gs construction: waste to energy experience
TRANSCRIPT
1
Environmental BusinessGS Engineering & ConstructionEnvironmental BusinessGS Engineering & Construction
■ Waste Business
• Key Reference Highlights
− Waste-to-Energy Plant
− Sewage Sludge Treatment Plant
− Landfill
− Automatic Waste Collecting System
− Soil Remediation
Great Challenge
Main Activities
Waste to EnergyWaste to Energy
MBT System(Pre Treatment)
STPSludge
Automated WasteCollection System
MSW
Electricity & Steam
Landfill
LFG
District Heating &Cooling / Electricity
MSWTreatment
GS E&C has Total Solution for waste management.
• Waste is recycled at all processes, converted to energy at waste treatment plant, and stabilized at sanitary land-fill.
• Waste cycle processes are environmental friendly, energy efficient city infrastructure.
Key Reference Highlight
Waste to Energy / Incineration Plant
Client Seoul Metropolitan Government.
Location Korea
Capacity
• 750 ton/day (250 t/d x 3EA)• Waste to Energy Production- Steam Heat : 45 Gcal/h(District Heating and Supplying Hot Water)
Type - Stoker Type
Mapo Resource Recovery Plant Daejeon Incineration Plant − Phase1&2Daejeon Incineration Plant − Phase1&2
ClientDaejeon Metropolitan City - Development Authority
Location Korea
Capacity
• 400 t/d (200t/d 2 unit)ⅹ• Steam Heat : 30Gcal/h (Dis-trict Heating and Supplying Hot Water)• Waste Heat Boiler : 31 ton/hr x 2 lines
Type Stoker Type
A. Stoker Type
Key Reference Highlight
Masan Municipal Solid Waste Treatment PlantMasan Municipal Solid Waste Treatment Plant
Client Municipality of Masan
Location Korea
Capacity
• 200 t/d• Production Electricity : 2.9MW (Selling to Korea Electric Power Corporation)
Type Stoker Type
Cheongju Metropolitan Solid Waste Disposal PlantCheongju Metropolitan Solid Waste Disposal Plant
Client Municipality of Cheongju
Location Korea
Capacity
• 200 t/d• Production Electricity : 2.0MW• Production Steam
Heat : 12 Gcal/h (Dis-trict Heating and Supplying Hot Water)
Type Stoker Type
Client Municipality of Icheon
Location Korea
Capacity
• 300 t/d (150t/d x 2EA)• Steam Heat : 30Gcal/h (District heating and Sup-plying hot water)
Type Stoker Type
Eastern Metropolitan Resource Recovery Plant
Waste to Energy / Incineration Plant
A. Stoker Type
Key Reference Highlight
Client Korea Procurement Corpo-ration
Location Korea
Capacity 300 ton/day (150 t/d x 2EA)
Type Gasification & Melting
Hwaseong Thermal Incin-eration Plant
Client Municipality of Jeju
Location Korea
Capacity 200 t/d (100 t/d x 2EA)
Type Gasification & Melting
Jeju Municipal Solid Waste Treatment Plant
Client Public Procurement Service
Location Korea
Capacity
• 200 t/d (100t/d x 2EA)• Steam Heat :15Gcal/h (District Heating and Supplying
Hot Water)
Type Gasification& Melting
Chungju Clean Energy Park- MSW Treatment Plant Chungju Clean Energy Park- MSW Treatment Plant
Waste to Energy / Incineration Plant
B. Gasification & Melting Type
Daegu Sewage Sludge Treatment PlantDaegu Sewage Sludge Treatment Plant
Client Municipality of Daegu
Location Korea
Capacity 1,260 m3/d
Type Ultrasonic Sludge Dry
Sewage Sludge Treatment Plant
Key Reference Highlight
Client Metropolitan Landfill Site Management Corp.
Location Korea
DescriptionOf
Works
• Area : Phase 1 - 251 ha / Phase 2 - 142 ha• Storm water Removal Facility • Gas Collection and Processing Plant• Phase 1 - Public Park 1 Unit /Phase 2 - Golf Resort : 18 Hole
Landfill
Metropolitan Area No.1 Landfill Stabilization Phase 1,2
Client Korea Land & Housing Corp.
DescriptionOf
Works
-Inlet : 652ea-Network : 66.67km-Collection Center : 4ea
2
1
5
4
3
Waste Disposal Unit Design for
Pipe Networks
Maintenance of Pipe
Networks
Environmental load-reducing
technology
Long Distance Conveying technology
Residential area
Youngjong Sky City Auto Clean-net Project Automated Waste Collecting Sys-
tem
City infrastructure for waste treat-ment: Door–to–platform system
- The same principle with vacuum cleaner. Pneumatic transfer/collection sys-
tem: Waste disposal long distance transfer system collection center
Key Reference Highlight
Automatic Waste Collecting System