Westford, Ma.
“The Coquitlam Experience”August 2, 2011g ,
Mark GauvinMark Gauvin
1
BSC Fifteenth Westford Symposium
Gauvin 1 of 95
A Building Enclosure Research Facility
Located at:1140 Austin Avenue Coquitlam B C1140 Austin Avenue, Coquitlam, B.C.(a suburb of the City of Vancouver)
BSC Fifteenth Westford Symposium
Gauvin 2 of 95
Some History About myself and Company About myself and Company About Vancouver’s Leaky Condo DisasterDisaster
Th C i l T HThe Coquitlam Test Hut Purpose Test Program Results
3
BSC Fifteenth Westford Symposium
Gauvin 3 of 95
Mark Gauvin, PresidentGauvin 2000 Construction Ltd.General Contractor
Building residential and commercial buildingsN 38 i b i Now 38 years in business.
About 4900 Residential Units ($ ½ billion) Numerous offices schools churches and retail Numerous offices, schools, churches and retail
buildings.
4
BSC Fifteenth Westford Symposium
Gauvin 4 of 95
Energy Efficiency is Important- Very Important!
Insulation is Important and Necessary!
V B i (R t d ) N ! Vapor Barriers (Retarders) are Necessary!
B tBut, We need to use them correctly.
5
BSC Fifteenth Westford Symposium
Gauvin 5 of 95
6
Problems started showing up inearly/mid 1990’s.
BSC Fifteenth Westford Symposium
Gauvin 6 of 95
Affected a lot of buildings
Cost a lot of money to remedy
Devastated so many homeowners
Devastated an industry
Still ongoing
7
BSC Fifteenth Westford Symposium
Gauvin 7 of 95
8
BSC Fifteenth Westford Symposium
Gauvin 8 of 95
Units BUILT 1982 - 1999“ k C d d” C l Cl“Leaky Condo Period” Coastal Climate Region
85 627 Wood frame Apartment Condos 85,627 Wood-frame Apartment Condos 43,409 Concrete Apartment Condos 30,943 Row/Townhouse (99.7% Wood-frame), / ( )_____________________________________________ 159,979 Total Units Built (10,346 Buildings)
(of these, 79% in Greater Vancouver Region)
9
BSC Fifteenth Westford Symposium
Gauvin 9 of 95
Built: 85,627 Wood-frame Unitsl 3 09 C Built: 43,409 Concrete Units
________________________________________ Total Apartment Condos Built: 129 036 Total Apartment Condos Built: 129,036 Units Repaired to Dec. 2007: 30,664 Estimated Still to Repair 41,529p ,
________________________________________ Total ‘Failed’ Units 72,193
Failure rate = 56%
10
BSC Fifteenth Westford Symposium
Gauvin 10 of 95
900010000
6000700080009000
Total Built
3000400050006000
Total
0100020003000 Repaired
S ill0 Still to Repair?
11
BSC Fifteenth Westford Symposium
Gauvin 11 of 95
Apartment Condos only HPO Loan Amounts: average $24,144 in 2000 up to $63,511 in 2007
‘C t t ’ E ti t ’‘Contractor’s Estimate’72,193 Failed Units at $45,000 per unit…
$3.25 Billion
12
BSC Fifteenth Westford Symposium
Gauvin 12 of 95
13
BSC Fifteenth Westford Symposium
Gauvin 13 of 95
Apartment Condos Townhouses Single Family High-Rise Co-Op Housing Social Housing Private Rental Bldgs Institutional Bldgs Commercial Bldgs
14
BSC Fifteenth Westford Symposium
Gauvin 14 of 95
June 16, 1998 “The Barrett Inquiry” submitted it’s report to governmentg
Following recommendations of the Inquiry,
Homeowner Protection Act passed July 28 1998 Homeowner Protection Act passed July 28, 1998
Homeowner Protection Office opened October 1, 1998,
- Mandatory residential builder/developer licensing,
- Mandatory Warranty backed by 3rd party insurers
- And a “no-interest loan” and “Sales Tax Relief program to assist owners of leaky homes
15
BSC Fifteenth Westford Symposium
Gauvin 15 of 95
16
…and flashings
BSC Fifteenth Westford Symposium
Gauvin 16 of 95
17
BSC Fifteenth Westford Symposium
Gauvin 17 of 95
DoTheyTheyWork ?
