Report run on: March 12, 2014 12:36 PM RECAPP Facility Evaluation Report St. Albert Public Health Centre B2173A St. Albert Alberta Health Services-Edmonton

Upload: others

Post on 12-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM

RECAPP Facility Evaluation Report

St. Albert Public Health CentreB2173A

St. Albert

Alberta Health Services-Edmonton

Page 2: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 2 of 27

B2173ABuilding Id:

St. Albert Public Health CentrBuilding Name:

St. AlbertLocation:23 Sir Winston Churchill AveAddress:

1,239.00Gross Area (sq. m): $3,698,214Replacement Cost:0Construction Year:

Evaluation Date: October 29 2013

ARUP DATTA ARCHITECT LTD.Evaluation Company:

Brian DennisEvaluator Name:

St. Albert Public Health Center is located on 23 Sir Winston Churchill Ave and has a gross floor area of 1239m². Thebuilding is single story concrete block construction, slab on grade on portions of the main floor and basement with acast in place foundation on strip footings. The health facility is composed of office rooms, lecture room, clinic rooms aswell as nursing offices.

General Summary:

Structural Summary:St.Albert Public Health Centre is concrete block construction. Cast in place concrete foundation wall on strip footings withslab on grade on main floor. Roof structure is open web steel joist with steel deck. The structure is in acceptable condition

Envelope Summary:St. Albert Public Health Centre exterior walls are concrete block construction with brick veneer masonry and sloppedmetal siding above window areas. Exterior windows are fixed and operable aluminum framed windows. The roofing isa Modified Bituminous Membrane Roofing (SBS) and is fairly new. Overall the envelope is in acceptable condition.

Interior Summary:Interior partitions within St. Albert Public health centre are metal stud walls with a painted gypsum board finish. Carpetflooring is used in nurses, office and administration rooms. RT can be would in the corridors, waiting area andreception areas. Suspended T-bar ceiling is used throughout the building. Overall the interior is in acceptable condition.

Mechanical Summary:Building mechanical systems includes 2-gas fired boilers providing hydronic (hot water) heating, dx cooling system,one air handling unit located inside building, roof mounted exhaust fans, one gas fired hot water heater. There is no sprinkler system provided in the buildingl. The HVAC equipment is controlled by a combined pneumaticand electric control system. Conventional plumbing fixtures Overall the mechanical system are in Acceptable condition.

Electrical Summary:Main service is 800 Amp 120/208 volt three phase. Six panels are located as required. Motor starters are operational.Interior lighting uses T8 technology. Life safety systems and security are operational. Communication equipment isfunctional. Over all, the electrical systems are in acceptable condition.

45.74%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $1,691,613

St. Albert - St. Albert Public Health Centre (B2173A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 3: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 3 of 27

A1010 Standard Foundations*

A1030 Slab on Grade*

A2020 Basement Walls (& Crawl Space)*

B1010.01 Floor Structural Frame (Building Frame)*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.03 Floor Decks, Slabs, and Toppings*

B1010.09 Floor Construction Fireproofing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Updated

Updated

St. Albert - St. Albert Public Health Centre (B2173A)S1 STRUCTURAL

Cast in place foundation wall with strip footings.

Portions of the main floor is slab on grade, basement is slab on grade.

Cast in place concrete foundation wall.

Cast in place concrete floor.

Concrete block construction.

Concrete Slab on grade.

Concrete floor provides adequate fire resistance rating

Page 4: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 4 of 27

B1010.10 Floor Construction Firestopping*

B1020.01 Roof Structural Frame*

B1020.06 Roof Construction Fireproofing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1976

1976

1976

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

St. Albert - St. Albert Public Health Centre (B2173A)

Penetrations thru concrete slab over basement appear to be sealed

Open web steel joist with steel deck.

All roof penetrations appear to be sealed.

Page 5: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 5 of 27

B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

B2010.01.06.03 Metal Siding**

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

B2010.06 Exterior Louvers, Grilles, and Screens*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

0

40

20

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Replace metal siding -(BOE 30m²)

Replace caulking -(BOE 220m)

Lifecycle Replacement

Lifecycle Replacement

2017

2017

$9,400

$6,400

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

Exterior wall is brick masonry veneer

Slopped metal siding located above windows.

Caulking applied to perimeter of windows and doors.

No drawings were available during observations but it is assumed that there is a vapour barrier and insulation in theexterior wall.

Prefinished metal grills for mechanical vents.

