experience - construction (2016.03.10)

4
PROJECTS - BRIEF DESCRIPTION PICTURES 3P project Dallas (Texas) 17 miles Highway Construction Value: $2.2 Bn. Construction Period: 5 years Concession period: 50 years The largest greenfield 3P project in USA history. 3P project Dallas – Fort Worth area (Texas) 13.5 miles Highway Construction Value: $1.5 Bn. Construction Period: 4.2 years (completed on 10/02/2014, nearly 9 months ahead of schedule). Concession period: 50 years 3P project Fort Worth (Texas) 10.2 miles Highway Construction Value: $1 Bn. Construction Period: 5 years Concession period: 52 years 60 Bridges (22 Connectors, 3 Underpasses and 35 Overpasses), one of the bridge crossing the Trinity river and 4 railroad crossings. 3P project Austin – San Antonio area (Texas) 40 miles Highway Construction Value: $1 Bn. Construction Period: 5 years (completed in October 2012) Concession period: 50 years. D&B project Virginia 55 miles Highway Construction Value: $1 Bn. Construction Period: 5 years

Upload: jaime-echanove

Post on 13-Apr-2017

15 views

Category:

Documents


2 download

TRANSCRIPT

PROJECTS - BRIEF DESCRIPTION PICTURES

• 3P project

• Dallas (Texas)

• 17 miles Highway

• Construction Value: $2.2 Bn.

• Construction Period: 5 years

• Concession period: 50 years

• The largest greenfield 3P project in USA history.

• 3P project

• Dallas – Fort Worth area (Texas)

• 13.5 miles Highway

• Construction Value: $1.5 Bn.

• Construction Period: 4.2 years (completed on 10/02/2014, nearly 9 months ahead of schedule).

• Concession period: 50 years

• 3P project

• Fort Worth (Texas)

• 10.2 miles Highway

• Construction Value: $1 Bn.

• Construction Period: 5 years

• Concession period: 52 years

• 60 Bridges (22 Connectors, 3 Underpasses and 35 Overpasses), one of the bridge crossing the Trinity river and 4 railroad crossings.

• 3P project

• Austin – San Antonio area (Texas)

• 40 miles Highway

• Construction Value: $1 Bn.

• Construction Period: 5 years (completed in October 2012)

• Concession period: 50 years.

• D&B project

• Virginia

• 55 miles Highway

• Construction Value: $1 Bn.

• Construction Period: 5 years

• 3P project

• Charlotte (North Carolina)

• 41.8 miles Highway

• Construction Value: $484 M.

• Construction Period: 4 years

• Concession period: 50 years.

• The design includes widening 26 miles (41.8 km) of lane in both directions on the I-77 in the northern part of the Charlotte metropolitan area, between connections with the I-277 in Charlotte and the NC-150 in Iredell County..

• 3P project

• Indianapolis (Indiana)

• 21 miles Highway

• Construction Value: $307 M.

• Construction Period: 2.5 years

• Concession period: 35 years.

• This project will convert approx. 21 miles (33.8 KM) of the State Route into an interstate facility: Upgrade 21 miles of roadway along the existing State Route 37, a four-lane divided highway, between Bloomington, IN and Martinsville, IN. Construction of an additional lane per direction with a total length of 13.26 miles across urban areas and modernization of numerous other road crossings along the project corridor

• 3P project

• North-west of Texas

• T&D project – 385 miles of transmission lines. 6 switching stations.

• Construction Value: $500 M.

• Construction Period: 4 years (completed in early 2014)

• Concession period: unlimited.

• The project is composed of seven (7) Transmission Line Segments of approximately 380 miles and six (6) Substations (345 kV)

• D&B + operation

• Manhattan (NY)

• Hotel and apartments buildings.

• Construction Value: $160M

• Construction Period: 2 years

• D&B + OPERATION

• El Centro (California)

• Solar (PV) Plant.

• Installed capacity: 25MW

• Production: 55 GWh/year

• Construction Value: $75 M.

• Construction Period: 2 years (completed in December 2013)

• 30 years PPA agreement

• D&B

• Tonopah (Nevada)

• Thermosolar Plant.

• Installed capacity: 110MW.

• Output: 125MW (gross power)

• Construction Value: $775 M.

• Construction Period: 5 years

• One of the largest central tower power generation plants of the world. The infrastructure has a 160 meters tall central tower and more than 100,000m3 of concrete (the world's largest of its kind), where a circular receiver is located. 10,400 heliostats collect and reflect the light onto the 30.48 meters tall receiver. The circular mirror array (with a radius of 1,380 meters) captures sunlight from a total area over 120 hectares. The entire complex will occupy an area of 700 hectares.

• D&B

• Mojave desert (California)

• Parabolic trough Plant.

• Output: 280MW (gross)

• Construction Value: $1.2 Bn

• Construction Period: 3 years

• Solar field: 1,765 acres

• D&B

• Salem (Massachusetts)

• Power Plant

• Construction Value: $713M

• Construction Period: 3.5 years

• D&B

• Guernsey (CA)

• Solar Plant

• Construction Value: $65M

• Construction Period: 1 year

• D&B

• Atlanta (GA)

• 10.35 miles of Highway

• Construction Value: $460M

• Construction Period: 3.5 years

• D&B

• Counties of Tulare and Kern (CA)

• High Speed Rail – CHSR CP4

• Construction Value: $457M

• Construction Period: 3 years