Today’s Presentation
• In response to various questions asked about battery storage, the ISO has prepared this presentation to describe how batteries have been modeled in Economic Studies and why they were modeled this way.
• Battery Energy Storage Systems (BESS) – Relatively novel technology for the electric power networks– Can help facilitate the integration of zero-carbon renewable resources– Are flexible enough for a wide range of applications – Evolving costs and operating characteristics are a focus of research– Representing storage in a production cost model requires that most salient
characteristics are reflected
ISO-NE PUBLIC3
Purpose of this Presentation
• This presentation will endeavor to:– Provide an overview of BESS in Economic Studies– Discuss several types of BESS deployments
• Grid-scale market facing batteries• Co-located with Variable Energy Resources (VER)• Vehicle-to-Grid• Distribution system• Customer site
– Introduce operational issues including battery degradation management– Discuss Variable O&M (VOM) costs– Present sensitivity cases showing the effect of VOM cost assumptions
ISO-NE PUBLIC4
BESS Modeling in Production Cost Simulations
• Energy storage has become a focus of Economic Studies– Pumped Storage– Grid-scale market facing batteries– Energy banking via Quebec in 2020 Economic Study
• GridView economic study production cost simulations – Investigate utilization of BESS under various cases and sensitivities– Capital cost and Fixed Operation and Maintenance (O&M) costs are not
considered in ISO-NE Economic Studies
ISO-NE PUBLIC
2,000 MW of Batteries Were Assumed in 2020 National Grid Economic Study Scenarios
5
ScenariosThreshold
Prices UsedRetirements Must Run Units
Wind Additions (Nameplate)
Peak Demand from Heat
Pumps
Peak Demand from Electric
Vehicles
Nameplate Storage
Additions
Bi-DirectionalExternal Tie(s)
Bi-Directional Reference(B)
REC-Inspired
FCA 14, Mystic 8&9,Millstone 2,
NE Coal,+ 75% of conventional
NE oil including dual-fuel based on age
Nuclear,Municipal Solid
Waste, Landfill Gas, Wood
1,330 MW Onshore
8,000 MWOffshore(2)
5,214 MW1,817 MW(2.2 million
vehicles)
2,000 MW Battery(2) None
Bi-Directional Legacy(B_HQNB)
2,000 MW Battery(2) and
Utilizing Hydro Quebec as
Virtual Storage
HQ PHII and NB, NECEC
Bi-Directional New Transmission 1
(B_HQNB_1T)
HQ PHII, NB, NECEC One
New1,200 MW
Tie(4)
Bi-Directional New Transmission 2(3)
(B_HQNB_2T)
HQ PHII, NB, NECEC, Two
New 1,200 MW Ties(4)
Incremental_8000(I)
Positive Threshold
Prices
FCA 14, Mystic 8&9,Millstone 2,
NE Coal
2,000 MW Battery(2) None
Incremental_8000with Oil retirements
(I_Oil) Same as (I) plus the rest of the oil units
Incremental_8000 Oil and NG Retirements
(I_Oil_NG)
Same as (I_Oil) plus 50% of the remaining NG
units including dual-fuelunits
(2) Other magnitudes of these resources may be considered as sensitivities(3) May be performed depending on utilization of the scenario where a single 1,200 MW transmission line is added(4) New ties added are from Hydro Québec to NEMA
ISO-NE PUBLICISO-NE PUBLIC
BATTERY DEPLOYMENT
6
ISO-NE PUBLIC7
Deployment of BESS for Wide Range of Applications
• Grid interconnected FCM battery vs. non-network battery systems– ISO market-facing batteries– Co-located with wind or PV– Tesla power walls– Vehicle-to-Grid– Mobile batteries– Non-transmission alternatives– Distribution system management
• Technology being driven by successful experience with Li-ion– Other battery chemistries exist (Li-ion vs. flow batteries, etc.)– Flexible, expandable energy niches for ½, 1, 2, 4, 6 or 8 hours batteries
• Service duty: Arbitrage, regulation/reserves vs. customer-site applications
ISO-NE PUBLIC8
ISO Grid-Scale Market-Facing Batteries
• Market facing framework assumed in the 2019 and 2020 Economic Studies– Responds to Locational Market Prices (LMP)– Provides capacity for the Forward Capacity Market (FCM) – Provides ISO orchestrated regulation and reserves
• Dispatch is optimized by GridView in production cost simulations– Primarily energy arbitrage– BESS capacity can be allocated to spinning reserves instead of energy
arbitrage
• EPECS – Will provide more granular time-step– Consider dispatch in different markets (day-ahead to real-time)
ISO-NE PUBLIC9
Co-located with Customer Load or Distribution System
• Co-location of BESS– Primary function is to manage energy interaction with ISO Markets– Active participation in ISO markets is secondary to other considerations
• Co-located with distribution system or non-transmission alternative– Manage distribution system loading– Enhance local reliability – May respond to reserves– Profit motivation for participation in ISO markets is not clear
