u.s. technical advisory group meeting recap of the october london pc 283 meeting november 15, 2013

63
1 U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Upload: kaethe

Post on 21-Mar-2016

36 views

Category:

Documents


0 download

DESCRIPTION

U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013. Agenda. I.Opening Remarks Vic Toy II.London Meeting Review a.Overall review of process (Document N73) (Kathy Seabrook) i. Key points (Document N 67) ii. Time lines (Document N 68) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

1

U.S. Technical Advisory Group MeetingRecap of the October London PC 283 Meeting

November 15, 2013

Page 2: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 2

AgendaI. Opening Remarks Vic Toy

II. London Meeting Review a. Overall review of process (Document N73) (Kathy Seabrook)

i. Key points (Document N 67)ii. Time lines (Document N 68)iii. Resolutions (Document N70)

b. Review development of a working drafti. Section 4 context of the organization, 5 Leadership/Participation, Support (Kathy

Seabrook)ii. Section 6 Planning 6 (VicToy)iii. Section 8 Operation (Todd Hohn) iv. Section 9 performance evaluation and 10 Improvement (Thea Dunmire)v. Terms and Definitions (Thea Dunmire)

III. Next Steps (Vic) a. Mirror TAG working groupsb. Remote meetings on development of working draft c. Face to face meeting January 14-17th.

IV. Administrative items a. TAG organization / working groups (Vic Toy)b. Committee Updates (Kathy Seabrook, Jim Howe)c. OHSAS Ballot (Vic Toy, Tim Fisher)d. ISO Management System Education Module (Vic Toy)

Page 3: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 3

Meeting Objectives

Overall Objective: The purpose of this meeting is to give the U.S. TAG Attendees a recap of the London Meeting and to start planning for review and action on the proposed standard. 1. Review and impressions from the October PC 283 Meeting2. Enhanced understanding of the process3. Strategies and plans for moving the work and organization of the

TAG Forward

Page 4: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 4

Principle goals for your delegation

Establish and nurture key relationships Provide positive participation with impactful (U.S. position) input Develop cadence and improve rhythm with the U.S. delegation

Page 5: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

5

Presented byKathy A. Seabrook

London Meeting ReviewISO 45001 OHSMS –

Requirements

Page 6: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 6

ISO PC 283 /45001

Page 7: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 7

ISO PC 283 – Meeting Participants

83 delegates (Experts) 27 Member bodies 5 Liaison members Some participated by

webinar

Page 8: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 8

Goals - Inaugural Meeting

To review the comments: Revised “proof of concept” draft and to Begin to

produce a first Working Draft (WD1) of ISO 45001. Design Specification to develop the final document.

(Live Document) Address agenda items for the Project Committee

(PC) Open Forum.

Page 9: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 9

Goals - US Delegation

Establish Key Relationships – Secretariat, Country allies & alliances

Advocate for US positions based upon Z10 and US Comments in (most comments were accepted): Proof of Concept Document Design Specification Open Forum (as applicable)

Page 10: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 10

Key points - Takeaways Developed good relationships with the Secretariat, Chair

- Working Draft 1 (WD1), various key countries US Comments on PoC and Design Specification were

accepted for the most part

Page 11: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 11

Key points - Takeaways

Open Forum Key issues for resolution by the PC:

The application of “risk”; “people” under the control of the management system; the understanding of what constitutes the “workplace”; ‘participation’ in the setting of policies and objectives.

Page 12: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 12

Key points - Takeaways Standard to include an Annex with guidance (ISO/TMB

must approve – (PC not TC so approved for Requirements only)

WD1 will be completed

Page 13: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 13

Terms Working Draft (WD) – First draft developed by the Project

Committee and experts (US will have TAG input) Committee Draft (CD) –First public draft for circulation to

public for comments Draft International Standard (DIS) Final Draft International Standard (FDIS)

Page 14: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 14

Timeline – 3 Years (N68) Dec 2013 –Working Draft 1 (WD1) circulated

Working Group 1 (WG1) Jan 2014 – Submit Comments on WD1 Jan 2014 – US TAG Face to Face Meeting (to

develop US positions/concerns on WD1) March 2014 – PC Meeting – Development of

Committee Draft 1 (CD1)

