    DESCRIPTION- R.A. BILL-383 (PIPE LINE CONNECTIONS AT C.F. SILO )

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/NOS

    CLAIMED

    QTY. (NOS)

    THIS BILL

    QTY. (NOS)

    DIFF.

    (NOS)

    AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.)R

    13/2'' Connection (Bend,

    Union, BF-Valve & Flange)75 378.00 378.00 0.00 28350.00 28350.00 0.00

    25/2'' Connection (Bend, BF-

    Valve & Flange )125 639.00 639.00 0.00 79875.00 79875.00 0.00

    33'' Connection ( Flange &

    BF- Valve)150 2.00 2.00 0.00 300.00 300.00 0.00

    45'' Connection (Bend &

    Flange)250 7.00 7.00 0.00 1750.00 1750.00 0.00

    56'' Connection (Bend,

    Flange & BF-Valve)300 6.00 6.00 0.00 1800.00 1800.00 0.00

    6 15/2'' Connection (Bend) 325 5.00 5.00 0.00 1625.00 1625.00 0.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

  • 7/27/2019 Gagan Engineering

    2/48

    78'' Connection (Bend, BF-

    Valve & Hose Pipe)400 29.00 29.00 0.00 11600.00 11600.00 0.00

    8 10'' Connection (Bend) 500 3.00 3.00 0.00 1500.00 1500.00 0.00

    0.00 126800.00 126800.00 0.00

    Net Payable Amount -- Rs.One Lac Twenty Six Thousand Eight Hundred Only

    TRUSST ENGINEER

    ABOVE SUM

    Net Payable Amount = Rs. 126800.00

    OTE:-Above Rates are converted as per size of Fittings.

  • 7/27/2019 Gagan Engineering

    3/48

  • 7/27/2019 Gagan Engineering

    4/48

  • 7/27/2019 Gagan Engineering

    5/48

    18

    DESCRIPTION- R.A. BILL-382 (PIPE LINE CONNECTIONS AT C.F. SILO )

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/MTR

    CLAIMED QTY.

    (MTR)

    THIS BILL

    QTY. (MTR)

    DIFF.

    (MTR)

    AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.)

    1MS-Pipe 1/2'' Erection

    Work at CF Silo37.50 50.40 0.00 50.40 0.00 0.00 0.00

    2Erection of MS-Pipe 3/4''

    at CF Silo56.25 57.40 57.40 0.00 3228.75 3228.75 0.00

    3Erection of MS-Pipe 3/2''

    at CF Silo112.50 12.05 12.05 0.00 1355.85 1355.85 0.00

    4Erection of MS-Pipe 5/2''

    at CF Silo187.50 364.92 364.60 0.32 68422.50 68362.50 60.00

    5Erection of MS-Pipe 3'' at

    CF Silo225.00 0.60 0.52 0.08 135.00 117.00 18.00

    6Erection of MS-Pipe 4'' at

    CF Silo300.00 0.54 0.54 0.00 162.00 162.00 0.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

  • 7/27/2019 Gagan Engineering

    6/48

    7Erection of MS-Pipe 5'' at

    CF Silo375.00 16.55 16.55 0.00 6206.25 6206.25 0.00

    8Erection of MS-Pipe 6'' at

    CF Silo450.00 192.27 192.25 0.02 86521.50 86512.50 9.00 Ex

    9Erection of MS-Pipe 13/2''

    at CF Silo487.50 15.80 15.80 0.00 7702.50 7702.50 0.00

    Erection of MS-Pipe 8'' at

    CF Silo600.00 23.10 23.10 0.00 13860.00 13860.00 0.00

    10Erection of MS-Pipe 10'' at

    CF Silo750.00 16.22 16.22 0.00 12165.00 12165.00 0.00

    749.85 699.03 50.82 199759.35 199672.35 87.00

    Net Payable Amount = Rs. 199672.35

    Net Payable Amount -- Rs.One Lac Ninety Nine Thousand Six Hundred Seventy Two & Thirty Five Paisa Only

    TRUSST ENGINE

    ABOVE SUM

    Net Excess Amount = Rs. 87.00

    OTE:-Above Rates are converted as per size of pipes.