Page 6: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 6 of 27

B2020.01.01.02 Aluminum Windows (Glass & Frame)** - Combined Technical Including Windows and Exterior Wal

2 - PoorRating

1976Installed

40Design Life

MAR-14Updated

Seal building envelope gaps and replace windowsBOE 400 m sq

Seal building envelope gaps and replace windowsBOE 400 m sq

Repair

Repair

2015

2014

$435,528

$544,410

High

High

Exposure and wear have caused damage to the buildingexterior and gaps in the building envelope. The seals on thewindows are also failing causing excessive energy loss.

Exposure and wear have caused damage to the buildingexterior and gaps in the building envelope. The seals on thewindows are also failing causing excessive energy loss.

Concern:

Concern:

Repair exterior and windows. Phase 2

Repair exterior and windows. Phase 1

Recommendation:

Recommendation:

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

Aluminum windows and frames and building envelope seals are failing and missing

Consequences of Deferral:

Consequences of Deferral:

Continued energy loss as well as interior discomfortcontinues. The issue of mould and mildew remediation maybecome imminent.

Continued energy loss as well as interior discomfortcontinues. The issue of mold and mildew remediation maybecome imminent.

Page 7: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 7 of 27

B2030.01.01 Aluminum-Framed Storefronts: Doors**

B2030.02 Exterior Utility Doors**

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**

B3010.08.02 Metal Gutters and Downspouts**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1976

2005

1976

Installed

Installed

Installed

Installed

30

40

25

30

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace Storefront doors. -(BOE 2 doors)

Replace exterior utility doors -(BOE 4 doors)

Replace SBS roof -(BOE 977m²)

Replace flashing -(BOE 130m)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2017

2017

2030

2017

$6,800

$3,400

$177,800

$3,800

Unassigned

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

MAR-14

Main entrance is aluminum framed storefront doors. Sliding and swing

Four single doors in metal frames to exterior.

SBS roofing membrane

Cap flashing on parapet.

Page 8: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 8 of 27

B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

4 - AcceptableRating

1976Installed

0Design Life

MAR-14Updated

St. Albert - St. Albert Public Health Centre (B2173A)

Vent penetrations in roof.

Page 9: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 9 of 27

C1010.01 Interior Fixed Partitions*

C1010.03 Interior Operable Folding Panel Partitions**

C1010.05 Interior Windows*

C1010.07 Interior Partition Firestopping*

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.03 Interior Fire Doors*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

Installed

0

30

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Updated

Replace folding panel partition -(BOE 22m²)

Lifecycle Replacement 2017 $25,125 Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: MAR-14

Metal stud partitions with gypsum board finish.

Folding panel partition located in toom 164 lecture room.

Interior windows located in room 160.

Penetrations appear to be sealed.

Wood doors throughout building.

Storage room door is metal in pressed steel frame.

Page 10: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 10 of 27

C1030.01 Visual Display Boards**

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.05 Wall and Corner Guards*

C1030.08 Interior Identifying Devices*

C1030.12 Storage Shelving*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

20

30

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Replace -(BOE 7 White, 30 Tack, 1 Black)

Replace fabricated compartments -(BOE 8compartments)

Lifecycle Replacement

Lifecycle Replacement

2017

2017

$30,700

$9,600

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

30 Tack board, 7 white board, 1 black board.

Fabricated toilet compartments are located in the mens, women and staff restrooms.

Stainless steel corner guards in high traffic areas.

Plastic laminate room numbers on doors

Wood storage shelving found in closet as well as storage rooms.

Page 11: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 11 of 27

C1030.14 Toilet, Bath, and Laundry Accessories*

C2010 Stair Construction*

C2020.08 Stair Railings and Balustrades*

C3010.06 Tile Wall Finishes**

C3010.11 Interior Wall Painting*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

0

0

0

40

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Replace tile wall finish -(BOE 125m²)

Lifecycle Replacement 2017 $31,900 Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Type Year Cost Priority

Updated: MAR-14

Mirror, soap dispenser, trash receptical, paper towels

Cast in place concrete steps with tile nosing to basement

Wood stained handrail.

Tile wall finish in washrooms

Gypsum board wall with paint finish.

Page 12: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 12 of 27

C3020.02 Tile Floor Finishes**

C3020.07 Resilient Flooring** - Sheet

C3020.07 Resilient Flooring** -Tile 1976

C3020.07 Resilient Flooring** -Tile 2008

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1976

1976

2008

Installed

Installed

Installed

Installed

50

20

20

20

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace tile floor finish -(BOE 37m²)

Replace sheet flooring -(BOE 106m sq)

Replace resislient tile -(BOE 190m²)

Replace resilient tile -(BOE 280m²)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2026

2017

2017

2028

$6,500

$8,500

$9,700

$14,600

Unassigned

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

MAR-14

Tile finish in washrooms.