Page 15: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 15

Timeline – 3 Years (N68) November 2014 – PC Meeting – Development of

Draft International Standard (DIS) November 2015 –PC Meeting – Development of

Final Draft International Standard (FDIS) October 2016 – Publish ISO 45001

- 3 Year Process -

Page 16: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 16

London Review Process

5 Task GroupsTG1: Section 4 the organization, 5 Leadership/Participation, 7 Support TG2: Section 6 Planning TG3: Section 8 Operation TG4: Section 9 Performance Evaluation and 10 Improvement TG5: Terms & Definitions (Formed at the end of meeting)

Page 17: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 17

Key Resolutions (N70):

Resolution 1/2013 - Following consideration of its Scope, and agreement to develop guidelines as an annex to ISO 45001 Occupational Health and Safety Management Systems – Requirements (in a similar manner to ISO 14001, Annex A)ISO/PC 283 resolves:

To request the ISO/TMB to extend the scope of the PC to cover the development of such guidelines

To request the ISO/TMB to change the title of the PC to reflect such a change in scope (either to “Occupational health and safety management systems – Requirements with guidance for use” or to be brief to just “Occupational health and safety management systems”)

To change the title of WG1 to “Occupational health and safety management systems – Requirements with guidance for use”

Page 18: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 18

Key Resolutions (N70):

Resolution 2/2013 - Following consideration of the various timeframe optionsISO/PC 283 resolves to: Follow the 3 year “default” timeframe for the development of ISO 45001

Resolution 3/2013 - Following a review of the comments received on the draft “Design Specification” (document N21), and its amendment,ISO/PC 283 resolves to: Adopt the “Design Specification” for the development of ISO 45001 given

in document N69

 

Page 19: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 19

Key Resolutions (N70):

Resolution 5/2013 - Following consideration of the resources needed to complete its task, ISO/PC 283 resolves to:-Impose a limit of 3 Experts per member on ISO/PC 283/WG1 

Page 20: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 20

Thank you!

Any Questions?

Page 21: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

21

Presented byKathy A. Seabrook

Task Group (TG 1)

Section 4: The OrganizationSection 5: Leadership/Participation Section 7: Support

Page 22: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 22

In General

Reviewed and resolved 32 comments from the POC Country comments Identified areas for further work and provided wording where there was agreement amongst the TG. Identified need for further defining: workplace, worker, participation, consultation, interested parties, internal and external Issues and organization. TG5 (Terms & Definitions task group) Guidance on ‘participation’ definition taking information from

Z10, ILO.

Page 23: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 23

In General

Guidance on Competence included Raised concern on how Scope is determined, tied to

yet to be defined terms and concepts of workplace, worker, and control of activities.

Scope should be defined at least the boundary of the workplace.

Page 24: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 24

5. Leadership

Policy to include commitment by Top Mgmt for worker/employee participation

5.3 Guidance - Assuring the organizations performance review, compensation, reward and recognition systems are aligned with the OH&S policy and OH&S management system performance objectives

 

Page 25: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 25

7. Support

7.4.2 C –obstacles and barriers to participation – Z10 Language in requirements and guidance (ILO agreed)

Guidance on competency to include re-training and recertification as well as meeting regulatory compliance.

Guidance: relevant means making sure each person in the organization has what they need to be effective in carrying out their obligations in the management system.

Page 26: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 26

TG1 Participants:

• Peck Thian Guan, TG Leader, Singapore

• Kathy Seabrook, Scribe, US• Barbara Libowitzky, Austria• Yusuke Chiba, Japan• Catherine Brakenhielm, ILO• Trevor Dodd, UK

• Sigrid Hansen-Tangen, Norway• Emily Sims, ILO• Eckard Metze, Germany• Ian Wrightson, UK• Peter Kwan Ming Cheng, Hong Kong• Julio Diaz Gerardi, Argentina

Page 27: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 27

Thank you!

Any questions?

