Page 1: Presentation ERA

PRESENTATIONERA MODULE ASSEMBLY PROJECT

ERA Brine Concentrator System

Energy Resources of Australia (Rio Tinto)

Page 2: Presentation ERA

OVERVIEW OF THE ERA PROJECT (AUSTRALIA)

Port of Darwin

Page 3: Presentation ERA

PORT OF DISCHARGE---DARWIN, AUSTRALIA

Page 4: Presentation ERA

ERA OWNED BY RIO TINTO PRODUCES DRUMMED URANIUM OXIDE AT ITS RANGER MINE IN AUSTRALIA’S NORTHERN TERRITORY

CLEANING THE LARGE POND / PRODUCING CLEAN DISTILLED WATER

ENERGY RESOURCES OF AUSTRALIA

Page 5: Presentation ERA

ERA – GENERAL ARRANGEMENTS FRONT VIEW

≈ 15 Meters

≈ 25 Meters

Page 6: Presentation ERA

ERA – GENERAL ARRANGEMENTS SIDE VIEW

≈ 8 Meters

≈ 25 Meters

Page 7: Presentation ERA

ERA – GENERAL ARRANGEMENTS TOP VIEW

≈ 50 Meters

Page 8: Presentation ERA

OVERALL WATER TREATMENT PLANT

Page 9: Presentation ERA

BRINE CONCENTRATOR AREA

Page 10: Presentation ERA

BRINE CONCENTRATORS (AL6XN, DUPLEX)

LARGE VAPOR WASHERS(AL6XN, DUPLEX)

LARGE DIAMETER DUCTING (DUPLEX & 316L SS)

Page 11: Presentation ERA

MODULARIZED SKIDS, FULLY PIPED / INSULATED WITH INSTRUMENTATION & CONTROL VALVES

Page 12: Presentation ERA

1) Vapour Washer 3 Units (JF-1517)

2) Tank (in the skid)5 Tanks(JF-1517)

3) Ducting Work 1 Set (JF-1517)

4) Skid Module 1 Set (JF-1543)

Including; Structure, Platform, Handrail , Piping, Duct support, Insulation, Electrical & Instrument

Delivery Condition:CIF at Darwin Port (NT),AustraliaDelivery date:On Sep. 30,2012 for Item 1) and 3) On Dec. 01,2012 for Item 2) and 4)