18
BSC Fifteenth Westford Symposium
Gauvin 18 of 95
Why Problems Now ?
19
Built 1996, Photo 2001
BSC Fifteenth Westford Symposium
Gauvin 19 of 95
Shoddy Construction. Inferior workmanship.N i t d◦ Non-union trades
◦ Building boom of the early 1990’s◦ Fly by Night contractors
I i d S i d T d◦ Inexperienced Supervisors and Trades
Greedy Developers◦ Cost cutting◦ Inferior materials
Faulty Design◦ Inappropriate California style design
20
BSC Fifteenth Westford Symposium
Gauvin 20 of 95
Mis-lapped building paper Inadequate head flashings Missing sill/pan flashings Pipe/vent penetrations not flashed Backsloped flashings, lapped connections
B k l d d k l d d i Backsloped decks, clogged drains
Handrails too short and any other code Handrails too short - and any other code violation attributable to any innocent bystander with an insurance policy.bystander with an insurance policy.
21
BSC Fifteenth Westford Symposium
Gauvin 21 of 95
Leaking windows OSB sheathing (instead of plywood) “New growth” lumber (vs. “old growth”) “deadly combination” Housewrap and Stucco Stucco too thin.
St i (l t?) Stucco mix (less soap, more cement?) No overhangs Complicated design corners decks etc Complicated design - corners, decks etc. Inadequate or no design details
22
BSC Fifteenth Westford Symposium
Gauvin 22 of 95
By 1995 -1996l d ld d Vinyl windows, welded corners
Extended head flashings with end dams Peel & stick sill pans + sheet metal w/end Peel & stick sill pans + sheet metal w/end
dams Really good stucco Really good caulking Sloped flashings, w/standing seam joints
B k t l d h thi Back to plywood sheathing Two layers 30 minute rated building paper
23
BSC Fifteenth Westford Symposium
Gauvin 23 of 95
Problems still showing up, some worse than ever.
Th l i CONSTRUCTION MOISTURE The culprit: CONSTRUCTION MOISTURE
The solution: Delmhorst Moisture Meters for The solution: Delmhorst Moisture Meters for all:◦ Consultants,Consultants, ◦ Superintendents ◦ Framers
24
BSC Fifteenth Westford Symposium
Gauvin 24 of 95
25
BSC Fifteenth Westford Symposium
Gauvin 25 of 95
26
BSC Fifteenth Westford Symposium
Gauvin 26 of 95
27Poly VB intact…
BSC Fifteenth Westford Symposium
Gauvin 27 of 95
28
BSC Fifteenth Westford Symposium
Gauvin 28 of 95
29
BSC Fifteenth Westford Symposium
Gauvin 29 of 95
30
BSC Fifteenth Westford Symposium
Gauvin 30 of 95
31Problem: Rainwater Penetration
BSC Fifteenth Westford Symposium
Gauvin 31 of 95
Built 1977Why older buildings not affected?• Vancouver always had rain
Built 1977
32
• Vancouver always had rain• Workmanship/materials ???