Page 28: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

28

Presented byVic Toy

Task Group (TG 2)

Section 6: Planning

Page 29: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 29

Section 6: General Remarks from TG2

Discussion of the type of definition we prefer for “risk” Brief review of 11 comments on Section 6, and 3 comments on

Risk Clause by Clause review and adjustment of Section 6 Final review and “sentencing” of comments Final review and adjustment of Section 6 Definition of Risk (Annex Sl or 18001/Z10) OHS risk and organisational risk Meaning of Opportunity

Page 30: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 30

Task Group 2 Planning

Eckehard Bauer (Austria) Hilde Vatslid (Norway) Seiji Machida (ILO) Abdeljalil El Kholti (Morocco) Mohd Rafee Baharudin (Malaysia) Roque Portillo (Argentina) Luisa Pellares (Columbia) Yoshito Hirambayashi (Japan) Janet Asherson (IOE) Chen Quan (China) Wang Shunqi (China) Martin Cottam (UK) Sally Swingwood (BSI)

Frans Geijlvoet (Netherlands) Gilbert Ljungberger (Sweden) Leonardo Omodeo-Zorini (IIOC) Antonio Terracina(Italy) Miriam Shalom (Israel) Uwe Marx (Germany) Maria McKeown (Ireland) Aykut Kirbas (Turkey) Vic Toy (U.S.) Stan Rogers (TC 207) Christele Hubert (France) Norma McCormick (Canada)

Page 31: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 31

Section 6 Planning

6. Planning

6.1 Actions to address risks and opportunities 6.1.1 Hazard identification 6.1.2 Determination of compliance

obligations 6.1.3 Determining and assessing risks

and opportunities6.1.4 Planning to take action

6.2 OH&S objectives and planning to achieve them

New subsections (additions to Annex SL Language) to address content clarity and organizational issues.

Page 32: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 32

Section 6 Planning

6. Planning

6.1 Actions to address risks and opportunities 6.1.1 Hazard identification 6.1.2 Determination of compliance

obligations 6.1.3 Determining and assessing risks

and opportunities6.1.4 Planning to take action

6.2 OH&S objectives and planning to achieve them

Subdivided into activities to be considered and potential impacts

Guidance considerations• “normal & abnormal activities• Change mgmt/Life cycle

impact• Impact from “other factors”

Page 33: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 33

Section 6 Planning

6. Planning

6.1 Actions to address risks and opportunities 6.1.1 Hazard identification 6.1.2 Determination of compliance

obligations 6.1.3 Determining and assessing risks

and opportunities6.1.4 Planning to take action

6.2 OH&S objectives and planning to achieve them

Terminology: “legal and other requirements to which the organization subscribes”

Guidance considerations:• collective agreements, good

practice etc.

Page 34: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 34

Section 6 Planning

6. Planning

6.1 Actions to address risks and opportunities 6.1.1 Hazard identification 6.1.2 Determination of compliance

obligations 6.1.3 Determining and assessing risks

and opportunities6.1.4 Planning to take action

6.2 OH&S objectives and planning to achieve them

Clarity around “opportunities” a.k.a. “positive risks”

Guidance considerations • On-going assessments vs.

continual improvements• Who can conduct

assessments

Risk assessment process mentioned but methodologies missing *

Consideration of OH&S risk and “organizational” risks

Page 35: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 35

Section 6 Planning

6. Planning

6.1 Actions to address risks and opportunities 6.1.1 Hazard identification 6.1.2 Determination of compliance

obligations 6.1.3 Determining and assessing risks

and opportunities6.1.4 Planning to take action

6.2 OH&S objectives and planning to achieve them

Mostly Annex SL language with some OHS descriptors added

Page 36: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 36

Section 6 Planning

6. Planning

6.1 Actions to address risks and opportunities 6.1.1 Hazard identification 6.1.2 Determination of compliance

obligations 6.1.3 Determining and assessing risks

and opportunities6.1.4 Planning to take action

6.2 OH&S objectives and planning to achieve them

Guidance considerations • Proactive & reactive indicators• Integration into business processes

Mostly Annex SL language

Other key thoughts:Consideration of interested parties, initial reviews

Page 37: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 37

Thank you!