  • 7/27/2019 Gagan Engineering

    7/48

  • 7/27/2019 Gagan Engineering

    8/48

  • 7/27/2019 Gagan Engineering

    9/48

    18.03

    DESCRIPTION- R.A. BILL-381 (FABRICATION & ERECTION AT C.F. SILO )

    SL.

    NO. DESCRIPTION

    RATE

    (Rs.)/MT

    CLAIMED

    QTY. (MT)

    THIS BILL

    QTY. (MT)

    DIFF.

    (MT)

    AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.) RE

    1Structural Fabrication

    Work at CF Silo6500.00 56.746 36.933 19.813 368849.00 240064.50 128784.50 Exce

    2Structural Erection Work

    at CF Silo5500.00 70.088 50.275 19.813 385484.00 276512.50 108971.50 Exce

    3Erection of Equipment

    (Load Cell )7900.00 0.570 0.570 0.000 4503.00 4503.00 0.00

    4Erection of Equipment (

    Blower Fan )6500.00 1.760 1.760 0.000 11440.00 11440.00 0.00

    5Hand Railing Work at CF

    Silo140.00 225.340 225.340 0.000 31547.60 31547.60 0.00

    354.50 314.88 39.63 801823.60 564067.60 237756.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

    Net Payable Amount = Rs. 564067.60

    Net Payable Amount -- Rs.Five Lac Sixty Four Thousand Sixty Seven & Sixty Paisa Only

    TRUSST ENGIN

    ABOVE SUM

    Net Excess Amount = Rs. 237756.00

  • 7/27/2019 Gagan Engineering

    10/48

  • 7/27/2019 Gagan Engineering

    11/48

    16.03.12

    DESCRIPTION- R.A. BILL-380 ( MAN POWER SUPPLY-- WORK AT C.F. SILO )

    SL. NO. DESCRIPTIONRATE

    (Rs.)/MT

    CLAIMED QTY.

    (Mandays)

    AMOUNT

    CLAIMED (Rs.)

    REMARKS

    1 Millwright Fitter 450.00 36.620 16479.00

    2 Welder 250.00 36.620 9155.00

    3 Rigger 250.00 36.620 9155.00

    4 Khalashis 200.00 146.000 29200.00

    63989.00

    63989.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING

    Net Payable Amount = Rs.

    Net Payable Amount -- Rs. Sixty Three Thousand Nine Hundred Eighty Nine Only

    TRUSST ENGINEERS

    Note:- As per Mechanical Department, the Above Amount Rs. 63989.00/- will be debited by M/s. FLS

    ABOVE SUM

  • 7/27/2019 Gagan Engineering

    12/48

  • 7/27/2019 Gagan Engineering

    13/48

    DATE:

    DESCRIPTION- R.A. BILL-385 (MAN POWER SUPPLY FOR MONTH JANUARY-FEBRUARY 2012 (COAL MILL AREA))

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/MT

    CLAIMED

    (Mandays)

    CHECKED

    (Mandays)

    CHECKED

    (Excess)

    AMOUNT

    CLAIMED (Rs.)

    AMOUNT

    CHECKED (Rs.)

    EXCESS

    / HOLD

    2 Fitter 250.00 64.400 59.275 5.125 16100.00 14818.75 1281.25

    3 Welder 250.00 64.400 59.275 5.125 16100.00 14818.75 1281.25

    5 Rigger 250.00 64.400 59.275 5.125 16100.00 14818.75 1281.25

    6 Khalashis 200.00 193.400 178.125 15.275 38680.00 35625.00 3055.00

    86980.00 80081.25 6898.75

    TRUSST

    Net Payable Amount -- Rs. Eighty Thousand Eighty One & Twenty Five Paisa Only

    Net Excess Amount = Rs. 6898.75

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING

    ABOVE SUM

    Net Payable Amount = Rs. 80081.25

  • 7/27/2019 Gagan Engineering

    14/48

    4.04.12

    REMARKS

    Excess

    Excess

    Excess

    Excess

    NGINEERS

  • 7/27/2019 Gagan Engineering

    15/48

    DESCRIPTION- R.A. BILL-386 (FABRICATION & ERECTION AT C.F. SILO )

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/MT

    CLAIMED

    QTY. (MT)

    THIS BILL

    QTY. (MT)

    DIFF.

    (MT)

    AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.)

