massena lateral bridge slide case study

17
JIM NELSON, IOWA DOT MASSENA LATERAL BRIDGE SLIDE CASE STUDY

Upload: elwyn

Post on 25-Feb-2016

29 views

Category:

Documents


0 download

DESCRIPTION

MaSSENA LATERAL BRIDGE SLIDE CASE STUDY. Jim Nelson, Iowa DOT. Project location. IA 92 over Small Natural Stream, 1.0 mile west of Jct. IA 148. Project location. Existing structure. 40’ x 30’ Steel I-beam Constructed 1930 Reconstructed 1949 Overlay 1968 Retrofit rail 1992 Overlay 1998. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

J I M N E L SO N , I O WA D O T

MASSENA LATERAL BRIDGE SLIDE CASE STUDY

Page 2: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

PROJECT LOCATION

• IA 92 over Small Natural Stream, 1.0 mile west of Jct. IA 148

Page 3: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

PROJECT LOCATION

Page 4: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

EXISTING STRUCTURE

• 40’ x 30’ Steel I-beam• Constructed 1930• Reconstructed

1949• Overlay 1968• Retrofit rail 1992• Overlay 1998

Page 5: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

EXISTING STRUCTURE

• Structurally deficient – sufficiency rating is 38.2• Bridge is not

adequate for legal loads – posted “One truck at a time.”

Page 6: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

PROPOSED REPLACEMENT BRIDGE

• Pretensioned Prestressed Concrete Beam Bridge

Page 7: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

MOBILITY IMPACTS

• Detour traffic for duration of construction• 7 miles out of distance travel for detour• AADT (2012) – 1,460 w/ 16% trucks• User costs for 180 day detour• Indirect $437,000• Direct $15,000 (Co. Road Maint. & Detour

Signing)

Page 8: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

PROJECT STAGING AREA

Page 9: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

UTAH DOT WANSHIP BRIDGE SLIDE

Page 10: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

BRIDGE CONSTRUCTION VISUALIZATION

Page 11: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

SEMI-INTEGRAL ABUTMENT

• Abutment Diaphragm Details – sheet number 14

Page 12: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

SLIDING PAD

• Superstructure Details – sheet number 15• Bonded PTFE surface on bearing pad detail

Page 13: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

PROJECT COST

• Let April 16, 2013

• Winning bid $1.3 Million

• Bridge unit cost - $112/SF

• Historic bridge unit cost - $85/SF

Page 14: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

CRITICAL CLOSURE SCHEDULE

Activity 1 2 3 4 5 6 7 8 9Bridge Removal and GradingPavement RemovalRevetmentPile DrivingAbutment FootingBridge slidePrecast wingsBarrier RailingGranular BackfillApproach pavingLongitudinal GroovingSteel GuardrailPavement Marking

Day

Page 16: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

CONSTRUCTION PROGRESS

Page 17: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

ACKNOWLEDGEMENTS

• Designer – Iowa DOT• Constructability Review – Michael Baker

Corporation• ABC Peer Exchange – Utah DOT• ABC Detail Testing – Iowa State University• Construction Administration – Iowa DOT• Prime Contractor – Herberger Construction Co., Inc.• Precast Wing Supplier – Cretex Concrete Products• Precast Beam Supplier – Cretex Concrete Products• HfL Grant – FHWA