installation instructions urbanline euro selekta clad cm40177

17
1 Installation Instructions: Urbanline Euro Selekta Clad Phone 1800 156 455 Email [email protected] For further product information and downloads Visit urbanline.com.au ESII AUS V4 31.01.20 Euro Selekta 2020 Modinex Limited CM40177 Euro Selekta Clad (Euro Selekta Clad profiles) are identical in terms of their core material and surface texture. However, they are available with different surface coatings. The particle wood core consists of processed timber. We use exclusively untreated pulpwood in the form of wood shavings, thinning material and round timber from sustainable, domestic forestry. Imported timber is not used - especially from tropical climates. The binding agent used is a thermosetting artificial resin with building authority approval for outdoor use. As a wood preservative, we use an eco-friendly boron-based product with building authority approval that does not contain lindane or PCP. This low flammability version is a mixture of boric acid and borax is used as a fire protection agent. No isocyanates, phosphates or halogens are added. Several layers of paper are impregnated with artificial resins for use as a coating. The surface and core are fused together without seams in a single process under the application of pressure and heat. Colorpan Base coating of paper impregnated with melamine resin, followed by coloured Colorpan surface coating using a pure, water-based acrylate. The pigments added are free of toxic heavy metals (no lead, chrome or cadmium). Dekopan Plus Multi-layer coating, printed or dyed; transparent, weather- resistant surface coating of the decor side. Rear side brown, no colour options. Product description – Ecology – Technical data WARNING Where installation of this product or system has not been undertaken strictly as per these Instructions, the CodeMark certification and claims for compliance under the National Construction Code (NCC) will be deemed null and void. Where this has occurred, alternate building compliance solutions will need to be sought for the specific site. SECTION 1 — CODEMARK COMPLIANCE INFORMATION Volume One Performance Requirement(s): FP1.4 Weatherproofing – Refer Limitation and condition 2 Deemed-to-Satisfy Provision(s): B1.2 (a)(iii), (b)(iii), (c)(ii) & (c)(iii) Structural Provisions – Determination of individual actions – Limited to external wall cladding C1.10(a)(ii) &(ix) Fire hazard properties – wall and ceiling Linings F5.2(a) Determination of airborne sound insulation ratings F5.5 Sound insulation rating of walls - as applicable - contributes to the acoustic properties of the wall G5.2 Construction in Bushfire Prone Areas - External walls – BAL A29 State or territory variation(s): Part F5 (NT), G5.2 (NSW) (G5.1 Application of part QLD, NSW)

Upload: others

Post on 28-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

1

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Euro Selekta Clad (Euro Selekta Clad profiles) are identical in terms of their core material and surface texture. However, they are available with different surface coatings.

The particle wood core consists of processed timber. We use exclusively untreated pulpwood in the form of wood shavings, thinning material and round timber from sustainable, domestic forestry. Imported timber is not used - especially from tropical climates.

The binding agent used is a thermosetting artificial resin with building authority approval for outdoor use.

As a wood preservative, we use an eco-friendly boron-based product with building authority approval that does not contain lindane or PCP.

This low flammability version is a mixture of boric acid and borax is used as a fire protection agent. No isocyanates, phosphates or halogens are added.

Several layers of paper are impregnated with artificial resins for use as a coating. The surface and core are fused together without seams in a single process under the application of pressure and heat.

ColorpanBase coating of paper impregnated with melamine resin, followed by coloured Colorpan surface coating using a pure, water-based acrylate. The pigments added are free of toxic heavy metals (no lead, chrome or cadmium).

Dekopan PlusMulti-layer coating, printed or dyed; transparent, weather- resistant surface coating of the decor side. Rear side brown, no colour options.

Product description – Ecology – Technical data

WARNING

Where installation of this product or system has not been undertaken strictly as per these Instructions, the CodeMark certification and claims for compliance under the National Construction Code (NCC) will be deemed null and void. Where this has occurred, alternate building compliance solutions will need to be sought for the specific site.

SECTION 1 — CODEMARK COMPLIANCE INFORMATION

Volume One

Performance Requirement(s):

FP1.4 Weatherproofing – Refer Limitation and condition 2

Deemed-to-Satisfy Provision(s):

B1.2 (a)(iii), (b)(iii), (c)(ii) & (c)(iii)

Structural Provisions – Determination of individual actions – Limited to external wall cladding

C1.10(a)(ii) &(ix) Fire hazard properties – wall and ceiling Linings

F5.2(a) Determination of airborne sound insulation ratings

F5.5 Sound insulation rating of walls - as applicable - contributes to the acoustic properties of the wall

G5.2 Construction in Bushfire Prone Areas - External walls – BAL A29

State or territory variation(s):

Part F5 (NT), G5.2 (NSW) (G5.1 Application of part QLD, NSW)

2

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Volume Two

Performance Requirement(s):

P2.2.2 Weatherproofing – Refer Limitation and condition 2

Deemed-to-Satisfy Provision(s):

3.0.3(a)(iii), (b)(iii) & (c)(iv)

Structural Provisions - Determination of individual actions – Limited to external wall cladding

3.8.6.2(a)(i) Sound insulation requirements - contributes to the acoustic properties of the wall

3.8.6.3(a)(i) Determination of airborne sound insulation ratings

3.10.5.0 Bushfire areas – External walls – BAL A29

State or territory variation(s):

Part 3.8.6 (NT), 3.10.5.0 (NSW, QLD)

SECTION 1 — CODEMARK COMPLIANCE INFORMATION (continued)

Type and intended use of product

Euro Selekta Clad is permitted to be used on the interior or exterior side of the wall frame or structure, vertically, horizontally on a soffit of a building, awning, architectural feature attached to a wall provided it is used within the condition and limitations detailed in this certificate.