    1Erection of Air Slide

    Blower's Fan & Motor6000.00 1.860 1.860 0.000 11160.00 11160.00 0.00

    2Erection of Bag Filter's

    Fan & Motor6500.00 1.210 1.210 0.000 7865.00 7865.00 0.00

    3Erection of Route Blower

    Motor10000.00 0.660 0.660 0.000 6600.00 6600.00 0.00

    4Equipment Erection at

    C.F. Silo9000.00 3.625 3.625 0.000 32625.00 32625.00 0.00

    Erection of Ventury & Bag 125.00 297.000 297.000 0.000 37125.00 37125.00 0.00

    Fabrication of Air Slide

    Parts6500.00 0.476 0.476 0.000 3096.34 3096.34 0.00

    5 Erection of Air Slide Parts 5500.00 0.476 0.476 0.000 2619.98 2619.98 0.00

    305.31 305.31 0.00 101091.00 101091.00 0.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

    Net Payable Amount -- Rs.One Lac One Thousand Ninety One Only

    TRUSST EN

    ABOVE SUM

    Net Payable Amount = Rs. 101091.00

  • 7/27/2019 Gagan Engineering

    16/48

    16.04.12

    REMARKS

    Rate/Pcs

    GINEERS

  • 7/27/2019 Gagan Engineering

    17/48

    DESCRIPTION- R.A. BILL-389 (FABRICATION & ERECTION AT C.F. SILO AREA )

    SL.NO. DESCRIPTION UNIT RATE(Rs.)/UNIT CLAIMEDQTY. THIS BILLQTY. DIFF. AMOUNTCLAIMED (Rs.) PAYABLEAMOUNT (Rs.) DIFF.(Rs.)

    1Erection of Flyash Unloading

    CompressorMT 9000 2.650 2.650 23850.00 0.00 23850.00

    2 Erection of Mono Rail Hoist MT 7100 2.800 2.800 19880.00 0.00 19880.00

    3Erection of Bag Filter Fan &

    MotorMT 6500 3.100 3.100 20150.00 0.00 20150.00

    4 Erection of Root Blower MT 10000 3.760 3.760 37600.00 0.00 37600.00

    5 Erection of Mounting Frame MT 9000 2.424 2.424 21816.00 0.00 21816.00

    6 Erection of Air Slide Blower MT 6000 2.370 2.370 14220.00 0.00 14220.00

    7Erection of Manual Gate,

    Pneumatic Gate & Dozing

    Valve

    MT 7000 1.232 1.232 8624.00 0.00 8624.00

    8 Erection of junction Box MT 9000 0.830 0.830 7470.00 0.00 7470.00

    9Erection of Manual Gate &

    Pneumatic Dozing ValveMT 7000 2.226 2.226 15582.00 0.00 15582.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

  • 7/27/2019 Gagan Engineering

    18/48

    10Erection of Manual Gate &

    Pneumatic Dozing ValveMT 7000 1.070 1.070 7490.00 0.00 7490.00

    11Erection of Manual Gate &

    Pneumatic Dozing ValveMT 7000 4.311 4.311 30177.00 0.00 30177.00

    12 Erection of Door MT 9000 2.000 2.000 18000.00 0.00 18000.00

    13 Erection of Flyash Bin MT 8000 8.928 8.928 71424.00 0.00 71424.00

    14Erection of Air Slide Root

    Casing 400W & 500 WMTR 400 59.583 59.583 23833.20 0.00 23833.20

    15 Fabrication of Structure MT 6500 2.617 2.617 17010.50 0.00 17010.50

    16 Erection of Structure MT 5500 2.617 2.617 14393.50 0.00 14393.50

    102.52 0.00 102.52 351520.20 0.00 351520.20

    Net Payable Amount -- Rs.Eight Lac Eighty Three Thousand One Hundred Forty Four Only

    TRUSST E

    ABOVE SUM

    Net Excess Amount = Rs. 351520.20

    Net Payable Amount = Rs. 0.00

  • 7/27/2019 Gagan Engineering

    19/48

    9.06.12

    REMARKS

  • 7/27/2019 Gagan Engineering

    20/48

    GINEERS

  • 7/27/2019 Gagan Engineering

    21/48

    DESCRIPTION- R.A. BILL-388 (FABRICATION & ERECTION AT C.F. SILO )

    SL.

    NO.DESCRIPTION UNIT

    RATE

    (Rs.)/MT

    CLAIMED

    QTY.