• Co-located with customer load – Manage customer’s interaction with energy supplier– May respond to LMP if beneficial to customer– May decrease customer’s retail demand charge – Providing regulation and reserves may be in conflict with customer’s cost
management objective
ISO-NE PUBLIC10
Co-located with Variable Energy Resources (VER)
• Co-located with variable energy resource behind an interconnection– May respond to LMP – subject to interconnection capability– Supports the FCM capacity attribute of the co-located VER– Enhances certainty of satisfying regulation, reserve and performance
obligations of the co-located VER
• Interconnection to accommodate both VER and battery simultaneously – Increases size of interconnection– May exacerbate local weak-grid conditions
• Interconnection to accommodate only VER with battery as back-up– Does not increase the size of the interconnection– Prevents simultaneous operation of VER and battery
ISO-NE PUBLIC11
Co-located with Dedicated VER charging
• Battery co-located with VER may not be permitted to charge from grid– During periods of high VER output battery may be “full”– During slack periods, with low VER output
• Battery may be prohibited from recharging using grid energy
Export Interface
BatteryWindor PV
Interconnection
Battery
Export Interface
X
Windor PV
Interconnection
Battery SupportsTo VER
Battery FunctionSeparated
ISO-NE PUBLIC12
Vehicle-to-Grid
• Large amounts of mobile batteries implied in the economic studies– 2020 study assumed 2.2 million electric vehicles– Equivalent to 180,000 MWh of vehicle battery storage
• Based on Tesla Model 3 at 82 kWh• About 22 times the assumed market facing batteries
– 8,000 MWh – Based on assumed 2,000 MW at 4 MWh/MW
– Advocates claim batteries are not degraded by vehicle-to-grid operation
• Time-of-use incentives for charging / discharging– May be useful strategy with large penetration of diurnal PV– May not be optimal with large penetrations of non-diurnal OSW wind
• “Repurposing” degraded vehicle batteries can augment stationary batteries
ISO-NE PUBLICISO-NE PUBLIC
OPERATING CHARACTERISTICS
13
ISO-NE PUBLIC14
Operating Characteristics
• Major BESS operating parameters– Round-trip efficiency of 86 percent modeled in the 2020 Economic Study– Battery degradation
• Causes duration of MWh storage capability to fade both over time and due to use• Does not affect MW capability of the inverter based interface
– Number of lifetime charge / discharge cycles• Not addressed in the literature as a quantified constraint• No specific number of charging/discharging cycles per period will be specified• Li-ion degradation affected by high and low states-of-charge, not only cycles
ISO-NE PUBLIC15
Simulating Aggregate Batteries in GridView
• Modeling of batteries in GridView are for relatively large aggregates– Aggregates of many battery facilities under many participants– Each facility may have multiple stacks that can be dispatched separately– Assumed that each operator will manage their BESS to minimize degradation
• Charging and discharging of individual batteries cannot be represented
• Dispatch of a fleet of batteries is likely to behave smoothly– Owners of specific battery stacks may elect to operate differently – Discharging for evening peak loads will be the dominate mode for large
penetrations
ISO-NE PUBLIC16
Degradation / Variable O&M
• Approaches for BESS operator to compensate for expected degradation– Augment initial installation of storage MWh sufficiently to account for
degradation at end of warranty period (e.g., part of “first cost”)– Augment battery capability as degradation occurs (e.g., expects improved,
lower cost battery modules in future)
• Literature supports various allocations of VOM to variable production– NREL uses zero for the VOM component– IEEE Access® paper on Li-ion battery sizing/degradation (October 14, 2020)
• H. Shin and J. Hur, "Optimal Energy Storage Sizing With Battery Augmentation for Renewable-Plus-Storage Power Plants," in IEEE Access, vol. 8, pp. 187730-187743, 2020, doi: 10.1109/ACCESS.2020.3031197, https://ieeexplore.ieee.org/document/9223659
– Effect of VOM costs assumption in GridView simulations will be investigated
ISO-NE PUBLIC17
From Paper by H. Shin and J. Hur
• SECTION I: Introduction“Several methods are available for BESS sizing. Oversizing is the conventional method to handle battery degradationby installing higher battery capacity than the required one to deliver the intended amount of energy at the beginning of life. Another method is battery augmentation, in which new batteries are added to the BESS over time. Battery augmentation defers initial investments and can exploit future cost reductions in batteries.”
