ANALISA HARGA SATUAN MATA PEMBAYARAN LAMPIRAN 2 PENAWARAN Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Contract Package : No. 3 (Three) Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032) Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032) Location : KABUPATEN ACEH TENGAH Pay Item Number :6.1.1 Pay Item Number :6.1.1 Type Of Work :Prime Coat Payment unit :Liter 12,657.06 PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA (Rp.) (Rp.) A. TENAGA A. TENAGA 1. Pekerja (L01) Jam 0.0025 7,150.00 17.88 2. Mandor (L03) Jam 0.0013 9,500.00 12.35 30.23 JUMLAH HARGA TENAGA B. BAHAN 1. Aspal (M10) Kg 0.6790 8,900.00 6,043.10 2. Kerosene (M11) liter 0.3708 10,500.00 3,893.40 9,936.50 JUMLAH HARGA BAHAN 9,936.50 C. PERALATAN JUMLAH HARGA BAHAN C. PERALATAN 1. Asp. Distributor (E03) Jam 0.0013 377,361.16 490.57 2. Compressor (E05) Jam 0.0031 151,777.15 470.51 961.08 JUMLAH HARGA PERALATAN 961.08 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 10,927.80 E. KEUNTUNGAN 5.0 % x D 546.39 JUMLAH HARGA PERALATAN F. HARGA SATUAN PEKERJAAN ( D + E ) 11,474.19 Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. 2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya. dibayar dari kontrak) dan biaya-biaya lainnya. Banda Aceh, 20 Juni 2012 PT. Perapen Prima Mandiri Ir. Mawardi Ir. Mawardi Direktur Utama

Upload: na-ja-ma

Post on 09-Sep-2015

107 views

Category:

Documents


27 download

TRANSCRIPT

  • ANALISA HARGA SATUAN MATA PEMBAYARAN

    LAMPIRAN 2 PENAWARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number :6.1.1Pay Item Number :6.1.1

    Type Of Work :Prime Coat

    Payment unit :Liter 12,657.06

    PERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGANO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)

    A. TENAGAA. TENAGA

    1. Pekerja (L01) Jam 0.0025 7,150.00 17.881. Pekerja (L01) Jam 0.0025 7,150.00 17.88

    2. Mandor (L03) Jam 0.0013 9,500.00 12.35

    30.23JUMLAH HARGA TENAGA

    B. BAHAN

    1. Aspal (M10) Kg 0.6790 8,900.00 6,043.10

    2. Kerosene (M11) liter 0.3708 10,500.00 3,893.402. Kerosene (M11) liter 0.3708 10,500.00 3,893.40

    9,936.50JUMLAH HARGA BAHAN 9,936.50

    C. PERALATAN

    JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Asp. Distributor (E03) Jam 0.0013 377,361.16 490.571. Asp. Distributor (E03) Jam 0.0013 377,361.16 490.57

    2. Compressor (E05) Jam 0.0031 151,777.15 470.51

    961.08JUMLAH HARGA PERALATAN 961.08

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 10,927.80

    E. KEUNTUNGAN 5.0 % x D 546.39

    JUMLAH HARGA PERALATAN

    E. KEUNTUNGAN 5.0 % x D 546.39

    F. HARGA SATUAN PEKERJAAN ( D + E ) 11,474.19

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri PT. Perapen Prima Mandiri

    Ir. MawardiIr. Mawardi

    Direktur Utama

  • Type Of Work :Prime Coat Analisa EI-611

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Prime Coat Analisa EI-611

    Payment unit :Liter

    Pay Item Number :6.1.1 URAIAN ANALISA HARGA SATUANPay Item Number :6.1.1 URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan

    3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM

    4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor kehilangan bahan Fh 1.03 -5 Faktor kehilangan bahan Fh 1.03 -

    6 Komposisi campuran :

    - Aspal AC-10 atau AC-20 As 64 % 100 bagian- Aspal AC-10 atau AC-20 As 64 % 100 bagian

    - Kerosene K 36 % 80 bagian

    7 Berat jenis bahan :7 Berat jenis bahan :

    - Aspal AC-10 atau AC-20 D1 1.03 Kg / liter

    - Minyak Flux / Pencair D2 0.80 Kg / liter

    8 Bahan dasar (aspal & minyak pencair) semuanya

    diterima di lokasi pekerjaan

    II. URUTAN KERJA

    1 Aspal dan Minyak Flux dicampur dan dipanaskan1 Aspal dan Minyak Flux dicampur dan dipanaskan

    sehingga menjadi campuran aspal cair

    2 Permukaan yang akan dilapis dibersihkan dari debu2 Permukaan yang akan dilapis dibersihkan dari debu

    dan kotoran dengan Air Compressor

    3 Campuran aspal cair disemprotkan dengan Asphalt3 Campuran aspal cair disemprotkan dengan Asphalt

    Distributor ke atas permukaan yang akan dilapis.

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN 1. BAHAN

    Untuk mendapatkan 1 liter Lapis Resap Pengikat

    diperlukan : ( 1 liter x Fh ) PC 1.03 liter campurandiperlukan : ( 1 liter x Fh ) PC 1.03 liter campuran

    1.a. Aspal = As x PC x D1 (M10) 0.6790 Kg.