    THIS BILL

    QTY.DIFF.

    AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.)

    1 Erection of Equipment -Bucket Elevator at Fly AshSilo

    MT 9000 30.580 30.580 0.000 275220.00 275220.00 0.00

    2Erection of Structures at Fly-

    Ash SiloMT 5500 48.351 47.634 0.717 265930.50 261987.00 3943.50

    3 Fabrication of Structure MT 6500 14.839 14.408 0.431 96453.50 93652.00 2801.50

    4 Erection of Structure MT 5500 14.839 14.408 0.431 81614.50 79244.00 2370.50

    5 Dismantling of Structures MT 2000 1.608 1.538 0.070 3216.00 3076.00 140.00

    6Erection of Equipment - Bag

    Filter at Fly Ash SiloMT 7000 12.400 12.400 0.000 86800.00 86800.00 0.00

    7Fixing of Ventury & Bags for

    Bag Filter at Fly Ash SiloNOS. 125 180.000 180.000 0.000 22500.00 22500.00 0.00

    8 Erection of Structures MT 5500 11.160 11.030 0.130 61380.00 60665.00 715.00

    313.78 312.00 1.78 893114.50 883144.00 9970.50

    TRUSST E

    Net Excess Amount = Rs. 9970.50

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

    ABOVE SUM

    Net Payable Amount = Rs. 883144.00

    Net Payable Amount -- Rs.Eight Lac Eighty Three Thousand One Hundred Forty Four Only

  • 7/27/2019 Gagan Engineering

    22/48

    6.05.12

    REMARKS

    Excess Qty.

    Excess Qty.

    Excess Qty.

    Excess Qty.

    Excess Qty.

    GINEERS

  • 7/27/2019 Gagan Engineering

    23/48

    09.06.

    DESCRIPTION- R.A. BILL-391 (MISCELLANEOUS PIPE LINE WORK AT C.F. SILO )

    SL.NO.

    DESCRIPTION RATE(Rs.)/MT

    CLAIMEDQTY. (MT)

    THIS BILLQTY. (MT)

    DIFF.(MT)

    AMOUNTCLAIMED (Rs.)

    PAYABLEAMOUNT (Rs.)

    DIFF.(Rs.)

    REM

    1Pipe Line Work for Bend,

    Butterfly Valve, Pneumatic

    Valve, Socket & Reducers

    . . . . 82405.00 82405.00

    2Pipe Line Work for Bend,

    Butterfly Valve, Pneumatic

    Valve, Socket & Reducers

    . . . . 20300.00 20300.00

    3

    Erection Step Pad ChuteFrom Silo to Air Slide

    Feeing & Air Slide to

    Bucket Elevator

    6000.00 0.00

    0.00 0.00 0.00 101091.00 101091.00 102705.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

    ABOVE SUM

    Net Payable Amount = Rs. 101091.00

    Net Payable Amount -- Rs.One Lac One Thousand Ninety One Only

  • 7/27/2019 Gagan Engineering

    24/48

    TRUSST ENGINEERS

  • 7/27/2019 Gagan Engineering

    25/48

    DATE: 23.06.12

    DESCRIPTION- R.A. BILL-392 (MAN POWER SUPPLY FOR CEMENT MILL AREA)

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/MT

    CLAIMED

    (Mandays)

    CHECKED

    (Mandays)

    CHECKED

    (Excess)

    AMOUNT

    CLAIMED (Rs.)

    AMOUNT

    CHECKED (Rs.)

    EXCESS

    / HOLDREMARK

    1 Fitter 250.00 13.000 11.000 2.000 3250.00 2750.00 500.00 Excess

    2 Rigger 250.00 6.400 5.500 0.900 1600.00 1375.00 225.00 Excess

    3 Welder 250.00 1.400 1.380 0.020 350.00 345.00 5.00 Excess

    4 Khalashi 200.00 197.400 178.750 18.650 39480.00 35750.00 3730.00 Excess

    5 Helper 200.00 1.400 1.380 0.020 280.00 276.00 4.00 Excess

    44960.00 40496.00 4464.00

    TRUSST ENGINEERS

    Net Payable Amount = Rs. 40496.00

    Net Payable Amount -- Rs. Forty Thousand Four Hundred Ninety Six Only

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING

    ABOVE SUM

    Net Excess Amount = Rs. 4464.00

  • 7/27/2019 Gagan Engineering

    26/48

  • 7/27/2019 Gagan Engineering

    27/48

    DATE: 31.07.12

    DESCRIPTION- R.A. BILL-392 (MAN POWER SUPPLY FOR CEMENT MILL AREA)

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/MT

    CLAIMED

    (Mandays)

    CHECKED

    (Mandays)

    CHECKED

    (Excess)

    AMOUNT

    CLAIMED (Rs.)

