Site Visit Report Facility Name: Evergreen Packaging, Inc. - Pine Bluff Mill Permit Number: AR0001970 Date of Site Visit: February 24, 2016 Permit Engineer: Loretta Reiber, P.E. Names and Numbers of Personnel Present for Site Visit: Name Company Phone # E-mail Loretta Reiber, P.E. ADEQ (501) 682-0612 [email protected] James Ellison Evergreen (870) 641-5720 [email protected] Kyle Hathcote GBMc (501) 847-7077 [email protected] Front Gate Coordinates: Latitude: 34 1309.09” N; Longitude: 91 5424.85” W Outfall Information to Confirm/Collect Outfall 001 Effluent Description Wood Pulping and Bleaching process water, Power Generation and Chemical Recovery process water (this includes non-contact cooling water, compressor wash water and boiler chemical cleaning), Papermaking process water, Sanitary Wastewater, Stormwater Runoff, Chip Mill Sprinkled Wood Storage Return, Landfill Leachate and, and Pine Bluff Energy Center Contribution (this includes cooling tower blowdown, and HRSG blowdown) Receiving Stream Arkansas River Monitoring Coordinates Latitude: 34 1410” N; Longitude: 91 53’ 50” W Outfall Coordinates Latitude: 34 1410” N; Longitude: 91 53’ 50” W Treatment Units settling pond (serving the chip mill wood storage area), primary clarifier, nitrogen based nutrient addition after clarifier as necessary, segregated aeration pond, phosphoric acid treatment at segregated aeration pond as necessary, secondary aeration, wetlands treatment (for approximately 1/4 of wastewater), and polishing pond (referred to as Johnson's Lake) Any changes requested by permittee to limits, terms, etc. for this outfall? N/A

Upload: others

Post on 17-Mar-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Site Visit Report

Facility Name: Evergreen Packaging, Inc. - Pine Bluff Mill

Permit Number: AR0001970

Date of Site Visit: February 24, 2016

Permit Engineer: Loretta Reiber, P.E.

Names and Numbers of Personnel Present for Site Visit:

Name Company Phone # E-mail

Loretta Reiber, P.E. ADEQ (501) 682-0612 [email protected]

James Ellison Evergreen (870) 641-5720 [email protected]

Kyle Hathcote GBMc (501) 847-7077 [email protected]

Front Gate Coordinates: Latitude: 34 13’ 09.09” N; Longitude: 91 54’ 24.85” W

Outfall Information to Confirm/Collect

Outfall 001

Effluent Description

Wood Pulping and Bleaching process water, Power Generation and

Chemical Recovery process water (this includes non-contact cooling

water, compressor wash water and boiler chemical cleaning),

Papermaking process water, Sanitary Wastewater, Stormwater

Runoff, Chip Mill Sprinkled Wood Storage Return, Landfill Leachate

and, and Pine Bluff Energy Center Contribution (this includes cooling

tower blowdown, and HRSG blowdown)

Receiving Stream Arkansas River

Monitoring Coordinates Latitude: 34 14’ 10” N; Longitude: 91 53’ 50” W

Outfall Coordinates Latitude: 34 14’ 10” N; Longitude: 91 53’ 50” W

Treatment Units

settling pond (serving the chip mill wood storage area), primary

clarifier, nitrogen based nutrient addition after clarifier as necessary,

segregated aeration pond, phosphoric acid treatment at segregated

aeration pond as necessary, secondary aeration, wetlands treatment

(for approximately 1/4 of wastewater), and polishing pond (referred to

as Johnson's Lake)

Any changes requested by

permittee to limits, terms,

etc. for this outfall?

N/A

Site Visit Report

Permit Number: AR0001970

AFIN: 35-00016

Outfall 002

Effluent Description non-contact cooling water and stormwater runoff

Receiving Stream an unnamed tributary of Cousart Bayou, thence to Cousart Bayou,

thence to Bayou Bartholomew, thence to the Ouachita River

Monitoring Coordinates Latitude: 34 13’ 10” N; Longitude: 91 54’ 10” W

Outfall Coordinates Latitude: 34 13’ 10” N; Longitude: 91 54’ 10” W

Treatment Units none

Any changes requested by

permittee to limits, terms,

etc. for this outfall?

N/A

Proposed Revisions to the Permit

1. The descriptions of the monitoring locations for Outfalls 001 and 002 have been changed

from coordinates to a narrative description. This will allow for small changes in the

monitoring location without the need to modify the permit.

2. The monitoring frequency for Nitrates plus Nitrites has been changed to once per quarter

for the months of November through April and to once per six months for the months of

May through October. See Item No. 14 of this Fact Sheet for additional information.

3. Total Recoverable Selenium limits have been added at Outfall 001 along with a Schedule

of Compliance. See Item Nos. 11.F and 15 of this Fact Sheet for additional information.

Issues Discussed

Additional testing for Total Recoverable Selenium

Nutrient monitoring frequency

Site Visit Report

Permit Number: AR0001970

AFIN: 35-00016

Pictures of the Treatment System:

Ditch from primary clarifier

Foul condensate line

Site Visit Report

Permit Number: AR0001970

AFIN: 35-00016

North Pond

primary clarifier

Site Visit Report

Permit Number: AR0001970

AFIN: 35-00016

Upper end of ASB, ready to dredge

Subsurface aerator in ASB

Segregation Zone

Segregation zone entering ASB with clarifier effluent

Secondary lift station

Polishing pond

Outfall 001

Outfall 002