    1.b. Kerosene = K x PC (M11) 0.3708 Liter

    2. ALAT 2. ALAT

    2.a. Asp. Distributor (E03)

    Kapasitas alat V 800.00 literKapasitas alat V 800.00 liter

    Faktor efisiensi alat Fa 0.75 -

    Waktu Siklus (termasuk proses pemanasan) Ts 0.75 JamWaktu Siklus (termasuk proses pemanasan) Ts 0.75 Jam

    Kap. Prod. / jam = V x Fa Q1 800.00 liter

    Ts

    Koefisien Alat / Liter = 1 : Q1 (E03) 0.0013 Jam

    2.b. Compressor (E05)

    Kapasitas alat ----->> diambil V 400.00 M2 / Jam

    Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi) Ap 0.80 liter / M2Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi) Ap 0.80 liter / M2

    Kap. Prod. / jam = ( V x Ap ) Q2 320.00 literKap. Prod. / jam = ( V x Ap ) Q2 320.00 liter

    Koefisien Alat / Liter = 1 : Q2 (E05) 0.0031 JamKoefisien Alat / Liter = 1 : Q2 (E05) 0.0031 Jam

    Berlanjut ke hal. berikut.Berlanjut ke hal. berikut.

  • Type Of Work :Prime Coat Analisa EI-611

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Prime Coat Analisa EI-611

    Payment unit :Liter

    Pay Item Number :6.1.1 URAIAN ANALISA HARGA SATUANPay Item Number :6.1.1

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    3. TENAGA

    Produksi menentukan : Asp. Distributor Q1 800.00 liter

    Produksi Lapis Resap Pengikat / hari = Tk x Q1 Qt 5,600.00 liter

    Kebutuhan tenaga :Kebutuhan tenaga :

    - Pekerja P 2.00 orang

    - Mandor M 1.00 orang- Mandor M 1.00 orang

    Koefisien tenaga / liter :Koefisien tenaga / liter :

    - Pekerja = (Tk x P) : Qt (L01) 0.0025 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0013 Jam- Mandor = (Tk x M) : Qt (L03) 0.0013 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 11,474.19 / liter.Rp. 11,474.19 / liter.

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 39.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 215,661.00 LiterVolume pekerjaan : 215,661.00 Liter

    00

    Banda Aceh, 20 Juni 2012

    0

    Ir. MawardiIr. Mawardi

  • Type Of Work :Tack Coat Analisa EI-612

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Tack Coat Analisa EI-612

    Payment unit :Liter

    Pay Item Number :6.1.2 URAIAN ANALISA HARGA SATUANPay Item Number :6.1.2 URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan

    3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM

    4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor kehilangan bahan Fh 1.03 -5 Faktor kehilangan bahan Fh 1.03 -

    6 Komposisi campuran (Spesifikasi) :

    - Aspal AC-10 atau AC-20 As 80 % 100 bagian- Aspal AC-10 atau AC-20 As 80 % 100 bagian

    - Minyak Flux / Pencair K 20 % 30 bagian

    7 Berat jenis bahan :7 Berat jenis bahan :

    - Aspal AC-10 atau AC-20 D1 1.03 Kg / liter

    - Kerosene D2 0.80 Kg / liter

    8 Bahan dasar (aspal & minyak pencair) semuanya

    diterima di lokasi pekerjaan

    II. URUTAN KERJA

    1 Aspal dan Minyak Flux dicampur dan dipanaskan1 Aspal dan Minyak Flux dicampur dan dipanaskan

    sehingga menjadi campuran aspal cair

    2 Permukaan yang akan dilapis dibersihkan dari debu2 Permukaan yang akan dilapis dibersihkan dari debu

    dan kotoran dengan Air Compressor

    3 Campuran aspal cair disemprotkan dengan Asphalt3 Campuran aspal cair disemprotkan dengan Asphalt

    Distributor ke atas permukaan yang akan dilapis.

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN 1. BAHAN

    Untuk mendapatkan 1 liter Lapis Resap Pengikat

    diperlukan : ( 1 liter x Fh ) PC 1.03 liter campurandiperlukan : ( 1 liter x Fh ) PC 1.03 liter campuran

    1.a. Aspal = As x PC x D1 (M10) 0.8487 Kg

    1.b. Kerosene = K x PC (M11) 0.2060 liter

    2. ALAT 2. ALAT

    2.a. Asp. Distributor (E03)

    Kapasitas alat V 800.00 literKapasitas alat V 800.00 liter

    Faktor efisiensi alat Fa 0.75 -

    Waktu Siklus (termasuk proses pemanasan) Ts 0.75 JamWaktu Siklus (termasuk proses pemanasan) Ts 0.75 Jam

    Kap. Prod. / jam = V x Fa Q1 800.00 liter

    Ts

    Koefisien Alat / Liter = 1 : Q1 (E03) 0.0013 Jam

    2.b. Compressor (E05)

    Kapasitas alat ----->> diambil V 400.00 M2 / Jam

    Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi) Ap 0.80 liter / M2Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi) Ap 0.80 liter / M2

    Kap. Prod. / jam = ( V x Ap ) Q2 320.00 literKap. Prod. / jam = ( V x Ap ) Q2 320.00 liter

    Koefisien Alat / Liter = 1 : Q2 (E05) 0.0031 Jam

    Berlanjut ke hal. berikut.

  • Type Of Work :Tack Coat Analisa EI-612

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Tack Coat Analisa EI-612

    Payment unit :Liter

    Pay Item Number :6.1.2 URAIAN ANALISA HARGA SATUANPay Item Number :6.1.2

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    3. TENAGA

    Produksi menentukan : Asp. Distributor Q1 800.00 liter

    Produksi Lapis Resap Pengikat / hari = Tk x Q1 Qt 5,600.00 liter

    Kebutuhan tenaga :Kebutuhan tenaga :

    - Pekerja P 2.00 orang

    - Mandor M 1.00 orang- Mandor M 1.00 orang

    Koefisien tenaga / liter :Koefisien tenaga / liter :

    - Pekerja = (Tk x P) : Qt (L01) 0.0025 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0013 Jam- Mandor = (Tk x M) : Qt (L03) 0.0013 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 11,243.12 / liter.Rp. 11,243.12 / liter.