    AMOUNT

    CHECKED (Rs.)

    EXCESS

    / HOLDREMARK

    1 Fitter 250.00 84.000 81.750 2.250 29800.00 20437.50 9362.50 Excess

    2 Rigger 250.00 16.000 15.125 0.875 4000.00 3781.25 218.75 Excess

    3 Welder 250.00 103.000 97.500 5.500 25750.00 24375.00 1375.00 Excess

    4 Khalashi 200.00 394.000 373.625 20.375 78800.00 74725.00 4075.00 Excess

    5 Oxygen Cylinder 230.00 14.000 14.000 0.000 3220.00 3220.00 0.00

    6 LPG Cylinder 1535.00 5.000 5.000 0.000 8500.00 7675.00 825.00

    7 Welding Electrode 768.00 9.000 9.000 0.000 6912.00 6912.00 0.00

    156982.00 141125.75 15856.25

    Net Payable Amount = Rs. 141125.75

    Net Payable Amount -- Rs. One Lac Fourty One Thousand One Hundred Twenty Five & Seventy Five Paisa Only

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING

    ABOVE SUM

    Net Excess Amount = Rs. 15856.25

    NOTE :- Rates for Oxygen Cylinder and Welding Electrodes are taken from Debit Note by KJS Store Dept.

  • 7/27/2019 Gagan Engineering

    28/48

    TRUSST ENGINEERS

    MRF FITTER WELDER RIGGER KHALASHI WELD ROD OXYGEN CYL LPG CYL DATE

    0 11 0 11 66 0 0 0 1 01.05.1

    0 11 0 11 66 0 0 0 2 2

    0 11 0 11 66 0 0 0 3 3

    0 11 0 11 66 0 0 0 4 4

    0 11 0 11 66 0 0 0 5 5

    0 11 0 11 44 0 0 0 6 6

    0 11 0 11 55 0 0 0 7 7

    0 11 0 11 66 0 0 0 8 8

    0 11 0 11 66 0 0 0 9 9

    0 11 11 11 55 2 1 1 10 10

    0 22 22 11 66 0 0 0 11 11

    0 22 22 0 77 0 0 0 12 12

    0 22 22 0 77 2 2 1 13 13

    0 22 22 0 77 0 0 0 14 14

    0 22 22 0 77 0 1 0 15 15

    0 22 22 0 77 0 0 0 16 160 22 22 0 77 0 0 0 17 17

    0 22 22 0 77 0 1 0 18 18

    0 22 22 0 77 0 2 0 19 19

    0 22 22 0 77 0 1 1 20 20

    0 11 11 0 55 0 0 0 21 21

    0 22 22 0 77 0 0 0 22 22

    0 11 11 0 44 0 1 0 23 23

    0 11 11 0 44 2 1 1 24 24

    0 11 11 0 33 0 0 0 25 25

    0 0 22 0 33 0 0 0 26 26

    0 0 22 0 33 1 1 1 27 27

    0 11 22 0 44 0 1 0 28 28

    0 0 22 0 33 0 0 0 29 29

  • 7/27/2019 Gagan Engineering

    29/48

    0 0 22 0 33 0 0 0 30 30

    0 11 22 0 44 0 0 0 31 31.05.12

    0 418 429 121 1848 7 12 5 TOTAL

    0 52.25 53.625 15.125 231 7 12 5 MANDAYS

    450 250 250 250 200 768 230 1700 RATE

    0 13062.5 13406.25 3781.25 46200 5376 2760 8500

    0 11 22 0 55 1 1 0 01.06.12

    0 22 22 0 77 0 0 0 2

    0 8 16 0 56 0 0 0 3

    0 11 22 0 77 0 0 0 4

    0 11 22 0 66 0 0 0 5

    0 11 22 0 77 1 1 0 6

    0 11 22 0 66 0 0 0 7

    0 11 22 0 66 0 0 0 8

    0 11 22 0 44 0 0 0 9

    0 11 22 0 44 0 1 0 10

    0 8 16 0 40 0 0 0 11

    0 11 22 0 55 0 0 0 120 11 11 0 55 0 0 0 13

    0 11 11 0 55 0 0 0 14

    0 11 11 0 55 0 0 0 15

    0 11 11 0 44 0 0 0 16

    0 11 11 0 44 0 0 0 17

    0 11 11 0 33 0 0 0 18

    0 11 11 0 44 0 0 0 19

    0 11 11 0 44 0 0 0 20

    0 11 11 0 44 0 0 0 21.06.12

    0 236 351 0 1141 2 3 0 TOTAL

    76450 16636 93086AMOUNTS

