Proposal for performing Consultancy on Developing
Solid Waste Management Detailed Plans for the four
Districts of Hoai Nhon, Phu My, An Nhon and Tay Son
VIE 07 035 11
Peoples Committee
of
BINH DINH Province
WATER SUPPLY & SANITATION PPMU
HOAI NHON
ACTION PLAN FOR THE DSWMP
-
7/31/2019 Hoai Nhon - Action Plan
2/18
Hoai Nhon DSWMP Action Plan
Contents
1. INTRODUCTION ............................................................................................................................................ 3
2. MAIN ACTIVITIES .......................................................................................................................................... 3
2.1. ESTABLISH A DISTRICT SOLID WASTE MANAGEMENT BOARD .................................................................................... 3
2.2. SETTING-UP A WASTE RESOURCE CENTRE............................................................................................................. 4
2.3. OVERALL INTEGRATED AWARENESS RAISING STRATEGY ........................................................................................... 5
2.4. ESTABLISHING ORGANIC COMPOSTING AT HOUSEHOLDS AND MARKETS ....................................................................... 6
2.5. ESTABLISHING A DOMESTIC SOLID WASTE COLLECTION AND TRANSPORTATION SYSTEM ................................................ 62.6. BUILDING A WASTE DISPOSAL SITE ....................................................................................................................... 6
2.7. ENSURING THAT ALL HEALTHCARE WASTE IS COLLECTED AND TREATED ........................................................................ 7
2.8. IMPROVEMENT OF INDUSTRIAL WASTE MANAGEMENT ............................................................................................. 7
3. IMPLEMENTATION AND SCHEDULE .............................................................................................................. 7
ANNEX A: IMPLEMENTATION SCHEDULE ............................................................................................................. 11
-
7/31/2019 Hoai Nhon - Action Plan
3/18
Hoai Nhon DSWMP Action Plan
1. INTRODUCTIONThe District Action Plan describes the main activities required to implement the District Solid Waste
Management Plan. The Action Plan covers a 5year period and addresses the following issues:
The set-up a District Solid Waste Management Board; Setting up a Waste Resource Centre The establishment of the Environmental Communication Teams; Taking the necessary decisions by authorities and permitting activities; For the domestic solid waste management system at the source level: Ensure (1) wastegeneration minimisation at source by reuse and recycling, home composting, etc., (2) dispose of
waste on time and in the right place, (3) polluter pays fee for collection and transportation of
waste;
Improve domestic solid waste collection and transportation system by investing in a sufficientnumber of good quality waste collection and transportation equipment to ensure a reliable
waste collection from the serviced areas;
Minimise environmental impacts from any dumpsite and/or use a modern sanitary landfill; For the healthcare waste management system ensure that infectious waste is collected from all
sources and treated in accordance with the Ministry of Health regulations;
For industrial solid waste management ensure that these are handled properly within the wastegenerators premises.
2. MAIN ACTIVITIESTo successfully implement the District Solid Waste Management Plan, a number of activities are
i d h i h di d i h f ll i i
-
7/31/2019 Hoai Nhon - Action Plan
4/18
Hoai Nhon DSWMP Action Plan
Treatment of organic waste at source Waste Collection and Transport Sanitary Landfill Industrial Waste Healthcare Waste Public information, awareness raising and capacity building.
Such working groups would in turn have contact persons appointed at the town or commune level.
The District Solid Waste Management Board will monitor the implementation of the waste management
system. The means that it will monitor process during the implementation phase and providesubsequent follow-up during the operation of the system. The District Solid Waste Management Board
will ensure that all actors are executing their activities in a timely manner. Hence each administrative
unit (towns/communes) will have a group or committee at their level that reports to the District level
board.
The Board will receive reports from all actors, allowing it to monitor progress and to take corrective
action whenever planned activities are falling behind schedule or now operating as planned. Important
areas that will require close attention from the District Solid Waste Management Board include thefollowing:
Ensuring at the waste treatment at source using Toptex, mesophilic units and biopods isimplanted and functioning as intended;
Making sure that the waste collection equipment is purchased in the most efficient mannerpossible; that it is distributed equitably between communes, towns and waste managements
companies;
Th t th it l dfill i t d d i t t h ft th B d t l l
-
7/31/2019 Hoai Nhon - Action Plan
5/18
Hoai Nhon DSWMP Action Plan
The WRC will serve as a knowledge centre providing expertise within the abovementioned fields.
Rationally it should be based in Quy Nhon and serve the whole province. Furthermore, the centre will
most likely endeavour to sell its services further afield. Ideally the centre should seek links to
universities, research institutions and other similar organisations to strengthen its work and knowledge
base.
2.3.Overall Integrated Awareness Raising Strategy
At provincial level, EPA is the overall supervisor of Awareness Raising for waste management. For every
type of waste management (industrial waste management, health care waste management, organic
waste treatment at source, collection and transport of domestic waste, landfill construction and
operation, agricultural waste management) EPA guides, supports and supervises the working groups
under the District Solid Waste Management Board.
