“Green Line to Hyde Square would be a ‘game changer’—serve people where they are.” —Roslindale roundtable “The Green Line should be extended 6/8 of a mile to Hyde Square, where there is great residential and commercial activity, and therefore serve the needs of hundreds more residents and bring thousands of people to the commercial and cultural hub of Boston’s Latin Quarter. This is more crucial now that the South Huntington Avenue corridor is in the midst of important development, with at least 200 new units along the avenue.” —02130 “Extend the Green Line to Hyde Square.” –02120 Mission Hill LMA Olmsted Park Egleston Square Jamaica Pond Mission Hill LMA Huntington Ave Centre St H e a t h S t P e r k i n s St S H u n t i n g t o n A v e Stony Brook Jackson Square Hyde Square Heath Street Huntington Ave Centre St H e a t h S t P e r k i n s St S H u n t i n g t o n A v e Stony Brook Jackson Square The existing Green Line beyond Brigham Circle would be upgraded and extended beyond Heath Street to Hyde Square, creating an improved transit connection between the Longwood Medical Area and Jamaica Plain. The existing protected rail median on Huntington Avenue would be extended to South Huntington by moving on-street parking to side streets converted to one- way pairs. In-street operations south of Huntington could continue, with the final alignment to serve Hyde Square determined through a separate process. Project Description #18 in public voting Local Project Score Best Practices In Los Angeles, CA, the most recent Gold Line light rail extension opened in 2016. Ridership is already well above expected levels, with 66% of new riders coming from private vehicle commutes. metro.net/projects/foothill-extension/ la.curbed.com/2016/4/11/11411796/ gold-line-foothill-extension-ridership Public Input Benefits and Issues Addressed Huntington Avenue is a heavily-traveled corridor that greatly interferes with Green Line operations west of Brigham Circle, where a protected transit median has not yet been built. More efficient operations increase transit access to the LMA in both directions, while a southerly extension to Hyde Square connects thousands of residents with rail transit and connects the Centre Street Main Street district in Jamaica Plain to the rest of the city on rail, further helping to reduce reliance on driving in this congested part of the city. Implementation Continue service on the E Line for a mile beyond Heath Street Green Line Extension to Hyde Square Access 1 Safety 1 Reliability Access 2 Safety 2 Affordability Sustainability/Resiliency 1 Sustainability/Resiliency 2 Governance Approximate Cost: $40 million for design and construction Potential Funding Sources: City capital plan, MBTA, and FTA Who’s responsible: MBTA Time Frame: 15+ years GO BOSTON 2030 ACTION PLAN Projects and Policies Boston Transportation Department March 2017

Upload: others

Post on 26-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Local Project Score Green Line Extension to Hyde Square...Square Jamaica Pond Mission Hill MA e t Heat h S t Per k i n s S t S Sqare H u n t i n g t o n A v e tony Brook Jacson Hyde

“ Green Line to Hyde Square would be a ‘game changer’—serve people where they are.”

—Roslindale roundtable

“The Green Line should be extended 6/8 of a mile to Hyde Square, where there is great residential and commercial activity, and therefore serve the needs of hundreds more residents and bring thousands of people to the commercial and cultural hub of Boston’s Latin Quarter. This is more crucial now that the South Huntington Avenue corridor is in the midst of important development, with at least 200 new units along the avenue.”

—02130

“Extend the Green Line to Hyde Square.”

–02120

Mission Hill

LMA

OlmstedPark

EglestonSquare

JamaicaPond

Mission Hill

LMA

Huntington Ave

Centre St

Heath St

Perkins St

S H

untin

gton

Ave

Stony Brook

JacksonSquare

Hyde Square

Heath Street

Huntington Ave

Centre St

Heath St

Perkins St

S H

untin

gton

Ave

Stony Brook

JacksonSquare

The existing Green Line beyond Brigham Circle would be upgraded and extended beyond Heath Street to Hyde Square, creating an improved transit connection between the Longwood Medical Area and Jamaica Plain. The existing protected rail median on Huntington Avenue would be extended to South Huntington by moving on-street parking to side streets converted to one-way pairs. In-street operations south of Huntington could continue, with the final alignment to serve Hyde Square determined through a separate process.

Project Description

#18 in public voting

Local Project Score

Best PracticesIn Los Angeles, CA, the most recent Gold Line light rail extension opened in 2016. Ridership is already well above expected levels, with 66% of new riders coming from private vehicle commutes. metro.net/projects/foothill-extension/

la.curbed.com/2016/4/11/11411796/gold-line-foothill-extension-ridership

Public Input

Benefits and Issues AddressedHuntington Avenue is a heavily-traveled corridor that greatly interferes with Green Line operations west of Brigham Circle, where a protected transit median has not yet been built. More efficient operations increase transit access to the LMA in both directions, while a southerly extension to Hyde Square connects thousands of residents with rail transit and connects the Centre Street Main Street district in Jamaica Plain to the rest of the city on rail, further helping to reduce reliance on driving in this congested part of the city.

Implementation

Continue service on the E Line for a mile beyond Heath Street

Green Line Extension to Hyde Square

Access 1 Safety 1 Reliability

Access 2 Safety 2 Affordability

Sustainability/Resiliency 1 Sustainability/Resiliency 2 Governance

Approximate Cost: $40 million for design and construction Potential Funding Sources: City capital plan, MBTA, and FTA Who’s responsible: MBTA Time Frame: 15+ years