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 14.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 76,000.00 LiterVolume pekerjaan : 76,000.00 Liter

    00

    Banda Aceh, 20 Juni 2012

    00

    Ir. Mawardi

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAHLocation : KABUPATEN ACEH TENGAH

    Pay Item Number :6.1.2

    Type Of Work :Tack CoatType Of Work :Tack Coat

    Payment unit :Liter 12,166.42

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.0025 7,150.00 17.88

    2. Mandor (L03) Jam 0.0013 9,500.00 12.352. Mandor (L03) Jam 0.0013 9,500.00 12.35

    30.23JUMLAH HARGA TENAGA 30.23

    B. BAHAN

    JUMLAH HARGA TENAGA

    B. BAHAN

    1. Aspal (M10) Kg 0.8487 8,900.00 7,553.431. Aspal (M10) Kg 0.8487 8,900.00 7,553.43

    2. Kerosene (M11) liter 0.2060 10,500.00 2,163.00

    9,716.43JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Asp. Distributor (E03) Jam 0.0013 377,361.16 490.57

    2. Compressor (E05) Jam 0.0031 151,777.15 470.512. Compressor (E05) Jam 0.0031 151,777.15 470.51

    961.08

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 10,707.73

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 10,707.73

    E. KEUNTUNGAN 5.0 % x D 535.39

    F. HARGA SATUAN PEKERJAAN ( D + E ) 11,243.12

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse) 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse) 0

    Payment unit :M2

    Pay Item Number :6.3.5.a URAIAN ANALISA HARGA SATUANPay Item Number :6.3.5.a URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi existing jalan : sedang3 Kondisi existing jalan : sedang

    4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM

    5 Tebal Lapis (AC-WC) padat t 0.04 M5 Tebal Lapis (AC-WC) padat t 0.04 M

    6 Jam kerja efektif per-hari Tk 7.00 Jam

    7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -

    - Aspal Fh2 1.05 -

    8 Komposisi campuran AC-WC :8 Komposisi campuran AC-WC :

    - Coarse Agregat CA 36.21 % Gradasi harus -

    - Fine Agregat FA 51.00 % memenuhi -- Fine Agregat FA 51.00 % memenuhi -

    - Fraksi Filler FF 6.59 % Spesifikasi

    - Asphalt minimum 5 % As 6.20 %

    9 Berat jenis bahan :9 Berat jenis bahan :

    - AC-BC D1 2.25 ton / M3

    - Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3

    - Fraksi Filler D3 2.00 ton / M3

    - Asphalt D4 1.03 ton / M3- Asphalt D4 1.03 ton / M3

    II. URUTAN KERJAII. URUTAN KERJA

    1 Wheel Loader memuat Agregat dan Ashal ke dalam

    Cold Bin AMP. Cold Bin AMP.

    2 Agregat dan aspal dicampur dan dipanaskan dengan

    AMP untuk dimuat langsung kedalam Dump TruckAMP untuk dimuat langsung kedalam Dump Truck

    dan diangkut ke lokasi pekerjaan.

    3 Campuran panas AC dihampar dengan Finisher dan3 Campuran panas AC dihampar dengan Finisher dan

    dipadatkan dengan Tandem & Pneumatic Tire Roller.

    4 Selama pemadatan, sekelompok pekerja akan4 Selama pemadatan, sekelompok pekerja akan

    merapikan tepi hamparaan dengan menggunakan Alat

    Bantu.

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.0199 M31.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.0199 M3

    1.b. Agregat Halus = (FA x (D1 x tM3) x Fh1) : D2 (M04) 0.0281 M3

    1.c. Filler = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 6.5241 Kg1.c. Filler = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 6.5241 Kg

    1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.8590 Kg

    2. ALAT

    2.a. WHEEL LOADER (E15)

    Kapasitas bucket V 1.50 M3Kapasitas bucket V 1.50 M3

    Faktor bucket Fb 0.90 -

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Waktu Siklus Ts1

    - Muat T1 2.00 menit- Muat T1 2.00 menit

    - Lain lain T2 1.00 menit

    Ts1 3.00 menitTs1 3.00 menit

    Berlanjut ke hal. berikut.

  • Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse) 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse) 0

    Payment unit :M2

    Pay Item Number :6.3.5.a URAIAN ANALISA HARGA SATUANPay Item Number :6.3.5.a

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod. / jam = D2 x V x Fb x Fa x 60 Q1 405.00 M2

    D1 x t x Ts1

    Koefisien Alat/M2 = 1 : Q1 (E15) 0.0025 JamKoefisien Alat/M2 = 1 : Q1 (E15) 0.0025 Jam

    2.b. ASPHALT MIXING PLANT (AMP) (E01)2.b. ASPHALT MIXING PLANT (AMP) (E01)

    Kapasitas produksi V 50.0 ton / Jam

    Faktor Efisiensi alat Fa 0.75 -Faktor Efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = V x Fa Q2 416.67 M2Kap.Prod. / jam = V x Fa Q2 416.67 M2

    D1 x t

    Koefisien Alat/M2 = 1 : Q2 (E01) 0.0024 Jam

    2.c. GENERATORSET ( GENSET ) (E12)

    Kap.Prod. / Jam = SAMA DENGAN AMP Q3 416.67 M2Kap.Prod. / Jam = SAMA DENGAN AMP Q3 416.67 M2

    Koefisien Alat/M2 = 1 : Q3 (E12) 0.0024 Jam

    2.d. DUMP TRUCK (DT) (E09)