Product specification

The Euro Selekta Clad is 170mm wide with a 155mm cover, 9mm-18mm thick and up to 5400mm in length.

Weatherproofing

Euro Selekta Clad testing, conducted in accordance with AS/NZS 4284:2008, passed the water testing portions of the AS/NZS 4284:2008, Clause 8.5 testing, at pressures of 455Pa static and up to 1066 Pa cyclic.

Limitations and conditions:

1. In the absence of a site-specific performance solution, this system is not suitable:a. for use in or on Class 2 to 9 buildings where NCC clauses C1.9 and C1.14 requires buildings and/or ancillary elements to be non-combustible; andb. for use in or on Class 2 to 9 buildings where internal walls are required to achieve an FRL regardless of the type of construction.

2. Weatherproof testing has not been conducted in accordance with FV1.1 or V2.1.1 and is subject to a site-specific design solution – (as illustrated in Section 2).3. Bushfire is limited to the tested specimen as listed in A3.4. This product has fixing requirements analysed, in accordance with the relevant Australian Standards, as suitable for wind classifications N1, N2, N3 & N4 and C1, C2, C3 & C4.5. It is the responsibility of the designer to ensure any timber framing is designed and constructed in accordance with AS 1720.1:2010 and AS 1684:2010.6. Installation requirements are outside the scope of this certificate and subject to project specific engineering advice.7. The Euro Selekta Clad has a maximum fixing spacing of 645mm for general cladding areas and 300mm for areas within 1200mm of corners using 6G-30mm stainless

steel screws.8. The Euro Selekta Clad has not been assessed for impact resistance for cyclonic areas in accordance with AS 1170.2:2011.

Fixing requirements

Maximum Spacing of Fasteners (mm)

N1 N2 N3 N4 C1 C2 C3 C4

General Corners General Corners General Corners General Corners General Corners General Corners General Corners General Corners

JD3 645 300 645 300 645 300 645 300 645 300 645 300 645 300 645 300

JD4 645 300 645 300 645 300 645 300 645 300 645 300 645 300 645 300

JD5 645 300 645 300 645 300 645 300 645 300 645 300 645 300 645 300

J3 645 300 645 300 645 300 645 300 645 300 645 300 645 300 645 300

J4 645 300 645 300 645 300 645 300 645 300 645 300 645 300 569 285

3

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Fire

Fire testing has been conducted in accordance with AS/NZS 3837:1998. For details of the tested specimen, contact the Certificate Holder.

Average Specific Extinction Area 2.6m2/kg

Group Number 3

Fire testing has been conducted in accordance with AS 1530.3:1999. For details of the tested specimen, contact the Certificate Holder.

Ignitability Index 13

Spread of Flame Index 0

Heat Evolved Index 4

Smoke Developed Index 3

Bushfire

Testing has been conducted in accordance with AS 1530.8.1:2007 and achieved a BAL-A29 rating. For details of the tested specimen, contact the Certificate Holder.

Acoustic Properties

The acoustic testing sample was constructed in accordance with the configuration as follows:

• External Cladding (Source room side) Euro Clad Composite (9mm-18mm thick x 155mm wide) with no sealant.

• 92mm Steel Stud 0.55BMT at 600mm centres, with 100mm thick EarthWool insulation (R2.5).

• 1 x layer 13mm thick Plasterboard (Receiving room side).

Results:

Rw: 47

C: -3

Ctr: -8

Evaluation methods

Structural Provisions – A5.2(1)(e). Reports from a professional engineer.

Fire Safety Provisions – A5.2(1)(d). Reports from Accredited Testing Laboratories.

Acoustic Provisions – A5.2(1)(d). Reports from Accredited Testing Laboratories.

Weatherproofing Provisions – A5.2(1)(d). Reports from Accredited Testing Laboratories.

Reports

AWTA; NATA Accreditation No. 1356; Test Report 7-586357-CQ; Testing in accordance with AS 1530.3:1999; Dated 02/08/2012 (Validated by Ignis Solutions, Report No. IGNS-7210-03 I01R00, Dated 07/05/2019).

Exova Warringtonfire; NATA Accreditation No. 3277; Test Report 326591-00cb.1; Testing in accordance with AS/NZS 3837:1998; Dated 31/08/2015.

ASK Consulting Engineers; Test Report number 6813R02V03_Euro; Laboratory acoustic testing of an external wall system in accordance with AS/ANZ ISO 717.1:2004; Dated 23/01/2020.

Exova Warringtonfire; NATA Accreditation No. 3277; Test Report 46212000.1; Bushfire resistance test of an external wall system to BAL–A29 in accordance with AS 1530.8.1:2007; Dated 16/2/2017.

Summermore Pty Ltd; Report No. 19-7043; Fixing Requirements Analysis; Wind loadings to AS/NZS 1170.1:2002 & AS/NZS 1170.2:2011; Dated 09/07/2019.

Summermore Pty Ltd; Engineering Report 18-1531; Structural clauses; Seismic Capacity Report to AS/NZS 1170.0:2002 & AS 1170.4:2007; Dated 24/03/2018.

Facadelab; IANZ Accreditation No. 1091 Report no. 17-17; Testing in accordance with AS/NZS 4284:2008, Clause 8.5 only; Dated 13/09/2017.

SECTION 1 — CODEMARK COMPLIANCE INFORMATION (continued)

4

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

General information, Profile dimensions, Calculating the required quantity & Guidelines

Scope

The scope of these installation instructions covers all installation variants of façade cladding, vertical, horizontal including soffits.

