  • CONTRACCIN TEMPRANA DEL HORMIGN

    Bibliografa recomendada: Erika E. Holt, 2001. Early Age Autogenous Shrinkage of Concrete. TecnicalReserch Centre of Finland.

    Oskar Esping & Ingemar Lfgren, 2005. Cracking due Plastic and AutogenousShrinkage Investigation of Early Age Deformation of Self-CompatingConcrete. Chalmers University of Technology, Sweden.

    W. Jason Weiss, 1999. Prediction of Early-Age Shrinkage Cracking in Concrete, for the degree Doctor of Philisophy in Field of Civil Engineering, Northwestern University.

    ACI International SP-220, 2004. Autogenous Deformation of Concrete

    Richard W. Burrows, 1998. The Visible and Invisible Cracking of Concrete, ACI Monograph N11.

    Concrete Society, 1992. Non-Structural Cracks in Concrete, Third Edition, Technical Report N22.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fisuras en Estado

    Fresco

    Fisuras en Estado

    Endurecido

    Congelamiento temprano

    Plsticas

    Movimientos constructivos

    contraccin asentamiento encofrados base

    Fsicas

    Qumicas

    Trmicas

    Estructurales

    contraccin de agregados contraccin por secado mapeo (crazing) corrosin de armaduras reaccin lcali-slice carbonatacin ciclos de congelacin y deshielo variaciones estacionales de temp. contraccin trmica temprana sobrecarga accidental creep cargas de diseo

    !

    !!

    !!

    !

    !!

    !!

    !!

    !

    !Tipos de Fisuras

    Fuente: Concrete Society - Non-structural Cracks in Concrete, Third edition (1992)

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNFisuras de Contraccin por Secado

    Estado inicial

    Luego de algunas horas

    Luego de algunos das

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Fuente: E. Becker, 2005. Deformaciones y Fisuracin Temprana del Hormign . Trabajo de Tesis.

    Influencia de la contraccin, creep y resistencia en el tiempo de fisuracin.

    resistenciatra

    ccin

    por co

    ntracc

    in

    sin cr

    eep traccin co

    nsiderando

    la

    relajacin p

    or creep

    Edad de fisuracin

    T

    e

    n

    s

    i

    n

    d

    e

    t

    r

    a

    c

    c

    i

    n

    resiste

    ncia

    traccin

    por con

    traccin

    sin creep

    traccin

    conside

    rando la

    relajaci

    n por cre

    ep

    No hay fisuracin por contraccin

    CONTRACCIN TEMPRANA DEL HORMIGN

    Menor relajacin que en caso a)

    T

    e

    n

    s

    i

    n

    d

    e

    t

    r

    a

    c

    c

    i

    n

    Tiempo Tiempo

    b) Hormign no fisuradoa) Hormign fisurado

  • PATOLOGAS HABITUALESFisuras de Contraccin por Secado

    Ventana de aserrado

    Demasiado temprano para

    aserrar

    Demasiado tarde para aserrar (fisuracin descontrolada)

    Resistencia del hormign = tensin generada por la restriccin

    R

    e

    s

    i

    s

    t

    e

    n

    c

    i

    a

    Resistencia mnima de aserrado

    Fraguado del hormign

    Hormign en estado fresco Hormign en estado endurecido

    Tiempo

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    (t) = E(t) . (t)donde: (t) : tensin en funcin al tiempo

    E(t) : mdulo de elasticidad en funcin al tiempo(t) : deformacin especfica en funcin al tiempo

    Fuente: E. Becker, 2005. Deformaciones y Fisuracin Temprana del Hormign . Trabajo de Tesis.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    De qu depende el mdulo de elasticidad?

    50

    40

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Fuente: A. M. Neville, 1996 Properties of Concrete

    0 1000 2000 30000

    10

    30

    20

    pasta

    ceme

    nticia

    hormign

    agre

    gado

    T

    e

    n

    s

    i

    n

    [

    M

    P

    a

    ]

    Deformacin [x 10-6]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Fuente: E. Becker & G. Fornasier, 2003. Influencia del tipo de Agregado sobre el Mdulo de Elasticidad del Hormign . 2do Seminario de Discusin Pblica del Proyecto de Reglamento CIRSOC 201-2002

    De qu depende el mdulo de elasticidad?

    y = 11,879x0,296

    R2 = 0,9432

    y = 13,675x0,2981

    R2 = 0,8131

    20,0

    25,0

    30,0

    35,0

    40,0

    45,0

    50,0

    0 20 40 60 80Resistencia Compresin [MPa]

    M

    d

    u

    l

    o

    d

    e

    E

    l

    a

    s

    t

    i

    c

    i

    d

    a

    d

    e

    s

    t

    t

    i

    c

    o

    [

    G

    P

    a

    ]

    Caliza

    de alto m

    dulo

    Granito

  • CONTRACCIN TEMPRANA DEL HORMIGN

    De qu depende el mdulo de elasticidad?