• SECTION III: Lithium-Ion Battery Degradation“Lithium-ion batteries are subject to capacity degradation as they are used ... The capacity degradation rate depends on many factors ... The stress factors determining the capacity retention are the levels of Depth of Discharge (DoD) and State of Charge (SoC), Charging-rate, cycle count, temperature, and total operation time.”
ISO-NE PUBLIC
NREL Allocated Battery Replacement / Renewal / Cycling Expense as Fixed O&M
18
Source: Cost Projections for Utility-Scale Battery Storage, Wesley Cole and A. Wi ll Frazier, June 2019, National Renewable Energy Laboratory, NREL/TP-6A20-73222, https ://www.nrel.gov/docs/fy19osti/73222.pdf
ISO-NE PUBLICISO-NE PUBLIC
EFFECT OF VARIABLE O&M
19
ISO-NE PUBLIC20
Effect of VOM for Batteries in GridView Simulations
• These simulations address questions of how sensitive GridView results are to VOM assumption
• GridView representation of BESS VOM– VOM applied for BOTH storing energy and discharging energy– Effective net VOM rate is slightly more that double (due to storage losses)
• VOM sensitivity cases– $ 0.00/MWh– $ 3.00/MWh – $ 6.00/MWh – $ 9.00/MWh – $12.00/MWh
ISO-NE PUBLIC
0.0
1.0
2.0
3.0
4.0
5.0
6.0
$0.00 $3.00 $6.00 $9.00 $12.00
Ene
rggy
Ge
ne
rati
on
(TW
h)
Battery VOM ($/MWh In and $/MWh Out)
Battery Generation vs. Battery VOM (TWh)
ES_Gen (TWh)
Battery generation TWhdeclines with the addition of VOM.
Effect of VOM on Battery Generation (TWh)
21
ISO-NE PUBLIC
0.0
1.0
2.0
3.0
4.0
5.0
6.0
$0.00 $3.00 $6.00 $9.00 $12.00
Ene
rggy
Ge
ne
rati
on
(TW
h)
Battery VOM ($/MWh In and $/MWh Out)
Battery and PS Generation vs. Battery VOM (TWh)
ES_Gen (TWh) PS_Gen (TWh)
Combined TWhgeneration of both
battery and pumped storage is relatively
stable as battery VOM increases.
