W i d e boulevards ( R O W 3 2 )are d e s i g n e d for your ease a n d comfort

A str ik ing conf igurat ion of horses a n d la n d s ca p i n g m a r ks the entrance to C i t raRaya B i z L i n k

A n integrated a n d enviromental f r iendly Resident ia l , L o g i s t i c a n d C o m m e rc ia l Park

J A S P E R L B / LT 27m 2 / 6 0 m 2 (5x12)

L .52

1

A G AT E L B / LT 3 6 m 2 / 72m 2 (6x12)

L .62

1

INSTALASI AIR

• Air Bersih standar PAM

SPESI F I KASI LINGKUNGAN

• Kawasan Tanpa Pagar

• Instalasi Jaringan Listr ik Kabel Udara

• Saluran Drainase Terbuka

Jalan Lingkungan Cluster Cor Beton,

CLUSTER BER YL

• ROW boulevard 18 (perkerasan 5

meter x 2 lajur)

• ROW 7 dan ROW 6 (perkerasan 4

meter)

CLUSTER TOURMALINE

• ROW boulevard 16 (perkerasan 5

meter x 2 lajur)

• ROW 8 (perkerasan 5)

• ROW 7 (perkerasan 4 meter)

CLUSTER CHALCEDONY

• ROW 12 (perkerasan 6 meter)

• ROW 8 (perkerasan 5)

• ROW 7 (perkerasan 4 meter)

PONDASI• Basangan Batu Kali + Beton Bertulang

S T R U K T U R

• Beton Bertulang

DINDING• Bata / Bata Ringan

diplester Aci finishing Cat

• Pagar Belakang Batako

diplester Aci finishing Cat

PLAFOND• Gypsum (Ruang Dalam)

• GRC Board

(Kamar Mandi, Teras dan Overstek)

LANTAI• Keramik 30X30 (Ruang Utama, Teras)

ex.Mulia Kwalitas Project (KWP) /

setara

• Keramik 20X20 (Km. Mandi/WC) ex.

Mulia Kwalitas Project (KWP) / setara

• Rabat Beton (Carport)

SANITAIR• Shower ex. American Standard / setara

• Closet Duduk ex. American Standard /

setara

RANGKA ATAP

• Rangka Baja Ringan

PENUTUP ATAP

• Genteng Beton ex. Monier / setara

JENDELA

• Kusen Aluminium

• Daun Jendela Aluminium dan Kaca

PINTU

• Kusen Aluminium

• Daun Pintu Utama Engineering Door

• Daun Pintu Ruang Dalam Double

Triplex Finishing Cat

INSTALASI L I S TR I K

• PLN 1.300 W

SPESIFIKASI TEKNIS

Data, ilustrasi, ukuran dan spesifikasi yang tercantum di s ini berdasarkan situasi dan kondisi pada masa perencanaan. Perubahan dapat terjadi sewaktu -waktu dan merupakan hak penuh Developer.