170

18

Coverage widths 155 +1

±1

-2

9

10

Wind side

d

d-e/5e/5

BA

d

Wind side e

Top view

View A(cladding side)

Calculating the required quantity (Calculation values exclude cutting waste)

Required quantity/m2 Required quantity/m2

Coverage width Standard lengths Façade profile Façade screw 3.5 x 50, stainless steel

Euro Selekta Clad (Colorpan/Dekopan plus) at max. fastening spacing = 645 mm

(Selekta) 155 mm 5400 mm 6.45 linear m 11 pcs.

SECTION 2 — INSTALLATION & OTHER SUPPORTIVE DATA

Sub-framework for façade cladding

Increased wind suction at the edge areas of the building walls must be considered when planning the sub-framework.

The fastening spacing of the Euro Selekta Clad profiles must be reduced to max. 300 mm in these areas; additional support battens must be provided as necessary.

Installation lengths

For installation lengths of more than 5400 mm, the profiles must be cut to a maximum length of 2700 mm in order to minimise the expansion joints. This is dependent on local temperature fluctuations.

Note: The wood decors are equivalent to natural wood surfaces, meaning that different grain textures are possible within a single shipment (plain and/or mottled). Unfortunately, sorting at the factory is not possible! In order to obtain a uniform overall finish, we recommend considering this fact and, for example, laying out the façade profiles before starting with the installation.

5

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Please note:

• The supporting wall must be watertight and correct flashings used in the event of any water penetration i.e. severe storms

• There must be ventilation/drainage at the base of the wall

• Install breathable sarking over the stud frame keeping all overlaps pointing downwards and tape all joints

• HPL products expand and contract with temperature longitudinally – see installation instructions for joint options.

Horizontal installation A Sub-framework

1. Euro Selekta Clad profile

2. Façade screw 6g x 50 mm, stainless steel

3. Support batten 30 x 42 mm, spacing max. 645 mm

4. Fastening with 2 screws 6g x 50 mm, stainless steel A2.

B Starter details

1. Euro Clad Selekta profile

2. Fastening with 2 screws 6g x 50 mm, stainless steel batten to wall frame or equivalent

3. Cavity batten 30 x 42 mm

4. Horizontal starter profile.

C Window details

1. Euro Selekta Clad profile

2. Horizontal starter profile

3. Window frame flashing

4. Window frame

5. Z profile.

max. 645

10 1

55 m

m

A Typical fixing detail

B Horizontal section C Vertical section

3

2

14

21

2

1

Euro Selekta Clad pro�le

Minimum 20mm cavity

Interior lining

Bottom plate w/DPC under

15mm drip min.

6g x 50mm SS screw

Batten

Foundation / �oor

Horizontal Starter Pro�le

Wallframing

Wall Sarking

150mm min.225mm min.

Top of Unpaved.

Paving

1

2

3

4

Ventilation cover5

Euro Selekta Clad pro�le

Interior lining

6g x 50mm SS screw

Cavity batten

Wallframing

Wall Sarking (breatheable)

Window Frame

Euro Selekta Clad pro�le

6g x 50 mm SS screw

Wall sarking (breatheable)

Interior lining Cavity batten

Minimum 20mm cavity

Horizontal starter pro�le

Timber sill

Wall

Lintel

Sarking

Sarking

1

4

1

2

Window frame �ashing(Z-pro�le)

3

Z-pro�le5

Window frame4

Minimum 20mm cavity

Euro Selekta Clad pro�le

Interior lining

6g x 50mm SS screw

Cavity batten

Wallframing

Wall Sarking (breatheable)

Window Frame

Euro Selekta Clad pro�le

6g x 50 mm SS screw

Wall sarking (breatheable)

Interior lining Cavity batten

Minimum 20mm cavity

Horizontal starter pro�le

Timber sill

Wall

Lintel

Sarking

Sarking

1

4

1

2

Window frame �ashing(Z-pro�le)

3

Z-pro�le5

Window frame4

Minimum 20mm cavity

Typical fixing detailA

Starter detailB

Window detailC

6

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Interior lining

Concretetilt slab

6g x 30mm SS screw5

Horizontal starter pro�le2

Galvanised vent pro�le3

Euro Selekta Clad pro�le

30 x 42 mm batten

Wall Sarking

1

Drive pin6

4

Fastening to masonry wallE

Please note:

• Baseboard termination At least 100 mm spacing to the floor.

• Avoid designs that allow moisture build-up.

E Masonry wall fastening

1. Euro Selekta Clad profile

2. Horizontal starter profile

3. Ventilation profile

4. 30 x 42 mm batten

5. 6g x 30 mm stainless steel screw

6. Drive pin.

10

10

D Internal corner

X

max.100

X

max.100

X

A Fastening spacing B Sub-framework, alternative

23

4

1 1

2

11

1

max. 20

C Start of installation, alternative

34

1

5

2

3

Horizontal installation

A Fastening spacing

1. Euro Selekta Clad profile

2. Façade screw 6g x 50, stainless steel A2

3. Support connection

4. Batten system 30 x 42 mm

X = 3 or more supports, max. 645 mm

X = for only 2 supports, max. 300 mm;

Profile excess length max. 100 mm.

Fastening materials

Use only screws 6g x 50, stainless steel A2.

Always centre the screws in the punched fastening holes of the façade profile.

B Sub-framework alternative

e. g. aluminium and wood sub-frameworks

1. Building wall

2. Support frame / top hat bracket

3. Masonry tapper.

Alternatively, other sub-framework systems can also be used, such as for very thick insulation layers.