Any questions?

Page 38: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

38

Presented byTodd Hohn

Report of Task Group 3SECTION 8 – Operation

Page 39: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 39

What we did

• Discussion of the Annex SL Text and other source/guidance documents (ILO-OSH 2001, Z10, ISO 9001, 14001, 55001)

• Review and disposition of 11 comments on clauses for Section 8

• Clause-by-clause review and discussion of requirements

• Discussion of items to include in “Annex A” - Guidance

• Final review of work product

Page 40: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 40

What we did

Restructured Clause 8 as follows • 8.1 Operational planning and control• 8.2 Management of change• 8.3 Outsourcing• 8.4 Emergency preparedness and response

Page 41: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 41

Main points of discussion – 8.1.1Operational Planning and Control

• Discussed definition and consistent use of workplace, worker, employee, personnel, contractors and contractors employees and outsourcing (TG5 – Terms and Conditions)

• Discussed guidance in the Annex in relation to providing examples “workplaces” and what constitutes a “workplace” (Z10)

• Discussed communication and information to suppliers and contractors/contractor employees as being adequately addressed in 7.4.1 (Communications)

• Inconsistent with the use of process and activities

Page 42: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 42

Main points of discussion – 8.1.2Hierarchy of Controls

• A lot of discussion on local laws and regulations that legislate hierarchy of controls

• Guidance in the Annex is needed to provide examples, (example Z10)

• Group accepted wording in Z10 for the hierarchy of controls

Page 43: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 43

Main points of discussion – 8.2Management of Change

• Originally discussed in one sentence – group expanded to a separate Clause

• Incorporated OH&S and included wording for planned, permanent or temporary

• Referenced Clause 6 for management of risks

Page 44: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 44

Main points of discussion – 8.3Outsourcing

• Discussed “Outsourcing” and what it is and what it is not – definition for outsourcing will be important to this clause

• 207 Comment – Risk and Control of Influence

• Created sub – clauses for General, Procurement and Control of Sub – Contractors

• Definitions and guidance were discussed for contractors and communications (Z10, 5.1.4 and 5.1.5, OHSAS 18002, ILO 3.10.5)

Page 45: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 45

Main points of discussion -8.4Emergency Preparedness and Response

• Discussed “potential” versus “anticipating” emergencies, “testing” and taking into account “needs” and “involvement” of interested parties

• Discussed guidance in the Annex on mitigation and prevention, training and information

Page 46: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 46

Members of the Task Group 3

Elizabeth O`Ferrall, (Ireland) (TG 3 Chair)Hendri Farabi, (Germany) (Scribe)Berit Sørset, (Norway)Todd Hohn, (US)Tsuyoshi Kawakami, (ILO)Guillermo Zucal, (Argentina)Thierry Lannuzel, (France)Andrew Foster, (UK)Hussein Rahmat, (Malaysia)Damir Zorcec, (Indonesia)

Page 47: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

47

Presented byThea Dunmire

Report of Task Group 4SECTION 9 – Performance Evaluation

SECTION 10 – Improvement

Page 48: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 48

What we did

• Discussion of the Annex SL Text and other source/guidance documents (CEN 17, ISO 14001)

• Review and disposition of 16 comments on clauses 9 & 10

• Clause-by-clause review and discussion of requirements

• Discussion of items to include in “Annex A” - Guidance

• Final review of work product

Page 49: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 49

Main points of discussion – 9.1.1Monitoring, measurement, analysis & evaluation

• Discussed definition of measurement and monitoring and the types of activities that are included in measurement, monitoring, analysis and evaluation (e.g. inspection)

• Discussed the requirements and suggested that clarification and guidance is needed – particularly for SMEs

• Need to expand in the guidance what is needed to ensure “valid results” (e.g. calibration)

• Discussed and added in language to address comment related to compliance monitoring (made by Stan in initial plenary)