    Tabla 3: coeficiente corrector del mdulo de deformacin en funcin de la edad.Fuente: Tabla 39.6.b de la Instruccin de Hormign Estructural EHE, 5 Edicin, 1 reimpresin enero de 2000.

    Valor de Edad del hormign [das] 3 7 28 90 365Hormign de endurecimiento normal (1) 0,63 0,80 1,00 1,09 1,16Hormign de endurecimiento rpido (1) 0,74 0,87 1,00 1,07 1,09

    Vase la definicin de hormign de endurecimiento rpido, o de endurecimiento normal, en 30.3 (Instruccin deHormign Estructural EHE).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Fuente: E. Becker & G. Fornasier, 2003. Influencia del tipo de Agregado sobre el Mdulo de Elasticidad del Hormign . 2do Seminario de Discusin Pblica del Proyecto de Reglamento CIRSOC 201-2002

  • CONTRACCIN TEMPRANA DEL HORMIGN

    De qu depende el mdulo de elasticidad?

    Tipo de agregado

    Resistencia de la pasta cementicia

    Edad

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Fuente: E. Becker & G. Fornasier, 2003. Influencia del tipo de Agregado sobre el Mdulo de Elasticidad del Hormign . 2do Seminario de Discusin Pblica del Proyecto de Reglamento CIRSOC 201-2002

  • CONTRACCIN TEMPRANA DEL HORMIGN

    De qu depende la deformacin?

    Volumen de pasta

    Velocidad de hidratacin

    Relacin a/c

    Velocidad de evaporacin

    Diferencias trmicas

    Absorcin de los agregados

    Restricciones internas y externas

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNAgregado grueso utilizado y relacin a/c

    Ensayo Edad [hs]

    Canto rodado fracciones

    6-20 + 10-30 + 30-50

    a/c = 0,40

    Canto rodado fracciones

    6-20 + 10-30a/c = 0,40

    Piedra Partida fracciones

    6-20 + 10-30 + 30-50

    a/c = 0,43

    17 5,3 4,5 3,2

    19:30 6,5 6,2 5,2

    24 10,2 8,7 8,7

    17 0,74 0,75 0,79

    19:30 1,1 1,0 0,9

    24 1,2 1,3 1,4

    17 14,0 16,7 24,7

    19:30 18,3 16,1 17,3

    24 11,8 14,9 16,1

    17 no determinado 23,0 no determinado

    19:30 no determinado no determinado no determinado

    24 30,5 26,9 17,9

    Mdulo de elasticidad [GPa]

    Traccin / Compresin [%]

    Traccin por compresin diametral [MPa]

    Resistencia a la compresin [MPa]

    Tabla 4: Diferencias de comportamiento entre hormigones con canto rodado y piedra partida como AG

    Fuente: E. Becker, 2007. Informe Tcnico 0257 del 28/09/2007

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNAgregado grueso utilizado y relacin a/c

    Ensayo Edad [hs]

    Canto rodado fracciones

    6-20 + 10-30 + 30-50

    a/c = 0,40

    Canto rodado fracciones

    6-20 + 10-30a/c = 0,40

    Piedra Partida fracciones

    6-20 + 10-30 + 30-50

    a/c = 0,43

    17 5,3 4,5 3,2

    19:30 6,5 6,2 5,2

    24 10,2 8,7 8,7

    17 0,74 0,75 0,79

    19:30 1,1 1,0 0,9

    24 1,2 1,3 1,4

    17 14,0 16,7 24,7

    19:30 18,3 16,1 17,3

    24 11,8 14,9 16,1

    17 no determinado 23,0 no determinado

    19:30 no determinado no determinado no determinado

    24 30,5 26,9 17,9

    Mdulo de elasticidad [GPa]

    Traccin / Compresin [%]

    Traccin por compresin diametral [MPa]

    Resistencia a la compresin [MPa]