Resilient Sheet Flooring is used in staff, janitor cline and storage rooms

Originial resilient tile in reception, waiting and lecture room.

Resilient tile flooring in corridor, general office and waiting area, lecture room.

Page 13: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 13 of 27

C3020.08 Carpet Flooring**

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

4 - Acceptable

4 - Acceptable

Rating

Rating

1976

1976

Installed

Installed

15

25

Design Life

Design Life

MAR-14

MAR-14

Updated

Updated

Replace carpet flooring -(BOE 106m²)

Replace t-bar ceiling -(BOE 1070 m sq)

Lifecycle Replacement

Lifecycle Replacement

2017

2017

$7,700

$46,850

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

Carpet flooring in nurses room, office area.

Suspended T-Bar used throughout building.

Page 14: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 14 of 27

D2010.04 Sinks**

D2010.08 Drinking Fountains/Coolers**

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1976

1976

1976

Installed

Installed

Installed

Installed

30

35

35

0

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace 10 S/S sinks and 1 Janitor sink

Replace one non-refrigerted drinking fountain.

Replace 8 WC's, 9 Lavs & 1 Urinal

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2017

2017

2017

$17,000

$2,000

$18,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

Single and two compartment stainless steel sinks with conventional faucets, located in kitchenettes. Floor mounted mopservice basin.

Wall mounted, stainless steel, non-refrigerated drinking fountain. Located in the corridor.

Floor mounted water closets with flush tanks, wall mounted urinal with sensor flush valve, vitreous china vanity lavs withsensor faucets, vitreous china wall hung lavs with conventional faucets.

Mainly copper water lines with solder joints throughout building.

Page 15: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 15 of 27

D2020.01.02 Valves: Domestic Water**

D2020.01.03 Piping Specialties (Backflow Preventers)**

D2020.02.06 Domestic Water Heaters**

D2020.03 Water Supply Insulation: Domestic*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1995

2008

1976

Installed

Installed

Installed

Installed

40

20

20

0

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace 20 domestic water valves

Replace 1 boiler make up water line backflowpreventor.

Replace 1 domestic water heater and recirculationpump.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2017

2017

2028

$10,000

$1,500

$5,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

Mainly 1/4 turn ball valves and gate valves - isolation service to water meter, hot water tank, and plumbing fixture supplylines.

There is a Zurn backflow prevention device in place on the boiler feed line. The installation date is estimated.

Natural gas fired domestic water heater located in the mechanical room, as follows: Bradford White Magnum Seriesmodel D80T1993N, 80 Usgal storage capacity, 199.9 MBH gas input capacity. Includes WILO fractional HP, wet rotor DHW recirculating pump.

Preformed fiberglass pipe insulation on water lines. Canvas jacketting in exposed areas.

Page 16: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 16 of 27

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

D2040.01 Rain Water Drainage Piping Systems*

D2040.02.04 Roof Drains*

D3010.02 Gas Supply Systems*

D3020.02.01 Heating Boilers and Accessories: H.W.**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

6 - Excellent

Rating

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

2013

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

35

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Updated

Replace 2 hot water boilers and accessoriess.

Lifecycle Replacement 2048 $100,000 Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Type Year Cost Priority

Updated: MAR-14

Mainly cast iron and copper waste and vent piping throughout the building.

Mostly conventional floor drains located in Mechanical rooms, washrooms and service areas throughout the building.

Cast iron piping from roof drains, down and collecting to rainwater leaders which discharge to city mains.

Cast iron dome type roof roof drains located in flat roof areas. Minimum one per roof area.

Schedule 40 steel piping, connecting incoming service to Boilers and Domestic water heater.

There are two natural gas fired boilers manufactured by RBI. Model DB900, with a gas input capacity of 900 MBH eachand located in the mechanical room c/w all operating and safety controls.

Page 17: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 17 of 27

D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**

D3020.02.03 Water Treatment: H. W. Boiler*

D3030.06.02 Refrigerant Condensing Units**

D3040.01.01 Air Handling Units: Air Distribution**

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2013

1976

1976

1976

Installed

Installed

Installed

Installed

35

0

25

30

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace Chimney & Comb. Air (1 stack @ 6 M)

Replace 2 roof mounted condensing units.

Replace one AHU.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2048

2017

2017

$18,000

$60,000

$50,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

The heating system has combustion air supply and exhaust flues which extend through the roof. The boilers are jointvented into a single stack.

Pot feeder is connected to the boiler hydronic loop. Water treatment program is provided for the hot water heatingsystem.