    Kapasitas bak V 10.00 TonKapasitas bak V 10.00 Ton

    Faktor Efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM / Jam

    Kecepatan rata-rata kosong v2 60.00 KM / Jam

    Kapasitas AMP / batch Q2b 1.00 ton

    Waktu menyiapkan 1 batch AC-BC Tb 1.00 menitWaktu menyiapkan 1 batch AC-BC Tb 1.00 menit

    Waktu Siklus Ts2

    - Mengisi Bak = (V : Q2b) x Tb T1 10.00 menit- Mengisi Bak = (V : Q2b) x Tb T1 10.00 menit

    - Angkut = (L : v1) x 60 menit T2 37.50 menit

    - Tunggu + dump + Putar T3 1.00 menit- Tunggu + dump + Putar T3 1.00 menit

    - Kembali = (L : v2) x 60 menit T4 25.00 menit

    Ts2 73.50 menitTs2 73.50 menit

    Kap.Prod. / jam = Q4 75.28 M2

    D1 x Ts2 x t

    V x Fa x 60

    Koefisien Alat/M2 = 1 : Q4 (E09) 0.0133 Jam

    D1 x Ts2 x t

    Koefisien Alat/M2 = 1 : Q4 (E09) 0.0133 Jam

    2.e. ASPHALT FINISHER (E02)2.e. ASPHALT FINISHER (E02)

    Kapasitas produksi V 50.00 ton / jam

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = V x Fa Q5 416.67 M2

    D1 x tD1 x t

    Koefisien Alat/M2 = 1 : Q5 (E02) 0.0024 Jam

    2.f. TANDEM ROLLER (E17)

    Kecepatan rata-rata alat v 3.00 Km / Jam Kecepatan rata-rata alat v 3.00 Km / Jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 8.00 lintasan 4 Awal & 4 AkhirJumlah lintasan n 8.00 lintasan 4 Awal & 4 Akhir

    Faktor Efisiensi alat Fa 0.75 -

    Berlanjut ke hal. berikut.

  • Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse) 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse) 0

    Payment unit :M2

    Pay Item Number :6.3.5.a URAIAN ANALISA HARGA SATUANPay Item Number :6.3.5.a

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod. / jam = (v x 1000) x b x t x Fa Q6 337.50 M2

    n x t

    Koefisien Alat/M2 = 1 : Q6 (E17) 0.0030 Jam

    2.g. PNEUMATIC TIRE ROLLER (E18)

    Kecepatan rata-rata v 2.50 KM / jamKecepatan rata-rata v 2.50 KM / jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 16.00 lintasanJumlah lintasan n 16.00 lintasan

    Faktor Efisiensi alat Fa 0.75 -

    Kap.Prod./jam = (v x 1000) x b x t x Fa Q7 140.63 M2

    n x t

    Koefisien Alat/M2 = 1 : Q7 (E18) 0.0071 JamKoefisien Alat/M2 = 1 : Q7 (E18) 0.0071 Jam

    2.h. ALAT BANTU2.h. ALAT BANTU

    - Rambu = 2 buah Lump Sum

    - Kereta dorong = 2 buah- Kereta dorong = 2 buah

    - Sekop = 3 buah

    - Garpu = 2 buah- Garpu = 2 buah

    - Tongkat Kontrol ketebalan hanparan

    3. TENAGA

    Produksi menentukan : Dump Trukc Q2 75.28 M2 / Jam

    Produksi AC-WC / hari = Tk x Q4 Qt 526.98 M2Produksi AC-WC / hari = Tk x Q4 Qt 526.98 M2

    Kebutuhan tenaga :

    - Pekerja P 10.00 orang- Pekerja P 10.00 orang

    - Mandor M 1.00 orang

    Koefisien Tenaga / M2 :

    - Pekerja = (Tk x P) / Qt (L01) 0.1328 Jam

    - Mandor = (Tk x M) / Qt (L03) 0.0133 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Lihat perhitungan dalam FORMULIR STANDAR UNTUKLihat perhitungan dalam FORMULIR STANDAR UNTUK

    PEREKEMAN ANALISA MASING-MASING HARGA

    SATUAN.SATUAN.

    Didapat Harga Satuan Pekerjaan :

    Rp. 88,948.09 / M2Rp. 88,948.09 / M2

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN Memakai

    Masa Pelaksanaan : 56.00 Hari 8 Unit Masa Pelaksanaan : 56.00 Hari 8 Unit

    Dump Truck

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 235,500.00 M2

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAHLocation : KABUPATEN ACEH TENGAH

    Pay Item Number :6.3.5.a

    Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse)Type Of Work :Asphaltic Concrete-Wearing Course (AC-WC) 4 cm (Fine/Coarse)

    Payment unit :M2 90,003.29

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.1328 7,150.00 949.52

    2. Mandor (L03) Jam 0.0133 9,500.00 126.35

    1,075.87JUMLAH HARGA TENAGA 1,075.87

    B. BAHAN

    JUMLAH HARGA TENAGA

    B. BAHAN

    1. Agregat Kasar (M10) M3 0.0199 114,360.35 2,275.771. Agregat Kasar (M10) M3 0.0199 114,360.35 2,275.77

    2. Agregat Halus (M11) M3 0.0281 126,095.94 3,543.30

    3 Filler Kg 6.5241 1,320.00 8,611.813 Filler Kg 6.5241 1,320.00 8,611.81

    4 Aspal Kg 5.8590 8,900.00 52,145.10

    66,575.98JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Wheel Loader Jam 0.0025 367,291.96 918.23