BSC Fifteenth Westford Symposium
Gauvin 32 of 95
33Built early 1950’s
BSC Fifteenth Westford Symposium
Gauvin 33 of 95
34
Water Test Windows
BSC Fifteenth Westford Symposium
Gauvin 34 of 95
Aluminum Window Frame
Corners not welded/sealed
Wall opening not papered
No head flashing
No sill pan or membrane
No air seal aro nd frame35
No air seal around frame
BSC Fifteenth Westford Symposium
Gauvin 35 of 95
Single layer
Reverse lapped
d lNo window lap
Holes all overHoles all over
36
BSC Fifteenth Westford Symposium
Gauvin 36 of 95
37Water stains below window
BSC Fifteenth Westford Symposium
Gauvin 37 of 95
Fl hi L kFlashing Leak
38
Built 1950
BSC Fifteenth Westford Symposium
Gauvin 38 of 95
d l Increased R-Values Increased Air-Tightness
◦ 1970’s - R8 Paper Backed Batts
◦ 1980’s - R12/R14 Batts w/2 mil Poly
◦ 1990’s - R14/R20 Batts w/6 mil Poly, …caulked and sealed
39
BSC Fifteenth Westford Symposium
Gauvin 39 of 95
Higher Insulation Values
Greater risk of interior condensation due to colder outer surfaces
Therefore: better vapor barriers
And: Better airtightness
Polyethylene solved vapor barrier and airtightness problemairtightness problem
40
BSC Fifteenth Westford Symposium
Gauvin 40 of 95
Burnaby Coquitlam
41Built 1996 R20
Built 1992 R14
BSC Fifteenth Westford Symposium
Gauvin 41 of 95
Dr Joseph LstiburekDr. Joseph Lstiburek
Principal of Building Science Corporationg Located at Boston , Ma.
For Building Science information/research:
Go to: http://www.buildingscience.com/
42
BSC Fifteenth Westford Symposium
Gauvin 42 of 95
Dr. John Straube, PhDDr. Joseph Lstiburek, PhD
May 17, 2004 First Discussion of Test Hut
43
May 17, 2004 First Discussion of Test Hut
BSC Fifteenth Westford Symposium
Gauvin 43 of 95
Gauvin 2000 Construction Ltd.C i d M iConstruction and Maintenance
Building Science Corporation Building Science CorporationExpertise, Guidance, Analysis
f Balanced Solutions Inc./University of WaterlooInstrumentation, Monitoring, Analysis
And Dupont, Icynene and James Hardiesome “hands off” Funding & Materials
44
BSC Fifteenth Westford Symposium
Gauvin 44 of 95
University of Waterloo, Building Engineering GroupBuilding Engineering Group
l l45
Natural Exposure & Test FacilityIn operation since 1990
BSC Fifteenth Westford Symposium
Gauvin 45 of 95
Charleston, South Carolina
46
June 2004
BSC Fifteenth Westford Symposium
Gauvin 46 of 95
Accessible
Secure
Power
Water
Internet
FREE RENT
Roof Top at 1140 Austin Avenue
FREE RENT
47
Roof Top at 1140 Austin Avenue,Coquitlam
BSC Fifteenth Westford Symposium
Gauvin 47 of 95
Phoenix Structural Designs Ltd.Port Coquitlam B C
48
Port Coquitlam, B.C.
BSC Fifteenth Westford Symposium
Gauvin 48 of 95
49October, 2005
BSC Fifteenth Westford Symposium
Gauvin 49 of 95
50
BSC Fifteenth Westford Symposium
Gauvin 50 of 95
Installing S iSensors inTest Panel
ChrisSchumacher
David Hill
51
SchumacherHill
BSC Fifteenth Westford Symposium
Gauvin 51 of 95
The beginnings of building science?