Two Carrier condensing units on ground on east side of the building, serving the DX cooling coils in the main air handlingunit. Models are unknown (nameplates are obscured). Cooling capacity (based on building area) is estimated to be 20tons each.

Ventilation in the school is provided by a single air handling system located in the main mechanical room. This unit servesthe entire building and includes a heating coil, , DX cooling coil, filter section, mixing section, supply fan. Make: Mark Hot Model: CSAH Capacity: estimated to be 12,000 CFM, based on building area.

Page 18: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 18 of 27

D3040.01.04 Ducts: Air Distribution*

D3040.01.07 Air Outlets & Inlets: Air Distribution*

D3040.03.01 Hot Water Distribution Systems**

D3040.04.01 Fans: Exhaust**

D3040.04.03 Ducts: Exhaust*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

0

0

40

30

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Replace Hot Water Distribution Systems (BOE for1,239 Sq.M/gfa.)

Replace 2 roof mounted exhaust fans.

Lifecycle Replacement

Lifecycle Replacement

2017

2017

$95,000

$4,000

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

Galvanized, low velocity steel ductwork throughout building, connecting air handling unit to grilles & diffusers. Mostly runin ceiling spaces.

Mainly ceiling mounted rectangular supply diffusers are used to supply ventilation air to the building. Eggcrate returngrilles.

Hot water heating distribution is through insulated steel piping to finned tube radiation, reheat coils, force flow heatersand, unit heaters in the building. Includes piping & circulation pumps.

There are approximately 2 centrifugal roof mounted exhaust fans serving washrooms

Galvanized, low velocity sheet metal ductwork connecting exhaust fans to exhaust grilles throughout building.

Page 19: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 19 of 27

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3050.02 Air Coils**

D3050.05.02 Fan Coil Units**

D3050.05.03 Finned Tube Radiation**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1976

1976

1976

Installed

Installed

Installed

Installed

0

30

30

40

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace 8 reheat coils

Replace 2 force flow units.

Replace 200 M of finned tube radiation.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2017

2017

2017

$12,000

$6,000

$60,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

Ceiling mounted grilles serve as exhaust air inlets - located mainly in washrooms.

Reheat coils in supply ductwork, providing zone supply air control to various areas of the building.

Wall mounted fan coil units are provided mainly in the entrance vestibules throughout the bulding

Finned tube baseboard and wall mounted radiation units are installed around perimeter zones throughout the building.Varied enclosure styles.

Page 20: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 20 of 27

D3050.05.06 Unit Heaters**

D3060.02.01 Electric and Electronic Controls**

D3060.02.02 Pneumatic Controls**

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1976

1976

1995

Installed

Installed

Installed

Installed

30

30

40

0

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace 2 horizontal unit heaters.

Replace unit heater and force flow heater controls.(5 total)

Replace Pneumatic control system (B.O.E. for 1239Sq.M./ gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2017

2017

2017

$3,000

$4,000

$15,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

Horizontal unit heaters located in Loading bay area.

Line voltage electric control of force flow heaters and unit heaters.

Pneumatic control of radiation and reheat coil zone valves. Includes simplex air compressor with 1 HP motor, Hankisonrefrigerated air dryer.

Handheld fire extinguishers are located in cabinets and on wall mounting brackets throughout the building and arechecked annually. Installation date estimated.

Page 21: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 21 of 27

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

D5010.07.02 Motor Starters and Accessories**

D5020.01 Electrical Branch Wiring*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

1976

1976

1976

Installed

Installed

Installed

Installed

40

30

30

0

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace 800 Amp 120/208 volt three phase MDPand related breakers.

Replace six 225 Amp panels and related breakers.

Repalce seven motor starters.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2017

2017

2017

$45,000

$24,000

$8,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)S5 ELECTRICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

General electric 800 Amp 120/208 volt three phase main breaker and MDP. 50% full.

Six General Electric, bolt in type breaker panels located as required.

Seven Westinghouse stand alone starters.

R90XLPE copper wiring in EMT conduit. AC90 flex cabling for final connection to the motors and light fixtures.

Page 22: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 22 of 27

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.02 Interior Fluorescent Fixtures**

D5020.02.03.02 Emergency Lighting Battery Packs**

D5020.02.03.03 Exit Signs*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

2011

2011

2011

2011

1976

Installed

Installed

Installed

Installed

Installed

0

30

20

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Replace lighting for (1,239 m²/gfa).

Replace 10 battery packs

Lifecycle Replacement

Lifecycle Replacement

2041

2031

$108,000

$12,000

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

120 volt wall switches.