  • 7/27/2019 Gagan Engineering

    30/48

    0 29.5 43.875 0 142.625 2 3 0 MANDAYS

    50 250 250 250 200 768 230 1700 RATE

    0 7375 10968.75 0 28525 1536 690 0

    0 81.75 97.5 15.125 373.625 9 15 5

    0 20437.5 24375 3781.25 74725 768 230 1700

    123318.75

    GRAND MAterial DETAILS

    18862

    AMOUNTS 49094.7546868.75 2226

    GRAND MANPOWER DETAILS

  • 7/27/2019 Gagan Engineering

    31/48

  • 7/27/2019 Gagan Engineering

    32/48

  • 7/27/2019 Gagan Engineering

    33/48

  • 7/27/2019 Gagan Engineering

    34/48

  • 7/27/2019 Gagan Engineering

    35/48

    DATE: 04.09.12

    DESCRIPTION- R.A. BILL-399 (MAN POWER SUPPLY FOR CEMENT SILO & FLYASH SILO)

    SL.

    NO.DESCRIPTION

    RATE

    (Rs.)/MT

    CLAIMED

    (Mandays)

    CHECKED

    (Mandays)

    CHECKED

    (Excess)

    AMOUNT

    CLAIMED (Rs.)

    AMOUNT

    CHECKED (Rs.)

    EXCESS

    / HOLDREMARKS

    1 Fitter 250.00 15.000 12.870 2.130 3750.00 3217.50 532.50 Excess Amou

    2 Rigger 250.00 15.000 12.870 2.130 3750.00 3217.50 532.50 Excess Amou

    3 Welder 250.00 18.000 15.750 2.250 4500.00 3937.50 562.50 Excess Amou

    4 Khalashi 200.00 246.000 224.000 22.000 49200.00 44800.00 4400.00 Excess Amou

    5 LPG Cylinder 1535.00 1.000 1.000 0.000 1535.00 1535.00 0.00

    6 Oxygen Cylinder 230.00 4.000 4.000 0.000 920.00 920.00 0.00

    7 Welding Electrode 768.00 9.000 9.000 0.000 6912.00 6912.00 0.00

    70567.00 64539.50 6027.50

    Net Payable Amount = Rs. 64539.50

    Net Payable Amount -- Rs. Sixty Four Thousand Five Hundred Thirty Nine & Fifty Paisa Only

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING

    ABOVE SUM

    Net Excess Amount = Rs. 6027.50

  • 7/27/2019 Gagan Engineering

    36/48

    TRUSST ENGINEERS

  • 7/27/2019 Gagan Engineering

    37/48

  • 7/27/2019 Gagan Engineering

    38/48

  • 7/27/2019 Gagan Engineering

    39/48

    DESCRIPTION- R.A. BILL-416 Dated-24.10.12 (FABRICATION, ERECTION AND HANDRAIL WORK )

    SL.

    NO. DESCRIPTION UNITRATE

    (Rs.)/UNIT

    CLAIMED

    QTY.

    THIS BILL

    QTY. DIFF.AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.)

    1

    Structural Fabrication for

    Platforms in Coal Mill & Un-

    burnt Clinker Silo Area

    MT 6500 6.723 6.585 0.139 43701.99 42800.55 901.44

    2Erection Work for Platforms in

    Coal Mill & Un-burnt Clinker

    Silo Area

    MT 5500 6.723 6.585 0.139 36978.61 36215.85 762.76

    3Fixing of Handrails at

    PlatformsMTR 140 157.795 79.282 78.513 22091.30 11099.48 10991.82

    171.24 92.45 78.79 102771.90 90115.88 12656.02

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

    Net Payable Amount -- Rs. Eighty Five Thousand Six Hundred Ten & Thirty Nine Paisa Only

    TRUSST E

    ABOVE SUM

    NOTE :- 5% of Payable Amount (i.e. Rs. 4505.49 /- Only) deducted for the incompletion of Pain Coat Work.