BSC Fifteenth Westford Symposium
Gauvin 52 of 95
Weather
solar
Wind drivenWind-drivenRain
7 Wall assemblies each orientation (x4) 3 Roof assemblies each orientation (x2) Full weather station
53
Full weather station
BSC Fifteenth Westford Symposium
Gauvin 53 of 95
54
BSC Fifteenth Westford Symposium
Gauvin 54 of 95
Observation Port
55
BSC Fifteenth Westford Symposium
Gauvin 55 of 95
T i l W ll A blTypical Wall Assembly
BSC Fifteenth Westford Symposium
Gauvin 56 of 95
70’s 90’s 90’s USA Rain/Screen Foam1 2 3 4 5 6 71 2 3 4 5 6 7
2x4 2x6 2x6 2x6 2x6 2x6 2x6paper Poly Paint Paint Poly Paint Paintpaper Poly Paint Paint Poly Paint Paint
R8 R20 R20 R20 R20 R20 R20+5
3/8 ply ½ OSB ½ OSB ½ OSB ½ OSB ½ OSB *½ OSB
1 paper 1paper 1paper Drain-™
House™
House™
Drain-™wrap™ wrap™ wrap™ wrap™
Stucco Stucco Stucco Stucco *Stucco *Stucco Stucco
57* Variation on N. & S. Walls
BSC Fifteenth Westford Symposium
Gauvin 57 of 95
Sensors – Walls and Roof TemperatureWood moisture content – EMC Relative Humidity
L t dLocated; Bottom and mid-height each wall Inside middle outside each wall Inside, middle, outside each wall
58
BSC Fifteenth Westford Symposium
Gauvin 58 of 95
R H & TempR.H. & Temp.
WettingApparatusApparatus
M C pins & Temp
59
M.C. pins & Temp.
BSC Fifteenth Westford Symposium
Gauvin 59 of 95
60
BSC Fifteenth Westford Symposium
Gauvin 60 of 95
61
by Chris Schumacher
BSC Fifteenth Westford Symposium
Gauvin 61 of 95
Indoor Temperature constant at 20° C.
Indoor R.H. not controlled.(Indoor Relative Humidity allowed to fluctuate
t ll l i i t hi h i )naturally – lower in winter, higher in summer)
Leak Simulation Controlled wetting at Leak Simulation - Controlled wetting at interior face of sheathing.
62
BSC Fifteenth Westford Symposium
Gauvin 62 of 95
Indoor temperature constant at 20° C.
Indoor R.H. constant at 50%
k l ll d f h Leak Simulation - Controlled wetting of the interior face of the sheathing.
63
BSC Fifteenth Westford Symposium
Gauvin 63 of 95
Indoor Temperature constant at 20° C.
Indoor R.H. constant at 40%
Controlled wetting of the Exterior and Interiorface of the sheathing.
Underway now - started November 2009
64
BSC Fifteenth Westford Symposium
Gauvin 64 of 95
There is a lot going on inside a building There is a lot going on inside a building enclosure.
The la s of ph sics appl to Enclos res The laws of physics apply to Enclosures.
Observation is a very useful tool. To understand, you must Measure what you
can’t see.
Everything affects something else!
65
BSC Fifteenth Westford Symposium
Gauvin 65 of 95
25
30
East Wall 1 Sheathing Mid MCEast Wall 2 Sheathing Mid MCEast Wall 3 Sheathing Mid MCEast Wall 4 Sheathing Mid MCEast Wall 5 Sheathing Mid MCEast Wall 6 Sheathing Mid MC
15
20
gEast Wall 7 Sheathing Mid MC
10
0
5
25-Sep-05 3-Jan-06 13-Apr-06 22-Jul-06 30-Oct-06 7-Feb-07 18-May-07 26-Aug-07
30West Wall 1 Sheathing Mid MCWest Wall 2 Sheathing Mid MCWest Wall 3 Sheathing Mid MCWest Wall 4 Sheathing Mid MC
20
25
e C
onte
nt (%
)
West Wall 4 Sheathing Mid MCWest Wall 5 Sheathing Mid MCWest Wall 6 Sheathing Mid MCWest Wall 7 Sheathing Mid MC
There is a lot going on inside a building 10
15
Shea
thin
g M
oist
ure
enclosure660
5
25-Sep-05 3-Jan-06 13-Apr-06 22-Jul-06 30-Oct-06 7-Feb-07 18-May-07 26-Aug-07
What’s going on here ?
BSC Fifteenth Westford Symposium
Gauvin 66 of 95
Observation is a very useful toolNorth Side - No Sun
Photo of test hut walls exterior showing graduated drying
67
Which wall looks to be the driest?