    2. AMP Jam 0.0024 3,466,142.99 8,318.742. AMP Jam 0.0024 3,466,142.99 8,318.74

    3. Genset Jam 0.0024 262,692.01 630.46

    4. Dump Truck Jam 0.0133 241,830.76 3,216.35

    5. Asp. Finisher Jam 0.0024 454,893.47 1,091.74

    6. Tandem Roller Jam 0.0030 229,528.74 688.59

    7 P. Tyre Roller Jam 0.0071 238,944.28 1,696.507 P. Tyre Roller Jam 0.0071 238,944.28 1,696.50

    8 Alat Bantu Ls 1.0000 500.00 500.00

    17,060.62

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 84,712.47

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 84,712.47

    E. KEUNTUNGAN 5.0 % x D 4,235.62

    F. HARGA SATUAN PEKERJAAN ( D + E ) 88,948.09F. HARGA SATUAN PEKERJAAN ( D + E ) 88,948.09

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse) 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse) 0

    Payment unit :M3

    Pay Item Number :6.3.6.a URAIAN ANALISA HARGA SATUANPay Item Number :6.3.6.a URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSII. ASUMSI

    1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi existing jalan : sedang3 Kondisi existing jalan : sedang

    4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM

    5 Tebal Lapis (AC-BC) padat t 0.06 M5 Tebal Lapis (AC-BC) padat t 0.06 M

    6 Jam kerja efektif per-hari Tk 7.00 Jam

    7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -

    - Aspal Fh2 1.05 -

    8 Komposisi campuran AC-BC :8 Komposisi campuran AC-BC :

    - Coarse Agregat CA 62.41 % Gradasi harus -

    - Fine Agregat FA 25.00 % memenuhi -- Fine Agregat FA 25.00 % memenuhi -

    - Fraksi Filler FF 6.59 % Spesifikasi

    - Asphalt minimum 5 % As 6.00 %

    9 Berat jenis bahan :9 Berat jenis bahan :

    - AC-BC D1 2.25 ton / M3

    - Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3

    - Fraksi Filler D3 2.00 ton / M3

    - Asphalt D4 1.03 ton / M3- Asphalt D4 1.03 ton / M3

    II. URUTAN KERJAII. URUTAN KERJA

    1 Wheel Loader memuat Agregat dan Asphalt ke dalam

    Cold Bin AMP

    2 Agregat dan aspal dicampur dan dipanaskan dengan

    dengan AMP untuk dimuat langsung ke dalam

    Dump Truck dan diangkut ke lokasi pekerjaan Dump Truck dan diangkut ke lokasi pekerjaan

    3 Campuran panas AC-BC dihampar dengan Finisher

    dan dipadatkan dengan Tandem & Pneumaticdan dipadatkan dengan Tandem & Pneumatic

    Tire Roller

    4 Selama pemadatan, sekelompok pekerja akan4 Selama pemadatan, sekelompok pekerja akan

    merapikan tepi hamparaan dengan menggunakan

    Alat Bantu Alat Bantu

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.8581 M31.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.8581 M3

    1.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.3438 M3

    1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 163.1025 Kg1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 163.1025 Kg

    1.d. Aspal = (AS x (D1 x 1M3) x Fh2) x 1000 (M10) 141.750 Kg

    2. ALAT

    2.a. WHEEL LOADER (E15)

    Kapasitas bucket V 1.50 M3Kapasitas bucket V 1.50 M3

    Faktor bucket Fb 0.90 -

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Waktu Siklus Ts1

    - Muat T1 2.00 menit- Muat T1 2.00 menit

    - Lain lain T2 0.50 menit

    Ts1 2.50 menitTs1 2.50 menit

    Berlanjut ke hal. berikut.

  • Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse) 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse) 0

    Payment unit :M3

    Pay Item Number :6.3.6.a URAIAN ANALISA HARGA SATUANPay Item Number :6.3.6.a

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod./jam = D2 x V x Fb x Fa x 60 Q1 19.44 M3 Kap. Prod./jam = D2 x V x Fb x Fa x 60 Q1 19.44 M3

    D1 x Ts1

    Koefisien Alat / M3 = 1 : Q1 (E15) 0.0514 JamKoefisien Alat / M3 = 1 : Q1 (E15) 0.0514 Jam

    2.b. ASPHALT MIXING PLANT (AMP) (E01)2.b. ASPHALT MIXING PLANT (AMP) (E01)

    Kapasitas produksi V 50.00 ton / Jam

    Faktor Efisiensi alat Fa 0.75 -Faktor Efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = V x Fa Q2 16.67 M3Kap.Prod. / jam = V x Fa Q2 16.67 M3

    D1

    Koefisien Alat / M3 = 1 : Q2 (E01) 0.0600 Jam

    2.c. GENERATORSET ( GENSET ) (E12)

    Kap.Prod. / Jam = SAMA DENGAN AMP Q3 16.67 M3Kap.Prod. / Jam = SAMA DENGAN AMP Q3 16.67 M3

    Koefisien Alat / M3 = 1 : Q3 (E12) 0.0600 Jam

    2.d. DUMP TRUCK (DT) (E09)

    Kapasitas bak V 10.00 tonKapasitas bak V 10.00 ton

    Faktor Efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 Km / Jam

    Kecepatan rata-rata kosong v2 60.00 Km / Jam

    Kapasitas AMP / batch Q2b 1.00 ton

    Waktu menyiapkan 1 batch AC-BC Tb 1.00 menitWaktu menyiapkan 1 batch AC-BC Tb 1.00 menit

    Waktu Siklus Ts2

    - Mengisi Bak = (V : Q2b) x Tb T1 10.00 menit- Mengisi Bak = (V : Q2b) x Tb T1 10.00 menit

    - Angkut = (L : v1) x 60 menit T2 37.50 menit

    - Tunggu + dump + Putar T3 1.00 menit- Tunggu + dump + Putar T3 1.00 menit

    - Kembali = (L : v2) x 60 menit T4 25.00 menit

    Ts2 73.50 menitTs2 73.50 menit

    Kap.Prod. / jam = V x Fa x 60 Q4 3.01 M3

    D1 x Ts2D1 x Ts2

    Koefisien Alat / M3 = 1 : Q4 (E09) 0.3321 JamKoefisien Alat / M3 = 1 : Q4 (E09) 0.3321 Jam