EPA will work together with all district working groups and with the related departments at provincial
level:
Awareness Raising & Training related to industrial waste: EPA works together with theprovincial Department of Science and Technology (DST) and the District Working Group
Industrial waste management;
Awareness raising & Training related to health care waste: EPA works together with theDepartment of Health (DoH) and the District Working Group Health care waste management;
Awareness raising & Training related to agricultural waste: EPA works together with theDepartment of Agriculture and Rural Development (DARD) and the District Working Group
Agricultural waste management;
Awareness raising & Training related to domestic solid waste management EPA, upon positiveevaluation of the pilot phase may continue the implementation of the projects awareness
i i t t 2010 2014 Th f EPA k t th ith th ( l d i ti th h
-
7/31/2019 Hoai Nhon - Action Plan
6/18
Hoai Nhon DSWMP Action Plan
2.4.Establishing organic composting at households and markets
In order to increase amount of organic waste to be reused and recycled (to produce compost), the
following activities should be done:
For market wastes
Organise demonstration models at a market to prove that it is possible, simple and profitable toreuse organic waste to produce compost even at small-scale;
Finding available area and getting agreement with residents who live close to centralcomposting area of organic wastes from market;
Training workers to operate the composting system of market wastes; Starting with small amount of wastes to get experience in operation and increase capacity
gradually;
Expanding this model wherever possible.For households
Organise demonstration models at several households to prove that it is possible, simple andprofitable to reuse organic waste to produce compost even at household-scale;
Organise public information and preparing guideline to instruct the technique; Organise training for households who are willing to apply this model (mesophilic storage unit); Installing mesophilic storage units at selected households, monitoring and helping the
households during operation of these units;
Organising public campaigns to promote this activity. Expanding this model in the other residential area wherever possible.
2.5.Establishing a Domestic Solid Waste Collection and Transportation System
-
7/31/2019 Hoai Nhon - Action Plan
7/18
Hoai Nhon DSWMP Action Plan
2.7.Ensuring that all healthcare waste is collected and treated
The improvement of the healthcare waste management system within the District is relatively simple,
given that a treatment system that meets the Ministry of Healths requirements is already in place and
treats infectious waste from large sources. The following activities will be needed:
Determine what institutions generate infections waste that is not treated; Resolve who will pay for the treatment of the collected waste Plan a collection system and determine what equipment is required (plastic bags, bins, safety
equipment, etc.);
Purchase any required equipment Training of health station and clinic staff Implement the system
2.8.Improvement of industrial waste management
The first task will be to establish what the present situation is, as it is not fully known what types and
quantities of industrial waste are generated within the district at the moment. The main proposed
actions are as follows:
Determine the types and characteristics of the industrial waste generated within the District. Establish a plan for the management of the identified industrial waste. Determine who will pay for the treatment of the industrial waste. Purchase any required equipment Training of all stakeholders as required Implement the industrial waste management system
3. IMPLEMENTATION AND SCHEDULE
Th i l t ti f thi A ti Pl ill t t ith th t bli h t f Di t i t S lid W t
-
7/31/2019 Hoai Nhon - Action Plan
8/18
Hoai Nhon DSWMP Action Plan
No. Activity Dates
2.3 Determine exactly what equipment should be purchased April 2012
2.4 Purchase 240 l bins, 660 l containers and 660 l pushcarts May July 2012
2.5 Purchase waste collection trucks. May July 2012
2.6 Purchase personnel equipment for workers May July 2012
2.7 Hire new staff: Additional staff will be needed in parallel with the
expansion of collection services and the purchase of new equipment.
June August
2012
2.8 Train all waste collection staff: All staff (waste collectors, street sweepers,
drivers, mechanics, etc.) must be properly trained and know what is
expected of them in their job situation.
June August
2012
2.9 Determine the best location for bins, containers and rendezvous points.Decide where pushcarts will be stored when not in use.
JuneSeptember 2012
2.10 Review and revise collection routes/collection schemes. New routing
plans/schedules for collection trucks must be made in accordance with the
increased collection coverage and rendezvous points.
June
December 2012
2.11 Provide training for administrative and operational staff at various levels:
Train administrative and operational staff in general solid waste
management and in specific issues relevant for the different working areas.
June
December 2012
2.12 Plan and undertake public awareness campaigns. Awareness campaignsmust be planned and conducted in parallel with the physical improvements
of the waste collection system.
2012 2016
Table 3.3 Actions to implement composting at households and markets
No. Activity Dates
3.1 Establish a working group under the District Solid Waste Management
Board that is responsible for the treatment of organic waste at source.