BSC Fifteenth Westford Symposium
Gauvin 67 of 95
68Which wall looks to be the wettest?
BSC Fifteenth Westford Symposium
Gauvin 68 of 95
To understand, measure what you can’t see.
69
BSC Fifteenth Westford Symposium
Gauvin 69 of 95
Everything affects something else
Let’s look at: OUTDOOR CLIMATE and
Wood Moisture Content (EMC)…
70
BSC Fifteenth Westford Symposium
Gauvin 70 of 95
3000
Accum RainNormal Precip 1971-2000Coquitlam Hut ~1600 mm/yr
2000
2500
q y
Recall Levelton Report, 2004:Port Moody – 1767 mm/yrBurnaby Mtn 1858 mm/yr
1500
ive
Rai
nfal
l (m
m)
Climate Normals for UBC
Burnaby Mtn – 1858 mm/yr
1000
Cum
ulat
i
500
0Nov-05 Dec-05 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Nov-06 Jan-07 Mar-07 May-07
41
BSC Fifteenth Westford Symposium
Gauvin 71 of 95
Outdoor Temperature & Relative Humidity - Coquitlam Test Hut
90
100
70
80
90
y (%
)
50
60
& R
elat
ive
Hum
idity
20
30
40
Tem
pera
ture
(°C
) &
0
10
Tamb RHambMax Daily Avg Temp 1971 2000 Normal Daily Avg Temp 1971 2000
-101-Oct-05 24-Dec-05 18-Mar-06 10-Jun-06 2-Sep-06 25-Nov-06 17-Feb-07 12-May-07 4-Aug-07 27-Oct-07 19-Jan-08 12-Apr-08
Max Daily Avg Temp 1971-2000 Normal Daily Avg Temp 1971-2000Min Daily Avg Temp 1971-2000
72
BSC Fifteenth Westford Symposium
Gauvin 72 of 95
73
BSC Fifteenth Westford Symposium
Gauvin 73 of 95
Average sorption isotherm for wood as a function ofas a function of temperature.
74US FPL Wood Handbook [1999]
BSC Fifteenth Westford Symposium
Gauvin 74 of 95
Better Insulation in stud space
Sh thi l t td ( ld ) t t Sheathing closer to outdoor (colder) temperature
Colder sheathing sees (high) outdoor RH
Therefore sheathing Moisture Content raised
L i d di ib Less capacity to store and redistribute moisture
Sheathing more susceptible to damage with anyadditional moisture - such as rain water
75
BSC Fifteenth Westford Symposium
Gauvin 75 of 95
Drying water requires change of state Drying water requires change of state◦ Liquid water to water vapor
Change of state requires energy Change of state requires energy◦ Latent Heat of Vaporization
Does not require change in temperature Does not require change in temperature
More insulation means less heat (energy) flow
Less energy = Less drying
76
BSC Fifteenth Westford Symposium
Gauvin 76 of 95
More Insulation gives us:More Insulation gives us:
Lower sheathing temperatures, Higher EMC Lower sheathing temperatures, Higher EMC
Higher EMC, reduced storage capacityg , g p y
Less energy for drying
Did we know this 20 years ago?
77
BSC Fifteenth Westford Symposium
Gauvin 77 of 95
Poly very effective for intended purpose:
Stops diffusion - of moist indoor air thru wall
Stops air leakage:To prevent moist indoor air reaching cold surfacesp gTo control heat (energy) loss to exterior
Protects wall from condensation on cold outer surfaces
78
BSC Fifteenth Westford Symposium
Gauvin 78 of 95
79
Poly wins! …but?
BSC Fifteenth Westford Symposium
Gauvin 79 of 95
Stucco, 2x4, R10 Paper Back Batt
What Happened??Paper Back Batt, Plywood gasket
Thick frost inside plywood(melting as wall opened up
OAT minus 8° C.
