notify this office in writing within 30 days after completion of the pipeline abandonment.
J. Rogers Pearcy Regional Director
cc: Case F i l e
F o r m 1-1181 (July UJI)
BILLING DATE
Proof of Construction Accepted 12/15/88 BILLING INDEX
Bond Fund symbol (Acq. lands only) : „ Serial No. ...™!l!Z^L.™?l?fi_ -
No bond Expiration date
Total rmtol rtue
Type. P /L R/W
Efftctim Jot* Uatt Uniu f s f w W , asiignmeni (Acrri, miles.
Giumy diitri' bution of
total rental rale
C o u n t y d i t t r v k u -l i o n ( C o u n t y M M * )
9/6/88 .l;0!ir..>.y.... $15.00 $30..C)0 W&S&SSJS&UJ&Q l iSSjSj and g68y Soiith
tesh.IsjUfld... ^.ea,..Nor.th.
,_^AY.4JU892U,
BILLS ISSUED Y . . r ol
I M M Dau ii
9/6/88 1988
Y H r o f • M M Dau i
. 6th.
U . B J V & L £ ^ 7th. ^ 12/1/89 pd .
8th.
12/1/90 pd . i t h 9th.
5th 12/ l /91. .p .d t Hhh.
No. AJdrm,
Principal
l.m..Lam ,...Sui.t.e...l.0.65.. Ho ton,..Texas.....7.7010....
A—tinam of undivided Inter—t
Operator
10102 Brooklyn Union Exploration Conpany, Inc.
To: Adjudication Unit (MS 5421)
From: Pipeline Unit, Field Operations (MS 5232)
Subjeot: Right-of-Way Relinquishment/Abandonment
Company: ^ t d / L L f A / ^//U/oio Qfl/b/Z/iT'/D/Lj IbmP/tAtt, JJOC ,
Right-of-Way Number: 0 / O / D 2 ^
The subject abandonment has been reviewed and has been found to be in compliance with 30 CFR 250.157(c).
A. Pipeline abandoned in place
Pipeline abandoned by removal
Pipeline never constructed
Enclosure
MINERALS M M ^ ^ ^ L C M T ^ ^ LEASING & ENVIRONMENT.
1331 LAMAR. SUITE 1065
HOUSTON. TEXAS 77010
(713 ) 6 5 2 - 2 8 4 7
May 26,1992
Mr. Daniel J. Bourgeois Regional Supervisor Office of Field Operations U. S. Department of the Interior Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394
Attention: Mr. Mike Connor FO 2-2
RE: Application to Abandon Pipeline and Relinquish Right-of-Way Grant OCS-G 10102, 6.625" Right-of-Way Pipeline Installed In and/or Through Blocks 280, 269 and 268, South Marsh Island Area, OCS Waters, Gulf of Mexico, Offshore, Louisiana
Gentlemen:
Pursuant to regulations contained in Title 30 CFR, Part 250.156(a)(1), Brooklyn Union Exploration Company, Inc. (Brooklyn Union) hereby submits an application, in triplicate, to relinquish and abandon in-place an existing 6.625" Right-of-Way Pipeline (8,207' in length) originating at Brooklyn Union's Platform A in South Marsh Island Block 280 and terminating at Torch Operating Company's Platform A iii South Marsh Island Block 268, Offshore, Louisiana.
As a result of reservoir depletion, Brooklyn Union has elected to plug and abandon existing Lease OCS-G 5197, Well No. A-l and remove Platform A on South Marsh Island Block 280. Brooklyn Union has detennined that no further service will be required of the 6.625"Right-of-Way Pipeline.
Subject to approval of this application, pipeline abandonment operations are scheduled to commence on approximately July 15,1992 with an anticipated project duration of 7 to 10 days.
Brooklyn Union will utilize an onshore support base located in Berwick, Louisiana.
ACCEPIED
Director Effective Date_
m 2 9 1992
Minerals Management Service Abandon Pipeline and Relinquish Right-of-Way OCS-G 10102, South Marsh Island Block 280 May 26,1992
Page Two
In support of this request, enclosed please find the following information:
1. Detailed abandonment procedure
2. As-Built Pipeline Route Map
3. Pipeline Riser Drawing
Should you have any questions or requests for additional information, please contact the undersigned, Jack Shelledy or our regulatory agent, J. Connor Consulting, Inc., Attention: Susan Wilson at (713) 558-0607.
Sincerely,
BROOKLYN UNION EXPLORATION COMPANY, INC.
'James G. Floyd President
JGF:SEW Enclosures
BROOKLYN UNION EXPLORATION COMPANY, INC.
SOUTH MARSH ISLAND BLOCK 280
PROPOSED ABANDONMENT IN-PLACE PROCEDURE
1. Move jack-up boat into location at South Marsh Island Block 268, Platform B and rig up.
2. Rig up pumping equipment at 6.625" pipeline connection at South Marsh Island Block 280, Platform A.
3. Connect a line from 6.625"pipeline connection at the South Marsh Island Block 268, Platform B to the jack-up boat to catch the pipeline flush returns.
4. Pump approximately 360 barrels of seawater into the pipeline at the South Marsh Island Block 280, Platform A to flush any remaining fluids out of the pipeline into a holding tank on the jack-up boat.
5. Once the returns are clean, stop pumping and release pressure on the pipeline.
6. Remove the 6.625"riser attached to the South Marsh Island Block 268, Platform B. Cut, cap and bury the end of the pipeline at least 3* below the mudline.
7. Disconnect pumping equipment.
8. Remove the 6.625"riser attached to the South Marsh Island Block 280, Platform A. Cut, cap and bury the end of the pipeline at least 3' below the mudline.
9. Conduct a bottom search of and debris removal for the entire pipeline right-of-way.
6" GAS/CONDENSATE P/L (AS-P r OATA)
POINT X Y RL -
1 1.828.128 163.937 RISER 268 "B" 2 1.827,837 163.838 3 1.827.714 163.758 4 1.827.429 163.350 5 1.827.198 162.931 6 1.826.962 162,492 7 1.826.526 161.654 8 1.826.241 161.200 9 1.825.984 160.768
10 1.825.932 160.668 11 1.825.744 160,329 12 1.825.251 159,457 13 1.824.995 159.042 14 1.824.752 158.616 15 1.824.462 158.097
' 16 1.824.287 157.761 17 1.824.124 157.505 TAP 18. 1.823.882 157.024 RISER WELL NO. 2
PLACID 268
TOTAL LENGTH 8,207'
269
6" GAS/CONDENSATE P/L (AS-BUILT) /
X > 1.824.186
UELL NO. 2
•Y « 158,127
Y ' 157,601.69
BEST AVAILABLE COPY
NOTES:
X, Y COORDINATES ARE BASED ON THE LOUISIANA STATE PLANE COORDINATE SYSTEM (LAMBERT). SOUTH ZONE.
DEPTH OF COVER AT WELL 5' FOR 300'.
DEPTH OF COVER AT TAP 3'.
DEPTH OF COVER ALONG ROUTE 3*.
THIS MAP HAS BCCN CARCFULLY PHEPABEO USING INFORMATION OBTAINED FROM VARIOUS SOURCES ANO ALL OATA OTHER THAN THAT SPECIFICALLY CERTIFIED CORRECT SHOULD 8E CONSIDERED FOR REFERENCE ONLY.
"' MICHAEL J . KINSELLA REG. No. 20087
."xGiSTCRED \ PrJCf ESSiCKAL EnllNEERj
SCALE 1:12,000
CERTIFIED CORRECT AS TO HORIZONTAL LOCATION OF AS.BUILT PIPELINE
AS-BUILT SURVEY
6-INCH BROOKLYN UNION PIPELINE
BLOCKS 268-280 SOUTH MARSH ISLAND AREA
NORTH ADDITION
OFFSHORE LOUISIANA
PRODUCTION MANAGEMENT INDUSTRIES
HNSELLA, COOK 4 ASSOCIATES, WC.
