Team:-

1. V S Iyer (Sr. VP- Operation)

2. S G Panse (GM)

3. C P Pachpande (Energy Mgr.)

Page 2: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

2

ISO:50001 Certified

Mfg.

Excellence

Award

10 Mfg.

Plants

ISO:18001 Certified

ISO:14001 Certified

ISO:9001Certified

1st prize

winner of

BEE Award

Sustainability

Award

Most Trusted

Moulded

Plastic brandState of the

Art M/C’s

Page 3: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

3

Established in 2004

Area- 20000 Sqm

Capacity- 8000 MT/Year

Injection & ROTO Molding

ENERGY POLICY 1st Prize NEC - BEE

SINNAR PLANT

Page 4: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

4

ISO:9001Manufacturing

Excellence AwardISO:14001

ISO:50001

ISO:18001

National Energy Conservation AwardISO:50001

Page 5: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

5

ISO:50001Employee

Involvement

GHG

Inventorisation

Bench-

marking

ENCON

Projects

Environment

Projects

Page 6: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

6

21%

Reduction in

SEC Since

2013-14

Page 7: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

7

Page 8: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

8

We want to achieve SEC Level of All Electric Machine(Latest

Technology) in our conventional machines.

External Benchmarking

Page 9: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

9

Machine wise SEC analysed and found that SIMD- 03 & 04 machine is

having lowest SEC

Breakup of entire cycle into small steps and study done with KryKard

load manager to know the power consumption at different steps

All Values in SEC

Page 10: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

10

Difference between two machine understood and Retrofitted

Functioning

Gear box with electric motor Other M/C- Hydraulic motor

Losses Losses Losses Losses

Ele.Induction

Motor

Ele to Mech

ConvertHydraulic Pump

Mech Energy

converted to

devolope Oil

Pressure

Hydraulic valves

& Pipes

Oil Pressure Losses

in Hydraulic

Control Valves

system

Hydromotor

Oil Flow &

Pressure Energy

converted to

Mechanical

Energy

Screw

Ele. Servo Motor Ele to Mech

ConvertGear Box

Mech Energy

direct Drives…Screw

Page 11: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

11

Krycard graph

Results- Refilling Operation SEC reduce by 0.15

Total Saving

153 Lakh INR

Electrical Units

18.85 lakh

New Gear box with ele. motor

Refill power

106 KWRefill power

71 KW

Before After

* Unit Price-8.11 Rs

Page 12: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

12

Analysis of Amps done at different stage of Process

Idle current has been calculated and based on that analysis we have

decided to install VFD

Result Other Advantages of VFD

- Oil temp remain less, so hydraulic system life improves

- Cycle time consistency and product quality improves

- KVA – MD is in control

INVESTMENT

13 Lakhs

Payback

9 months

Total Saving

17.7 Lakh INR

Electrical Units

3.1 lakhs units

* Unit Price- 7.50 Rs

SOMD-09 -BEFORE SOMD-09 - AFTER

Page 13: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

13

Page 14: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

14

Optimization of Mould and Machine combination

M3 – TOOL

USED

Daily Monitoring

by SMS sheet

Resulted in…

Saving 4.4 Lac Kwh.

Saving Rs.34 Lacs

Page 15: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

15

Sustainability with National Pride

Page 16: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

16

Overall Energy Cost has

come down BY 7 %

inspite of increase in

UNIT RATE by 14 %

2013-14 …….. 6.76 Rs/Kwh

2016-17 …….. 7.69 Rs/Kwh

Energy47%

Other53%

0%

0%

SINNER - MOC Breakup-2013-2014

Energy40%

Other60%

SINNER-MOC Breakup-2016-2017

Page 17: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

17

Page 18: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

18NILKAMAL - PONDY

Project 24 : Reduction of unit consumption in SIMD1A by Heater jacket Dept: MT Month : OCT 2014

1. In SIMD1A unit consumption is high

18.7 5unit / hr.

1.Saving energy consumption = 2.9 5unit / hr.

2.Unit Savings per month = 2.95x 24 x30 = 2124

3. Saving per month in Rs = 2124 x 6 = Rs.12744

4. Savings per year = 12744 x 12 = 1.52 Lakhs

PAIN GAINAFTER ACTION

1.After installation of heater jacket energy consumption reduced to 15.8 Unit/hr

Initiator Team Member Team Member Team Member Team Member

BEFORE AFTER

Employee Involvement V 30 WINNERS SERIES 2014-15

Sandip AvhadSG PANSE RAM SHINDE GOVIND GANESH

Page 19: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

19

We are using wind energy at our Hosur plant

around 4 lakh unit/ mnth

Use of Sunlight by using transparent sheet

during day time in all plant area – No lights ON

in day time

Use of Turbo ventilator for air circulation

Saving of 6 Lac Kwh/Year Reduction of 497 Ton CO2e

Page 20: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

20

Sewage Water Treatment Plant installed investing 30 Lacs.

That water is Reused for Gardens…

Rain Water Harvesting …

Water Saving

5,000 ltr/day

Zero Water

Discharge

Plant

BOD/COD within limit

Page 21: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

21

Some More Small Energy Conservation steps taken as ….

BEFORE – ASIAN make T5 Fitting

AFTER – Bajaj Make LED Fitting

Page 22: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

22

Energy Conservation Across Nilkamal Group….

Page 23: Team:- 1. V S Iyer (Sr. VP- Operation) 2. S G Panse (GM) 3 ...greenbusinesscentre.com/energyaward2017presentations/General... · load manager to know the power consumption at different

23