PROJECTS - BRIEF DESCRIPTION PICTURES
• 3P project
• Dallas (Texas)
• 17 miles Highway
• Construction Value: $2.2 Bn.
• Construction Period: 5 years
• Concession period: 50 years
• The largest greenfield 3P project in USA history.
• 3P project
• Dallas – Fort Worth area (Texas)
• 13.5 miles Highway
• Construction Value: $1.5 Bn.
• Construction Period: 4.2 years (completed on 10/02/2014, nearly 9 months ahead of schedule).
• Concession period: 50 years
• 3P project
• Fort Worth (Texas)
• 10.2 miles Highway
• Construction Value: $1 Bn.
• Construction Period: 5 years
• Concession period: 52 years
• 60 Bridges (22 Connectors, 3 Underpasses and 35 Overpasses), one of the bridge crossing the Trinity river and 4 railroad crossings.
• 3P project
• Austin – San Antonio area (Texas)
• 40 miles Highway
• Construction Value: $1 Bn.
• Construction Period: 5 years (completed in October 2012)
• Concession period: 50 years.
• D&B project
• Virginia
• 55 miles Highway
• Construction Value: $1 Bn.
• Construction Period: 5 years
• 3P project
• Charlotte (North Carolina)
• 41.8 miles Highway
• Construction Value: $484 M.
• Construction Period: 4 years
• Concession period: 50 years.
• The design includes widening 26 miles (41.8 km) of lane in both directions on the I-77 in the northern part of the Charlotte metropolitan area, between connections with the I-277 in Charlotte and the NC-150 in Iredell County..
• 3P project
• Indianapolis (Indiana)
• 21 miles Highway
• Construction Value: $307 M.
• Construction Period: 2.5 years
• Concession period: 35 years.
• This project will convert approx. 21 miles (33.8 KM) of the State Route into an interstate facility: Upgrade 21 miles of roadway along the existing State Route 37, a four-lane divided highway, between Bloomington, IN and Martinsville, IN. Construction of an additional lane per direction with a total length of 13.26 miles across urban areas and modernization of numerous other road crossings along the project corridor
• 3P project
• North-west of Texas
• T&D project – 385 miles of transmission lines. 6 switching stations.
• Construction Value: $500 M.
• Construction Period: 4 years (completed in early 2014)
• Concession period: unlimited.
• The project is composed of seven (7) Transmission Line Segments of approximately 380 miles and six (6) Substations (345 kV)
• D&B + operation
• Manhattan (NY)
• Hotel and apartments buildings.
• Construction Value: $160M
• Construction Period: 2 years
• D&B + OPERATION
• El Centro (California)
• Solar (PV) Plant.
• Installed capacity: 25MW
• Production: 55 GWh/year
• Construction Value: $75 M.
• Construction Period: 2 years (completed in December 2013)
• 30 years PPA agreement
• D&B
• Tonopah (Nevada)
• Thermosolar Plant.
• Installed capacity: 110MW.
• Output: 125MW (gross power)
• Construction Value: $775 M.
• Construction Period: 5 years
• One of the largest central tower power generation plants of the world. The infrastructure has a 160 meters tall central tower and more than 100,000m3 of concrete (the world's largest of its kind), where a circular receiver is located. 10,400 heliostats collect and reflect the light onto the 30.48 meters tall receiver. The circular mirror array (with a radius of 1,380 meters) captures sunlight from a total area over 120 hectares. The entire complex will occupy an area of 700 hectares.
• D&B
• Mojave desert (California)
• Parabolic trough Plant.
• Output: 280MW (gross)
• Construction Value: $1.2 Bn
• Construction Period: 3 years
• Solar field: 1,765 acres
• D&B
• Salem (Massachusetts)
• Power Plant
• Construction Value: $713M
• Construction Period: 3.5 years
• D&B
• Guernsey (CA)
• Solar Plant
• Construction Value: $65M
• Construction Period: 1 year
• D&B
• Atlanta (GA)
• 10.35 miles of Highway
• Construction Value: $460M
• Construction Period: 3.5 years
• D&B
• Counties of Tulare and Kern (CA)
• High Speed Rail – CHSR CP4
• Construction Value: $457M
• Construction Period: 3 years