••at mat• law* 4 Mtaa aooal « l e w u a u 4 taaw
ORN. J F L PREP. TAO CAL. TAO APP J / V o FILE NO. 2 6 - 8 - 0 6 2 - O I A
CHK CHK / I S OATC i i -01-ee FIO MO |
AVAILABLE COPY
A14+ aVEft NWfU? L I K E — —,'
f V n MMEPilAU
. t. ,' "
gfeu ws'-g' / ra - i
E O F B t - W i ^ '
AS' i CAISSON
Tf
* PiUNO *Mlf1EP Ftfh
*,-*5r*MJ.wiH Fw.<'/4<.B«)E-/mteUt. wrr laufftJED BV OTHERS)
HI1
^_ TT^S •S ^>_ci:_(-) \t>- 6>
! I
—1* I
i , ;
y g TTPS -•2 ^£L (-) &g-g
I
I
^2
I O
1 I
1 * 6 6 *HT * l ^ f t Wft KELP
t o R I H * t f -SWIM Rfc.
3 SEC SHT S101 TOR fcENT.RAL NOTTS • PAINT SPECIFICATIONS
e^Aue V - I'-O"
MA'
L f t i , . i ^ *UUUI« lg I 7-24 nev NORTH AWgw vr
PRODUCTION MANAGEMENT INDUSTRIES, INC. A nooucnoN ^
C0NSVIIM6 mGWOBNC
M A I V I T . lOUI t lAKA
rAUXUION AND COMSnWCDON
NOUtlOM THAI
BROOKLYN UNION EXPLORATION
S M I 2 8 0
RISER ORIENTATION & CLAMP LOCATIONS
A
In Reply Refer To: FO-2-2 DEC 13 1988
BEST AVAILABLE COPY Brooklyn Union Exploration Company, Ino. Attention: Hr. G. Ross Frassier 1331 Lamar Street, Suite 1065 Houston, Texas 77010
Gentlemen:
In accordance with 30 CFR 250.158(b), your l e t t e r dated November 14, 1988, transmitted a pipeline construction report for the following right-of-way pipeline:
Pipeline Right-of-way Number
Size (inches)
6 5/8
Length (feet)
8,207
Service
Gas and Condensate
From
Platform A Block 280 South Marsh Island Area, North Addition
To
Platform A Block 268 South Marsh Island Area, North Addition
The data which you provided indicates the following test information and establishes the assigned maximum allowable operating pressure (MAOP) for this pipeline:
Pipeline Right-of-way Number
Test Pressure Duration MAOP MAOP (hours) (psig) Determination
OCS-G 10102 2,200 8 1,200 Connecting pipeline
The tot a l length of the "as-built" pipeline right-of-way i s 1.55 miles.
In future correspondence, please refer to the above pipeline by i t s assigned right-of-way number.
Sincerely yours,
{Orig. Sgd.) A. DonaM Giroir D. J. Bourgeois Regional Supervisor Field Operations
bcc: 11502-01 OCS-G 10102 (w/orig report) (FO-2-2) (K. Faust) 1502-01 OCS-G 10102 (FO-2-2) LE-3-1
0PS-6 (w/cy of location plat)
ABritton:ds:12/8/88:LEXITyPE Disk 4
1V
1331 LAMAR, SUITE 1065 HOUSTON, TEXAS 77010
(713 ) 6 5 2 - 2 8 4 7
November 14, 1988
Mr. Daniel J. Bourgeois Regional Supervisor Office of Field Operations U. S. Department of the Interior Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394
Attention: Mr. Autry Britton FO-2-2
RE: 6-5/8" Natural Gas and Condensate Right-of-Way Pipeline (OCS-G 10102) Blocks 280, 269 and 268, South Marsh Island Area, Offshore, Louisiana
Gentlemen:
Reference is made to that certain application dated July 21, 1988 approved by your office on September 6, 1988, pertaining to the installation of a 6-5/8" right-of-way natural gas and condensate pipeline to transport production from Brooklyn Union's Platform "A" in South Marsh Island Block 280 to Apache's Platform "A" in South Marsh Island Block 268.
In accordance with regulations contained in Title 30 CFR 250.158(b), please be advised that installation of the subject pipeline was completed on October 31, 1988; with an actual first operations commencing on November 9, 1988.
Enclosed are copies each of the "as-built" location plat and hydrostatic test pressure data.
Should you have any questions or requests concerning this matter, please contact the undersigned at your convenience.
Sincerely,
BROOKLYN UNION EXPLORATION COMPANY, INC.
G. Ross Frazer Operations Engineer
GRF:JAC:CJG Enclosures
1 0 / 3 6 / 8 7121 S 17136336727 / .
V
ei
BEST AVAILABLE COPY
HYDROSTATIC TEST PRESSURE LOG Sheet Of
Company:
Project: KSM TTJLAff-A-Tested By: DA^/O fkueTT
Test Section:
Deadweight Gauge: MFG D,C«&/KJ>Pe*/A&//S< Serial NO.: /y^??
Date Calibrated: tf-Z-J-frf?
DATE TIME PRESSURE (PSIG) PIPE TEMP. ( 0 F) AMBIENT TEMP.(0F REMARKS
9'3/-tt 3.00 A-u 37°
35° Jo-oo Per 33° Jloo P5Z~ 33° 2?-oo PST 3*6
tPzoo prr 3/° 3/° 3/°
cPWo PSS 3?° 3?° 35°
REMARKS:
WI TNESS: COMPANY /)£f<4oA<f!/>pfr«*rZ^..
rONTRAPTOR
DATE /£/?//??
DATE
i e ' 3 i / e e i45
Ov*f 35 Yetrt
S 17136536727 ei
BEST AVAILABLE COPY
Oil & Gas Specialties Company
INSTRUMENT CALIBRATION
DATE OF CALIBRATION: 9-23-88
TYPE OF INSTRUMENT: Dead Weight Tester
PRESSURE RANGE: 0-5000 PSI
Calibrated to Dead Weight Tester traceable to National Bureau of Standards. Serial No: 17499 »
DEAD WEIGHT INSTRUMENT
0 0
.1000 1000
2000 2000
4000 v 4000
5000 5000
4000 4000
2000 2000
1000 1000
0 0
'7 CALIBRATED BY
Q0ALITY CONTROL MANAGER
le/sir ieM6 S 17136336727' e i
Ovtr 35 Yeaw
BEST AVAILABLE COPY
Oil & Gas Specialties Company 11321 Todd 81. a BOxBSSM • MOullon, T M M 77269 • (713) 0064444 • Tclax 29-3366 • F»* (713) 686-0162
PLEASE REPLY TO
INSTRUMENT CALIBRATION
DATE OF CALIBRATION: 9-23-88
TYPE OF INSTRUMENT: Pressure Recorder
TEMPERATURE RANGE: 0-150°?
Calibrated to Sand Bath Tester traceable to National Bureau of Standard. Serial No.
8 8
74 . 74
150 150
74 74
8 8
•
fBRA^ED BY
QUALITY CONTROL
-n i t? / - - /•inrmo. RM 51424 OCS. P.O. BOX 6157
18/31 " 10145
Over 35 Ytert
S 1713655672- 02
BEST AVAILABLE COPY
Oil & Gas Specialties Company
INSTRUMENT CALIBRATION
DATE OF CALIBRATION:
TYPE OF INSTRUMENT: Pressure Reoorder
PRESSURE RANGE: 0-5000 PSI
Calibrated to Dead Weight Tester traceable to National Bureau of Standards. Serial No: 17499 DPIR 316 »
DEAD WEIGHT INSTRUMENT
0 0
1500 1500
2500 2500
3500 * 3500
5000 5000
3500 3500
2500 2500
1500 1500
0 0
CALIBRATED BY ,
UALITY CONTROL MANAGER
-cbi AVAILABLE COPY
to
BEST AVAILABLE COPY
of.' 0
... '-.^
\
e'lteAS/CONOENSATE P/L (AS-BUI OATA)
POINT X Y REMARKS
1 - 1,828,128 163,937 ^ RISER 268 "B" 2 1,827,837 163,838 / 3 1.827,714 163,758 ^ 4 1,827.429 163,350-/
162,931 y 5 1,827.198 163,350-/ 162,931 y
6 1,826,962 162,492 ^ 7 1,826,526 161,654 / 8 1,826,241 161,200 ^
160,768/ 9 1,825,984 161,200 ^ 160,768/
10 1,825,932 160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /
11 1,825,744 160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /
12 1.825,251
160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /
13 1.824,995
160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /
14 1.824,752
160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 / 15 1,824,462
160,668 / 160,329// 159,457 y 159,042i// 158,616 158,097 /
• 16 1,824,287 157,761 - / 157,505 - / 157,024 /
17 1,824,124 157,761 - / 157,505 - / 157,024 /
TAP 18, 1,823,882
157,761 - / 157,505 - / 157,024 / RISER WELL NO. 2
TOTAL LENGTH 8,207'
BEST AVAILABLE COPY
X, Y COORDINATES ARE BASED ON THE LOUISIANA STATE PLANE COORDINATE SYSTEM (LAMBERT). SOUTH ZONE.