80
Photo taken 9:00 AMDecember 20, 2008
BSC Fifteenth Westford Symposium
Gauvin 80 of 95
81
BSC Fifteenth Westford Symposium
Gauvin 81 of 95
Indoor (RH) matters - ventilation
Surface Temperatures matter
Diffusion matters
All h i i l iAll these increasingly important as we move away from poly vapor barriers
82
BSC Fifteenth Westford Symposium
Gauvin 82 of 95
83East Walls
BSC Fifteenth Westford Symposium
Gauvin 83 of 95
84
Off to the lab for testing…
BSC Fifteenth Westford Symposium
Gauvin 84 of 95
Changes:All New WallsAll New WallsAll New Instrumentation
Plus:Walls will be wetted Exterior and InteriorWalls will be wetted Exterior and Interior Interior R.H. will run at 40% (was 50%) Top of walls instrumented (to monitor p (
convective looping and condensation)
85
BSC Fifteenth Westford Symposium
Gauvin 85 of 95
Does poly vapor barrier inhibit drying (to interior)?
O id W i h d i “l k ” Outside Wetting - how do rain water “leaks” affect performance?
Is solar drive a factor - wetting, drying or both?both?
Effect of lower (controlled) indoor RH( )
86
BSC Fifteenth Westford Symposium
Gauvin 86 of 95
Do They Work? Yes!Do They Work? Yes!
C ill B k Capillary Break Drainage Space Drainage Space Pressure Equalization
l AND Ventilation
87
BSC Fifteenth Westford Symposium
Gauvin 87 of 95
1. Surface EvaporationVentilation
2. Vapor movement byi) Diffusionii) Convectionii) Convection
3. Drainage by gravity4 Ventilation4. Ventilation
(Intentional convection)
88
BSC Fifteenth Westford Symposium
Gauvin 88 of 95
Static Light
Laser
Cylindrical
Static LightSheet
yPrism
Right AnglePrism
89
BSC Fifteenth Westford Symposium
Gauvin 89 of 95
90
BSC Fifteenth Westford Symposium
Gauvin 90 of 95
20
14
16
18TambWE1-TENMWE2-TENMWE3-TENMWE7-TENME t i F
10
12
14 WE7 TENMExterior Foam
4
6
8
mpe
ratu
re (°
C)
-2
0
2Te
-8
-6
-4
East Walls: Sheathing Temp & Outdoor Temp (red)
91
-10
Jan-21 00:00 Jan-22 00:00 Jan-23 00:00 Jan-24 00:00 Jan-25 00:00 Jan-26 00:00 Jan-27 00:00 Jan-28 00:00
East Walls: Sheathing Temp. & Outdoor Temp. (red)
BSC Fifteenth Westford Symposium
Gauvin 91 of 95
Keeps wood warm Keeps wood dry
R d d i Reduces condensation potential
Reduce thermal Reduce thermal bridging
Reduces heat (energy) Reduces heat (energy) loss
BUT…
92
BSC Fifteenth Westford Symposium
Gauvin 92 of 95
High Energy Performance is compatible with Durability
R h d T i i G d Research and Testing is Good
Institutionalized Thinking is Bad Institutionalized Thinking is Bad
Building Science needs to Reach Industry Building Science needs to Reach Industry
93
BSC Fifteenth Westford Symposium
Gauvin 93 of 95
Gauvin Construction Ltd.
#200 1140 Austin Avenue• #200 - 1140 Austin Avenue• Coquitlam, B. C. C q , C
• (across from McDonalds)
• Email: [email protected]
94
BSC Fifteenth Westford Symposium
Gauvin 94 of 95
The Coquitlam Test Hut The Coquitlam Test Hut http://vancouver.buildingscience.com/
Building Science Corporation http://www.buildingscience.com/ http://www.buildingscience.com/
Building and Safety Standards - Gov’t of B.C.g y http://www.housing.gov.bc.ca/building/
95
BSC Fifteenth Westford Symposium
Gauvin 95 of 95