    Tabla 4: Diferencias de comportamiento entre hormigones con canto rodado y piedra partida como AG

    +70% Tensin

    Fuente: E. Becker, 2007. Informe Tcnico 0257 del 28/09/2007

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNAgregado grueso utilizado y relacin a/c

    Ensayo Edad [hs]

    Canto rodado fracciones

    6-20 + 10-30 + 30-50

    a/c = 0,40

    Canto rodado fracciones

    6-20 + 10-30a/c = 0,40

    Piedra Partida fracciones

    6-20 + 10-30 + 30-50

    a/c = 0,43

    17 5,3 4,5 3,2

    19:30 6,5 6,2 5,2

    24 10,2 8,7 8,7

    17 0,74 0,75 0,79

    19:30 1,1 1,0 0,9

    24 1,2 1,3 1,4

    17 14,0 16,7 24,7

    19:30 18,3 16,1 17,3

    24 11,8 14,9 16,1

    17 no determinado 23,0 no determinado

    19:30 no determinado no determinado no determinado

    24 30,5 26,9 17,9

    Mdulo de elasticidad [GPa]

    Traccin / Compresin [%]

    Traccin por compresin diametral [MPa]

    Resistencia a la compresin [MPa]

    - 42%Resistencia

    Tabla 4: Diferencias de comportamiento entre hormigones con canto rodado y piedra partida como AG

    Fuente: E. Becker, 2007. Informe Tcnico 0257 del 28/09/2007

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Ahora, qu ocurre en la pasta de cemento durante

    las 1eras horas?

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNHidratacin del cemento

    Compuestos S-C-H

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNHidratacin del cemento

    Evolucin tpica de la hidratacin de la pasta cementicia (de izquierda a derecha) con decrecimiento de la porosidad [Knonlf, 1999].

    Fuente: E. Holt, 2001. Early Age Autogenous Shrinkage of Concrete.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNHidratacin del cemento

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    0,0 0,2 0,4 0,6 0,8 1,0

    100

    0

    Grado de Hidratacin,

    Productos de hidratacin

    Poros del gel

    Poros capilares

    Cemento anhidro

    V

    o

    l

    u

    m

    e

    n

    O

    c

    u

    p

    a

    d

    o

    [

    %

    ]

    80

    60

    40

    20

    Volumenes relativos en funcin del grado de hidratacin para a/c = 0,50Fuente: F. Irassar, 2004. Estructura de la Pasta de Cemento Prtland. Apuntes de clase de la materia Materiales Componentes del Hormign de la Maestra de Tecnologa y Construcciones de Hormign.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    0,2 0,3 0,4 0,5 0,6 0,7

    100

    0

    V

    o

    l

    u

    m

    e

    n

    O

    c

    u

    p

    a

    d

    o

    [

    %

    ]

    Poros capilaresPoros del gel

    Productos de hidratacin

    Cemento anhidro

    80

    60

    40

    20

    Relacin a/c [kg/kg]

    Fuente: F. Irassar, 2004. Estructura de la Pasta de Cemento Prtland. Apuntes de clase de la materia Materiales Componentes del Hormign de la Maestra de Tecnologa y Construcciones de Hormign.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • 0.50 0.50 w/cw/c

    0.30 0.30 w/cw/c

    Incremento del grado de hidrataciIncremento del grado de hidratacinn

    0.50 0.50 w/cw/c

    0.30 0.30 w/cw/c

    Granos de cemento inicialmente

    separados por agua

    CONTRACCIN TEMPRANA DEL HORMIGN

    Fraguado inicial de la pasta

    La contraccin qumica asegura alguna porosidad remanente an en = 1

    Agua extra disponible en poros pequeos, incluso

    hasta = 1

    Poros hasta 50 nm vacos

    HR interna y la presin de poros se reduce a medida que los poros pequeos se vacan

    ContracciContraccin n autautgenagena

    Fuente: Zachary C. Grasley & David A. Lange, 2005. Autogenous Shrinkage as a Viscoelastic Response to Self-Desiccation

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • estado endurecidoestado fresco

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    alta a/c

    (relacin agua/cemento, en

    masa)

    D =

    f (a/c,

    s)

    baja a/c

    (relacin agua/cemento, en

    masa)D

    = f (a

    /c, s)

  • CONTRACCIN TEMPRANA DEL HORMIGN

    r2 r1

    r1

    r2 r2 r1

    r1

    r2

    Pc

    **

    Esquema de un lquido entre 2 partculas esfricas en la superficie.