DEPTH OF COVER AT WELL 5' FOR 300'.
DEPTH OF COVER AT TAP 3'.
DEPTH OF COVER ALONG ROUTE 3'.
THIS MAP HAS BEEN CAREFULLY PREPARED USING INFORMATION OBTAINED FROM VARIOUS SOURCES AND ALL DATA OTHER THAN THAT SPECIFICALLY CERTIFIED CORRECT SHOULD BE CONSIDERED FOR REFERENCE ONLY.
WELL NO.
~ MICHAEL J. KINSELLA REG. No. 20087
REGISTERED
.PROFESSIONAL mm
SCALE 1:12,000
u
m 7 T*
CERTIFIEd CORRECT AS TO HORIZONTAL LOCATION OF AS'BUILT PIPELINE
AS-BUILT SURVEY
6-INCH BROOKLYN UNION PIPELINE
BLOCKS 268-280 SOUTH MARSH ISLAND AREA
NORTH ADDITION
OFFSHORE LOUISIANA
PRODUCTION MANAGEMENT INDUSTRIES
KINSELLA, COOK & ASSOOATES, INC. OFFSHORE orrsMORi simverma • t i l • I I O I N I A N I 4 iATOH KOUOi 4 l O U I t l A * * 4 » • • • •
DRN JFL PRt'P. TAO CAL. TAO APP. J ^ - O FILE NO. 2 6 - 8 - 0 6 2 - O I A
CHK CHK '""/If/-, OATF 11-01-88 FIO NO |
Date of Inspection: / / - r • g Lessee/Operator:
PIPELINE INSPECTION CHECK LIST BEST AVAILABLE COPY
Company Contact:
MMS Inspector:
Segment No.: G tO io^l
From: SM
Contractor: Barge ID
Barge or Platform: < M 2f tQfcObJ 26>8 A Location
A DOT/DOI:
To: 5M2MA
Size:
Grade:
Seamless:.
Coating:
PIPELINE CONSTRUCTION/SPECIFICATIONS
Wall Thickness:
Anodes:
Type:
No.:
Pipeline Crossing & Clearance:.
Existing Pipel1ne(s) Bouyed:
Length:
Weight:
Spacing:
Burial Depth:
Valves/Taps Cover:
HTP DATA
(Medium) Water or Product
Duration Time
Pressure (PSI)
MINIMUM RATING OF VALVES. FLANGES, FITTINGS AND PRESSURE DATA
Rating: /j>Dt) Approved MAOP:
Service: " G /C
Source: SgPAft f rT&rt
IF Well(s). SITP: N
Pipeline Flowing Pressure: A)OT PlOtOtA/fr
Range Setting
High Sensor(s): \
Low Sensor(s): ^
PSV:
Is low sensor Installed where it could not be Isolated?.
Bumper Guard: iES >|T 2^S Splash Guard: y-"^^ Coating:.
Water Depth:.
Remarks: P j f f C^t J j i M ^ f c ^ J U A J I ^QMOU^ ^ I U M O flUofl CWLM^/)
C5UAA A^L th a t >aA tjL LCM^ ^
Disk 9 -WuX\ >J1A^XI^JX^\ .p^^TJUW^C^o ^JU^A^
PLATFORM
ILE COPY
SOUTH MARSH ISLAND BLOCK 268
1. A a BALL VALVES, CHECK VALVES & FLGD. FITTTNCS TO BE 600/ ANSI RTJ FLCO. EXCEPT AS NOTED
2. NEEDLE VALVES TO BE 1" S.S. 6000# W.P.
Risgr Pipe;
6.625 O.D. x .432 W.T. API 5L Grade B Seamless (Bare Weight = 28.58 # / f t . ) g
Line Pipe:
6.625 x .280 W.T. API 5L Grade B Seamless (Bare Weight - 18.98 # / f t . )
o o to
CM
GENERAL NOTES
BROOKLYN UNION'S GAS SALESLINE COMPLIES IMTH DOT TITLE 49. PART 192 & 30 CFR 250 SUBPART J
i t 5 2. BROOKLYN UNION'S PROPOSED PLATFORM FACILITIES COMPLY WITH 30 CFR SUBPART H
3. HIGH PRESSURE SENSOR WILL BE SET AT 1200 PSIG
4. LOW PRESSURE SENSOR WILL BE SET AT 945 PSIG.
5. DESIGN PRESSURE OF THE PIPE LINE IS 1440 PSIG. MAOP IS 1200 PSIG
A= SACRIFICIAL ZINC ANODE. 80# EACH, SPACING TO BE A MAXIMUM OF 500 FEET.n,
—rn— ! NOTE: ALL VALVES IN ! SALES METERING i FACILITIES ARE ANSI
s! 600 lb. ~r-
jjj! WV (d tf) L-
t^s r A MAXIMUM OF 5 0 0 1 - t t T . f i ,
(0
O l Q I .1 •
P
PROD.-i
!
(LJ) C7
SEPARATOR 1440 PSIG
COND^ METER
GAS SALES
J CMETER
GAS CONTACTOR 1440 PSI
o
s o Q O cn a.
Application b y BROOKLYN UNION EXPL COMPANY
BROOKLYN UNION EXPLORATION COMPANY PRODUCTION PLATFORM
SOUTH MARSH ISLAND BLK. 280
REV DATC OESCRP. BY
SCHEMATIC FOR 6.625" O.D. NAT. GAS & COND.SALESUNE
S.M.I. BLK. 280 TO S.M.I. BLK. 268 - GULF OF MEXICO
JOB NO: NE-1234 DATE: 7/20/88
DWG. NO.: SKETCH f l
- jffia&j -•.
"BEST AVAILABLE COPY
ID;
. NOTIFICATION OF PIPELINE INSTALLATION/HTP
REPORT RECEIVED BY
Name:
Date! / b ^ (
REPORT GIVEN BY
Name; "g Q w ^ - ^ A ^
CoinDany:^T> L^-^O-^^M^^^'
PIPELINE INSTALUATION
Date of Installations; '/ft ~ ( ftj^J. -?\rC ' ^ tXr^U^-*)
Contractor and Barge No;/^U^i»A/ y^^^^Helloort Location; Q-^-
Slze of Pipeline; foYf
G/c~ To: Structure/SSTI
Block
Service:.
. From: Structure.
fey- ^ Jlhere Construction beglits: cP^T A*
Length of time barge will be on Job: &^Uu*-i-*Jn>
District Notified Date:
Time:
Person Contacted:
Date of Inspection: Date Inspection Report Received:.
PIPELINE HTP
Date of Test:
Location of Recorder:,
Location of Heliport:.
District Notified Date:.
" Time:.
Person Contacted:, i
Date of Inspection: Date Inspection Report Received:. i .
Remarks:
. . . J
dEST AVAILABLE COPY
SEP 6 1988 In Reply Refer To: FO-2-2 (OCS-O 10102)
Brooklyn Union Exploration Conpany, Ino. Attention: Mr. G. Boss Frazer 1331 Laiaar Street, Suite 1065 Houston, Texas 77010
Gentlement
Pursuant to the authority granted by i»3 U.S.C. 1334(e) and 30 CFR 250.150(d), your applloation dated July 21, 1988, for a pipeline right-of-way two-hundred feet (200*) in width for the installation, operation, and mlntenanoo of a 6 5/8-lnoh pipeline, 1.57 olles in length, is hereby approved, as proposed.
