THE ENERGY STORY : A PRESENTATION BYHimanshu Agrawal, Milind Bhandarkar, Ajit Patil, Rajdeep Hegde
Products
Viscose Filament Yarn
Pot Spun Yarn 46 TPD
Continuous Spun Yarn 9 TPD
Tyre Yarn 17 TPD
Caustic soda (& allied
chemicals)
63 TPD
Carbon disulphide 54 TPD
Sulphuric Acid 200 TPD
Utilities
Power 24 MW
Water Treatment Plant 17000 M3/day
Effluent Treatment Plant 13500 M3/day
Raw Material
38%
Power & Fuel20%
Salary Wages
19%
Stores9%
Others14%
Energy is the second largest
contributor to the cost
Energy cost = Rs. 180 Crores
SPECIFIC ENERGY CONSUMPTION
56238.41
53735.76
54670.83
50293.69
47000
48000
49000
50000
51000
52000
53000
54000
55000
56000
57000
2013-14 2014-15 2015-16 2016-17
6643.72
6336.34 6336.85
6220.32
6000
6100
6200
6300
6400
6500
6600
6700
2013-14 2014-15 2015-16 2016-17
Specific Thermal Energy Consumption in KJ/Kg of Equivalent Production
Specific Electrical Energy Consumptionin Kwh/Ton of Equivalent Production
(SEC is based on PAT Data equivalent production; baseline of 2013-14)
CENTURY RAYON :: THE BEST AMONG INDIAN COMPANIES
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
CR 71 68 68 67 66 67 67 67
Competitor 1 67 72 69 69 70 66 74 73
Competitor 2 79 78 80 77 75 74 72 74
Electrical Power Consumption in kwh/Million Mtrs of Yarn
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
CR 273 248 232 226 217 210 206 206
Competitor 1 215 213 202 205 208 217 222 232
Competitor 2 312 291 301 291 294 319 346 337
Steam Consumption in Kgs/Million Mtrs of Yarn
ACHIEVING ENERGY EFFICIENCY : A MULTI-PRONGED APPROACH
A well built Organization wide structure
Targeted energy plan
Innovation & use of new technology
Continuous energy monitoring
Energy Audits
TQM culture & suggestion scheme ensuring involvement of all
Renewable energy exploration
Very well maintained equipment and machineries
Reduce, Reuse, Recycle
Energy week celebration
ENERGY CONSERVATION MANAGEMENT SYSTEM
Energy TeamRayon
EM-01, EA-03
Quality Circle(Rayon)
Energy TeamTC & CSY
EM-02
Quality Circle(T/C & CSY)
Energy TeamChemical
EM-01
Quality Circle(Chemical)
Energy TeamAuxiliary
EM-01
Quality Circle(Auxiliary)
Energy TeamBH-PH
EM-02, EA-03
Quality Circle(BH-PH)
Quarterly Review
MonthlyReview
FortnightlyReview
Apex Energy committeeChaired by Business Head
Target2.2%
ENERGY TARGETS : RAISING THE BAR CONTINUOUSLY
2011 2012 2013 2014 2015 2016
Target 1.50 1.80 2.00 2.00 2.20 2.20
Achieved 1.97 1.45 2.00 2.09 1.80 1.95
0.00
0.50
1.00
1.50
2.00
2.50
3.00Savings Purely from Energy Schemes in Rs Crores/Year
USE OF NEW TECHNOLOGY & INNOVATIVE APPROACH
Sr. No.
Project DescriptionSavings/Year Investme
nt LakhsRs.
Lakhsunits
Lakhs Rs.
1Replacement of conventional cooling Towers with Mist cooling tower
3.94 25.61 90.00
2Power Generation from LP Turbine utilizing pressure reduction across control valve
4.53 29.45 38.00
3 Mist Condenser for CSY degasser (2Nos) 2.98 22.34 22.00
4 Jet Type Cooling Tower in place of Induced draft Tower 0.76 4.90 4.00
5Higher head acid cooling PHE pump & sending the cooling water directly to cooling tower
0.88 6.57 3.60
6Turbine gland recovery pump by direct feeding of steam to feed water tank in Boiler House
0.06 0.45 1.00
7Reduction in Condensate Pump Loading by feeding Feed Water condensate to direct to Feed water tank & running of small capacity pump in Boiler House
0.02 0.10 0.30
MIST COOLING TOWER
Investment 90 Lakhs Rs.
Power Saving
47 kw x 24 hrs x 350 days = 3.94 lakhs kwh/annum
Financial saving
3.94 x 6.5 Rs/kwh= 25.61 lakhs Rs/annum
Pay Back Period
42 Months
Rayon Engine room had cooling tower No. 1 & 2 (cross flow) & Cooling Tower No. 3, 4, 5 & 6 (Counter flow). Approach of these cooling tower was ranging between 4° C to 5° C.
