quantity surveyor cv
TRANSCRIPT
From,
Vasant Kumar. M. Koli Bhagyodaya SocietyDarshan Apprt B/102Chala – Daman Road ,VAPIDist. Valsad Pin : 396191 – Gujarat, INDIATel : 00 91 260 246 5077 / 0091 9824939126Email:[email protected]
Sir,
Sub: Application for the Post of Senior Quantity Surveyor - Reg.
Having come to understand that you are looking for suitable Senior Quantity Surveyor personnel for your esteemed organization, I would like to furnish my C.V herewith, for your kind perusal and favorable consideration.
I have been employed in M/s Al Fahjan Dubai , U.A.E. as a Senior Quantity Surveyor predominantly involved in construction of major highway, Strom water, Sewerage and Water line projects, since 1985. presently I am working in Al Fahjan – Abudhabi. Hope my present experience would find a suitable place in your esteemed organization and I eagerly solicit your favorable orders.
Yours sincerely,
Vasant Kumar. M. Koli 00971 50 132345100971 55 3745808
Vasant Kumar. M. Koli –Quantity Surveyor
Objective
To work with a leading company where I can make into effect my potential and capabilities to achieve good results. Keen to apply self-improvement techniques to promote quality of output to the maximum level of excellence.
Personal Details:
NationalityDate of birthPassport No.Marital StatusVisa StatusLanguages known
Driving LicenseComputer Knowledge
::::::
::
Indian1st May 1963K 7421426MarriedEmploymentEnglish, Hindi, Gujarati (Can speak, read and write) Arabic and Urdu (Can speak only)Valid U.A.E. Driving License(Automatic Vehicle)Microsoft Office ( Excel)
Present Address : Post Box No. : 9733ABUDHABI-U.A.E. Mobile : 050-1323451 : 055-3745808
Permanent Address : Bhagyodaya SocietyDarshan Apprt B/102Chala – Daman Road ,VAPIDist. Valsad Pin : 396191 – Gujarat, INDIATel : 00 91 260 246 5077 / 0091 9824939126Email : [email protected]
Educational Qualification:
Academic :Diploma in Civil Engineering( 3 Year-Diploma) (1983)
Experience Summary and Profile: 30.0 year in U.A.E.
8 Year(2008-todate) Quantity Surveyor in Dubai & Abu Dhabi-U.A.E.
1 Year(2007) Quantity Surveyor Doha -Qatar
13 Year(1994-2006) Chief Surveyor/Quantity Surveyor in U.A.E.
8Year(1986-1993) Surveyor in U.A.E.
1Year(1985) Supervisor in Govt. Of India (N.W.D.A.)
Project Completed Sucessfully as Quantity Surveyor
Sr Nr LocationWorking
With Name of Project Consultant Client Contract Duration Budget
1 Abudhabi
Consultant
Improvement of Mafraq to Al Ghwaifat Border Post Highway Section-3B Al Mirfa to Abu Al Abyad
Dorsch MUSANADAJan-2016 to Till to date
991 Million
2 Al Ain
Contractor Construction Works for Replacement and Enhancement of Septic Tank in Alain Part-2
MWH ADSSCNOV-2014 to Dec-2015
97 Million
3 Al Ain
ContractorShiebat Al Watah Development WS Atkins Alain
Municipality
April-2014 to Till to December-2014
204 Million
4 Abu Dhabi
Contractor Parking for adnoc head quarter RTS Adnoc
Oct-2013 to March-2014
12 Million
5 Abu Dhabi
Contractor940/3 Dorsch Abu Dhabi
Municipality
Jan-2012 To Sep-2013
106 Million
6 Abu Dhabi
ContractorMaintenance Aecom Abu Dhabi
Municipality
Dec-2011 To Sep-2013
98 Million
7 DubaiContractor
R-816 Al-Turath RTAJan-2010 To Nov-2010
93 Million
8 DubaiContractor
R-931 Aecom RTAFeb 2008 To Dec-2009
88 Million
9 Qatar
Contractor
Azizia Project GEIC
Public Works Authority (Road Affairs) ASHGHAL
Jan-2007 To Dec-2007
46 Million
10 Al AinContractor Solid Waste
Management,Entec Europe
Alain Municipality
Dec. 2003 To Dec.2006
120 Million
CURRENT EMPLOYMENTDorsch GruppeProject : January-2016 to Till to DateDesignation :Quantity SurveyorProject :Improvement of Mafraq to Al Ghwaifat Border Post : :Highway Section;3B Al Mirfa to Abu Al Abyad Client : MUSANADA
MACEPeriod : January-2015 to Dec-2015Designation :Quantity SurveyorProject :Construction Works for Replacement and Enhancement of Septic Tanks in Alain Part-2Client : ADSSC
AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-AbudhabiPeriod : April-2014 to Till todateDesignation : Quantity SurveyorProject : (1)Shiebat al watah Development Infrastructure Construction
Works Zone-B at Alain
Client : Alain Municipality
AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-AbudhabiPeriod : Jan-2010 to March-2014Designation : Quantity SurveyorProject : (1)Roads and Parking in Abudhabi city(940/3)
(2) Maintenance and Rehabitation and additional works for Roads and Bridges in Abudhabi-IslandClient : Government of Abudhabi Municipality
AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-DUBAIPeriod : Feb-2008 to Dec-2009Designation Quantity SurveyorProject : Contract-R / 931, Levelling and roads in Oud Al Muteena-2Client : RTAProject Scope of Work : Construction of Dual Carriageway and Internal Roads Including all like duct work, Embankment cut & fill