The proposed pipeline will transport natural gas and condensate from Brooklyn Union Exploration Company, Inc.'s Platfona A in Blook 280, South Marsh Island Area, North Addition, aorosa Blook 269, Smith Marsh Island Area, North Addition, to Placid Oil Company's Platform A in Blook 268, South Marsh Island Area, North Addition.
This approval is subject to the following conditions:
1. There are pipelines located within 500 feet of the proposed aotivities* Precautions as outlined in Notice to Lessees and Operators (NTL) No. 83-3. Section IV.B.l. shall be taken prior to conducting the proposed operations.
2. The unidentified magnetic anomalies listed below may represent archaeological resources. In accordance with (NTL) No. 75-3 (Revision No. 1, Enclosure No. 3). you shall either determine that the potential archaeological resources do not have historic significance, or avoid them when conducting proposed activities as indicated by the avoidance criteria below:
Blocks
268 268 268 268
Line No,
2 2
5
Shot Point
17.«» 15.2 7.9 8.6
Avoidance Criteria (feet)
250 250 250 250
i f
7*
gEST AVAILABLE CUPY
Baaed on our analysis of your applloation, the BBXIOUS allowable operat pressure for this pipeline will be 1,200 psig.
Sinoerely yours,
'"tfriginal signed" - 0. J. Bourgeois
D. J. Bourgeois Regional Supervisor Field Operations
oo: Department of Transportation 2320 La Branch, Room 2116 Houston, Texas 77004 (w/enclosure)
bcc: 11502-01 (P/L OCS-G 10102) (K. Faust) (FO-2-2) TB02-01 (P/L OCS-G 10102) (FO-2-2) F0-5 LE-5 LE-3-1 (w/attch) 0PS-6 (W/cy of plat)
ABritton:ds:8/30/88:LEXITIPE
•
UNITED STATES GOVERNMENT MEMORANDUM
FIELD -OPERATIONS
^ 0 t « R e g i o n . ^ '
August 26, 1988
To: Regional Supervisor* Field Operations, GOM OCS Region (FO)
From: Regional Supervisor, Leasing and Environment, GOM XS Region (LE)
Subject: National Environmental Policy Act Review for Pipeline
Right-of-Way Application XS-G 1 0 1 0 2
Our National Environmental Policy Act (NEPA) review of the subject action is
complete. Environmental protective measure(s), if any, identified to avoid or
mitigate potential impacts associated with the action were included as part of
the NEPA analysis and are shown on the attached Categorical Exclusion Review
(CER).
H. P. Sieverding
Attachment
cc: Pipeline File XS-G 10102 (LE-5)
Action No. OCS-G 10102
United States Department of the Interior Minerals Management Service Gulf of Mexico OCS Region
NEPA CATEGORICAL EXCLUSION REVIEW
The Categorical Exclusion Review (CER) evaluated the proposed action and determined that it meets the categorical exclusion criteria as defined by 516 DM 2.3A(1) which states "(a) The action or group of actions would have no significant effect on the quality of the human environment, and (b) The action or group of actions would not involve unresolved conflicts concerning alternative uses of available resources." The analysis of potential impacts by environmental and resource specialists was based on the assumption that the following mitigative measure(s) will be imposed.
Environmental Protective Measures
The following measure(s) was/were identified in the plan/application by the lessee/operator submitting the proposal: None.
The measures identified by MMS during the plan/application review or in the lease stipulation were:
1. There are pipelines located within 150 meters (490 feet) of the proposed activities. Precautions in accordance with NTL No. 83-3, Section IV.B, will be taken prior to conducting the proposed operations.
2. The unidentified magnetic anomalies or side-scan sonar contacts listed below may represent archaeological resources. In accordance with NTL No. 75-3 (Revision No. 1, Enclosure No. 3), the applicant will either determine that the potential archaeological resources do not have historic significance, or they will avoid them when conducting proposed activities as indicated by the avoidance criteria below:
PlocKs Line No. Shot Point Avoidance Criteria
268 268 268 *268
2 2 4 5
17.4 15.2 7.9 8.6
76 m 76 m 76 m 76 m
*See attached Archaeological Report dated August 23, 1988
Exclusion Peterminatlon
The proposed action was evaluated and reviewed against the CER exception criteria defined by 516 DM 2.3.A(3). With inclusion of the above mitigation, it does not represent an exception to the categorical exclusions. Therefore, preparation of an EA is not required.
Date Preparer
I concur.
Regional Supervisor, Leasing and Environment
" ' ^ ' d£ST AVAILABLE COPY Date:
4b To: Right-of-Way Pifelir.v File OCS-G / 0 / 0 ^ (gg)
Through: Supervisor, Platferr ipel 1ne Unit, Plans, Platform and Pipeline Section, Field Opercxions, Gulf of Mexico OCS Region (FO-2-2)
From: Petroleum Engineer, Platform/Pipeline Unit, Plans, Platform and
Pipeline Section, Field Operations, Gulf of Mexico OCS Region (FO-2-2)
Subject: Pipeline Right-of-Way Application, Technical Review, 73ruc>)c<-^
^JL^ CLA^. %«L . xs-G /C/02-
Size Length (inches) (feet) SgrviCe From
I ^ L flM£~ 4-
Recommendations:
1. The technical aspects of the proposed pipeline are acceptable 1n accordance with appropriate Regulations and Standards.
2. Advise applicant of Notice to Lessees and Operators No. 83-3.
3. Valve protection cover shall not protrude above the level of the mud line.
4. Subsea valves and taps associated with this pipeline shall be provided with a minimum of three feet of cover, either through burial, with sandoags, or other acceptable method.
A. Britton
cc: 1502-01 XS-G I & I ^ ^ (w/orig appln) (Seg. 5 3 ) (FO-2-2) (o
OPS-© (w/cy of p l a t )
ABritton:jj:LEXITYPE Disk 6
BEST AVAILABLE COPY
HPEUNE RIGHT-OF-WAY AFPUCATION TNGINEERINC CSECKUSr'
60M «e&to»M- OFF ice
A. Dwctiption of pipeline and location of propowd roate (UL, rite of pipe, prodnet to be tnnsported, from where Jo where, platfonn auntar aime, Vjockjn^ng^gea^g ^ ^ ^ ^
B. Safety Flow Schematic - Verify that the infonnation riiown ra the afety flow achematk diagram contains the foOowing:
1. Fresuie source is drawn into the schematic with the foDowiqg:
a. ~ ~ -. — - » S l / ^ t ^
b. designworfcingpmsure f^f^
c. high ow preoure sensor settings
2. "ANSr ratings of aD vaKes, flanges, and fittinp between the aoorce aad the connecting pipeline are shown.
3. Presnre relief vaKes, where applicable, are shown with the letting eel no higher than the maxfanum working presnre (MWP) of dw vessel,
4. If the maxfanum input aource presnre is greater than the maxfamnn allowable operating presnre (MAOP) of the pipeline, redundant safety equipment is required.
5. MAOP of proposed pipeline does aot exceed MAOP of connecting pipeline.
6. The pipeline leaving the platfonn receiving production from the platfonn is equipped with higMow presnre sensors to dirtctiy or indirectly shut-in the weD or weDs on the platform.
7. The pipeline delKering production to the production facilities on the platform is equipped with an automatic faD-close vaKe tied into the automatic and remote iut-in system.
Hie pipeline crossing the platform which does not delKer production to the pbtform, but which may or may not receKe production from the platfonn, is tquipped with high-low presnre senson connected to an automatic faD-close vaKe located in the upstream portion of the pipeline at the platform. In addition, the aenson are tied info either the platform't automatic and remote shut-in system or an independent remote shut-in system.
BEST AVAILABLE COPY
9. Ibc rtpeBne boarding Ac phtfonnfripcBnt k oqaipped witb a chodc vahe
JO. Ibe pipeline leaving tbe platfonn b equipped wift a check vahe
J l . Ibe hfeMow preaaue aemon on Ihe depv qg pipeBne b located die check vahe.
12. Where appBeabk, higMow aemon are located downstream of Oe back pleasure legulator.
J ^ X 3 . If there b Bquid injection into tbe Une, are pumps asaodated with the Mection? (Yes or No) £42
.14. Direction of flow tndirated.
-15. Pipe specifications (Le size, gnde, weight, and waS thickaen).
J6. Total length of propoeed pipeBne (feet and mfles).