C Start of installation from below

1. Euro Selekta Clad profile

2. Starting profile T + G, aluminium

3. Minimum 20 mm cavity

4. Ventilation profile, galvanised

5. Wall sarking

6. Cavity batten.

D Internal corner

1. Euro Selekta Clad profile

2. Aluminium internal corner profile

3. 75 x 75 mm flashing

4. 6g x 50 mm S/S screws.

Euro Selekta Clad pro�le

Minimum 20mm cavity

Interior lining

Bottom plate w/DPC under

6g x 50mm SS screw

Cavity batten

Wallframing

Wall Sarking

Wallframing

1

5

3

6

7

Horizontal starter pro�le2

Galvanised vent pro�le

4

Fastening spacingA Sub-framework, alternativeB

Start of installation, alternativeC

Euro Selekta Clad pro�leWatergate building paper continuous around corner

Solid timber batten

Solid timber batten

Aluminium internalcorner trim

6g x 50mm SS screw

75x75mm �ashing

6g x 60mm S/S drill screws through batten into stud

Note: Double solid timber 75x45mm studs required at internal corners

Interior lining

1

4

2

3

4

Internal cornerD

10

10

D Internal corner

X

max.100

X

max.100

X

A Fastening spacing B Sub-framework, alternative

23

4

1 1

2

11

1

max. 20

C Start of installation, alternative

34

1

5

2

3

7

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Horizontal installation

A External corner

1. Euro Selekta Clad profile

2. 30 x 42 mm batten

3. Aluminium internal corner profile

4. Aluminium external corner profile

5. 75 x 75 mm flashing.

Euro Selekta Clad pro�le

Minimum 20mm cavity

Interior lining

6g x 50 mm SS screw

Cavity battenWallframing

Wall Sarking

Cavity battenConnectionpro�le FInterior

lining

Wallframing

Wall Sarking

6g x 50 mm SS screw

Horizontal starter pro�le

Minimum 20mm cavity

1

2

3

4

Ventilation pro�le

5

6

7

Connection to pitched roof and soffitC

B External corner Alternative

1. Euro Selekta Clad profile

2. 30 x 42 mm batten

3. Aluminium external Y profile

4. 75 x 75 mm flashing

5. 6g x 50 mm stainless steel screw.

C Roof connection

1. Euro Selekta Clad profile

2. 6g x 50 mm stainless steel screw

3. Cavity batten

4. wall sarking

5. Horizontal starter profile

6. Ventilation profile

7. Connection profile F.

External CornerA

Interiorlining

Solid timber 90x45mm wall frame

Aluminium internal corner trim

Aluminium external corner trim

Euro Selekta Clad pro�le

Watergate building paper continuous around corner

75x75mm �ashing

Solid timber cavity batten with 5º slope on top edge

1

2

3

4

5

6

Solid timber vertical cavity batten (corners only) �xing with 6g x 50mm S/S pre drill screws through batten into stud

External Corner alternativeB

Interiorlining

Solid timber 90x45mm wall frame

Mitred edge

Euro Selekta Clad pro�le

6g x 50 mm SS screw

Watergate building paper continuous around corner

75x75mm �ashing

1

2

5 4

Solid timber cavity batten with 5º slope on top edge

Solid timber vertical cavity batten (corners only) �xing with 6g x 50mm S/S pre drill screws through batten into stud

Aluminium external Y pro�le

3

Please note:

• The Aluminium External/Internal corner profile can be used in reverse for Internal corner applications.

8

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Window lintel and sill connectionA

Euro Selekta Clad pro�leHorizontal installation

Watergate building paper

Solid timber double studs behind vertical jointer 75 x 45mm

Interior lining

2 piece edge cover 40/25

Windowframe

Batten

12

4

3

Euro Selekta Clad pro�le

Minimum 20mm cavity

Interior lining

Bottom plate w/DPC under

6g x 50mm SS screw

Cavity batten

Wallframing

Wall Sarking

1

3

7

Horizontal starter pro�le2

Galvanised ventilation pro�le

4

Window horizontalB

Pier floorC

Euro Selekta Clad pro�le

Interior lining

6g x 50mm SS screw

Cavity batten

Wallframing

Wall Sarking (breatheable)

Window Frame

Euro Selekta Clad pro�le

6g x 50 mm SS screw

Wall sarking (breatheable)

Interior lining Cavity batten

Minimum 20mm cavity

Horizontal starter pro�le

Timber sill

Wall

Lintel

Sarking

Sarking

1

4

1

2

Window frame �ashing(Z-pro�le)

3

Z-pro�le5

Window frame4

Minimum 20mm cavity

Euro Selekta Clad pro�le

Interior lining

6g x 50mm SS screw

Cavity batten

Wallframing

Wall Sarking (breatheable)

Window Frame

Euro Selekta Clad pro�le

6g x 50 mm SS screw

Wall sarking (breatheable)

Interior lining Cavity batten

Minimum 20mm cavity

Horizontal starter pro�le

Timber sill

Wall

Lintel

Sarking

Sarking

1

4

1

2

Window frame �ashing(Z-pro�le)

3

Z-pro�le5

Window frame4

Minimum 20mm cavity

Horizontal installation

A Window lintel connection

1. Euro Selekta Clad profile

2 Horizontal starter profile

3 Window Z profile

4 Window frame flashing

5 Ventilation opening (continuous).

Window sill connection

1. Euro Selekta Clad profile

2 2 piece edge cover

3 Cavity batten

4 Window frame.

B Window reveal connect

1. Euro Selekta Clad profile

2. Jamb flashing profile

3 Cavity batten

4. Aluminium window frame.

C Pier floor

1. Euro Selekta Clad profile

2. Horizontal starter profile

3 Cavity batten

4. Ventilation profile (continuous).

Please note:

• At the transition between the reveal and the lintel, the connection profiles are given a mitre cut.

