ercot it update
DESCRIPTION
ERCOT IT Update. Ken Shoquist VP, CIO Information Technology Board Meeting October 2003. Metrics Cost Savings Efficiency Effectiveness Portal Summary. Agenda. Metrics. Metrics Identified opportunities for improvement Maintain reporting of key metrics IT Blue Book - PowerPoint PPT PresentationTRANSCRIPT
ERCOT IT Update
Ken ShoquistVP, CIO Information Technology
Board Meeting
October 2003
October 2003
page 2AgendaAgenda
Metrics Cost Savings Efficiency Effectiveness Portal Summary
October 2003
page 3MetricsMetrics
MetricsIdentified opportunities for improvementMaintain reporting of key metrics
IT Blue BookDeveloped and in useMeasuring key indicators
EMMS Acceptable levels Missed 3 intervals in September
Transaction Processing Market volume slightly down by
7% (seasonal) Average processing time
continues to decrease
Settlements All-time high of 7351 in September 75% volume increase in 8 months
Project Management 4 projects completed in September 23 in process Schedule slips from EMMS vendor
for ERCOT and PUC projects forecasted
October 2003
page 4Cost SavingsCost Savings
VendorsVendors Savings Savings %%
SavingsSavings$$
Market Market Flow ThruFlow Thru
Consultant and Contractor Rates
(Capital $)
A 20.0 1,800K
B 22.5 50K
C 17.5 364K
Communications (WAN)
A 46.0 265K 40%
B 54.0 645K 40%
Service/Support Agreements
A 54.0 1,000K 100%
Annual Savings $4,124,000
Three-Year Projected Savings
$ 10.57M
October 2003
page 5EfficiencyEfficiency
Requirements TrainingDrive down consulting costsPrepare us for future projects; i.e., Texas Nodal
Progress Tools purchased to support consistent development methodology Implementing tools for enterprise project management
OpportunitiesWeakness in transition of software from test to productionProduction processes continue to be a significant focus area
• Example: failure of portal implementationNew Key Management in Place
Tony Dulin, Manager System Engineering & AdministrationCarlos Gonzalez-Perez, Manager EMMS Production
Skillfulness in avoiding wasted time and effortand
The ratio of the output to the input of any system =
BusinessValue
BusinessValue
October 2003
page 6EffectivenessEffectiveness
Effective EMMS Systems Improving network modeling with more effective use of state estimator for
improved reliability Focusing on production processes
Effective Commercial Systems Focus on commercial systems architecture/Reliability – Requirements
underway CIG (Common Interest Group) Texas architecture group in process ISO architecture meeting held at ERCOT last week
Effective Server Consolidation & Automation Consolidation – effective staffing ratio, avoid expanding costs Automation – effectively build and manage servers Virtualization – effectively utilizes server assets
Effective Security Practices ERCOT CIP meetings progressing Secured infrastructure = high value
October 2003
page 7CIP Advisory GroupCIP Advisory Group
Critical Infrastructure Protection Advisory Group Meeting held October 13 Unanimous agreement on importance of group Base charter created, modifications being made Providing advice, assistance and best practices
Companies volunteering time and energy BP Energy Reliant TXU
Steering Committee & Group Proposed steering committee from Generators (6), Transmission (2), QSE
(4), ERCOT (1) Group membership – open to all ERCOT market entities Working task groups created from group membership
Working task groups (examples) Regulation compliance Texas market standards
CenterPoint LCRA ERCOT
Trending Analysis & Reporting Confidentiality
October 2003
page 8Texas Market Link – SummaryTexas Market Link – Summary Background
TML migration began Friday, 10/3 and completed Sunday, 10/5, as scheduled Stability issues reported on Monday morning 10/6 at 7:45 AM Efforts to research TML stability issues halted at 9:30 AM TML backed out and pre-migration portal restored Wholesale functionality (excluding Rpt Explorer) available by 10:30 AM Retail functionality (excluding Rpt Explorer) available by 6:00 PM Full functionality for Report Explorer not available until 10/9
Root Cause Migration produced issues in Production that did not exist in Test
Proposed Migration Solution Team will expand load tests to identify/correct potential issues For migration, MPs will be pointed to the new TML servers at cut-over Target re-launch and potential pilot date based on Market and User input
Separate incident with the Commercial Applications API Impacting MP ability to extract commercial reports programmatically Cause: Hardware failure twice Issue: Unable to regain full functionality restored without rebuilding modules Manual solution via portal in place Redeploy commercial API functionality within 2-3 weeks
October 2003
page 9SummarySummary
Good progress in renegotiation of major contracts, several key contracts remaining to rework/establish.
Major focus areas: EMMS vendor product delivery schedule issues Production process and procedures Server consolidation Commercial Systems Architecture Project Delivery of new Portal