March 2012
-
7/31/2019 Hoai Nhon - Action Plan
9/18
Hoai Nhon DSWMP Action Plan
No. Activity Dates:
4.4 Complete Environmental Impact Assessment (EIA) June
September 2012
4.5 Get EIA approved September
October 2012
4.6 Tender the construction of the new sanitary landfill October
December 2012
4.7 Construct the sanitary landfill and ancillary systems January
December 2013
4.8 Tender and purchase of landfill moving equipment April
December 20134.9 Training of landfill staff in proper landfill operation and maintenance: The
training should cover overall landfill aspects (proper disposal techniques,
environmental monitoring etc.) and specific training in operation and
maintenance of new landfill equipment and facilities
December 2013
4.10 The landfill starts receiving waste January 2014
4.11 Close old dumpsites January June
2014
Table 3.5 Actions to be taken to ensure all healthcare waste is collected and treated
No. Activity Dates:
5.1 Establish a working group under the District Solid Waste Management
Board that is responsible for healthcare waste management
March 2012
5.2 Determine what institutions (private clinics, commune health stations, etc.)
generate infections waste that is not treated
April 2012
5.3 Resolve who will pay for the treatment of the collected waste May June
-
7/31/2019 Hoai Nhon - Action Plan
10/18
Hoai Nhon DSWMP Action Plan
No. Activity Dates:
their storage, transportation and disposal.
6.7 Implement the industrial waste management system and provision of
technical assistance to resolve any issues.
April
September
2013
-
7/31/2019 Hoai Nhon - Action Plan
11/18
Hoai Nhon DSWMP Action Plan
Annex A: Implementation Schedule
-
7/31/2019 Hoai Nhon - Action Plan
12/18
Hoai Nhon DSWMP Action Plan
12
Implementation Schedule
Activities 2011 2012 2013 2014 2015 2016
Sep. Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Authority Decisions
Establish District
Solid WasteManagement Board
*
Approve District
Solid Waste
Management Plan
*
Approve budgets and
establish financing*
Decision to establish
a provincial WRC*
Amend legislation*** *** *** ***
Supervise
implementation*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
Establishing a domestic waste collection and transportation system
Establish working
group*
Determine whether a
new tariff system is
required for the
different users
** *
Determine
equipment to be
purchased
*
Purchase bins and
containers ** *
Purchase waste
collection trucks** *
Purchase personnel
equipment for
workers
** *
Hire new staff * **
-
7/31/2019 Hoai Nhon - Action Plan
13/18
Hoai Nhon DSWMP Action Plan
13
Train all waste
collection staff* **
Determine the best
location for
equipment
* ***
Revise collection
routes* *** ***
Provide training foradministrative and
operational staff
* *** ***
Plan and undertake
public awareness
campaigns
** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
-
7/31/2019 Hoai Nhon - Action Plan
14/18
Hoai Nhon DSWMP Action Plan
14
Activities 2011 2012 2013 2014 2015 2016
Sep. Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Actions to implement composting at households and markets
Establish a working
group
*
Carrying out
demonstration
projects
*** ***
Prepare guideline for
mesophilic storage
unit
***
Organise public
information through
the Environmental
Communication
Teams
*** *** *** *** *** *** *** ***
Implement the use of
mesophilic storage
units in selected
areas
*** *** *** *** *** *** *** ***
Monitoring and
evaluating the
results
*** *** *** *** *** *** *** ***
Preparing plan to
expand this
composting model
among residential
areas
*** *** *** *** *** *** *** *** *** *** *** ***
Preparing project of
market waste
composting system
and get approval
* ***
Purchase any
required equipment*
***
Operating market
waste composting*
-
7/31/2019 Hoai Nhon - Action Plan
15/18
Hoai Nhon DSWMP Action Plan
15
system
Expand system to
other markets*** *** *** *** *** *** *** *** *** *** *** ***
Actions to be taken to establish a sanitary landfill for the District
Establish a working
group
*
Tender the design of
the new sanitary
landfill
***
Get Construction and
Investment report
approved
* ***
Complete
Environmental
Impact Assessment
(EIA)
* ***
Get EIA approved * ***
-
7/31/2019 Hoai Nhon - Action Plan
16/18
Hoai Nhon DSWMP Action Plan
16
Activities 2011 2012 2013 2014 2015 2016
Sep. Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Tender the
construction of the
new sanitary landfill
***
Construct the
sanitary landfill*** *** *** ***
Purchase of landfill
moving equipment*** *** ***
Training of landfill
staff*
The landfill starts
receiving waste*
Close old dumpsites *** ***
Actions to be taken to ensure all healthcare waste is collected & treated
Establish a working
group*
Determine what
institutions generate
waste that is not
treated
*
Resolve who will pay
for the treatment of
the collected waste
**
Plan a collection
system and
determine what
equipment is
required
**
Purchase any
required equipment**
Training of health
station and clinic
staff
*
Start receiving and
treating infectious*
-
7/31/2019 Hoai Nhon - Action Plan
17/18
Hoai Nhon DSWMP Action Plan
17
waste
-
7/31/2019 Hoai Nhon - Action Plan
18/18
Hoai Nhon DSWMP Action Plan
18
Activities
2011 2012 2013 2014 2015 2016
Sep. Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Jan-
Mar
Apr-
June
July-
Sep.
Oct-
Dec.
Actions to be taken to improve the management of industrial wasteEstablish a working
group
*
Determine the
characteristics of the
industrial waste and
establish a plan
** ***
If necessary, resolve
who will pay ***
If needed, draft and
have the DPC
approve a new
decision
***
Purchase any
required equipment*
Training of District
staff, industrial
cluster staff and
waste collection staff
** *
Implement the
industrial waste
management system
*** ***