    2.e. ASPHALT FINISHER (E02)2.e. ASPHALT FINISHER (E02)

    Kapasitas produksi V 50.00 ton / Jam

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = V x Fa Q5 16.67 M3

    D1 D1

    Koefisien Alat / M3 = 1 : Q5 (E02) 0.0600 Jam

    2.f. TANDEM ROLLER (E17)

    Kecepatan rata-rata alat v 3.50 Km / Jam Kecepatan rata-rata alat v 3.50 Km / Jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 8.00 lintasanJumlah lintasan n 8.00 lintasan

    Faktor Efisiensi alat Fa 0.75 -

    Berlanjut ke hal. berikut.

  • Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse) 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse) 0

    Payment unit :M3

    Pay Item Number :6.3.6.a URAIAN ANALISA HARGA SATUANPay Item Number :6.3.6.a

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod./jam = (v x 1000) x b x t x Fa Q6 23.63 M3

    n

    Koefisien Alat / M3 = 1 : Q6 (E17) 0.0423 Jam

    2.g. PNEUMATIC TIRE ROLLER (E18)

    Kecepatan rata-rata v 4.00 KM / JamKecepatan rata-rata v 4.00 KM / Jam

    Lebar efektif pemadatan b 1.50 M

    Jumlah lintasan n 16.00 lintasanJumlah lintasan n 16.00 lintasan

    Faktor Efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = (v x 1000) x b x t x Fa Q7 16.88 M3

    n

    Koefisien Alat / M3 = 1 : Q7 (E18) 0.0593 JamKoefisien Alat / M3 = 1 : Q7 (E18) 0.0593 Jam

    2.h. ALAT BANTU2.h. ALAT BANTU

    diperlukan : Lump Sum

    - Kereta dorong = 2 buah- Kereta dorong = 2 buah

    - Sekop = 3 buah

    - Garpu = 2 buah- Garpu = 2 buah

    - Tongkat Kontrol ketebalan hanparan

    3. TENAGA

    Produksi menentukan : Dump Truck Q2 3.01 M3/Jam

    Produksi AC-BC / hari = Tk x Q4 Qt 21.08 M3Produksi AC-BC / hari = Tk x Q4 Qt 21.08 M3

    Kebutuhan tenaga :

    - Pekerja P 10.00 orang- Pekerja P 10.00 orang

    - Mandor M 1.00 orang

    Koefisien Tenaga / M3 :

    - Pekerja = (Tk x P) / Qt (L01) 3.3208 Jam

    - Mandor = (Tk x M) / Qt (L03) 0.3321 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Lihat perhitungan dalam FORMULIR STANDAR UNTUKLihat perhitungan dalam FORMULIR STANDAR UNTUK

    PEREKEMAN ANALISA MASING-MASING HARGA

    SATUAN.SATUAN.

    Didapat Harga Satuan Pekerjaan :

    Rp. 2,121,363.66 / M3.Rp. 2,121,363.66 / M3.

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN Memakai

    Masa Pelaksanaan : 97.00 Hari 10 Unit Masa Pelaksanaan : 97.00 Hari 10 Unit

    Dump Truck

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 20,351.00 M3

  • ANALISA HARGA SATUAN MATA PEMBAYARAN

    LAMPIRAN 2 PENAWARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAHLocation : KABUPATEN ACEH TENGAH

    Pay Item Number :6.3.6.a

    Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse)Type Of Work :Asphaltic Concrete-Binder Course (AC-BC) (Fine/Coarse)

    Payment unit :M3 2,145,056.04

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 3.3208 7,150.00 23,743.72

    2. Mandor (L03) Jam 0.3321 9,500.00 3,154.952. Mandor (L03) Jam 0.3321 9,500.00 3,154.95

    26,898.67JUMLAH HARGA TENAGA 26,898.67

    B. BAHAN

    JUMLAH HARGA TENAGA

    B. BAHAN

    1. Agregat Kasar (M10) M3 0.8581 114,360.35 98,132.621. Agregat Kasar (M10) M3 0.8581 114,360.35 98,132.62

    2. Agregat Halus (M11) M3 0.3438 126,095.94 43,351.78

    3 Filler Kg 163.1025 1,320.00 215,295.303 Filler Kg 163.1025 1,320.00 215,295.30

    4 Aspal Kg 141.7500 8,900.00 1,261,575.00

    1,618,354.70JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Wheel Loader Jam 0.0514 367,291.96 18,878.81

    2. AMP Jam 0.0600 3,466,142.99 207,968.582. AMP Jam 0.0600 3,466,142.99 207,968.58

    3. Genset Jam 0.0600 262,692.01 15,761.52

    4. Dump Truck Jam 0.3321 241,830.76 80,312.004. Dump Truck Jam 0.3321 241,830.76 80,312.00

    5. Asp. Finisher Jam 0.0600 454,893.47 27,293.61

    6. Tandem Roller Jam 0.0423 229,528.74 9,709.07

    7 P. Tyre Roller Jam 0.0593 238,944.28 14,169.407 P. Tyre Roller Jam 0.0593 238,944.28 14,169.40

    8 Alat Bantu Ls 1.0000 1,000.00 1,000.00

    375,092.97

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,020,346.34

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,020,346.34

    E. KEUNTUNGAN 5.0 % x D 101,017.32

    F. HARGA SATUAN PEKERJAAN ( D + E ) 2,121,363.66F. HARGA SATUAN PEKERJAAN ( D + E ) 2,121,363.66

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Binder Course Levelling (AC-BC (L)) (Fine/Coarse) Analisa EI-636a