    Net Excess Amount = Rs. 17161.51

    Net Payable Amount = Rs. 85610.39

  • 7/27/2019 Gagan Engineering

    40/48

    REMARKS

    Excess Qty.

    Excess Qty.

    Excess Qty.

  • 7/27/2019 Gagan Engineering

    41/48

    DATE:DESCRIPTION- R.A. BILL-412 Dated-18.10.12 ( PIPE LINE & SUPPORTING PLATFORM WORK )

    SL.

    NO. DESCRIPTION UNIT

    RATE

    (Rs.)/MT

    CLAIMED

    QUANTITY

    CHECKED

    QUANTITY

    EXCESS

    QUANTITY

    AMOUNT

    CLAIMED (Rs.)

    AMOUNT

    CHECKED (Rs.)

    EXCESS

    / HOLD

    1 MS-Pipe Line Work --14''INCH

    /DIA75 20.500 20.500 0.000 21525.00 21525.00 0.00

    2 MS-Pipe Line Work --12''INCH

    /DIA75 31.400 31.400 0.000 28260.00 28260.00 0.00

    3 MS-Pipe Line Work --6''INCH

    /DIA75 90.000 90.000 0.000 40500.00 40500.00 0.00

    4 Fixing of Hand Railing MTR 140 8.000 8.000 0.000 1120.00 1120.00 0.00

    5 Fixing Valve--6''INCH

    /DIA50 1.000 1.000 0.000 300.00 300.00 0.00

    6 Fixing of Flange--6''INCH

    /DIA50 19.000 19.000 0.000 5700.00 5700.00 0.00

    7 Fabrication of SupportingPlatform

    MT 6500 0.467 0.467 0.000 3035.50 3035.50 0.00

    8Erection of Supporting

    PlatformMT 5500 0.467 0.467 0.000 2568.50 2568.50 0.00

    103009.00 103009.00 0.00

    TRUSST E

    Net Payable Amount = Rs. 103009.00Net Payable Amount -- Rs. One Lac Three Thousand Nine Only

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING

    ABOVE SUM

  • 7/27/2019 Gagan Engineering

    42/48

    REMARKS

  • 7/27/2019 Gagan Engineering

    43/48

    DESCRIPTION- R.A. BILL-413 Dated-20.10.12 (FABRICATION AND ERECTION AT WORK SHOP AREA )

    SL.

    NO.

    DESCRIPTION UNITRATE

    (Rs.)/UNIT

    CLAIMED

    QTY.

    THIS BILL

    QTY.

    DIFF.AMOUNT

    CLAIMED (Rs.)

    PAYABLE

    AMOUNT (Rs.)

    DIFF.

    (Rs.)

    1Fabrication of Structural

    Rack at Work Shop AreaMT 6500 0.480 0.280 0.201 3120.00 1816.75 1303.25

    2Erection of Structural Rack at

    Work Shop AreaMT 5500 0.480 0.280 0.201 2640.00 1537.25 1102.75

    3Erection of Equipment

    Hydraulic JackMT 7000 5.000 5.000 0.000 35000.00 35000.00 0.00

    4Fabrication of Structural Tool

    Box at Work ShopMT 6500 1.650 1.638 0.013 10725.00 10643.75 81.25

    5Erection of Structural Tool

    Box at Work ShopMT 5500 1.650 1.638 0.013 9075.00 9006.25 68.75

    60560.00 58004.00 2556.00

    M/S. K J S CEMENT LIMITED

    FOR- 6000 TPD CEMENT PLANT

    CONTRACTOR- M/S. GAGAN ENGINEERING DATE :

    Net Payable Amount -- Rs. Forty Nine Thousand Three Hundred Three & Forty Paisa OnlyTRUSST EN

    ABOVE SUM

    Net Hold Amount = Rs. 8700.60

    NOTE :- 15% of Payable Amount put on Hold (I.e. Rs. 8700.60 Only) due to Wt. of Hydraulic Jack.