.17. MAOPofconnecdngpipdine.
.18. Statement that design meets or exceeds DOT Regulations 192 or 195, as applicable, and/or applicable OCS orders, registered engineer's seal, registntion aumber, date, and signature.
J 9. Area and block aumber of proposed pipeline platform.
JO. Cathodic protection specifications.
C Design Infonnation • Verify dial die pipeline design infonnation ghen in die application and/or on the dau sheet is complete and correct:
— \. Product to be transported: 71 ffi^ j-GuxL
2. Pipeline, riser, and subsea vahe assembly spedfkatiom:
(1) Sise WaO Thickness Grade _S—Weight tMg.lbs/ft.
(2) Size WaD Thickness Gnde Weight Ibs/ft.
(3) Size WaO Thickness Gnde Weight lbs/ft.
b. Riser:
(1) Size £±i£WaD Thickness ' ^ ' o n d c ^ Weight ££^®.Ibs/ft.
(2) Size WaD Thickness Gnde Weight Ibs/ft.
(3) Size WaO Thkkness Gnde Weight Ibs/ft.
c. Subsea vahe assembly:
(I) Size WaD Thkkness Gnde Weight Ibs/ft.
(2l Size WaO Thkkness Gnde Wright Ibs/ft.
•JEST MAILABLE COPY f i
3 b IffefcrnM. - 3 ^ 3. Water tfepft: Mufanffl ^ ^ MiatenB
.4. Type of corroskm protection:
au bnpiened cuneut lystco)
•i^^b. SurifkiaJ anode lystem
(1) Type of anode ^ • / A ^ C
(2) Spadns i n t m i J _ ^ l £ .
(3) Weight of onit anode gKen by applicant. % O
— c. If platform anodes are used, art fliey considered adequate?
Yes No
d. If pipdine anodes art oaed:
Where: W0 - Weight of Anode unit (lbs) D •Dia. of pipe (inches) I •> Separation between anodes (ft.) R * the foOowing Ibs/amp/year (Rate of Consumption) Aluminum or CaKahim • 7.6
^—Zinc~ _ ^r~r^ Magnesium • 17.5
Does the calculated life expectancy equal or exceed 20 years?
Yes — No
5. Description of protective coating:
a. Pipeline ^C^teJo*'*- /^-/^^ o^^Ma^^r </«*y ^
b. Riser —^ r r f < '' " ' f " " " ^
c. Subsea vaKe assembly
6. Description of weighted coating:
a. Preconcrete coating
b. Density of concrete PCF
c. Thickness of concrete
d. Thickness of asphalt _ _ _
7. Calculate the specific gravity (one of the foDowing formulae may he used)
BEST AVAILABLE COPY
^ T a . For epoxy MMdm: I G - U t t W / D 3 ^ P-.$<b£~ A ' S - ? ^ / / ? - ? 4 ? - / ' ^ ^
— b. Deadly coraparboa witii flnid materU: S G * W+F A E
c. Lines whh a specific thkknes of concrete:
SG«RC+ K, /W+P-RC R a - K , ) 2 ^ R
— d. lines haffag two coatings «f caamd and a felt wnp, or only asphahmastk coating:
SG-W+P
^3
Where: S G * specific gmity RC • density of concrete (Ib/cn. ft) K,,K,,K3-coefficients T • thickness of concnte coating (Indies) W • weight of ban pipe (Ib/f t) P* weight of coating R * density of fluid material (lb/cu. ft); Lc^ aea water • 64 Ibs/cu. ft. D • diameter of pipe (inches) A * cross^ectional area
S. GKen specific gravity
a.-^fL-b. -1 ^ 9 . G m i t y o r d e n r i t y o f p r o d u c t ( . ) ^ ^ ^ ^ ^ ^
J ^ } 0 . D e r i g n c a p a c i t y o f p i p e l i n e ^ ^ ^ ^ ^ ^ ^ ' 1 ^
.11. Given Hydrostatic Test Pressure: line P i p e i Z ^ . Hold Time ^ bn.
Pninstallation Test R i s e r ^ £ ^ l d Tfane L h n .
Recommended maximum hydrostatic body test for ANSI vaKes, flanges, and fittings an as follows:
ANSI 300-1.100 psig ANSI 400 • 1,450 psig ANSI 600-2.175 psig ANSI 900-3.250 psig ANSI 1400 -5.400 pdg
BEST AVAILABLE COPY
Note: MinfanDm hold
line Pipe-8 hn. 4 hn€ 125% of MOP C M - Riser» 4 hn. (pretest) liquid- Phis 4 hn.€ 110% If leak tepee-
or DOT 192.S07(c) Hon is aot visabk during lest
12. Maximum ADowabie Operating Pressure (MAOP) of Une pipe: .
MAOP-2ttxFxExT Note: F-.72;E-1;T-1
Z^5
b. MAOP-
cMAOP-
.13. MAOP of riser pipe. Note: F • .50 for risen on nstunl ps transmission Unes. Note: F-.60 for risen on liquid pipelines. ^ A n <
.MAOP- > ^ ^ J ^ ! L ) C ^ O = 4 ^ ^ b. MAOP-
_^__14. MAOP of flanges, fittings, and valves:
15. MAOP of proposed pipeline as determined fat accordance with Titk 49 CFR Part 195 or 192. as applicabk. is / ^ r Q r««|
___16. Items 12. 13, and 14 above an equal to or mon than the maxfanum aDowabk working pnssun (MAWP) of source.
17. Verify: 1:25 maximum source pnssun (MSP) < hydrostatic test pnssun (HTP) < .95 (smaDer IP 6 SMYS of Hems 12 or 13 above)
Note: The ncommended Hmit of test as a percentage of internal pressure £ specificed minimum ykld stnngth is equal to 95'*:
I P * S M Y S - 2 x s x t -D V
.18. Verify MAOP does nof exceed the lowest of the following:
a. Suomerged componenu: HTP/1.25- Z ^ 0
b.Riser: HTP/1.5- ((/({OP*?^
BEST AVAILABLE COPY
VaKefiunlioKd: Yes No.
D. hsflbtioa Rtqulieimim:
1. AO pipelines wO be fatstdled or bid to • minJnnun of three feet below the lerd of the modline ont to and faichidins the 300 foot water depth, except at pdpeUne crossings. Any devbtion mast bejustified at the time of application.
AD valves and taps arast be provided with a minhnum of Aree feet of actaal cover either with sofl or sandbags or Jetted to a minimum of three feet below the mudline. VJUms approved vahe protection covers are nsed, the valves aad taps are NOT required to have a minimum of three feet of actual cover or Jetted three feet below the mudline. However, the top of die vaKe protection cover shaU not protrude above the kvd of die mudline. Aay devbtion must bejusti-fied at the time of application.
£. Pipeline Crossings:
AJffry 0 pipdine crossings fai water depths ap to and including 300 feet riiafl be cement'bagged with a minimum of 18 inches between the lines with die uppermost line having a minimum of 3 feet of cover in the form of cement bags bi* stalled so as to provide a three foot horizontd to a one foot verded (3:1) dope with a crown width that is one and one-half (IK) times die pipe diameter. Any devbtion must bejustified at the tfane of application.
AO pipeline crossings in water depths greater dian 300 feet shaU be cement bagged with a minimum of 18 inches between die lines and installed so as to provide a three foot horizontd to a one foot verticd (3:1) slope. Any devbtion must bejustified at die tfane of application.
