Page 1: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

The Great Agile ChallengeAre You Right-handed in a Left-handed World?

Steve WilleAuthor, Colorful Leadership

Copyright © 2018 Steven F. Willewww.ColorfulLeadership.info Agile Waterfall

Page 2: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Waterfall:

Predictable and

controlled process

• Full scope

• On time

• On budget

Page 3: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Agile:Thriving in an

unpredictable world• Prioritized scope• Time boxed• Budgeted

Page 4: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Time Cost

Scope

Triple

Constraints

Product BacklogNever Finished

More Features…

Minimum Viable Product

MVP

Page 5: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Time Cost

Scope

More Features…

Minimum Viable Product

MVPThe Great Agile

Challenge #1

OrganicLet It Happen

MechanicalMake It Happen

Unknown / Planned

Page 6: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Sequential

Page 7: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Random

Page 8: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Sequential, Linear Step-By-StepRandom, Multi-dimensional

Agile Waterfall

Page 9: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

The Great Agile Challenge #2

Random / Sequential

Page 10: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Random• Now: total of the

past, interactive present, and seed for the future

• Patterns that are random and three dimensional

Sequential• Discrete unites of

past, present, and future

• Step-by-step linear progression of activities

Source: An Adult’s Guide top style, Published by Gregorc

Viewof Time

Page 11: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

0

10

20

30

40

50

60

70

Random Neutral Sequential

Survey Results

Page 12: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

0%

10%

20%

30%

40%

50%

60%

Technical Staff Project Mgr Business Mgt Business Staff Other Unknown

Role

0%

5%

10%

15%

20%

25%

30%

35%

40%

20 30 40 50 Unknown

Age

28%

29%

30%

31%

32%

33%

34%

35%

36%

37%

Male Female Unknown

Gender

Page 13: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Abstract

Concrete

How do you feel? What do you think?

What will you do?

Page 14: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

• Well researched information

• Work through ideas thoroughly

• Step-by-step process

• A schedule to follow

Random Sequential

Meeting People’s Needs

Abstract

Concrete

• Concrete Examples

• Try it

• Speak From the heart

• Collaboration

Page 15: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

• Well researched information

• Work through ideas thoroughly

• Concrete Examples

• Try it

• Speak From the heart

• Collaboration

Meeting People’s Needs

Waterfall• Step-by-step

process• A schedule to

follow

Page 16: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

• Well researched information

• Work through ideas thoroughly

• Concrete Examples

• Try it

• Speak From the heart• Collaboration

Meeting People’s Needs

Agile• Step-by-step

process• A schedule to

follow

Page 17: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Random Sequential

Validation Techniques:

Abstract

Concrete

• Personal proof via the senses

• Accredited experts

• Personal intellectual formulae

• Conventionally accredited experts

• Inner guidance system

• Practical demonstration

• Rarely accepting of outside authority

Page 18: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Validation Techniques:

• Personal proof via the senses

• Accredited experts

• Personal intellectual formulae

• Conventionally accredited experts

• Inner guidance system

• Practical demonstration

• Rarely accepting of outside authority

Waterfall

Page 19: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Validation Techniques:

• Personal proof via the senses

• Accredited experts

• Personal intellectual formulae

• Conventionally accredited experts

• Inner guidance system

• Practical demonstration

• Rarely accepting of outside authority

Agile

Page 20: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

What They Might Dislike:

• Having to justify feelings• Having to quantify

• Fuzzy thinking and inaccurate conclusions

• Lack of logic and testing

• People who need guarantees

• Procedures without exception

• Broken promises and surprises

• Questions withoutright/wrong answers

Random Sequential

Abstract

Concrete

Page 21: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Scrum: in rugby, an ordered formation of players, used to restart play

58% Scrum10% Scrum/XP8% Multiple8% Scrumban5% Kanban5% Other2% Iterative Development1% Lean Development<1% Lean Startup<1% Feature Driven Development (FDD)<1% DSDM<1% XP<1% Agile Unified Process (AgleUP)2% I Don’t Know

https://explore.versionone.com/state-of-agile/versionone-11th-annual-state-of-agile-report-2

Agile Practice Survey

Page 22: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

58% Scrum10% Scrum/XP8% Multiple8% Scrumban5% Kanban5% Other2% Iterative Development1% Lean Development<1% Lean Startup<1% Feature Driven Development (FDD)<1% DSDM<1% XP<1% Agile Unified Process (AgleUP)2% I Don’t Know

https://explore.versionone.com/state-of-agile/versionone-11th-annual-state-of-agile-report-2

Agile Practice Survey

Showcase

ReleasableProduct

Retrospective

Product Backlog

• User stories

• Features

• Epics

Sprint Backlog

Plan Sprint

Sprint Time-Box

Inspect and Adapt

Plan Big Picture

• Daily 15 min Standup Meeting

• Develop and Test

• Refine Backlog

Page 23: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

• Well researched information

• Work through ideas thoroughly

• Concrete Examples

• Try it

• Speak From the heart• Collaboration

Meeting People’s Needs

Scrum• Step-by-step

process• A schedule to

follow

Page 24: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

User Stories• Written by end users.