• The Z profile covers the vertical left and right hand side flashing profiles.

9

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

max. 2max. 2700 mm

A Staggered arrangement

11

22 3

10

C Profile butt joint without butt connector

114

5

2 3

B Butt connector 1/155

1

1

2

X

D Notching of the groove lip

max. 2700 mm max. 2700 mm

E Continuous profile butt joint

11

2

3

4

25

F Cover profile T + G

11

23

4 5

Horizontal Installation

A Door head detail

1. Euro Selekta Clad profile

2. Horizontal starter profile

3. Ventilation profile

4. 6g x 50 mm stainless steel screw

5. Z–profile.

B Parapet detail 1

1. Euro Selekta Clad profile

2. Edge trim

3. Parapet flashing

4. 30 x 42 mm batten.

C Parapet detail 2

1. Euro Selekta Clad profile

2. Edge trim

3. Parapet flashing

4. 30 x 42 mm batten.

D Horizontal to vertical profile

1. Euro Selekta Clad profile

2. Support batten

3. Connection cover profile

4. Pan head screw 4 x 40 mm, stainless steel into flashings or profiles.

Profile butt joints

The profiles preferred installation is a continuous vertical joint to 5.4 metres length. Local temperature variations should be considered with the inherent thermal expansion and contraction.

E Butt joint

1. Euro Selekta Clad profile

2. Support batten

3. Cover profile, aluminium

4. Backing bead

5. Clear UV resistant silicon.

Interior lining Minimum 20mm cavity

Horizontal starter pro�le

Timber Head

Door Frame

Euro Selekta Clad pro�le

Wall Sarking

Lintel

Wall

6g x 50 mm SS screw

Cavity batten

Door Trim

Door

Ventilation-pro�leZ-pro�le

1

2

3

4

5

6Euro Selekta Clad pro�lehorizontal installation

Solid timber wall

Parapet Flashing

Batten

Sarking

Packer

Edge Trim

Euro Selekta Clad pro�lehorizontal installation

1

4

1

2

3

Euro Selekta Clad pro�lehorizontal installation

Solid timber wall

Parapet Flashing

Batten

Sarking

Packer

Edge Trim

Euro Selekta Clad pro�lehorizontal installation

1

4

1

2

3

Cavitybattens

Pan head screw4 x 40mm stainless steel

3

1 Euro Selekta Clad profilevertical installation

Conncetion cover profile

75 x 75mm flashing

Sarking

Solid timber double studs behind vertical jointer 75 x 45mm

Solid timber cavity batten with 5º slope on top edge

Interior lining

2

Door head detailA Parapet detail 1B

Parapet detail 2C

Butt joint – end elastometric waterproof jointE

Horizontal to vertical profileD

Tip:

Peg a 30 mm wide batten to the sub-framework at the joint location. Position the façade profiles flush on both sides. After installation of the façade profiles, remove the batten and fix, then push cam home.

10

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Please note:

• Ventilation penetration holes as per section allowance table.

• Otherewise a secondary batten is required.

Vertical installation

A Sub-framework

1. Euro Selekta profile

2. Façade screw 6g x 50 mm, stainless steel

3. Timber batten 30 x 42 mm, spacing max. 645 mm

4. Fastening with 2 screws 4 x 50 mm, stainless steel

5. Timber frame construction at least 45 mm x 75 mm, or at least 20 mm higher than structural wall

6. Dowel and screw with building authority approval.

B - C Sections

1. Euro Selekta profile

2. Back ventilation spacing (at least 20 mm*)

3. Timber batten 30 x 42 mm spacing max 645 mm.

Note:

Optional ventilation detail must conform to local sectional penetration table.

10 155 mm

A Sub-framework

B Horizontal section C Vertical section

5

6

2

1

21

3

3

Vent

2

1

AS REQUIRED

645

max

.3

4

Sub-frameworkA

10 155 mm

A Sub-framework

B Horizontal section C Vertical section

5

6

2

1

21

3

3

Vent

2

1

AS REQUIRED

645

max

.

3

4

Horizontal sectionB Vertical sectionC

11

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Euro Selekta Clad profile

Watergate building paper

Minimum 20mm cavity

Bottom plate - 75 x 45mm solid timber

PVC cavity closure flashing

15mm drip min. or vertical starter profile

Ventilation opening, continuous

Interior lining

Solid timber cavity battenwith 5º slope on top edge

Foundation / floor

Wall framing75 x 45mmsolid timber

1

3

Ventilation profileglavanised steel

2

Euro Selekta Clad pro�le

6g x 50mm SS screw

with bottom edge mitre cut @ 10º max

Wall Sarking

Batten

Minimum 20mm cavity

Wall

Vertical starter-pro�le

Wall Wrap

2

1

Foundation / floor

Starter detailC Alternative detailD

Solid timber batten with 5º slope on top edge

Euro Selekta Clad pro�leVertical installation

Euro Selekta Clad pro�leVertical installation

Connection cover pro�le

75x75mm �ashing

Pan head screw 4 x 40mm, stainless steel

Watergatebuilding paper

Solid timber double studs behind vertical jointer 75 x 45mm

Interior lining

EdgeTrim

12

34

1

Joiner detailE

Please note:

• Baseboard termination at least 100 mm spacing to the floor.

• Avoid designs that allow moisture build-up.