F. Construction Infonnation:
_ 1. Proposed coastniction commencement date — fy^^v^f ^ ^
_ 2. Method of constniction
3. Method of burial
^^4. Tfane required to by pipe S'^Y1—
5. Time required to compkte project
C. Applicant complies with current OCS pipeline guidelines:
Yes ^ No
1331 LAMAR. SUITE 1065 HOUSTON. TEXAS 77010
(713 ) 6 5 2 - 2 8 4 7
July 21, 1988
Mr. Daniel J. Bourgeois Regional Supervisor Office of Field Operations U. S. Department of the Interior Minerals Management Service Gulf of Mexico OCS Region 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394
Attention: Mr. Autry Britton FO-2-2
RECEIVED \
JU12 71988 t
FIELD \ . . OPERATIONS
Region. ^ 5 *
RE: Application for a 6.625-Inch O.D. Natural Gas Pipeline to be Installed In and/or through Blocks 280, 269 and 268, South Marsh Island Area, Gulf of Mexico, Federal Waters, Offshore Louisiana
Gentlemen:
Pursuant to the authority granted in Section 5(e) of the Outer Continental Shelf Lands Act (67 Stat. 462 (43 U.S.C. 1331), as amended (92 Sta. 629), and in compliance with the regulations contained in Title 30 CFR, Part 250.150(b), Brooklyn Union Exploration Company, Inc. (Brooklyn Union), hereby submits this application in quadruplicate (original ana three copies) for a right-of-way two hundred feet (200') in width for the construction, maintenance and operation of a 6.b25-inch O.D. natural gas pipeline in the South Marsh Island Area, Gulf of Mexico. Brooklyn Union agrees that said right-of-way, if approved, will be subject to the terms and conditions of said regulations.
This 6.625-inch O.D. pipeline will be used to transport gas and condensate from Brooklyn Union's proposed Platform "A" (Well No. 2) OCS-G 5197 in South Marsh Island Area Block 280 to Placid Oil Corporation's (Placid) existing Platform "A", OCS-G 2310 in South Marsh Island Block 268. The pipeline will depart Brooklyn Union's proposed Platform "A" in South Marsh Island Block 280 in a northeasterly direction and go approximately 8,285 feet (1.57 miles) to Placid's Platform "A" in South Marsh Island 268, all being in the Gulf of Mexico, Federal Waters, Offshore, Louisiana. The proposed construction commencement date is August 30, 1988, with the time reguired to lay the pipe being estimated at 5 days with an overall completion of project time being estimated at 21 days. The base of operations will be Grand Chenier, Louisiana.
ffirtrohlytt Union Exttlnnttian Company, ha.
Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Two
This application (and any amendments made hereto) is made with our full knowledge and concurrence with the OCS Lands Act (43 U.S.C. 1331, et. seq.), as amended (P.L. 95-372), including the following: Sec. 5(e) addressing pipeline rights-of-way, requirements of the Federal Energy Regulatory Commission relating to notice of hearing, transportation and purchase of oil and gas without discrimination; Sec. 5(f)(1) addressing operation of pipelines in accordance with competitive principles, including open and nondiscriminatory access to both owner and non-owner shippers; Sec. 5(f)(2) which may allow exemption of the requirements in Sec. 5(f) assuring of maximum environmental protect' for pipeline installation; and Sec. 5(f)( throughput capacity of any pipeline excep Barbara Channel.
(i); Sec. 5(e) addressing the on, including the safest practices )(B) which may require expansion of for the Gulf of Mexico or the Santa
In accordance with applicable regulations, we have delivered a copy of the application and attachments thereto by certified mail, return receipt requested, to each lessee or right-of-way or easement holder whose lease, right-of-way or easement is so affected. A list of such lessees or right-of-way or easement holders is attached (see Attachment "A") and copies of the return receipts showing date and signature as evidence of service upon such lessees or right-of-way or easement holders will be forwarded to your office when received. In order to expedite the permit process, we have requested a letter from the lessee, right-of-way or easement holder expressing no objection to the proposed project. When obtained, these letters will be forwarded to your office. The proposed right-of-way does not adjoin or subsequently cross state submerged lands.
Applicant agrees to be bound by the foregoing regulations, and further agrees to comply with the applicable stipulations as set forth in the OCS Pipeline Procedures Guidebook dated March, 1984, revised September, 1984.
In support of our application and for your review and use, the following maps, drawings and documents have been enclosed herewith and made a part hereof:
1. Index or Vicinity Map, (four copies enclosed)
2. Route Map, (four copies enclosed)
3. Engineering and Hazard Survey (four copies enclosed)
4. Schematic, (four copies enclosed)
5. General Pipeline Information, (four copies enclosed)
Sirnohlyn Union Exttlnration (Bompant), inr.
Minerals Management Service Pipeline R-O-W Application South Marsh Island Blocks 280/269/268 July 21, 1988 Page Three
6. Originally signed copy of Nondiscrimination in Employment Stipulation is attached to each copy of the application.
7. A check in the amount of $ 1430.00 of which $1,400.00 covers the application fee and $30.00 covers the first year's rental on 1.57 miles of right-of-way.
Contact on technical points or other information:
G. Ross Frazer Brooklyn Union Exploration Company 1331 Lamar Street, Suite 1065 Houston, Texas 77010 (713) 652-2847
"Brooklyn Union Exploration Company, Inc. hereby certifies that the proposed activity described in this application complies with and will be conducted in a manner that is consistent with the Coastal Zone Management Program of the State of Louisiana."
Further, "Brooklyn Union Exploration Company, Inc. hereby agrees to keep open at all reasonable times for inspection by the Minerals Management Service, the area covered by this right-of-way and all improvements, structure, and fixtures, thereon and all records relative to the design, construction, operation, maintenance, and repairs, or investigations on or with regard to such area."
Please refer to your New Orleans Miscellaneous File No. 1046 for a copy of a resolution approved by the Board of Directors authorizing the undersigned to sign for and on behalf of Brooklyn Union Exploration Company, Inc.
If the above information meets with your approval, we would appreciate you issuing the necessary decision for tne right-of-way at your earliest convenience. Inquiries concerning this application should be directed to our regulatory agent at J. Connor Consulting, Attention: Ms. Jodie Connor. (713) 558-0§07.
Sincerely,
Barnes G. Floyd President
JGF:JAC:bna257 Attachment and enclosures
Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Four
CC: Lessees and Right-of-Way Holders as indicated on Attachment "A", all with Copy of Attachments and Enclosures
Placid Oil Corporation 3900 Thanksgiving Tower Dallas, Texas 75201 Attention: Mr. Jim McGowen (Certified Mail No. P 815 159 510)
Trunkline Gas Company P. 0. Box 1642 Houston, Texas 77001 Attention: D. N. Huebner (Certified Mail No. P 815 159 511)
Chevron Pipeline Company 3520 General DeGaulle Drive New Orleans, Louisiana 70114 Attention: Mr. R. L. Downie (Certified Mail No. P 815 159 512)
Hunt Oil Company 1401 Elm Street Dallas, Texas 75202 Attention: Mike Cook (Certified Mail No. P 815 159 513)
Hamilton Brothers Oil Company P. 0. Box 5870 Denver, Colorado 80217 Attention: David P. Oberbrockling (Certified Mail No. P 815 159 514)
Hunt Industries 2800 Thanksgiving Tower Dallas, Texas 75201 (Certified Mail No. P 815 159 515)
Hamilton Brothers Exploration Company 1560 Broadway, Suite 2000 Denver, Colorado 80202 Attention: David P. Oberbrockling (Certified Mail No. P 815 159 516)
Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Five
CC: Prosper Energy Corporation 2800 Thanksgiving Tower Dallas, Texas 75201 Attention: Mr. Jim McGowen (Certified Mail No. P 815 159 517)
Mobil Oil Exploration & Producing 1250 Poydras Street New Orleans, Louisiana 70113 Attention: R. L. Fajhowski (Certified Mail No. P 815 159 518)
Texaco Producing, Inc. P. 0. Box 60252 New Orleans, Louisiana 70160 Attention; Mr. J. C. Culp (Certified Mail No. P 815 159 519)
Hunt Petroleum Corporation 2800 Thanksgiving Tower Dallas, Texas 75201 Attention; Mr. Steve Brooks (Certified Mail No. P 815 159 520)
Rosewood Resources (P0C) Inc. 200 Crescent Court, Suite 300 Dallas, Texas 75201 Attention: Mr. Walter M. Lenamon (Certified Mail No. P 815 159 521)
Petro-Hunt Corporation 2800 Thanksgiving Tower Dallas, Texas 75201 Attention: Mr. Jim McGowen (Certified Mail No. P 815 159 522)
The George R. Brown Partnership 4700 First City Tower 1001 Fannin Street Houston, Texas 77002-6708 Attention: W. H. Heisler (Certified Mail No. P 815 159 523)
Samedan Oil Corporation 350 Glenborough, Suite 240 Houston, Texas 77067 Attention: Annalisa M. Taylor (Certified Mail No. P 815 159 524)
Minerals Management Service Pipeline R-O-W Application South Marsh Island Area Blocks 280/269/268 July 21, 1988 Page Six
CC: Kerr McGee Corporation P. 0. Box 39400 Lafayette, Louisiana 70593 Attention: Cary V. Bradford (Certified Mail No. P 815 159 525)
Kerr McGee Federal Limited Partnership 1-1981 P. 0. Box 25861 Oklahoma City, Oklahoma 73125 Attention: Barry N. Hill (Certified Mail No. P 815 159 526)
Exxon Pipeline Company Attn: Mr. Haskel T. Rogers P. 0. Box 2220 Houston, Texas 77252-2220 (Certified Mail No. P 815 159 527)
Columbia Gas Transmission Company Attn: Mr. H. D. Moy Post Office Box 683 Houston, Texas 77001 (Certified Mail No. P 815 159 528)
ATTACHMENT "A"
The following Lessees and Rights-of-Way holders on even date with this application were furnished a copy of this application by Certified Mail, Return Receipt Requested (Note: Tne status of blocks listed below was current as of July 22,1988, per research of MMS records by Debbie Armond and Mary Holmes).