Effect of VOM on Battery and Pumped Storage (TWh)
22
ISO-NE PUBLIC
-40-30-20-10
0102030405060708090
173 14
521
728
936
143
350
557
764
972
179
386
593
710
0910
8111
5312
2512
9713
6914
4115
1315
8516
5717
2918
0118
7319
4520
1720
8921
6122
3323
0523
7724
4925
2125
9326
6527
3728
0928
8129
5330
2530
9731
6932
4133
1333
8534
5735
2936
0136
7337
4538
1738
8939
6140
3341
0541
7742
4943
2143
9344
6545
3746
0946
8147
5348
2548
9749
6950
4151
1351
8552
5753
2954
0154
7355
4556
1756
8957
6158
3359
0559
7760
4961
2161
9362
6563
3764
0964
8165
5366
2566
9767
6968
4169
1369
8570
5771
2972
0172
7373
4574
1774
8975
6176
3377
0577
7778
4979
2179
9380
6581
3782
0982
8183
5384
2584
9785
6986
4187
13
LMP
($
/MW
h)
Percent of Time
Effect of Battery VOM on LMPsBattery VOM of $0/MWh vs. $12/MWh
LMP_00 LMP_12 LMP_12 vs. LMP_00
Addition of VOM on batteries increases
positive LMPs and also increases the number of hours of negative LMPs.
Effect of Battery VOM on LMPs ($0 vs. 12/MWh)
23
More hours of negative LMPs, but fewer export hours at -$25/MWh
Higher LMPs
ISO-NE PUBLIC
19.0
19.1
19.2
19.3
19.4
19.5
19.6
19.7
$0.00 $3.00 $6.00 $9.00 $12.00
CO
2 Em
issi
on
s
Battery VOM ($/MWh In and $/MWh Out)
CO2 Emissions (Million Short Tons/Year)
CO2
Effect of increasing VOM on CO2 emissions is small.
The reduction in CO2
appears to be related to reduced fossil generation needed because of lower
total storage losses.
Change in unit commitment may also be
a factor.
Effect of VOM on New England CO2 Emissions
24
No
te: e
xpa
nd
ed s
cale
ISO-NE PUBLIC25
Summary
• For the key metrics used in the 2020 Economic Study, the effect of VOM to account for battery degradation and augmentation is relatively small– Primary effect of higher VOM for batteries
• Shift energy storage opportunities to pumped storage• Raise LMPs in some hours because charge / discharge cannot be justified
– Results in a small reduction in the number of export hours in bidirectional ties
• Developments in the evolution of batteries merit continued monitoring– Augmentation strategies and associated VOM to be reviewed prior to next
economic studies– Assumed vehicle-to-grid batteries may be many times greater than assumed
grid-facing batteries, but uncertainties exist if electric vehicle owners will be receptive to sharing batteries for power grid services
ISO-NE PUBLIC26
ISO-NE PUBLICISO-NE PUBLIC
APPENDIXAcronyms
27
ISO-NE PUBLIC
Acronyms
28
ACDR Active Demand Capacity Resource
ACP Alternative Compliance Payments
AGC Automatic Generator Control
BESS Battery Energy Storage Systems
BTM PV
Behind the Meter Photovoltaic
BOEM Bureau of Ocean Energy Management
CCP Capacity Commitment Period
CELTCapacity, Energy, Load, and Transmission Report
CSO Capacity Supply Obligation
Cstr. Constrained
DR Demand-Response
EE Energy Efficiency
EFORd Equivalent Forced Outage Rate demand
EIA U.S. Energy Information Administration
EPECS Electric Power Enterprise Control System
FCA Forward Capacity Auction
FCM Forward Capacity Market
FOM Fixed Operation and Maintenance Costs
HDR Hydro Daily, Run of River
HDP Hydro Daily, Pondage
HQ Hydro-Québec
HY Hydro Weekly Cycle
LFR Load Following Reserve
LMP Locational Marginal Price
ISO-NE PUBLIC
Acronyms, continued
29
LSE Load-Serving Entity
MSW Municipal Solid Waste
NECEC New England Clean Energy Connect
NESCOE
New England States Committee on Electricity
NG Natural Gas
NICR Net Installed Capacity Requirement
NREL National Renewable Energy Laboratory
OSW Offshore Wind
O&M Operation and Maintenance
PHIIPhase II line between Radisson and Sandy Pond
PV Photovoltaic
RECs Renewable Energy Credits
RFP Request for Proposals
RGGI Regional Greenhouse Gas Initiative
RPS Renewables Portfolio Standards
SCC Seasonal Claimed Capability
Uncstr. Unconstrained