    Payment unit :TonnePayment unit :Tonne

    Pay Item Number :6.3.6.c URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGANNo. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi existing jalan : sedang

    4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM

    5 Tebal Lapis (AC-BC) Leveling padat t 0.05 M

    6 Jam kerja efektif per-hari Tk 7.00 Jam6 Jam kerja efektif per-hari Tk 7.00 Jam

    7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -

    - Aspal Fh2 1.05 - - Aspal Fh2 1.05 -

    8 Komposisi campuran AC-BC :

    - Coarse Agregat 61,0 - 77,0 % CA 65.91 % Gradasi harus -

    - Fine Agregat 23,0 - 39,0 % FA 21.66 % memenuhi -

    - Fraksi Filler 4,0 - 8,0 % FF 6.59 % Spesifikasi

    - Asphalt minimum 5 % As 5.84 %- Asphalt minimum 5 % As 5.84 %

    9 Berat jenis bahan :

    - AC-BCL D1 2.25 ton / M3- AC-BCL D1 2.25 ton / M3

    - Coarse Agregat & Fine Agregat D2 1.80 ton / M3

    - Fraksi Filler D3 2.00 ton / M3- Fraksi Filler D3 2.00 ton / M3

    - Asphalt D4 1.03 ton / M3

    II. URUTAN KERJA

    1 Wheel Loader memuat Agregat dan Asphalt ke dalam

    Cold Bin AMP Cold Bin AMP

    2 Agregat dan aspal dicampur dan dipanaskan dengan

    dengan AMP untuk dimuat langsung ke dalamdengan AMP untuk dimuat langsung ke dalam

    Dump Truck dan diangkut ke lokasi pekerjaan

    3 Campuran panas AC-BC dihampar dengan Finisher3 Campuran panas AC-BC dihampar dengan Finisher

    dan dipadatkan dengan Tandem & Pneumatic

    Tire Roller Tire Roller

    4 Selama pemadatan, sekelompok pekerja akan

    merapikan tepi hamparaan dengan menggunakan

    Alat Bantu

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN 1. BAHAN

    1.a. Agregat Kasar = (CA x ( 1TON) x Fh1) : D2 (M03) 0.4028 M3

    1.b. Agregat Halus = (FA x ( 1TON) x Fh1) : D2 (M04) 0.1324 M31.b. Agregat Halus = (FA x ( 1TON) x Fh1) : D2 (M04) 0.1324 M3

    1.c. Filler = (FF x ( 1 TON) x Fh1) x 1000 (M05) 72.4900 Kg

    1.d. Aspal = (AS x ( 1 TON) x Fh2) x 1000 (M10) 61.320 Kg

    2. ALAT

    2.a. WHEEL LOADER (E15)2.a. WHEEL LOADER (E15)

    Kapasitas bucket V 1.50 M3

    Faktor bucket Fb 0.90 -Faktor bucket Fb 0.90 -

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Waktu Siklus Ts1

    - Muat T1 2.00 menit- Muat T1 2.00 menit

    - Lain lain T2 0.50 menit

    Ts1 2.50 menit

    Berlanjut ke hal. berikut.Berlanjut ke hal. berikut.

  • Type Of Work :Asphaltic Concrete-Binder Course Levelling (AC-BC (L)) (Fine/Coarse) Analisa EI-636a

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Binder Course Levelling (AC-BC (L)) (Fine/Coarse) Analisa EI-636a

    Payment unit :Tonne

    Pay Item Number :6.3.6.c URAIAN ANALISA HARGA SATUANPay Item Number :6.3.6.c

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod./jam = D2 x V x Fb x Fa x 60 x D1 Q1 43.74 Ton

    D1 x Ts1

    Koefisien Alat / Ton = 1 : Q1 (E15) 0.0229 JamKoefisien Alat / Ton = 1 : Q1 (E15) 0.0229 Jam

    2.b. ASPHALT MIXING PLANT (AMP) (E01)2.b. ASPHALT MIXING PLANT (AMP) (E01)

    Kapasitas produksi V 50.00 ton / Jam

    Faktor Efisiensi alat Fa 0.75 -Faktor Efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = V x Fa Q2 37.50 tonKap.Prod. / jam = V x Fa Q2 37.50 ton

    Koefisien Alat / Ton = 1 : Q2 (E01) 0.0267 Jam

    2.c. GENERATORSET ( GENSET ) (E12)

    Kap.Prod. / Jam = SAMA DENGAN AMP Q3 37.50 TonKap.Prod. / Jam = SAMA DENGAN AMP Q3 37.50 Ton

    Koefisien Alat / Ton = 1 : Q3 (E12) 0.0267 Jam

    2.d. DUMP TRUCK (DT) (E09)

    Kapasitas bak V 15.00 tonKapasitas bak V 15.00 ton

    Faktor Efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 Km / Jam

    Kecepatan rata-rata kosong v2 60.00 Km / Jam

    Kapasitas AMP / batch Q2b 1.00 ton

    Waktu menyiapkan 1 batch AC-BCL Tb 1.00 menitWaktu menyiapkan 1 batch AC-BCL Tb 1.00 menit

    Waktu Siklus Ts2

    - Mengisi Bak = (V : Q2b) x Tb T1 15.00 menit- Mengisi Bak = (V : Q2b) x Tb T1 15.00 menit