SOUTH MARSH ISLAND AREA
BLOCK 268
Hunt Oil Company OCS-G 2310 Oil & Gas Lease Placid Oil Corporation Hamilton Brothers Oil Company Hunt Industries Hamilton Brothers Exploration Co. Prosper Energy Corporation Mobil Oil Exploration & Producing Texaco Producing Inc. Hunt Petroleum Corporation Rosewood Resources, Inc. Petro-Hunt Corporation George R. Brown Partnership
Placid Oil Corporation OCS-G 2816 Right-of-Way Trunkline Gas Company OCS-G 2817 Right-of-Way Chevron Pipeline Company OCS-G 7553 Right-of-Way Columbia Gas Transmission OCS-G 3836 Right-of-Way
BLOCK 269
Hunt Oil Company OCS-G 2311 Oil & Gas Lease Placid Oil Corporation Hamilton Brothers Oil Company Hunt Industries Hamilton Brothers Exploration Co. Prosper Energy Corporation Mobil Oil Exploration & Producing Texaco Producing Inc. Hunt Petroleum Corporation Rosewood Resources, Inc. Petro-Hunt Corporation George R. Brown Partnership Chevron Oil Company
Trunkline Gas Company OCS-G 2817 Right-of-Way Exxon Pipeline Company OCS-G 1347 Right-of-Way
BLOCK 280
Kerr McGee Corporation OCS-G 5197 Oil & Gas Lease Samedan Oil Corporation Kerr McGee Federal Ltd. Partnership
None Pipeline R-O-W
UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE
NONDISCRIMINATION IN EMPLOYMENT
As a condition precedent to the approval of the granting of the subject pipeline right-of-way, the grantee, Brooklyn Union Exploration Company, Inc. hereby agrees and consents to the following stipulation which is to be incorporated into the application for said right-of-way.
During the performance of this grant, the grantee agrees as follows:
During the performance under this grant, the grantee shall fully comply with paragraphs (1) through (7) of section 202 of Executive Order 11246, as amended (reprinted in 41 CFR 60-1.4(a)), which are for the purpose of preventing discrimination against persons on the basis of race, color, religion, sex or national origin. Paragraphs (1) through (7) of section 202 of Executive Order 1124b, as amended, are incorporated in this grant by reference.
GENERAL INFORMATION & CALCULATIONS
6.625" O.D. GAS & CONDENSATE SALESLINE
SOUTH MARSH ISLAND BLOCK 280 TO SOUTH MARSH ISLAND BLOCK 268
1. The water depth along the proposed pipeline route and in relationship to the natural bottom i s set forth on the attached PLAT. Water depth i s (-) 36' MSL at the proposed Platform South Marsh Island Block 280 and (-) 32' MSL at Placid's "A" Platform, South Marsh Island Block 268.
2. The description of the pipe and coating i s as follows:
a. Line Pipe: 6.625" O.D. x .280" W.T., API 5L Grade B seamless; bare weight = 18.98# per foot. Coated with 12-14 mils of Scotchkote 205 fusion bonded epoxy. Specific-gravity in seawater (empty) = 1.25. Welded joints w i l l be protected with heat shrinkable sleeves.
b. Riser Pipe: 6.625" O.D. x .432" W.T. API 5L Grade B seamless. Bare weight = 28.58# per foot. Coated with 12-14 mils Scotchkote 205 fusion bonded epoxy and 1/4 splash-tron at +/" 2 0 MSL.
c. Internal Coating. The analysis of transported products w i l l be monitored.
3. The proposed salesline i s approximately 8,285 feet long. This does not include the +/- 94' of r i s e r piping at the platform. The line w i l l transport natural gas and condensate.
4. Valves and flanges on the proposed platform w i l l be 600# ANSI.
5. The design of the proposed saleslines and r i s e r s i s in accordance with the DOT T i t l e 49, Part 192, API RP 14E and 30 CFR Part 250 Subpart J .
6. The cathodic protection system for the pipeline w i l l use zinc tapered semi-cylindrical bracelet anodes. Calculations are as follows:
a. Anticipated line l i f e i s 20 years.
b. Assumed maximum of 2% bare pipe.
c. Current 5 MA/sq. f t .
d. 26 #/amp year
e. Anode spacing calculations:
Area/mile = 5280~ft:/iniT x 3.14 x i6i625)/12 f t .
= 9153 sq. f t . / m i .
Amps = 9153 sq. f t / mi. x .02 x .005 A/sq.ft.
= .9153 amps/mi.
Line l i f e = .9153 A/mi. x 20 = 18.31 amp yr./mi.
#/mile = 18.31 amp yr/mi. x 26 #/amp y r .
= 476.1 #/mile
Anode spacing = (476.1 #/mi.)/80# = 5.95/mi.f 887 f t .
Use one (1) 80# every 500 fe e t .
7. The design pressure f o r the l i n e pipe and r i s e r :
a. Riser:
t = PD/2S P = i n t e r n a l design
pressure = 1440 psig
= 1440 x 6.625 /(2 x 17,500) t = w a l l thickness, inches
= .273 + 1/16" C.A. S = SMYS X .5 = 17,500
= .335 D = nominal outside
diameter = 6.625"
Use 6.625" O.D. x .432" W.T. API 5L Grade B seamless
Hydrostatic t e s t pressure:
I n accordance with.API 14E
HTP = 1.5 x MAOP
= 1.5 X 1440 = 2160 PSIG
b. Line Pipe:
t = PD/2S P = i n t e r n a l design
pressure = 1440 psig
= 1440 x 6.625 /(2 x 25,200) t = wa l l thickness, inches
= .189 + 1/16" C.A. S = SMYS X .72 = 25,200
= .252 D = nominal outside diameter = 6.625"
Use 6.625" O.D. x .280" W.T. API 5L Grade B seamless Hydrostatic t e s t pressures
In accordance w i t h DOT T i t l e 49, Part 192
HTP = 1.25 x MAOP + external pressure
= 1.25 X 1440 + 35 f t . X (1.02)/2.31 p s i / f t .
= 1815 PSIG (use 2160 PSIG - same as r i s e r )
8. The hydrostatic t e s t w i l l be conducted i n accordance w i t h applicable regulations. Test duration w i l l be eight hours. The t e s t pressure i s less than 90% of the hoop stress using the steel's SMYS.
9. The s p e c i f i c g r a v i t y of the l i n e pipe was calculated as follows:
The l i n e pipe weighs 18.98 Ibs/LF
The pipe displaces D /4 x 12/1728 x 62.4 x 1.02 = 15.23 lbs w a t e r / f t
Specific g r a v i t y f l o w l i n e = 18.98/15.23 =1.25
The weight of coatings, anodes, and other materials was not considered i n these c a l c u l a t i o n s .
10. The design capacity of the f l o w l i n e i s approximately 30 MMSCFD gas and 900 BCPD.
Specific g r a v i t y of condensate = 50 API and .65 f o r gas.