Nael & Bin Harmal Hydroexport Qatar, Doha, State of Qatar. Period : January2007 to November2007
Designation : Quantity Surveyor Project : Main Roads at Al Azeezia
Client : PUBLIC WORKS AUTHORITY (Road Affairs) ASHGHAL
Project Scope of Work :Construction of Double lane carriage way with 4m medians with Interlocking tiles, 2.5m width parking lanes on both sides, 2m width foot path with interlocking tiles on both sides, Trench soak ways according to corridor widths, Catch pit chambers, soak way chambers, storm water carrier lines with &without Land Drains, Manholes ranging from internal diameter 1200mm to 2200mm & Depth ranging from 3.00m to 8.5 m, KAHRAMMA WATER D.I Pipes ranging from 600mm, 400mm, 300mm, 200mm, 150mm, &100mm associated with line valves, Air release valve, washing valve chambers. fire hydrants correspondingly with cast in site chambers & Pre cast Chambers. Relocation works for QATAR TELECOM & KAHRAMMA ELECTRICAL such as re alignment of cables, construction of joint boxes, Protection works & ducts works for road crossings, positioning of street lighting works according corridor widths & construction of high mask luminaries 25m & 30m inside Round about, realignment of foul sewer lines by bringing them into reservation of corridors, Land aquistation, demolition of buildings inside selected corridor, Road markings, Fixing of Traffic sign boards according to Qatar Traffic Manual, fixing of Pre cast concrete Bollards at desired locations, fixing road buttons & construction of speed humps by Interlocking tiles At locations specified by local authorities.
Responsibility : I am associated with total independent Quantity survey works for main roads at Al Azizia project a Nael & Bin Harmal Hydroexport Experience Details
1 M/s Nael & Bin Harmal Hydroexport Est., Al Ain, U.A.E
Period Dec. 2003 to Dec.2006Job Title Quantity Surveyor /Chief SurveyorProject Solid Waste Management, Al Ain.
Consultant M/s. Entec Europe Ltd
Responsibilities I was associated with total independent Quantity survey works for transfer station, clinical waste incinerator, sorting station & landfill (first time introduce in U.A.E.) under the supervision of M/s Entec Europe Ltd Consultant, having responsibility of all survey works and taking approval from TPD (Al Ain). Preparing shop drawing and as-built drawing.
2 M/s Nael Construction & Contrating., Dubai
Period June 2002 to Nov. 2003Job Title Chief Surveyor Project Irrigation Mains For Desert Afforestation in
Jebal – Ali (DS-173)
Consultant M/s. Al Turath / Dr. Ahmed Abdul Warith
Responsibilities I was associated with total independent survey works for Irrigation Pipe Line Projects leading a team of eight surveyors and support staff worked under the supervision of M/s Al Turath / AAW Consultant having responsibility of all survey works and taking approval from Dubai Municipality. Preparing shop drawing and as-built drawing, Preparing daily, weekly and monthly progress reports.
3 M/s Nael & Bin Harmal Hydroexport Est., Al Ain, U.A.E
Period Feb. 2001 to May. 2002
Job Title Chief Surveyor / Assistant EngineerProject Roads, Storm water Drainage & Sewer in Al Ouha
Extension Area (Contract : M24A) &Development of Nadood Jaham Area with the Border Road in Al Ain (Contract : 0050)Irrigation Mains for Desert Afforestation in Jebal – Ali (DS-173)
Consultant M/s. W. S. Atkins & Partners Overseas (M24A)M/s. Maunsell Consultancy (NJ)
Responsibilities Storm water and Wastewater works, I was associated with total independent survey works for two different projects leading a team of seven surveyors and support staff worked under the supervision of WS Atkins and Maunsell Consultant having responsibility of all survey works and taking approval from T.P.D. Preparing shop drawing and as-built drawing, Preparing daily, weekly and monthly progress reports.
4 M/s Al Marmar Gen. Cont. Co. (W.L.L), Al Ain, U.A.E. Subsidiary Of M/s Bin Hafeez Establishment, Abu Dhabi, U.A.E
Period Feb. 2000 to Jan. 2001Job Title Chief SurveyorProject Construction of Road & Bridge to connect Falaj Hazza &
El Muwaiji AreasConsultant Dr. AHMED ABDEL WARITH
Responsibilities: Associated with total independent survey works. My Job involves planning for work distribution to subordinates about day to day work execution of works should be completed as per the technical specification & approving the work by consultant. All the setting out approved taken from T.P.D. also. Co-ordination with the Q.S. Department & Drafting section for the preparation of shop drawing as-built drawing,
Tender Survey, and work out quantity for new projects, quantity takeoff as per site measurement, preparing daily, weekly and monthly progress reports.