    - Angkut = (L : v1) x 60 menit T2 37.50 menit

    - Tunggu + dump + Putar T3 1.00 menit- Tunggu + dump + Putar T3 1.00 menit

    - Kembali = (L : v2) x 60 menit T4 25.00 menit

    Ts2 78.50 menit

    Kap.Prod. / jam = V x Fa x 60 Q4 9.52 ton

    Ts2Ts2

    Koefisien Alat / Ton = 1 : Q4 (E09) 0.1051 JamKoefisien Alat / Ton = 1 : Q4 (E09) 0.1051 Jam

    2.e. ASPHALT FINISHER (E02)2.e. ASPHALT FINISHER (E02)

    Kapasitas produksi V 50.00 ton / Jam

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = V x Fa Q5 37.50 ton

    Koefisien Alat / Ton = 1 : Q5 (E02) 0.0267 Jam

    2.f. TANDEM ROLLER (E17)

    Kecepatan rata-rata alat v 3.00 Km / Jam Kecepatan rata-rata alat v 3.00 Km / Jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 8.00 lintasanJumlah lintasan n 8.00 lintasan

    Faktor Efisiensi alat Fa 0.75 -

    Berlanjut ke hal. berikut.

  • Type Of Work :Asphaltic Concrete-Binder Course Levelling (AC-BC (L)) (Fine/Coarse) Analisa EI-636a

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Asphaltic Concrete-Binder Course Levelling (AC-BC (L)) (Fine/Coarse) Analisa EI-636a

    Payment unit :Tonne

    Pay Item Number :6.3.6.c URAIAN ANALISA HARGA SATUANPay Item Number :6.3.6.c

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod./jam = v x 1000 x b x t x Fa x D1 Q6 37.97 Ton

    n

    Koefisien Alat / Ton = 1 : Q6 (E17) 0.0263 Jam

    2.g. PNEUMATIC TIRE ROLLER (E18)

    Kecepatan rata-rata v 2.50 KM / JamKecepatan rata-rata v 2.50 KM / Jam

    Lebar efektif pemadatan b 1.50 M

    Jumlah lintasan n 8.00 lintasanJumlah lintasan n 8.00 lintasan

    Faktor Efisiensi alat Fa 0.75 -

    Kap.Prod. / jam = v x 1000 x b x t x Fa x D1 Q7 39.55 Ton

    n

    Koefisien Alat / Ton = 1 : Q7 (E18) 0.0253 JamKoefisien Alat / Ton = 1 : Q7 (E18) 0.0253 Jam

    2.h. ALAT BANTU2.h. ALAT BANTU

    diperlukan : Lump Sum

    - Kereta dorong = 2 buah- Kereta dorong = 2 buah

    - Sekop = 3 buah

    - Garpu = 2 buah- Garpu = 2 buah

    - Tongkat Kontrol ketebalan hanparan

    3. TENAGA

    Produksi menentukan : Dump Truck Q2 9.52 Ton/Jam

    Produksi AC-BCL / hari = Tk x Q4 Qt 66.61 TonProduksi AC-BCL / hari = Tk x Q4 Qt 66.61 Ton

    Kebutuhan tenaga :

    - Pekerja P 6.00 orang- Pekerja P 6.00 orang

    - Mandor M 1.00 orang

    Koefisien Tenaga / Ton :

    - Pekerja = (Tk x P) / Qt (L01) 0.6305 Jam

    - Mandor = (Tk x M) / Qt (L03) 0.1051 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 911,731.44 /Ton.Rp. 911,731.44 /Ton.

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN Memakai

    Masa Pelaksanaan : 4.00 Hari 13 Unit Masa Pelaksanaan : 4.00 Hari 13 Unit

    Dump Truck

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 2,800.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number :6.3.6.cPay Item Number :6.3.6.c

    Type Of Work :Asphaltic Concrete-Binder Course Levelling (AC-BC (L)) (Fine/Coarse)

    Payment unit :Tonne 994,354.26

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.6305 7,150.00 4,508.23

    2. Mandor (L03) Jam 0.1051 9,500.00 998.332. Mandor (L03) Jam 0.1051 9,500.00 998.33

    5,506.56JUMLAH HARGA TENAGA

    B. BAHANB. BAHAN

    1. Agregat Kasar (M03) M3 0.4028 114,360.35 46,064.351. Agregat Kasar (M03) M3 0.4028 114,360.35 46,064.35

    2. Agregat Halus (M04) M3 0.1324 126,095.94 16,695.10

    3 Filler (M05) Kg 72.4900 1,320.00 95,686.803 Filler (M05) Kg 72.4900 1,320.00 95,686.80

    4 Aspal (M10) Kg 61.3200 8,900.00 545,748.00

    704,194.25JUMLAH HARGA BAHAN 704,194.25JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Wheel Loader (E15) Jam 0.0229 367,291.96 8,410.991. Wheel Loader (E15) Jam 0.0229 367,291.96 8,410.99

    2. AMP (E01) Jam 0.0267 3,466,142.99 92,546.02

    3. Genset (E12) Jam 0.0267 262,692.01 7,013.883. Genset (E12) Jam 0.0267 262,692.01 7,013.88

    4. Dump Truck (E09) Jam 0.1051 241,830.76 25,416.41

    5. Asphalt Finisher (E02) Jam 0.0267 454,893.47 12,145.66

    6. Tandem Roller (E17) Jam 0.0263 229,528.74 6,036.61

    7 P. Tyre Roller (E18) Jam 0.0253 238,944.28 6,045.29

    8 Alat Bantu Ls 1.0000 1,000.00 1,000.008 Alat Bantu Ls 1.0000 1,000.00 1,000.00

    158,614.85

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 868,315.66

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 868,315.66

    E. BIAYA UMUM DAN KEUNTUNGAN 5 % x D 43,415.78

    F. HARGA SATUAN = ( D + E ) 911,731.44

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri PT. Perapen Prima Mandiri

    Ir. MawardiIr. Mawardi

    Direktur Utama