presentation era
TRANSCRIPT
PRESENTATIONERA MODULE ASSEMBLY PROJECT
ERA Brine Concentrator System
Energy Resources of Australia (Rio Tinto)
OVERVIEW OF THE ERA PROJECT (AUSTRALIA)
Port of Darwin
PORT OF DISCHARGE---DARWIN, AUSTRALIA
ERA OWNED BY RIO TINTO PRODUCES DRUMMED URANIUM OXIDE AT ITS RANGER MINE IN AUSTRALIA’S NORTHERN TERRITORY
CLEANING THE LARGE POND / PRODUCING CLEAN DISTILLED WATER
ENERGY RESOURCES OF AUSTRALIA
ERA – GENERAL ARRANGEMENTS FRONT VIEW
≈ 15 Meters
≈ 25 Meters
ERA – GENERAL ARRANGEMENTS SIDE VIEW
≈ 8 Meters
≈ 25 Meters
ERA – GENERAL ARRANGEMENTS TOP VIEW
≈ 50 Meters
OVERALL WATER TREATMENT PLANT
BRINE CONCENTRATOR AREA
BRINE CONCENTRATORS (AL6XN, DUPLEX)
LARGE VAPOR WASHERS(AL6XN, DUPLEX)
LARGE DIAMETER DUCTING (DUPLEX & 316L SS)
MODULARIZED SKIDS, FULLY PIPED / INSULATED WITH INSTRUMENTATION & CONTROL VALVES
1) Vapour Washer 3 Units (JF-1517)
2) Tank (in the skid)5 Tanks(JF-1517)
3) Ducting Work 1 Set (JF-1517)
4) Skid Module 1 Set (JF-1543)
Including; Structure, Platform, Handrail , Piping, Duct support, Insulation, Electrical & Instrument
Delivery Condition:CIF at Darwin Port (NT),AustraliaDelivery date:On Sep. 30,2012 for Item 1) and 3) On Dec. 01,2012 for Item 2) and 4)
SCOPE OF WORK
Unit3Vapour Washer
Unit2Vapour Washer
Unit1Vapour Washer
DUCTING(VWH)Evap to Vapour Body
DUCTING(FHT)Fan to Evap
DUCTING(VWF)Vapour Body to Fan
DUCTING(REC)Recirculation
Tanks in skid
VAPOUR WASHER 3 UNITS
DUCTING
Vent Separator Tank
CIP Tank
Hot Water DayTank
Start-Up Seed&Chem Mix Tank
Distillate Collection Tank
5 TANKS IN MODULE
Vent Separator Tank
Distillate Collection Tank
Start-Up Seed&Chem Mix Tank
CIP Tank
Hot Water DayTank
A
B
D
C
F
E
H
G
L
K
J
M
STRUCTURE & FRAME
TOTAL 12 MODULES
MODULE A
MODULE B
MODULE C
MODULE D
MODULE E
MODULE F
MODULE G
MODULE H
MODULE J
MODULE K
MODULE L
MODULE M
STRUCTURE SHOP FABRICATION AREA
TRACABILITY CONTROL
ERRECTION STARTED AT STRUCTURE SHOP
ERRECTION STARTED AT STRUCTURE SHOP
TOTAL ASSEMBLY AT STRUCTURE SHOP
M
A
K
J
H
G
F
E C
DB
L
STRUCTURE LAID DOWN IN MODULE SHOP
TOP VIEW
STRUCTURE LAYED DOWN IN MODULE SHOP
SAFETY CONTROL
STRICT INDOCTRINATION
SAFETY CONTROL
PIPING
PIPE RACK
STORING
PIPE RACK
STORING SMALL PARTS NEATLY
STORING SMALL PARTS
DUCTING
DUCTING
DUCTING
COLLABORATION OF PIPING E & I INSULATION
PUMP INSTALLED
VALVE PUNCH-LISTED
INSULATING PIPE
GRATING
INSTALLING PLATE HEAT EXCHANGERS
INSTALLING PLATE HEAT EXCHANGERS
CABLE INSTALLATION
WORKING ON UPPER MODULE
SCAFFOLDING
INSULATING PIPES
STEAM LINE VALVE ON TOP OF MODULES
INSULATING VALVE PART
INSULATING BY MATRESS
EYE WASHERDRAIN PIPING
FINALIZING
PUNCH LISTING
START PACKING
BLUE SHEET + NETTING
PIPE SHUE CLAMP & LASHING
PIPE SHUE CLAMP & LASHING
READY FOR TRANSPORT
CENTER OF GRAVITY
TRANSPORTATION BEAM
LIFTING LUG
TRANSPORTATION TO LCB PORT
TRANSPORTING VAPOR WASHERS
LIFTING POWER LINE
TRANSPORTING VAPOR WASHERS
TRANSPORTING VAPOR WASHERS
LIFTING AT THE PORT OF THAILAND
LIFTING AT THE PORT OF THAILAND
UNDER DECK BREAK BULK
UNDER DECK BREAK BULK
TRANSPORTING DUCTING
TRANSPORTING DUCTING
UNDER DECK BREAK BULK
UNDER DECK BREAK BULK
LASHING INSIDE VESSEL
RIGGING OPERATION
LIFTING OPERATION
UNDER DECK BREAK BULK
LASHING INSIDE VESSEL
LASHING INSIDE VESSEL
CARGO LOADING COMPLETED--SAILING
DELIVERED TO JOBSITE ON 1ST DEC'12