• Use local penetration tables.

max.100

X

max.100

X

X

A Fastening spacing B Sub-framework, alternative

3

4

2

mind. 20 mm

10

E Internal corner, alternative

C Start of installation D Connection to pitched roof

23

1

1

4

2

3

4

12

4

1

at least

1

1

4

5

3

Vertical installation

A Fastening spacing

1. Euro Selekta Clad profile

2. Façade screw 6g x 50 mm, stainless steel

3. Elongated fixing holes

4. Timber batten 30 x 42 mm

X = 3 or more supports, max. 645 mm

X = For only 2 supports, max. 300 mm; profile excess length max. 100 mm

Fastening materials

Use only screws 6g x 50 mm, stainless steel. Always centre the screws in the fastening holes of the façade profile.

B Sub-frameworks – alternatives

1. Building wall

2. Support batten – ferrule, top hat

3. Masonary fixing screw.

Alternatively, other sub-framework systems can also be used.

C Start of installation from below

1. Euro Selekta Clad profile

2. Ventilation profile, galvanised steel

3. Ventilation opening, continuous.

D Alternative detail

1. Euro Selekta Clad profile

2. Vertical starter profile.

E Joiner detail

1. Euro Selekta Clad profile

2. Connection cover profile 2 piece

3. Pan head screw 4 x 40 mm stainless steel

4. Edge trim profile.

Fastening spacingA Sub-framework, alternativeB

max.100

X

max.100

X

X

A Fastening spacing B Sub-framework, alternative

3

4

2

mind. 20 mm

10

E Internal corner, alternative

C Start of installation D Connection to pitched roof

23

1

1

4

2

3

4

12

4

1

at least

1

1

2

3

12

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Vertical installation

A External corner

1. Euro Selekta Clad profile

2. External corner (two-part), aluminium

3. Internal corner (two-part), aluminium

4. 75 x 75 mm flashing.

B Internal corner

1. Euro Selekta Clad profile

2. Internal corner (two-part), aluminium

3. 75 x 75 mm flashing

4. 6g x 50 mm Stainless steel screw.

C Masonry wall

1. Euro Selekta Clad profile

2. 30 x 42 mm timber batten

3. Drive pin

4. 6g x 30 mm Stainless steel screw.

External corner, alternativeA

Euro Selekta Clad pro�leWatergate building paper continuous around corner

Solid timber batten

Solid timber batten

Aluminium internalcorner trim

6g x 50mm SS screw

75x75mm �ashing

6g x 60mm S/S drill screws through batten into stud

Note: Double solid timber 75x45mm studs required at internal corners

Interior lining

1

4

2

3

4

Internal cornerB

75x75mm �ashing

Interiorlining

Solid timber 90x45mm wall frame

Aluminium internal corner trim

Aluminium external corner trim

Euro Selekta Clad pro�le

6g x 50mm SS screw

Watergate building paper continuous around corner

Solid timber batten

Solid timber batten

2

3

1

4

Please note:

• The Aluminium External/Internal corner profile can be used in reverse for Internal corner applications.

Interior lining

Concretetilt slab

6g x 30mm SS screw4

30 x 42 mm batten

Euro Selekta Clad pro�le1

Wall Sarking5

Drive pin3

2

Fastening to masonry wallC

13

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Vertical installation

A Window lintel connection

1. Euro Selekta Clad profile

2. Vertical starter profile

3. Z profile, aluminium.

B Door head connection

1. Euro Selekta Clad profile

2. Ventilation profile, continuous

3. Z profile, aluminium.

C Window reveal connection

1. Euro Selekta Clad profile

2. 2 piece edge cover 40/25

3. External corner profile, aluminium.

Window reveal connectionA

Euro Selekta Clad pro�le

Minimum 20mm cavity

Interior lining

6gx50mm SS screw

Batten

Wallframing

Wall Sarking

Z-pro�le

Window Frame

B69450

Window Frame

Euro Selekta Clad pro�le

Wall Sarking

Interior lining

Minimum 20mm cavity

Vertical starter pro�le

Z-pro�le

Timber Sill

Wall

Lintel

6gx50mm SS screw

Batten

1

1

2

3

3

Breatheable Sarking

Breatheable Sarking

Timber Head

Wall

Lintel

Door Frame

Euro Selekta Clad pro�le

Wall Sarking

Interior lining Minimum 20mm cavity

Vertical starter pro�le

Z-pro�leVentilation pro�le

6gx50mm SS screwBatten

Door Trim

Door

1

2

3

Door head connectionB

Euro Selekta Clad pro�levertical installation

Watergate building paper

Solid timber double studs behind vertical jointer 75 x 45 mm

Interior lining

2 piece edge cover 40/25

Batten

1 2

Window reveal connectionC

Please note:

• At the transition between the reveal and the lintel, the connection profiles are given a mitre cut.