11. The proposed flowine w i l l t i e - i n at the 22" Trunkline Pipeline South Marsh Island Block 268. (Placid "A" Platform)
12. Overpressuring of the salesline shall be prevented by the following method. The pipeline shall have both high and low limits. High limits-shall beset no higher than 10% above operating pressure and in no case above the maximum rated pipeline pressure. The low pressure shut-in shall activate no lower than 10% below the operating pressure. The effect of any pressure exceeding either limit wi l l be the automatic and orderly shutdown of a l l pressure sources on the platform.
PIPELINE SUMMARY
1.
2.
3.
4.
Line Pipe Specifications;
Line O.D. W.T. Grade
6.625n .280" API 5L B
Riser Pipe Specifications;
Line O.D. W.T. Grade
6.625" .432"- API 5L B
Line Pipe;
Thin film epoxy.
Existing 22" TRUNKLINE PIPELINE
O.D. W.T. Grade
5.
6.
7.
22 .562
Name of Product:
X52
Length
8,285'
Length
94'
MAOP
MAOP
1200 PSI
MAOP
1200 PSI
MOP
1200 PSIG 1200 PSIG
Natural gas and condensate
Class Location:
Class I .
Governing Code:
30 CFR Part 250 Subpart J ; DOT T i t l e 49, Part 192; API RP 14E
Application by Brooklyn Union Exploration
Company
REV DATE DESCRIPTION
6.625" O.D. Gas & Condensate Salesline
South Marsh Island 280/South Marsh Island 268
Gulf of Mexico
EXISTING 22" TRUNKLINE PIPELINE
NOTES;
1. ALL BALL VALVES. CHECK VALNCS It FLG'D. FITTINGS TO BE 6O0# ANSI RTJ FLG'D. EXCEPT AS NOTED
2. NEEDLE VALVES TO BE
r s.s. 6ooo# w.p.
Risgr Pip?;.
6.625 O.D. x .432 W.T. API 5L Grode B Seamless
Line Pipe:
6.625 x .280 W.T. API 5L Grode 8 Seamless (Bare Weight = 18.98 # / f t . )
BEST AVAILABLE COPY
PLACID. *A" PLATFORM SOUTH MARSH ISLAND BLOCK 268
o o
o m CM
<
J
o
"8 CM
i : F H
5 1
| NOTE: ALL VALVES IN j SALES METERING i FACILITIE5 ARE ANSI
600 lb.
C O N D N . M E T E R / O
O Q .1
00 I
PROD.-i r \ GAS j
SEPARATOR 1440 PSIG
GAS CONTACTOR 1440 PSI
I ' Application by
BROOKLYN UNION EXPL COMPANY
S o Q O OC CL
GENERAL NOTES
1. BROOKLYN UNION'S GAS SALESLINE COMPLIES WITH DOT TITLE 49, PART 192 & 30 CFR 250 SUBPART J
2. BROOKLYN UNION'S PROPOSED PLATFORM FACILITIES COMPLY WITH 30 CFR SUBPART H
3. HIGH PRESSURE SENSOR WILL BE SET AT 1200 PSIG
4. LOW PRESSURE SENSOR WILL BE SET AT 945 PSIG.
5. DESIGN PRESSURE OF THE PIPE LINE IS 1440 PSIG. MAOP IS 1200 PSIG "
SACRIFICIAL ZINC ANODE. 80# EACH, SPACING TO BE A MAXIMUM OF 500 FEET.
BROOKLYN UNION EXPLORATION COMPANY PRODUCTION PLATFORM
SOUTH MARSH ISLAND BLK. 280
REV- DATE DESCRP. BY
SCHEMATIC FOR 6.625" O.D. NAT. GAS & COND.SALESUNE
S.M.I. BLK. 280 TO S.M.I. BLK. 268 - GULF OF MEXICO
JOB NO- NC-12M DATE: 7/20/88
DWG. NO.: SKETCH #1
LOUISIANA GULF COAST INDEX M.M.S. O.C.S. LEASING AREAS
BEST AVAILABLE COPY
NQ 15-2
GARDEN BANKS AREA
CHANDELEUR AR£fi
CHANDELEUR AREA E A S T A D D I T I O N
IDA
MAIN PASS AREA
SOUTH a ADDITIOI
NH 1 6 - 7 VIOSCA KNOLL
AREA
SOUTH PASS AREA —'SOUTH a EAST ADDITION
WEST DELTA AREA ^SOUTH ADDITION.
GRAND ISLE AREA SOUTH ADDITION
NG 16-10 M I S S I S S I P P I
CANTON AREA
N
AREA OF INTEREST
NG I S - S
GREEN CANYON AREA
S U t
AREA MAP
PROPOSED MINERAL DEVELOPMENT GULF OF MEXICO
SOUTH MARSH ISLAND AREA NORTH ADDITION
BROOKLYN UNION EXPLORATION CO.
P R E P A R E D BY K C OFFSHORE DATE-SHEET J _ _ OF 3
RFST AVAILABLE COPY
246 oi 4B9oas* £ M,«a» t « i * J
245
247 49*1'»* H.ili 791'
2 6 0 . . / J 9 S > ° t ' M.TOJ JST"
261 4999 If* K.eoa s a l '
274
275 •on i ' * i s . c n « M -
S I 248
S 259
S 262
2 4 4 / / I
249
258
263
• i * « < - 243 :
250
t t t o i . a r a B I T '
257
T-HT.I IT 767
4 264
r u T j . j s s T i r '
242
251
256
265
241
252 C 253-iSO* 19*
ITtt lit'
255/ S
266 "S
PROPOSED 6" GAS/CONDENSATE P/L ? ' 273
£ 276
14.758 05
- • 2 7 2
277
286
M.73P 05'
271
T-157.601 SB7.'
278
Y.UJ.BIJSVT"
285
14.756 05
270
279
284
14,758 OS" Til2B,OB5 587
VICINITY MAP
••280.. S
283 S
287 S
14.758 OS
T. I I J .JJ73J7
" 240
9789 I0»'
254
267 :
9 5 6 8 292'
/ ^ 6 8
281
9 4 i « 424
282 j / f l t o * 9587 490'
288 sis*"* 9520 556'
N
PREPARED BY K C OFFSHORE
PROPOSED MINERAL DEVELOPMENT GULF OF MEXICO
SOUTH MARSH ISLAND AREA NORTH ADDITION
BROOKLYN UNION EXPLORATION CO.
DATE-' SHEET cZ OF 3
/PROPOSED 6" GAr 'DENSATE P/L
WELL NO. 2 STA. O+OO X - 1,823.874.16 . S V - 157,004.22 ^ LAT. - 29° 05' 50.06"N LONG. » 91° 53' 05.12"W>
TAP STA. 6+00 X - 1,824,169.97 Y » 157,526.23
\
R/W LIMITS
PROPOSED P/L
R/W LIMITS
tM
.
2 0 I 10 HI
§ 3 0 -§ 40-m 50^ ^ 6 0 -
STA. 6+86.73 X - 1,824,212.7 P.C.
STA. 71+07.15 X • 1,827.378.16 Y « 163,187.55
R - 750.00' L - 1,178.10V
N 29° 32' 22" E 7,107.15'
FLOW STA. 12+26.36 Y - 158,071.17
PLAN
1,000' 0 2 , 0 0 0 '
>LACID 268 "A" STA. 82+85.25 X •= 1,828,128.16 Y • 163,937.55 LAT. = 29e 06' 58.90"N LONG. = 91° 52' 17.54^
'WATER SURFACE
—TJ. **™y™>* s- M.H.^aC_ P R 0 P
COVXR P/L
T Y P I C A L D I T C H D E T A I L
. CL.
'—• s
o
y S ' MIN. COVER
K-300'
MUD LINE 3' MIN. COVER IL PROPOSED 6" GAS/CONDENSATE P/L
80* 0 SO'
PROFILE
1,006' 0 2 , 0 0 0 *
VERTICAL SCALE HORIZONTAL SCALE
PREPARED BV K C OFFSHORE
RFST AVAILABLE COPY PROPOSED MINERAL DEVELOPMENT B t d l HwnifciuM- GULF OF MEXICO
SOUTH MARSH ISLAND AREA NORTH ADDITION
BROOKLYN UNION EXPLORATION CO.
D A T E ; 3 OF 3 SHEET