Surface and recessed 2x4 and 1x4 T8 light fixtures through out the facility.

Lumacell battery packs located as required.

Lumacell LED exit signs located as required.

Three HPS pot lights and two wall packs are located over the exits and the parking walkways.

Page 23: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 23 of 27

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

D5030.01 Detection and Fire Alarm**

D5030.02.02 Intrusion Detection**

D5030.02.04 Video Surveillance**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1976

2011

2011

2011

Installed

Installed

Installed

Installed

0

25

25

25

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Replace fire alarm system for (1,239 m²/gfa).

Replace security system for (1,239 m²/gfa).

Replace four camers and DVR

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2036

2036

2036

$45,500

$14,000

$6,000

Unassigned

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-14

MAR-14

MAR-14

Photocell controlled.

Seimens FS-250C fire alarm panel. Horn strobes located as required. Detection devices located as required.

ADT DSC Power 835 control panel and DSC Power Series 1864 auto dialler. Lenel Security keypad for patient alarms.Sentrol Alarm for staff protection.

Four colour cameras located inside and outside the building. DVR on the computer.

Page 24: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 24 of 27

D5030.04.01 Telephone Systems*

D5030.04.05 Local Area Network Systems*

D5030.05 Public Address and Music Systems**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

2011

2011

2011

Installed

Installed

Installed

0

0

20

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Replace public address system for (1,239 m²/gfa).

Lifecycle Replacement 2031 $8,000 Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)

Event:

Type Year Cost Priority

Updated: MAR-14

Meridan handsets located as required. MITEL main telephone control panel. Connected to public address system.

Supernet in the building from Bell. Four ICC hubs and three CISCO and HP switches. Cat 5 cabling.

TOA two channel system with speakers in the ceiling. Connected to the telephone system.

Page 25: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 25 of 27

E1090.04 Residential Equipment*

E2010.02 Fixed Casework**

E2010.03.01 Blinds**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1976

1976

1976

Installed

Installed

Installed

0

35

30

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Replace case work -(BOE 1239m²/gfa)

Replace blinds -(BOE 130m²)

Lifecycle Replacement

Lifecycle Replacement

2017

2017

$63,100

$14,200

Unassigned

Unassigned

St. Albert - St. Albert Public Health Centre (B2173A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-14

MAR-14

Staff room has a residential grade dishwasher, microwave.

Fixed case work includes wood stained upper and lower cabinets with plastic laminate countertops. Estimate is based ongross floor area.

Horizontal venetian on exterior windows.

Page 26: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 26 of 27

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

K4030.01 Asbestos*

K4030.04 Mould*

K4030.09 Other Hazardous Materials*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

Rating

1976

1976

1976

1976

1976

1976

1976

Installed

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

MAR-14

Updated

Updated

Updated

Updated

Updated

Updated

Updated

St. Albert - St. Albert Public Health Centre (B2173A)S8 SPECIAL ASSESSMENT

There are curb cuts in sidewalk from parking lot to entrance.

Front entrance is sliding door with auto sensor to activate door to open

Barrier free circulation in the within main floor, no barrier free access to basement.

Barrier free washrooms included in facilities.

No observation or reports of Asbestos

No observation or reports of Mould

No observation or reports of other hazardous materials.

Page 27: RECAPP Facility Evaluation Report · Overall the mechanical system are in Acceptable condition. Electrical Summary: Main service is 800 Amp 120/208 volt three phase. Six panels are

Report run on: March 12, 2014 12:36 PM Page 27 of 27

K5010.01 Site Documentation*

K5010.02 Building Documentation*

4 - Acceptable

4 - Acceptable

Rating

Rating

2013

2013

Installed

Installed

0

0

Design Life

Design Life

MAR-14

MAR-14

Updated

Updated

St. Albert - St. Albert Public Health Centre (B2173A)

The prime consultant is ARUP DATTA ARCHITECT LTD. The evaluation date was Oct 29, 2013 Site Description: The site is fairly flat with mature lawn throughout to the west and east side of the site. There is also an asphalt parking lotlocated front and the rear of the site. The main entrance is accessed on the south side of the building.

The prime consultant is ARUP DATTA ARCHITECT LTD. The evaluation date was Oct 29, 2013 The entire building was observed St. Albert Public Health Centre is located at 23 Sir Winston Churchill Ave. The building is a one storey concrete blockbuilding with open web steel joist and steel decking. Exterior brick masonry and metal siding above the window. Windowsare fixed and operable aluminum frame. Interior finishes include resilient tile, tile and carpet flooring.

Google site view

Main and Basement floor plans