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGNLa teora ms difundida dice que la contraccin plstica se produce directamente por evaporacin del agua superficial del hormign. Si la tasa de evaporacin excede la velocidad de exudacin, la superficie del hormign se seca y provoca la formacin de meniscos de agua cerca de la superficie del hormign. La formacin del menisco de agua produce una presin negativa en el poro de agua y consecuentemente fuerzas de contraccin entre las partculas. Esas fuerzas capilares son inversamente proporcionales al radio del menisco. Las tensiones capilares de traccin, consecuentemente, se incrementarn con la disminucin del espacio interpartcula (baja relacin a/c, alta finura, etc.). Las observaciones prcticas confirman la teora de la contraccin plstica, como que la tendencia a que se produzcan en tiempo caluroso, seco y ventoso cuando la superficie tiende a secarse en forma generalizada.

    En un hormign donde se evit la evaporacin, la presin capilar (negative) comenzar a desarrollarse cuando fragua. Como un esqueleto slido en formacin, la contraccin qumica no se traduce completamente en un cambio volumtrico externo. Si se suspende la disponibilidad de agua, aparecen poros vacos en la pasta y se forman meniscos de aire-agua (ver figura). La fuerza capilar (Pc) que se genera puede describirse por la ecuacin de Gauss-Laplace (1), que relaciona la presin con el radio de capilaridad y por la ecuacin de Kelvin (2) que relaciona la presin con la humedad relativa (HR):

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Ecuacin de Gauss Laplace:

    Pc Pv = . ( )1 1+r1 r2Pc : presin capilarPv : presin de vaporr1 y r2 : radios de curvatura: tensin superficial del agua capilar

    Ecuacin de Kelvin:

    Pc : presin capilarPv : presin de vaporR : constante de los gases [8.314 J/mol.K]T : temperatura absolutaM : masa molar del aguav : volumen especfico del agua

    Pc Pv =R . T ( RH ). lnM . v

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Combinando ambas ecuaciones y suponiendo Pv = 0 y r1 = r2:

    Pc = =2 r

    ( RH )R . T . lnM . v

    De acuerdo a Powers (1968), la presin capilar en la pasta de cemento es:

    Pc : presin capilar [MPa] : tensin superficial del agua capilar [N/m2]S : superficie especfica del cemento [m2/kg]w/c : relacin a/c, en masa

    . Sw/cPc = 1 . 10

    -3 .

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    0 20 40 60 80 100Humedad relativa [%]

    1.000.000

    100.000

    10.000

    1.000

    100

    10

    1

    P

    r

    e

    s

    i

    n

    c

    a

    p

    i

    l

    a

    r

    [

    k

    P

    a

    ]

    Relacin entre humedad relativa y presin (succin) basado en una combinacin de las ecuaciones de Laplace y Kelvin.Fuente: E. Holt, 2001. Early Age Autogenous Shrinkage of Concrete.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    10-2 10-1 100 101 102Dimetro de poros [m]

    Vporos

    Vagua

    V

    o

    l

    u

    m

    e

    n

    d

    e

    p

    o

    r

    o

    s

    [

    c

    m

    3

    /

    c

    m

    3

    ]

    aguaporo

    Volumen de poros vacos

    Volumen de poros llenos de agua

    Representacin esquemtica de la distribucin de poros con nfasis en el estado de los poros de agua respecto del volumen total de poros [Koenders, 1997].Fuente: E. Holt, 2001. Early Age Autogenous Shrinkage of Concrete.

  • CONTRACCIN TEMPRANA DEL HORMIGN

    1 2 4 6 8 10 1 3 70

    200

    400

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Desarrollo de la extensibilidad de una mezcla de hormign

    Fuente: Concrete Society, 1992. Non-structural cracks in concrete. Technical Report N22

    100

    300

    Tiempo [h, das]

    E

    x

    t

    e

    n

    s

    i

    b

    i

    l

    i

    d

    a

    d

    [

    x

    1

    0

    6

    ]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

    Fuente: B. Pease, A.B. Hossain & W.J. Weiss, 2004. Quantifying Volume Change, Stress Development, andCracking Due to Early-Age Autogenous Shrinkage, ACI SP-220, Autogenous Deformation of Concrete, pp 23 38.

