cleaner production center and the montreal protocol

25
CLEANER PRODUCTION CENTRE OF SERBIA CLEANER PRODUCTION CENTRE OF SERBIA AND MONTREAL PROTOCOL AND MONTREAL PROTOCOL ECA network meeting, Belgrade, Serbia, May 2011

Upload: unep-ozonaction

Post on 30-Nov-2014

797 views

Category:

Technology


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Cleaner production center and the montreal protocol

CLEANER PRODUCTION CENTRE OF SERBIA CLEANER PRODUCTION CENTRE OF SERBIA

AND MONTREAL PROTOCOLAND MONTREAL PROTOCOL

ECA network meeting, Belgrade, Serbia, May 2011

Page 2: Cleaner production center and the montreal protocol

NCPC SERBIA INAUGURATION

• The CPC is inaugurated on October 11, 2007 during 6th Ministerial Conference“Environment for Europe”, Belgrade

ECA network meeting, Belgrade, Serbia, May 2011

“Environment for Europe”, Belgrade

Page 3: Cleaner production center and the montreal protocol

ContextClimate

change

Jobs

Resource

ECA network meeting, Belgrade, Serbia, May 20113

Pollution, chemicals and waste

Productivity and competitiveness

Resource

Use

Page 4: Cleaner production center and the montreal protocol

Cleaner Production

– Continuous application of an integrated preventive environmental strategy

to processes, products and services to increase efficiency and reduce risks

to humans and environment

complexity of environmental issueslow high

ECA network meeting, Belgrade, Serbia, May 20114

UNEP (1994), Government Strategies for Cleaner Production, United Nations Environment Programme, Paris

PollutionDispersion

PollutionControl

Recycling

PollutionPrevention

environmentalpreference

1960 1980 1990

Cleaner Productionand Eco-Efficiency

high

low

SustainableDevelopment

Van Berkel (2007), Cleaner Production and Eco-Efficiency, in International Handbook for Environmental Technology Management

Page 5: Cleaner production center and the montreal protocol

CPC Serbia, Belgrade

Technical Assistance and In-plant

Assessments

Training

CP Technology and Investment Promotion

Information Dissemination

CP Policy Advice

MAIN SERVICES AND

TARGET INDUSTRIES

ECA network meeting, Belgrade, Serbia, May 2011

CP Policy Advice

Chemical Leasing (ChL)

IPPC consulting

Waste management

Corporate Social Responsibility (CSR)

All industry sectors, focus on chemical,

metalworking and food-processing industry

Target industries:

Page 6: Cleaner production center and the montreal protocol

Serbian CPC have not been involved directly in MP

implementation but the key advantages of CPCs

that would facilitate MP implementation at the

national level include:

• excellent rapport with local industries, governments and academia

and other stakeholders;

ECA network meeting, Belgrade, Serbia, May 2011

and other stakeholders;

• ability to adjust and adopt environmental strategies to suit the

local conditions, the culture and manufacturing practices of their

country; and

• support of national and inter-CPC networks of qualified

professionals.

Page 7: Cleaner production center and the montreal protocol

PARTICIPATING COMPANIES

ECA network meeting, Belgrade, Serbia, May 2011

Page 8: Cleaner production center and the montreal protocol

PARTICIPATING COMPANIES – continued...

ECA network meeting, Belgrade, Serbia, May 2011

Page 9: Cleaner production center and the montreal protocol

PARTICIPATING COMPANIES – continued...

ECA network meeting, Belgrade, Serbia, May 2011

Page 10: Cleaner production center and the montreal protocol

MEETING WITH COMPANY’S MANAGEMENT

AND WORKERS

ECA network meeting, Belgrade, Serbia, May 2011

Page 11: Cleaner production center and the montreal protocol

MODUL 1: WORKSHOPS

ECA network meeting, Belgrade, Serbia, May 2011

Page 12: Cleaner production center and the montreal protocol

MODUL 2: COMPANY VISITS

ECA network meeting, Belgrade, Serbia, May 2011

Page 13: Cleaner production center and the montreal protocol

MODUL 3: EVALUATION AND OPTION IMPLEMENTATION

ECA network meeting, Belgrade, Serbia, May 2011

BEFORE AFTER

Page 14: Cleaner production center and the montreal protocol

FINAL CONFERENCE AND AWARD CEREMONY

ECA network meeting, Belgrade, Serbia, May 2011

Page 15: Cleaner production center and the montreal protocol

RESULTS:

•So far, (2006-2010) total of 42 companies participated

with about 8,000 employees

•54 NE trained and certified

ECA network meeting, Belgrade, Serbia, May 2011

•54 NE trained and certified

•Average savings per company: 100,000 EUR/year

•Average decrease of water consumption: 50,000 m3/year

•Average decrease in electrical power consumption: 500

MWh/year

•Average decrease in CO2 emission: 500 t/year

Page 16: Cleaner production center and the montreal protocol

CHEMICAL LEASING – BUSINESS MODEL FOR

SUSTAINABLE MANAGEMENT OF CHEMICALS

ECA network meeting, Belgrade, Serbia, May 2011

Page 17: Cleaner production center and the montreal protocol

Chemical Leasing in a nutshell

Chemical Leasing is a service-oriented business model. It suggests new forms of payments for chemicals that direct the economic interests of all partners towards process optimisation and reduction of chemicals consumption.

Principle

EconomicEnvironmental

Cost reduction/ added value for all involved partners

Reduction of emissions/wasteObjectives/ Benefits

ECA network meeting, Belgrade, Serbia, May 2011

air pollutionwater pollution

waste load

CostsUsers

Costs chemical producer

Costsothers

Chemical user

Equipment/plant supplier

Recycling/disposal companies

OthersActors Chemical supplier/producer

Page 18: Cleaner production center and the montreal protocol

Chemical Leasing: MotivationsTraditional business models:

Contradictory motivations

Chemical leasing models:

Bundled motivations

ECA network meeting, Belgrade, Serbia, May 2011

Material(costs, volume)

supplier

"the more the better"

consumer

"less is more"

Delivery of goods

Life cycle costs(material, work, waste

management)

supplier consumerDelivery of services

"less is more" "less is more"

Page 19: Cleaner production center and the montreal protocol

FACTORY OF ROLLING BEARINGS AND CARDAN SHAFTS (FKL) - SAFECHEM

The chemical will be substituted

Process will be optimized

ECA network meeting, Belgrade, Serbia, May 2011

Process will be optimized

Page 20: Cleaner production center and the montreal protocol

CLEANING OF METAL PARTS BY

TRICHLOROETHYLENE

ECA network meeting, Belgrade, Serbia, May 2011

Page 21: Cleaner production center and the montreal protocol

THE UNIT OF PAYMENT

NUMBER OF

WORKING HOURS

of the cleaning equipment

ECA network meeting, Belgrade, Serbia, May 2011

of the cleaning equipment

Page 22: Cleaner production center and the montreal protocol

EXPECTED RESULTS

• The best practice risk management which is a unique state-of-the art closed loop delivery system

• Consumption of carcinogenic solvent should be 60% less while there is no solvent emissions and lifespan of the product is significantly increased

ECA network meeting, Belgrade, Serbia, May 2011

no solvent emissions and lifespan of the product is significantly increased

• Better occupational health and safety, as the cleaning system will be completely closed

• Waste take-back and recovery

Page 23: Cleaner production center and the montreal protocol

Regional RECP Network:

ECA network meeting, Belgrade, Serbia, May 2011

Albania, Armenia, Bulgaria, Croatia, Czech Republic, Hungary, Montenegro, Republic of Moldova, Romania, Russian Federation, Serbia, Slovakia, Macedonia, Ukraine and Uzbekistan

Page 24: Cleaner production center and the montreal protocol

CONCLUSION:

•CPC SERBIA SUPPORTS MANUFACTURING SECTOR

•PERFORMED OVER 50 CPA

•IMPLEMENTING PROJECT “CHEMICAL LEASING”

•INCLUDING HPMP SUPPORT IN CPC PORTFOLIO BASED ON

ECA network meeting, Belgrade, Serbia, May 2011

THE EXPERIENCE AND NETWORK WE HAVE WITH THE

INDUSTRY SECTOR.

•POTENTIAL AT THE REGIONAL LEVEL AS A MEMBER OF

UNIDO/UNEP RECP Net

Page 25: Cleaner production center and the montreal protocol

Thank you for your attention!!!

ECA network meeting, Belgrade, Serbia, May 2011

attention!!!