CLEAN WATER FEE BILL STAKEHOLDER MEETING August 4, 2016

Upload: others

Post on 25-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

CLEAN WATER FEE BILLSTAKEHOLDER MEETING

August 4, 2016

Page 2: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

WIFI and adobe connect

CDPHE campus wifi– Network: HealthyColorado– ID is guest, passcode is Vax$aves

Conference call in1-857-216-6700 / Code 820116 Adobe Connect meeting infohttps://cdphe.adobeconnect.com/wqcdfees/

2

Page 3: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Agenda

CW fee discussion webpage: www.colorado.gov/cdphe/clean-water-fee-structure-discussion

Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps.

3

Page 4: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

MEETING TWO RECAP

4

Page 5: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Meeting 2 Overview

Meeting one and interim – recap. Feedback received. Additional scenarios. Questions on assumptions. Breakout discussion by sector.

5

Page 6: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Meeting Plan

6

Meeting 1• Informational

meeting.• Policy proposal and

discussion.

Meeting 2• Discuss feedback.• Develop policy

recommendations.• Discuss legislative

proposal.

Meeting 3• Discuss feedback.• Finalize policy

recommendations.• Finalize legislative

proposal.

Page 7: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Feedback Process

7

Mtg 1• Online comment form• Will be basis for second meeting

Mtg 2

• Online survey focused on policy recommendations and legislative proposal

• Will be basis for third meeting

Mtg 3• Finalize policy recommendations and legislative

proposal

Page 8: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

FEEDBACK RECEIVED

8

Page 9: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Sectors Represented

9

C&I

Construction

MS4

Pesticides

PPU

WQ Certs

Other

Page 10: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

0

1

2

3

4

Current GF/CF Ratio 50/50 GF to CF Ratio Resolve Deficit w/ GF

Aver

age

Scor

e

10

General Fund to Cash Fund Ratio Recommendations

Page 11: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

0

1

2

3

4

Current GF/CF Ratio 50/50 GF to CF Ratio Resolve Deficit w/ GF

C&I MS4 PPU

11

General Fund to Cash Fund Ratio Recommendations

Page 12: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

How favorably do you viewa fee cap?

0

1

2

3

4

5

6

7

8

9

10

1 2 3 4 5

Num

ber o

f Res

pons

es

12

Page 13: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

How favorably do you view the WQCC settings fees within the cap?

0

1

2

3

4

5

6

7

8

9

1 2 3 4 5

Num

ber o

f Res

pons

es

13

Page 14: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

YEAR END EXPENDITURE TRACKING

14

Page 15: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Fiscal Year 2015-16 Year End Report

Cash revenue less than budgeted – had to hold vacancies. Received additional $240K in General

Fund POTS from other division’s vacancy savings. Used funds typically set aside for

operating, travel and monitoring. Reallocated federal funds.

15

Page 16: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

FY2016-17 Budget

Reduced cash budget by $1.5M to match revenue projections for C&I, MS4 and PPU. Decreased federal funds to match award

amount.

16

Page 17: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

2017-18 Budget

Used FY2016-17 total as starting point or Long Bill (HB16-1405) plus HB16-1413. If HB16-1413 were replaced by General

Fund in perpetuity it would be a 49% increase in base General Fund compared to HB16-1405 (Long Bill).

17

Page 18: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

DEPARTMENT PROPOSAL

18

Page 19: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Recommendations

1. Fees should remain in statute.2. Fee structure should remain the same.3. Services should remain the same, for now.4. Develop sector specific fee changes based

on General Fund/cash fund ratios.5. Fee changes should be based

on a five year forecast.6. Develop a five week reserve or 10 percent

fund balance by sector over a five year period.

19

Page 20: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Legislative Intent-General Fund to Cash Funds Ratios

Sector General Fund Percentage

Cash Funds Percentage

Commerce and Industry 50% 50%

Construction 18% 82%

MS4 50% 50%

Pesticides 94% 6%

Public and Private Utilities 50% 50%

Water Quality Certifications 5% 95%

20

Page 21: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

General Fund to Cash Fund Ratios

19.5% increase in base General Fund compared to HB16-1405 (Long Bill). General Fund to cash fund ratio 50/50 for

C&I, MS4, and PPU. Construction, Pesticides, and Water

Quality Certification handled separately based on previous fee increases.

21

Page 22: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Cash Fee Increases by SectorSector Cash Fee IncreaseCommerce and Industry 61%

Construction 0%

MS4 30%

Pesticides 2%

Public and Private Utilities 22%

Water Quality Certifications 2%*

22

*2% Increase for Tier 1 and Tier 2 Certificationsto develop a fund balance

Page 23: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Effective Date and Phasing

July 1, 2017. Phasing not recommended at this time.

23

Page 24: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Cash Fee Cap

Not recommended (across the board) at this time. Sector specific pilot?

24

Page 25: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

NEXT STEPS

25

Page 26: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Next Steps: Near Term

Complete: Online survey.– Opens Monday, August 8– Closes Monday, August 22

Finalize: CDPHE Decision Item Request. Review: Office of State Planning &

Budgeting (OSPB). Review: Joint Budget Committee (JBC).

26

Page 27: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Next Steps: Long Term* *assumes successful legislative outcome

Year 1-3– October meeting to discuss year end close.

Year 4-5– Begin stakeholder process to assess if fees

need to be adjusted beyond five year time frame.

27

Page 28: Clean Water Program Meeting - Colorado · 2016. 8. 5. · Start-up. Meeting two recap. Feedback received. Year end expenditure tracking. Department proposal. Next steps. 3. MEETING

Contact Information

Nicole Rowan 303.692.6392Meghan Trubee 303.692.6351

CW fee discussion webpage:www.colorado.gov/cdphe/clean-water-fee-structure-discussion