• Ensure ventilation profile is underneath Z profile

14

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

10

10

10

10

25

25

LA

X =

max

. 625

X =

max

. 625

a

600 - 625

E Vertical / horizontal installation F Continuous vertical butt joint

C Vertical / horizontal installation D Continuous horizontal butt joint

A Vertical installation B Continuous horizontal butt joint

G Diagonal installation

1

1

1

1

2

2

2 3

1

2

3

1

4

1

5

4

3

2

2

1

3

4

4

2

3

2 45

3 11

5 11

6

3

5

2

7

1

8

9

4

10

10

10

10

25

25

LA

X =

max

. 625

X =

max

. 625

a

600 - 625

E Vertical / horizontal installation F Continuous vertical butt joint

C Vertical / horizontal installation D Continuous horizontal butt joint

A Vertical installation B Continuous horizontal butt joint

G Diagonal installation

1

1

1

1

2

2

2 3

1

2

3

1

4

1

5

4

3

2

2

1

3

4

4

2

3

2 45

3 11

5 11

6

3

5

2

7

1

8

9

4

10

10

10

10

25

25

LA

X =

max

. 625

X =

max

. 625

a

600 - 625

E Vertical / horizontal installation F Continuous vertical butt joint

C Vertical / horizontal installation D Continuous horizontal butt joint

A Vertical installation B Continuous horizontal butt joint

G Diagonal installation

1

1

1

1

2

2

2 3

1

2

3

1

4

1

5

4

3

2

2

1

3

4

4

2

3

2 45

3 11

5 11

6

3

5

2

7

1

8

9

4

Butt joints and diagonal installation

A & B Vertical installation, continuous

1. Euro Selekta Clad profile

2. Install 2 support battens 30 x 42 mm in each joint area

3. 10 mm* expansion gap.

* Expansion amount is based on 120 Celsius variation in temperature over 5.4m plank lengths

C & D Vertical / horizontal installation, continuous horizontal butt joint

The sub-framework must be modified at the butt joint according to the installation direction.

1. Euro Selekta Clad profile

2. Support battens 30 x 42 mm

3. Z profile, maintain 10 mm gap at top and bottom

4. Back ventilation spacing at least 20 mm

5. Connection cover profile.

E Vertical / horizontal installation, continuous vertical butt joint

1. Euro Selekta Clad profile

2. Connection cover profile

3. Pan head screw 4 x 40 mm, stainless steel.

Euro Selekta Clad pro�levertical installation

DynaFlash

Watergatebuilding paper

Solid timber double studs behind vertical joiner 75 x 45 mm

Interior lining

Timber cavitybatten with 5º slope on top edge

1

30 x 42 mmbatten

Z pro�le

Euro Selekta Clad pro�levertical installation

1

Vertical junctionBVertical installationA

Vertical/horizontal installationC Vertical/horizontal installationD

Cavity battens

Pan head screw4 x 40mm stainless steel

3

1 Euro Selekta Clad profilevertical installation

Conncetion cover profile

75 x 75mm flashingSarking

Solid timber double studs behind vertical jointer 75 x 45mm

Solid timber cavity batten with 5º slope on top edge

Interior lining

2

Joiner detail horizontalE

Tip: Peg a 30 mm wide batten to the sub-framework at the joint location. Position the façade profiles flush on both sides. After installation of the façade profiles, remove the batten and screw on the cover profile T + G in its place.

Note: Position the vertical support battens at the transition point at least 30 mm above the horizontal counter batten to ensure back ventilation.

15

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Minimum 20mm cavity

Interior lining

6g x 50mm SS screw

Cavity battenWallframing

Wall Sarking

Minimum 20mm cavity

Interior lining

Wallframing

Wall Sarking

Cavity batten

Euro Selekta Clad pro�le (Horizontal)1

Horizontal starter pro�le2

Connection pro�le F

Ventilation pro�le3

4

Roof and soffit detail – verticalB

A Parapet detail

1. Euro Selekta Clad profile

2. Edge trim

3. Parapet flashing

4. Cavity batten.

B Roof and soffit detail – vertical

1. Euro Selekta Clad profile

2. Horizontal starter profile

3. Ventilation profile

4. Connection profile F.

C Horizontal pipe detail

1. Euro Selekta Clad profile

2. 30 x 42 mm batten

3. Pipe flashing (min 100 mm outside pipe)

4. Flashing tape

5. Sealant over backing rod

6. Protective pipe flange.

D Vertical pipe detail

1. Euro Selekta Clad profile

2. 30 x 42 mm batten

3. Pipe flashing (min 100 mm outside pipe)

4. Flashing tape

5. Sealant over backing rod

6. Protective pipe flange.

Pipe to have min. 5º fall to outside

Square of flexible flashing tape to a min. of 100 mm outside of pipe. Ensure seal with pipe bandage

PVC protective flange

Sealant over backing rod

20mmØ pipe

Solid timber cavity batten with 5º slope on top edge

Building underlay carefully cut to suit pipe

Euro Selekta Clad profile over flashing tape, carefully cut to suit pipe. Seal with PVC flange and flexible sealant

Flexible flashing tape bandage min. 25mm wide all round pipe

1

2

3

4

5Pipe to have min. 5º fall to outside

Square of flexible flashing tape to a min. of 100 mm outside of pipe. Ensure seal with pipe bandage

PVC protective flange

Sealant over backing rod

20mmØ pipe

Cavity batten

Building underlay carefully cut to suit pipe

Euro Selekta Clad profile over flashing tape, carefully cut to suit pipe. Seal with PVC flange and flexible sealant

Flexible flashing tape bandage min. 25mm wide all round pipe

1

3

2

4

5

6

Euro Selekta Clad pro�lehorizontal installation

Solid timber wall

Parapet Flashing

Batten

Sarking

Packer

Edge Trim

Euro Selekta Clad pro�lehorizontal installation

1

4

1

2

3

Parapet detailA

Horizontal pipe detailC

Vertical pipe detailD

16

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

General guidelines

Arguments for a back-ventilated curtain cladding of the exterior wall

• Energy savings

• Weather protection

• Attractive design

• Increased building value

Handling

The Euro Selekta Clad profiles must be stored in their packaging, lying flat and dry until use.

Sawing with power tools

Hard metal saw blade, high number of teeth, (tooth pitch approx. 10 – 15 mm), saw blade with alternate top bevel or hollow-tooth flat-top teeth.