These were replaced by Mist cooling tower in year 2016, which doesn’t have any moving part (no fan, no motor, no gear box), no fill, no wooden structure hence no Maintenance.
This resulted in saving of fan power and also improved Chiller power consumption thanks to lower approach of 2 deg C.
JET COOLING TOWER
Investment 4 Lakhs Rs.
Power Saving
2 x 4.5 kw x 24 hrs x 350 days = 75600 kwh/annum
Financial saving
0.756 x 6.5 Rs/kwh= 4.9 Lakhs Rs/annum
Pay Back Period
10 Months
In Boiler House one induced cooling tower having two induced draught fans, was installed to cater various plant needs. These fans had motors of 4.5 KW each.
This cooling tower was replaced with new Jet cooling tower in Jan’17. The draft in such tower is created by water jets.
This resulted in saving of fan power and also the cost of maintenance.
LP TURBINE
Investment 38 Lakhs Rs.
Power Generation
452669 Kwh in year 2016
Financial saving
4.53 x 6.5 Rs/kwh= 29.45 Lakhs Rs/annum
Pay Back Period
15 Months
Total 4 TPH Steam throttling for Boiler Feed water heating. 2.3 kg/cm2 to 0.2
kg/cm2 for 35 oC to 80oC and 2.3 kg/cm2 to 0.25 kg/cm2 for 80oC to 105oC
through PRDs.
LP Turbine was installed in August 2015 to reduce Steam pressure from 2.3 kg/cm2 to 0.25 kg/cm2 & supplying to Feed water Tank & Dearator tank simultaneously producing avg. 60 kw power.
ENCON PROJECTS IN PREVIOUS YEARS
Projects Undertaken Investment (in Rs. Lakhs) Savings (in Rs. Lakhs)
19
33
18
23
27
36
0
5
10
15
20
25
30
35
40
20
11
-12
20
12
-13
20
13
-14
20
14
-15
20
15
-16
20
16
-17
73
144
536
299 294 294
0
100
200
300
400
500
600
20
11
-12
20
12
-13
20
13
-14
20
14
-15
20
15
-16
20
16
-17
197
145
200209
180
195
0
50
100
150
200
250
20
11
-12
20
12
-13
20
13
-14
20
14
-15
20
15
-16
20
16
-17
Transformer
Humidification
Cooling towers
Steam Belts LightsSulphur system
Compressors
VFDsPiping system
Motors Pumps FansElectrol
yser
3.50 4.10 4.25 5.75 8.20 8.35 8.90 16.76 30.52 33.58 40.00 54.78 71.12 84.97
Total accumulated savings/Year
69 Lakhs kwh52 MT coal
375 Lakhs Rs
Total Investment : 589 lacs Rs.
ENCON PROJECTS IN LAST TWO YEARS
Savings in Rs. Lakhs/yr
Sr. No.
ENCON PROJECTSLakhsUnits
Savings (Rs.Lakhs)
1 Optimization of Air washer & Exh. Fan power consumption 1.62 12.12
2Reduction in water lifting due to arrest of leakages and old-line replacement
1.56 11.77
3Optimization of HF frequency on high denier & Color Spinning m/cs
2.29 15.24
4 Segregation of high wattage pot motors 1.16 6.38
5 Optimization of no. of circulation fan running in AT Dryer 0.87 5.7
6Reduction in unloading time of Air Compressor by decreasing speed.
0.12 0.9
7 Energy saving by reduction in DG set Lube oil pump running hrs 0.103 0.78
8Reduction in flash steam loss & Desuper heating water pumping power in Boiler House
5 MT Coal
0.32
ENCON PROJECTS WITH NIL INVESTMENT (LAST 3 YEARS)
Steam consumptionPower Consumption
REAL TIME ENERGY MONITORING
PAT CYCLE -1
ENERGY REDUCTION TARGET 598 MTOE
RECOMMENDATIONISSUANCE OF 12420 ESCerts By Ministry of Power
PAT CYCLE -2
SEC REDUCTION TARGET 1.8392 TO 1.7294 (6%)
SEC for year 2016-17 (w.r.t base year 2014-15)
1.78 (3.22%)
Compliance Assessment Year : 2014-15Ministry of Power (Govt. of India)
PERFORM, ACHIEVE & TRADE (PAT) CYCLE -1
LIST OF ENERGY AUDITSName of the Agency Area
Period 2005-2010
Green Audit by CII, Hyderabad Complete Plant
Madura Compressor, Kalyan Compressed air system
Marco Blower, Kolkata Exhaust system
Pack Plast, Kota Air washer system
CII Complete Plant
Period 2011 – till date
Bapat Energy Consultant Engine Room
Schneider Electric India Pvt. Limited Complete Plant
Forbes Marshal pvt.Ltd. Complete TC-CSY Plant
Ecube Motors
TUV India Pvt Ltd Complete Plant
Venus Audit Systems Boiler House
It has been a soul searching journey since year 2000 by Century Rayon as far as energy conservation is concerned. Above is a list of major audits we carried out in after 2005.