Page 50: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 50

Main points of discussion – 9.1.2Evaluation of Compliance

• Discussed definition of “applicable requirements (“legal and/or other requirements to which the organization subscribes”) but did not resolve what term to use – agreed that the intent of requirements is to evaluate compliance status of the “requirements” identified as applicable by the organization to which compliance was committed to in the OH&S Policy

• Discussed process for evaluation of compliance – decided to use ISO 14001 language since many organizations have integrated compliance assessment functions

Page 51: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 51

Main points of discussion – 9.2Internal Audit

• Discussed definition of internal audit and the requirements for an audit program; discussed the use of ISO 19011

• Suggested that competence of internal auditors and those conducting incident investigations – as well as other with OHSMS responsibilities – should be covered generally in 7.2 and expanded upon in guidance; again reference can be made to ISO 19011

• Added in subclauses to address ISO formatting issue

Page 52: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 52

Main points of discussion – 9.3Management Review

• Discussed what items of information are important for review by Top Management and how they should be ordered in clause 9.3

• Discussed meaning of the word “trends” in identifying what Top Management should consider in management review and added status since that may be as important as trends

• Avoided adding in new requirements because this section is already very perscriptive

Page 53: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 53

Main points of discussion -10.1Incident Investigation, nonconformity & corrective action

• Discussed whether incident investigation and corrective action should be two different clauses and perhaps in different sections (e.g. in section 9) and concluded they should be in the same clause but it must be clear that organizations can have more than one process to address them

• Added suggestions for guidance – including the tie between corrective action and both risk assessment and management of change to ensure actions do not create risk

Page 54: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 54

Main points of discussion- 10.2Continual Improvement

• Stayed with Annex SL text – to give organization flexibility

• Added suggestions for guidance – including the definitions of suitability, adequacy and effectiveness and examples for the organization to consider for continual improvement

Page 55: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 55

Members of the Task Group 4

Thea Dunmire, U.S. chairSimone Cencetti, ItalyTeresa Hawkins, UKAmin Prey, GermanyChristopher Ward, UKJerry Ramdunee, South AfricaBrenda Henry, CanadaSyamsul Zahrin Zainudin, Malaysia

Page 56: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

56

Presented byVic Toy

Next Steps

Page 57: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 57

III. Next Steps

a. Mirror TAG working groups - leverage the strength of our numbers, expertise and diversity - Sign up processb. Remote meetings on development of working draft - Begin work on developing U.S. Positions *c. Face to face meeting January 14-17th. - Review language and comment on WD1 - Logistics to be determined

* PC283 Experts will continue to work on language of WD1 through January

Page 58: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 58

IV. Administrative items

a. TAG organization / working groups (Vic) b. Committee Updates (Kathy, Jim) c. OHSAS Ballot (Vic) d. ISO Management System Education Module (Vic/Thea)

Page 59: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 59

US TAG to PC 283 Organizational Structure

Executive Committee Vic Toy, Chair

Kathy Seabrook, Vice Chair

SecretariatTim Fisher

Membership Jim Howe

Procedures(Adhoc) Kathy

Sebrook

WG1TBD

WG2TBD

WG4TBD

Terms & Def TBD

PC 283 Delegates/ExpertsVic Toy

Kathy SeabrookThea Dunmire

Todd Hohn (obsever)

WG3TBD

Page 60: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 60

PC 283 Membership Work Group*Committee members and alternates only.

First meeting next Thursday, November 21 at 3 PM EST

The membership committee will review and make recommendations in the following areas:1. Existing roster for categories, interest groups and balance2.Future membership applications3.Observers that desire to become members4.Employment sectors not represented5.Procedures for replacing members for non participation6.Maximum committee size

Page 61: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 61

IV. Administrative items

a. TAG organization / working groups (Vic) b. Committee Updates (Kathy, Jim) c. OHSAS Ballot (Vic) d. ISO Management System Education Module (Vic/Thea)

Page 62: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 62

Thank you!

Any questions?

Page 63: U.S. Technical Advisory Group Meeting Recap of the October London PC 283 Meeting November 15, 2013

Presentation TitleDate or Event Slide 63

International Organizational Relationships