    Esquema conceptual de la microfisuracin por contraccin autgena.

    Def

    orm

    aci

    nD

    efor

    mac

    in

    Microfisuras

    PastaAgregados

    Desarrollo de tensiones localizadas de traccin

    Tiempo

    Tiempo

  • CONTRACCIN TEMPRANA DEL HORMIGNHidratacin

    Contraccin volumtrica

    Aporteexternode agua

    Poros y capilares

    conectados?

    Sin meniscoSin contraccinautgena

    Auto disecacin

    Menisco

    Contraccin autgena

    No

    S

    S

    No

    Cundo y cmo se desarrolla la contraccin autgena.Fuente: P.C. Atcin, G. Haddad & R. Morin, 2004. Controlling Plastic and Autogenous Shrinkage in High-Performance Concrete Structures by an Early Water Curing, ACI SP-220, Autogenous Deformation of Concrete, pp 69-82.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    V =

    DespusAntesNivel de pasta de cemento en el frasco

    volumen de agua que penetr en la pasta

    DespusAntes

    Esquema de la experiencia de Le Chatelier.Fuente: P.C. Atcin, G. Haddad & R. Morin, 2004. Controlling Plastic and Autogenous Shrinkage in High-Performance Concrete Structures by an Early Water Curing, ACI SP-220, Autogenous Deformation of Concrete, pp 69-82.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fisuras de Retraccin Plstica

    Base

    Losa de Hormign

    2 a 3 cm

    Fuente: E. Becker, 2001. Seminario sobre Patologas Habituales en el Hormign.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006

    Fuente: FHWA HIF 07-004. Integrated Materials and Construction Practices for Concrete Pavement: A State of the Practice Manual

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fuente: FHWA HIF 07-004. Integrated Materials and Construction Practices for Concrete Pavement: A State of the Practice Manual

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fuente: ASTM C 1581-04: Standard Test Method for Determining Age at Cracking and Induced Tensile Stress Characteristic of Mortar and Concrete under Restrained Shrinkage.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fuente: ASTM C 1581-04: Standard Test Method for Determining Age at Cracking and Induced Tensile Stress Characteristic of Mortar and Concrete under Restrained Shrinkage.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fuente: ASTM C 1581-04: Standard Test Method for Determining Age at Cracking and Induced Tensile Stress Characteristic of Mortar and Concrete under Restrained Shrinkage.

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Fuente: Oskar Esping & Ingemar Lfgren, 2005. Cracking Due to Plastic and Autogenous Shrinkage Investigation ofEarly Age Deformation of Self-Compacting Concrete (Chalmers University of Technology, Gteborg, Sweden).

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    Las 4 acciones prcticas para evitar la fisuracin temprana:

    1) Minimizar la contraccin temprana

    2) Aumentar la extensibilidad de la mezcla

    3) Disminuir la restriccin entre la losa de pavimento y la base

    4) Adecuado debilitamiento controlado (materializacin de

    juntas)

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    1) Minimizar la contraccin temprana

    a) Utilizar 0,42 w/c 0,58b) Minimizar el CUC (contenido unitario de cemento)c) Minimizar el volumen de pasta de cementod) Maximizar el volumen de AGe) Evitar la prdida temprana de aguaf) Reducir la evaporacing) Realizar un curado hmedoh) Provocar una expansin controlada de la mezclai) Reducir la contraccin de la mezcla

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    2) Aumentar la extensibilidad de la mezcla

    a) Utilizar piedra partida como AGb) Utilizar un AG de bajo mduloc) Utilizar fibrasd) Incorporar aire en forma controlada

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    3) Reducir la restriccin entre la losa de pavimento y la base

    a) Colocar una lmina de nylonb) Colocar una capa de material compresiblec) Maximizar la planicidad de la superficie de la based) Pintar la superficie de la base con una lechada de cal

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]

  • CONTRACCIN TEMPRANA DEL HORMIGN

    4) Adecuado debilitamiento controlado (materializacin de juntas)

    a) Asegurar la alineacin y ubicacin de los pasadoresb) Asegurar la alineacin y paralelismo de las juntasc) Aserrar en el momento adecuadod) Aserrar con la secuencia adecuadae) Aserrar a la profundidad adecuada

    ASESORA TCNICA Av. Cnel. Roca 6757 (C1439DWE) Buenos AiresTel.: (011) 4605-3000, Fax: (011) 4605-3006E-mail: [email protected]