Identification of Energy Loss during Energy Week
RED TAG
PlantNo. of Red Tags Identified
2012 2013 2014 2015 2016
TC & CSY 11 60 51 78 19
Rayon 20 216 159 64 100
Chemical 126 39 4 44 11
Auxiliary 40 290 330 270 320
Total 197 605 544 456 450
INVOLVEMENT OF ALL
USE OF RENEWABLE ENERGY
Solar heater for hot water
Solar street light
Wind ventilators on roofs
Solar Day lighting System
Total savings realised: Rs. 30 lakhs per annum
IMPROVED MAINTENANCE HELPING THE CAUSE
Laser Alignment Thermography Vibration analysis
2011-12 2016-17 % Reduction
CSY plant 16 8 50%
PSY plant 10 4 60%
Electrical 56 32 43%
No. of breakdowns
/ Year
UTILIZATION OF WASTE
70-80 Kg of Canteen food waste produce 60 Kg of Manure per
day.
Recyling of Canteen Waste
Food Waste Convertor
Currently about 0.5% of our total coal energy requirement is being met through fuel from waste
0
50
100
150
200
250
300
350
400
2013-14 2014-15 2015-16 2016-17
Industrial Waste used as Fuel (MT/Yr)
Publication of Energy Bulletin.
Quiz Competition for Staff & Workmen.
Presentation on ENCON by External Faculties
Poem, Slogan & Poster Competitions.
Best Energy Conservation scheme Competition.
Energy loss / Wastage Identification (Red tags).
Training & Tips on Energy conservation for Workmen.
Drawing Competition & Awareness Programme for School Children.
ENERGY CONSERVATION WEEK CELEBRATION
REDUCTION IN CO2 EMISSION THROUGH ENCON PROJECTS
Plantation of Trees in Century Rayon
2013-14 2014-15 2015-16 2016-17
425
95007050
(M3 / day) Uses
2013-14 800• Lime batch
preparation
• CS2 deashing
• Fly Ash quenching
• Degasser Vacuum System
• Gardening
• Dust suppression
2014-15 1000
2015-16 2300
2016-17 2300
Recycling of Treated ETP Water
0
2000
4000
6000
2012-13 2013-14 2014-15 2015-16 2016-17
8500
FUTURE ROADMAP
Solar energy
HF power of spinning machines
Fans
Cooling towers
Pumping systems
Insulation
No. of energy saving schemes already identified : 18
Total calculated saving : Rs. 138 Lakhs
Total estimated investment : Rs 205 Lakhs
SOME ENCON PROJECTS ALREADY PLANNED FOR 2017-18
Sr. No.
Project DescriptionSavings/Year Investme
nt LakhsRs.
Lakhsunits
LakhsRs.
1 Increase the LP turbine load factor from 77% to 90% 0.75 5.67 Nil
2 Energy efficient pumps 5.81 43.69 100.00
3 Mist Condenser for CSY Degassers (2Nos) 2.93 22.00 30.00
4 LED lights 0.34 2.65 15.90
5 Change of V belts to flat belts 0.59 4.50 4.90
6 VFDs on pumps 0.14 1.08 2.50
7 Modified rewinding for CSY m/c old Rolls motors 0.33 2.50 1.35
8 Automation of turbine back pressure control. 218 MT 11.99 30
9 AFBC Boiler CBD automation 150 MT 8.25 12
10 Using HP steam from Acid plant for Boiler feed water heating 907MT 19.85 8
11 Rescheduling of DG set trial from 8 days to 15 days. 4.8 KL HSD 2.69 Nil
No. Details of Awards Year Organization
1 CII Award for Excellent Energy efficient Unit 2015 CII
2ICC Award for Excellence in Energy conservation & Management
2013 ICC
3State Level Award in “Excellence in Energy Conservation & Management” 1st Prize in Textile Sector
Every year since 2006
till 2016
Maharashtra Energy Development Agency (MEDA)
4National Award for “Energy Efficient Unit” in Energy Conservation
2005-2006 CII
5Winner of Platinum Award at 14th Annual Greentech Safety Award – 2015
201514th Annual Greentech Safety Award – 2015
6 Green Tech Environment Award 2014 201415th Green Tech Environment Award
7Water resources management in chemical
industry2005
Indian Chemical ManufacturersAssociation, Mumbai.
AWARDS