    Net Excess Amount = Rs. 2556.00

    Net Payable Amount = Rs. 49303.40

  • 7/27/2019 Gagan Engineering

    44/48

    REMARKS

  • 7/27/2019 Gagan Engineering

    45/48

    Bank Branch Branch Code Address

    DIST GURDASPUR, PUNJAB 145021

    City:DHAR KALAN

    District:GURDASPUR

    State:PUNJAB

    DHAR RD., UDHAMPUR, J AND K

    City:UDHAMPUR

    District:UDHAMPUR

    State:JAMMU AND KASHMIR

    DISTT DHAR, MADHYA PRADESH 472336

    City:PITHAMPUR

    District:DHAR

    State:MADHYA PRADESH

    DIST DHAR, MADHYA PRADESH 454001

    City:DHAR

    District:DHAR

    State:MADHYA PRADESH

    HOUSE OF DR G N MALVIA MANGAL NAGAR,

    DHAMNOD

    City:DHAR

    District:DHAR

    State:MADHYA PRADESH

    MANGLADEVI.MARG, SINGHANA.ROAD,

    MANAWAR, MADHYA PRADESH, DIST: DHAR,

    454446

    City:MANAWAR

    District:DHAR

    State:MADHYA PRADESH

    M.G.ROAD, PIPLI BAZAR, DHAR - 454001.

    City:DHAR

    District:DHAR

    State:MADHYA PRADESH

    ANAND GANJ MANDI, KUKSHI - 454331.

    City:KUKSHI

    District:DHAR

    State:MADHYA PRADESH

    106, JAWAHAR MARG, BADNAWAR - 454660.

    City:BADNAWAR

    State Bank

    Of India

    (SBI)

    DHAR KALAN 2335

    State BankOf India

    (SBI)

    UDHAMPUR 1186

    State Bank

    Of India

    (SBI)

    PITHAMPUR 8283

    State Bank

    Of India(SBI)

    DHAR 3417

    State Bank

    Of India

    (SBI)

    DHAMNOD 10802

    State Bank

    Of India

    (SBI)

    MANAWAR 10803

    State Bank

    Of India

    (SBI)

    DHAR 30041

    State Bank

    Of India

    (SBI)

    KUKSHI 30042

    State Bank

    Of India

    (SBI)

    BADNAWAR 30043

  • 7/27/2019 Gagan Engineering

    46/48

    District:DHAR

    State:MADHYA PRADESH

    DHARAMPURI - 454449.

    City:DHARAMPURI

    District:DHAR

    State:MADHYA PRADESHNEAR BUS STAND, MANAWAR - 454446.

    City:MANAWAR

    District:DHAR

    State:MADHYA PRADESH

    RAJGARH, TESH.SARDARPUR, DIST.DHAR, PIN -

    454116.

    City:DHAR

    District:DHAR

    State:MADHYA PRADESHMANAWAR, DHAR, PIN - 454448.

    City:MANAWAR

    District:DHAR

    State:MADHYA PRADESH

    GANDHWANI, DHAR PIN - 454350.

    City:GANDHWANI

    District:DHAR

    State:MADHYA PRADESH

    BADNAWAR, DHAR, PIN - 454665.

    City:BADNAWAR

    District:DHAR

    State:MADHYA PRADESH

    State Bank

    Of India

    (SBI)

    DHARAMPURI 30044

    State Bank

    Of India

    (SBI)

    MANAWAR 30045

    State Bank

    Of India

    (SBI)

    RAJGARH[DHAR] 30046

    State Bank

    Of India

    (SBI)

    BIDWAL 30161

    State Bank

    Of India

    (SBI)

    BAKANER 30147

    State Bank

    Of India

    (SBI)

    GANDHAWNI 30149

  • 7/27/2019 Gagan Engineering

    47/48

    Contact

    IP 401680, 01870-255417

    IP:405635, 01992-274229,270728, 276453, 271879

    07292-503050

    IP: 201556

    9425603122

    9424659754, 07294-

    233609

    07292-234135, 222237

    07297-234525

    07295-232035

  • 7/27/2019 Gagan Engineering

    48/48

    07291-264224, 265190

    07294-232228, 232686

    07296-232224, 235582

    07295-273931

    07294-263221

    07294-261228