SCOPE OF WORK

Page 13: Presentation ERA

Unit3Vapour Washer

Unit2Vapour Washer

Unit1Vapour Washer

DUCTING(VWH)Evap to Vapour Body

DUCTING(FHT)Fan to Evap

DUCTING(VWF)Vapour Body to Fan

DUCTING(REC)Recirculation

Tanks in skid

Page 14: Presentation ERA

VAPOUR WASHER 3 UNITS

Page 15: Presentation ERA

DUCTING

Page 16: Presentation ERA

Vent Separator Tank

CIP Tank

Hot Water DayTank

Start-Up Seed&Chem Mix Tank

Distillate Collection Tank

5 TANKS IN MODULE

Page 17: Presentation ERA

Vent Separator Tank

Distillate Collection Tank

Start-Up Seed&Chem Mix Tank

CIP Tank

Hot Water DayTank

Page 18: Presentation ERA

A

B

D

C

F

E

H

G

L

K

J

M

STRUCTURE & FRAME

TOTAL 12 MODULES

Page 19: Presentation ERA

MODULE A

Page 20: Presentation ERA

MODULE B

Page 21: Presentation ERA

MODULE C

Page 22: Presentation ERA

MODULE D

Page 23: Presentation ERA

MODULE E

Page 24: Presentation ERA

MODULE F

Page 25: Presentation ERA

MODULE G

Page 26: Presentation ERA

MODULE H

Page 27: Presentation ERA

MODULE J

Page 28: Presentation ERA

MODULE K

Page 29: Presentation ERA

MODULE L

Page 30: Presentation ERA

MODULE M

Page 31: Presentation ERA

STRUCTURE SHOP FABRICATION AREA

TRACABILITY CONTROL

Page 32: Presentation ERA

ERRECTION STARTED AT STRUCTURE SHOP

Page 33: Presentation ERA

ERRECTION STARTED AT STRUCTURE SHOP

Page 34: Presentation ERA

TOTAL ASSEMBLY AT STRUCTURE SHOP

M

A

K

J

H

G

F

E C

DB

L

Page 35: Presentation ERA

STRUCTURE LAID DOWN IN MODULE SHOP

TOP VIEW

Page 36: Presentation ERA

STRUCTURE LAYED DOWN IN MODULE SHOP

Page 37: Presentation ERA

SAFETY CONTROL

Page 38: Presentation ERA

STRICT INDOCTRINATION

Page 39: Presentation ERA

SAFETY CONTROL

Page 40: Presentation ERA

PIPING

Page 41: Presentation ERA

PIPE RACK

Page 42: Presentation ERA

STORING

Page 43: Presentation ERA

PIPE RACK

Page 44: Presentation ERA

STORING SMALL PARTS NEATLY

Page 45: Presentation ERA

STORING SMALL PARTS

Page 46: Presentation ERA

DUCTING

Page 47: Presentation ERA

DUCTING

Page 48: Presentation ERA

DUCTING

Page 49: Presentation ERA

COLLABORATION OF PIPING E & I INSULATION

Page 50: Presentation ERA

PUMP INSTALLED

Page 51: Presentation ERA

VALVE PUNCH-LISTED

Page 52: Presentation ERA

INSULATING PIPE

Page 53: Presentation ERA

GRATING

Page 54: Presentation ERA

INSTALLING PLATE HEAT EXCHANGERS

Page 55: Presentation ERA

INSTALLING PLATE HEAT EXCHANGERS

Page 56: Presentation ERA

CABLE INSTALLATION

Page 57: Presentation ERA

WORKING ON UPPER MODULE

Page 58: Presentation ERA

SCAFFOLDING

Page 59: Presentation ERA

INSULATING PIPES

Page 60: Presentation ERA

STEAM LINE VALVE ON TOP OF MODULES

Page 61: Presentation ERA

INSULATING VALVE PART

Page 62: Presentation ERA

INSULATING BY MATRESS

Page 63: Presentation ERA

EYE WASHERDRAIN PIPING

Page 64: Presentation ERA

FINALIZING

Page 65: Presentation ERA

PUNCH LISTING

Page 66: Presentation ERA

START PACKING

Page 67: Presentation ERA

BLUE SHEET + NETTING

Page 68: Presentation ERA

PIPE SHUE CLAMP & LASHING

Page 69: Presentation ERA

PIPE SHUE CLAMP & LASHING

Page 70: Presentation ERA

READY FOR TRANSPORT

CENTER OF GRAVITY

TRANSPORTATION BEAM

LIFTING LUG

Page 71: Presentation ERA

TRANSPORTATION TO LCB PORT

Page 72: Presentation ERA

TRANSPORTING VAPOR WASHERS

LIFTING POWER LINE

Page 73: Presentation ERA

TRANSPORTING VAPOR WASHERS

Page 74: Presentation ERA

TRANSPORTING VAPOR WASHERS

Page 75: Presentation ERA

LIFTING AT THE PORT OF THAILAND

Page 76: Presentation ERA

LIFTING AT THE PORT OF THAILAND

Page 77: Presentation ERA

UNDER DECK BREAK BULK

Page 78: Presentation ERA

UNDER DECK BREAK BULK

Page 79: Presentation ERA

TRANSPORTING DUCTING

Page 80: Presentation ERA

TRANSPORTING DUCTING

Page 81: Presentation ERA

UNDER DECK BREAK BULK

Page 82: Presentation ERA

UNDER DECK BREAK BULK

Page 83: Presentation ERA

LASHING INSIDE VESSEL

Page 84: Presentation ERA

RIGGING OPERATION

Page 85: Presentation ERA

LIFTING OPERATION

Page 86: Presentation ERA

UNDER DECK BREAK BULK

Page 87: Presentation ERA

LASHING INSIDE VESSEL

Page 88: Presentation ERA

LASHING INSIDE VESSEL

Page 89: Presentation ERA

CARGO LOADING COMPLETED--SAILING

Page 90: Presentation ERA

DELIVERED TO JOBSITE ON 1ST DEC'12