Sawing with hand saws

A well-sharpened and dressed saw with small teeth is sufficient.

Fastening the façade profiles

Only with façade screws 6g x 50 mm, stainless steel A2. Centre the fastening screws through the existing punched holes. The screws may only be screwed in until the screw head rests against the surface.

Fastening of all connection profiles

Only with façade screws 6g x 50 mm, stainless steel A2.

Please note: Heavy structures, such as an awning, climbing trellis, etc., may not be fastened directly to the cladding or its sub-framework. Provide separate sub-frameworks.

Expansion

The length change of the façade profiles is approx.

1 – 3 mm/linear m, depending on moisture and temperature. Expansion joints of 10 mm* must be maintained at profile butt joints and profile connections.

Sealing cut edges

Cut edges must be sealed free of pores with Werzalit edge sealant. Exception: Sufficiently covered cut edges under the roof overhang.

Cleaning

Clean only with water and a liquid detergent. Never use an abrasive cleaner.

* Expansion amount is based on 120 Celsius variation in temperature over 5.4 m plank lengths

Sub-framework

Façade profiles are typically fastened to a wood sub-framework. In principle, the following guidelines should be followed for wood sub-frameworks:

a) The sub-framework must be fastened using dowels and screws with building authority approval and in accordance with the instructions of the manufacturer.

b) The support battens must be fastened to the counter battens with at least 2 wood screws, stainless steel A2, per intersection, in a diagonal arrangement.

c) The sub-framework must be level and plumb.

d) All Structural framework must be in accordance to Australian Building Standards & Local Building Codes.

Thermal insulation

The thermal insulation material must be fastened with appropriate hardware, such as insulation pins, in accordance with the instructions of the manufacturer. The installation must be made windproof to prevent cold air from flowing behind it. We therefore recommend installing in two layers with overlapping joints. The insulation must be flush against the wall.

Back ventilation

The back ventilation spacing must be at least 20 mm.

The back ventilation cross-section may not be regularly diminished by battens or other objects. The ventilation inlets and outlets must have consistent widths of at least 20 mm.

Profile surface finishes

Colorpan: Single-colour coating based on an acrylic paint system.

Dekopan Plus: Wood decor with transparent acrylic coating. When stored in damp conditions (e.g. kept outdoors, wrapped in film packaging), the paint layer might undergo partial changes, givin it a milky appearance. These disappear completely once the profiles have dried. The resistance of the paint system is not affected. The environmentally-friendly acrylic coating is finally cured by the effects of weathering.

Connections

Clearance at least 10 mm.

Butt joints and expansion joints

When profiles have been joined (when fixed) horizontally over lengths exceeding 5.4 metres, individual profiles should not exceed 2.7 metres in lenth so as to keep expansion joints as narrow as possible. With profiles 2.7 metres long, a 10 mm wide expansion joint is needed.

17

Installation Instructions: Urbanline Euro Selekta Clad

Phone 1800 156 455 Email [email protected]

For further product information and downloads Visit urbanline.com.au

ESII AUS V4 31.01.20Euro Selekta 2020 Modinex Limited

CM40177

Wind loadings This is a simplified form or general rule of thumb for wind loadings.

Wind Loading

Speed

Equivalent from test data

Low <32m/s N1, N2

Medium 37m/s C1, N3

High 44m/s C2, N4

Very High 50m/s C2, N4

Extra High 55m/s C2, N4

Specific Design >55m/s Engineered design

Important Building Design Notes:

• The supporting wall must be watertight and correct flashings used in the event of any water penetration i.e. severe storms

• There must be ventilation/drainage at the base of the wall

• Install breathable sarking over the stud frame keeping all overlaps pointing downwards and tape all joints

• HPL (High Pressure Laminate) products expand and contract with temperature longitudinally – see installation instructions for joint options.

Technical data Values Unit Test specificationSustainability PEFC certified N/A PEFCDensity 800 – 950 kg/m3 EN 323Flexural strength 40 – 45 N/mm2 EN 310

Elasticity modulus 4000 – 6000 N/mm2 EN 310

Tensile strength vertical to the surface 2.0 – 3.0 N/mm2 EN 319

Screw withdrawal strength (1) 800 – 1300 N

WERZALITTEST STANDARD

Swelling after storage after 2 hrs 0.3 – 0.6 % EN 317

in water at 20 °C after 24 hrs 3.0 – 5.0 % EN 317

Moisture content 5 – 10 % EN 322

Temperature resistance under permanent load under temporary load

-50 to +70+120

°C°C

WERZALITTEST STANDARD

Length change due to moisture/heat exposure (3) 1 – 3 mm/m

WERZALITTEST STANDARD

Thermal conductivity λ 10 0.20 W/m·K DIN 52 612

Water vapour permeability diffusion-equivalent air layer thickness 5 – 15 m DIN 52 615

Cross-cut test (4) GT 0A – GT 1A N/A EN ISO 2409

Scratch resistance 0.5 – 1.5 N EN 438

Light fastness Level 8 N/A DIN 54 004

Chemical resistance limited resistance N/A EN 438

Cigarette burn resistancenot resistant to burns

N/A as for EN 438

Colour deviation (5) Δ E < 1 N/A DIN 5033

Impact load impact resistant N/AWERZALITTEST STANDARD

1) 4 mm particle board screw, using a hole of 3 mm diameter, 10 mm deep.2) Not available for all products, please ask for specific information.3) Maximum expected length change under extreme climate fluctuations.4) Gt 0A is the best, Gt 4A is the worst value.5) With measurement geometry 0°/45°, standard illuminant “C”.