• Intentionally ambiguous

• Intentionally brief

• The essence, not the details

As a <role> I want <what> so that <why>.

Acceptance Criteria:1.2.

Requirements

Specific

Measurable

Achievable

Relevant

Time-bounded

The system shall:

1.

2.

CustomerExpectations

Agile Waterfall

Page 25: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

UserStories

• Having to justify feelings• Having to quantify

• Fuzzy thinking and inaccurate conclusions

• Lack of logic and testing

• People who need guarantees

• Procedures without exception

• Broken promises and surprises

• Questions without right/wrong answers

What They Might Dislike:

Page 26: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Requirements

• Having to justify feelings• Having to quantify

• Fuzzy thinking and inaccurate conclusions

• Lack of logic and testing

• People who need guarantees

• Procedures without exception

• Broken promises and surprises

• Questions without right/wrong answers

What They Might Dislike:

Page 27: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

The Great Agile Challenge #3

Excellence / Perfection

User Stories

As a <role> I want <what> so that <why>.

Acceptance Criteria:12

Requirements

The system shall:

1.

2.

• Written by end users.

• Intentionally ambiguous

• Intentionally brief

• The essence, not the details

Specific

Measurable

Achievable

Relevant

Time-bounded

Page 28: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Manifesto for Agile Software Development

We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:

Individuals and interactions

Working software

Customer collaboration

Responding to change

That is, while there is value in the items on the right,

we value the items on the left more.

© 2001 http://agilemanifesto.org/ this declaration may be freely copied in any form, but only in its entirety through this notice

over processes and tools

over comprehensive documentation

over contract negotiation

over following a plan

Page 29: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

People

Innovation Process

Colorful Leadership

Model

• Individuals and

interactions

• Working software

• Customer

collaboration

• Responding to

change

• Processes and

tools

• Comprehensive

documentation

• Contract

negotiation

• Following a plan

Page 30: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

1. Our highest priority is to satisfy the customer through early and continuous delivery of valuable software.

2. Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage.

3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale.

4. Business people and developers must work together daily throughout the project.5. Build projects around motivated individuals. Give them the environment and support they need, and

trust them to get the job done.6. The most efficient and effective method of conveying information to and within a development team

is face-to-face conversation.7. Working software is the primary measure of progress.8. Agile processes promote sustainable development. The sponsors, developers, and users should be

able to maintain a constant pace indefinitely.9. Continuous attention to technical excellence and good design enhances agility.10. Simplicity--the art of maximizing the amount of work not done--is essential.11. The best architectures, requirements, and designs emerge from self-organizing teams.12. At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its

behavior accordingly.© 2001 http://agilemanifesto.org/ this declaration may be freely copied in any form, but only in its entirety through this notice

Page 31: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

People

Innovation Process

Agile Principles2. Changing requirements

9. Technical excellence

10. Simplicity

3. Deliver frequently

7. Working software measure of progress

8. Constant pace

4. Work together daily

5. Motivated individuals

6. Face-to-face

11. Self-organizing teams

12. Team reflects

1. Satisfy the customer

Page 32: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

At the core, I believe Agile Methodologists are really about "mushy" stuff…

as if people were the most important, and lose the word "asset".

Jim Highsmith, for the Agile Alliance©2001 Jim Highsmith

People

Innovation Process

Colorful Leadership

Model

Page 33: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Our industry does not respect tradition — it only respects innovation.

Satya Nadella, to Microsoft Employees, February 4, 2014

People

Innovation Process

Colorful Leadership

Model

Page 34: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

Improvise…Adapt Predictability…Security

OrganicLet It Happen

MechanicalMake It Happen

Multi-Dimensional Sequential

Page 35: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

The Great Agile Challenges

1. Unknown / PlannedTime Cost

Scope

More Features…

Minimum Viable Product

MVP

2. Random / Sequential

3. Excellence / Perfection

4. People / Process

As a <role> I want <what> so that <why>.

The system shall:1. 2.

Page 36: The Great Agile Challenge · Product Backlog Never Finished More Features… Minimum Viable Product MVP. Time Cost Scope More Features… Minimum Viable Product MVP The Great Agile

The Great Agile ChallengeAre You Right-handed in a Left-handed World?

Steve WilleAuthor, Colorful Leadership

Copyright © 2018 Steven F. Willewww.ColorfulLeadership.info Agile Waterfall