Period June 1998 to Jan. 2000Job Title Chief SurveyorProject Construction and Paving of Internal Roads for Low cost
Houses at Al Salamat & Al Maqam Consultant Conseco International Ltd. Responsibility Associated with total independent survey works. Worked
under the supervision of Conseco International Ltd. Consulting Engineers. During the leave period of Q.S. had worked as acting Q.S. My Job involves planning for work distribution to subordinates about day to day work execution of works should be completed as per the technical specification & approving the work by consultant. All the setting out approved taken from T.P.D. also. Co-ordination with the Q.S. Department & Drafting section for the preparation of shop drawing as-built drawing, Tender Survey, and work out quantity for new projects, quantity takeoff as per site measurement, preparing daily, weekly and monthly progress reports.
Period January 1996 – May 1998Job Title Chief SurveyorProject Esharig Stage 1 and 2 of Al Ain Municipality projects for
the Construction of Roads, Parking Area, Storm and Wastewater drainage.
Consultant Dr. Ahmed Abdel WarithResponsibility Associated with total independent survey works. Negotiating
with the Consultant & leading team of Eight Surveyors support of staff. Worked under the supervision of Dr. Ahmed Abdel Warith Consulting Engineers. During the leave period of Q.S. had worked as acting Q.S. My Job involves planning for work distribution to subordinates about day to day work execution of works should be completed as per the technical specification & approving the work by consultant. All the setting out approved taken from T.P.D. also. Co-ordination with the Q.S. Department & Drafting section for the preparation of shop drawing as-built drawing, Tender Survey, and work out quantity for new projects, quantity takeoff as per site measurement, preparing daily, weekly and monthly progress reports.
M/s. Saif Bin Darwish Gen. Cont. Co., Abu Dhabi (Dec. 1985 to Sept. 1995)
Period Jan. 1994 to Sept. 1995
Position Chief Surveyor
Project Al Shuwaib Project of P.W.D. Abu Dhabi (Shuwaib)Consultant Fredric R. Harris
Responsibilities Having internal Roads, Stormwater and Wastewater works, including pumping station, lifting station and treatment plant etc. I was associated with total independent survey works leading a team of six surveyors and support staff worked under the supervision of F.R.H. Inc. Consultant having responsibility of all survey works and taking approval from T.P.D. Preparing shop drawing and as-built drawing, Preparing daily, weekly and monthly progress reports.
Period Sept. 1993 to Dec. 1993Position Senior SurveyorProject Shahama interchange Project Abu Dhabi – Dubai Main Road
and interchange from Shahama to main Road.Consultant Halcrow International
Responsibility Job involves setting out, preparing drawings for site condition and handing over to consultant profile works etc.
Period Jan. 1991 to Aug. 1993Position Senior SurveyorProject Internal Roads, Storm & Wastewater in Baniyas (Abu Dhabi)
EB-05-06 Project including Pumping StationConsultant Dorsch International & D.I.W.I.
Responsibility Job involves setting out, preparing profile work settlement and as-built drawings.
Period Dec. 1990 to May 1991Position Quantity Surveyor & Senior SurveyorProject SHJ-RAK and Shj Dhaid Road Maintenance Project of Dubai
MunicipalityConsultant Jozy and Partners
Responsibility Preparing all measurement sheet, taking approval from consultant, setting out for side slopes, slope protection spill way works, guard rails etc.
Period June 1990 to Nov. 1990Position Senior SurveyorProject Sweihan Dune Sand levelling project of Al Ain MunicipalityConsultant Alexander & Gibbs International
Responsibility Job involves setting out, preparing cross section before levelling and cross section after levelling also. Daily measurement sheet of work done.
Period Dec. 1989 to May 1990Position Senior SurveyorProject Al Ain Camel Race Road & Quttara Road Projects Al Ain
Responsibility Job involves setting out, profile work and preparing as-built drawings according to site measurement.
Period June 1988 to Nov. 1989Position SurveyorProject Abu Dhabi Trip Project (18 MC Project)Consultant D.C.I.L.
Responsibility Associated with the pipe line and road work.Period Nov. 1986 to May 1988Position SurveyorProject Shahama & Shamha Internal Road Project at Shahama
(Abu Dhabi). Consultant Roughton and Partners
Responsibility Job involves setting out, profile work and daily measurement according and taking approval from consultant.
Period Dec. 1985 to Oct. 1986Position SurveyorProject Abu Dhabi Trip Project (Contract No. 13)Consultant D.C.I.L.
Responsibility Associated with pipe levelling and taking approval from consultant.
Period April 1985 to Nov. 1985Position SupervisorProject N.W.D.A. (Govt. India)
Responsibility Job involves canal survey planning work, preparing site details like contours, raifall data collection and details about the land either it is private property or Government etc.
Period June 1983 to Mar. 1985Position Site Engineer
Worked with a private firm (builder) having construction of residential villas building upto 4 floors. Responsibility was supervision advise to site workers according to drawing, labour control and preparing daily report of work and material also.