Experience of Sleipner CO2 Storage

Tore A Torp, Dr.ing.

Adviser CO2 Storage, StatoilHydro ASA, Norway

Page 2: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

2

Experience with Sleipner CO2 Storage

CONTENT:

• VISION & History

• Sleipner – What did we find?

• Why is it safe?

Page 3: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

3

Page 4: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

4

The Sleipner field – CO2 Treatment and Injection

Page 5: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

5

Sleipner CO2 injection:

- Decided in 1992- In operation since 1996- 1 million tonne CO2/år

Time Magazine,17. May 2004

Page 6: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

6

Yara CO2-tankers, 1500 m3 capacity

Page 7: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

7

Sleipner CO2 Injection

Page 8: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

8

The Utsira Formation

Page 9: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

9

SAFETY STRATEGY

- Prepare

- Detect

- Remediate

Page 10: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

10

What is keeping the CO2 down?

Trapping Mechanisms

• Closure - from day one –faults?

• Micro-pore trapping - during injection - lasting

• Dissolution in water - sinking to the bottom – centuries

• Mineral binding - precipitating solids – centuries/millennia

Page 11: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

11

Time-lapse seismic datasets of CO2 stored in Utsira formation

Page 12: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

12

Simulated picture of the distribution of CO2 after three years.Radius of largest bubble 800 m and the total plume 200 m high.Ref: SINTEF Petroleum 2001

Page 13: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

13

Dissolution of CO2 in the Utsira Brine

Year 2021 Year 2412

Year 2621 Year 5019 Year 7018

Source: Gemini No. 1, 2004 (NTNU and Sintef)

Page 14: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

14

Monitoring and safety over TIME?

• Before start: Site selection, Planning and Risk assessment =>licence

• During injection: Monitoring – “Watch the barn doors” => report

• Closure: Monitoring and long-term risk => agreement

• Post-closure: Monitoring gradually less => hand-over

Safety against leakage will be better over time!

Page 15: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

15

Snøhvit, the next field to implement CO2 storage

Page 16: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

1616

Norway as a ”CO2-laboratory”

Tjeldbergodden – Halten CO2 –2,5 mill tonnes/yr. 2012?

Kårstø – Naturkraft – 1 mill tonnes/yr, 2011/2012

Mongstad – 1,3 to 2,1 mill tonnes/yr, 2014

CO2 from

natural gas

CO2 from electricity generation

Sleipner, 1 million tonnes/yr from 1996

Snøhvit LNG train 1, 2007Cleaning up

our operations

Cleaning up

our products

Snøhvit LNG train 2

NORW

AY

Page 17: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

17

European map of CO2 storage prospectivity

Page 18: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

18

CO2 Capture and Storage (CCS) needs two legs to walk!

Leg 2: COST of Capture• Energy use

• Costs

Better technologies

Leg 1: TRUST in Storage• Methods from oil and gas industry

• Geology varies from place to place

More demonstrations

Pace: CO2 Transport• Pipeline

• Ship

Large projects

Page 19: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

Classification: Internal Status: Draft

Worst case scenariois business as usual!

Need to get started now!

Page 20: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

20

CO2 Storage Cooperation Poland – Norway

“CO2NET EAST” – EU supported 5 year project to make aware of CCSCS, PL, HR, ES, HU, SLO, RO, NO+

• “CCS in Poland” – Polish-Norwegian R&D Fund with EEA support?Universities: Gliwice, Krakow,Wroclaw, NTNU, +?Industries: Vattenfall, PGNIG?, Turoszow?, Statoilhydro.

• “CO2ReMoVe” – Tarnow CO2-EOR – Proposal with EEA support?

• ACID GAS injection in ?

Page 21: Experience of Sleipner CO2 Storage - Regjeringen.no · 2014. 12. 1. · Sleipner, 1 million tonnes/yr from 1996 Snøhvit LNG train 1, 2007 Cleaning up our operations Cleaning up our

21

Experience with SLEIPNER CO2 Storage

THANKS for your attention!