Page 1: 1 Update from ERCOT Market Services to RMS October 16, 2002

1

Update from ERCOT Market Services

to RMS

October 16, 2002

Page 2: 1 Update from ERCOT Market Services to RMS October 16, 2002

2

Retail Market Update

Topics– ERCOT’s Master Project Plan– Move-In/Move-Out Issues/Initiatives – GISB 1.4 Update – Data Transparency Project Update– Quick Recovery Team Update– New Power Transfer Update– Market Synchronization Activities

• Retailer• TDSP as LSE• Non PTB

– Consumption Data Loading Reports– Lodestar Data Loading Improvements– Resettlement Update

Page 3: 1 Update from ERCOT Market Services to RMS October 16, 2002

3

Master Project Plan Update

Page 4: 1 Update from ERCOT Market Services to RMS October 16, 2002

4

Master Project Plan

• 2003 Proposed Projects– Project worksheet established with list of all known requested projects

• Status/Updates

• Targeted outcomes

• Resources (Funding & Headcount) required identified where known

– Internal reviews of projects with ERCOT steering committee completed

– PRS completed prioritization of projects originated by Market Participants on August 28th

– TAC approved list of priorities on September 5th

– List delivered to ERCOT BOD targeted for approval at October meeting

– 3 New projects requested since September 5th

Page 5: 1 Update from ERCOT Market Services to RMS October 16, 2002

5

Master Project Plan

• 2002 Planned Projects– 51 Projects in progress– 22 Projects completed between August 1st and October 14th 2002– 5 Projects continuing on into 2003 for completion– 5 Projects removed from the 2002 plan (require reprioritization for

2003)

• 2002 Projects continuing into 2003 for completion include:– PR-20117 Internal Map Testing and Verification– PR-20079 Change Deployment Instructions_PRR281– PR-20067 Simultaneous Procurement of Ancillary Services– PR-20111 Hardening Initiatives– PR-2007801 IDR/NIDR Gap Corrections

Page 6: 1 Update from ERCOT Market Services to RMS October 16, 2002

6

Master Project Plan

• 2002 Projects removed from active status (requires reprioritization to proceed)– PR-20068 Interzonal Congestion Management:  Interim fix completed; any

further effort will go back through the prioritization process.

– PR-20071 Two Settlement System: Manual fix announced to market and Board.  If automated solution desired a new project request will be submitted through the prioritization process.

– PR-20080 Define OOME as Instructed Deviation:  PRR282 withdrawn and project canceled

– PIP106 Direct Load Control:  Deleted from 2002 Active list and has been prioritized for 2003 and included in Consolidated Prioritization List.

– PR-20083 Ratcheting of OOME:  Project withdrawn

Page 7: 1 Update from ERCOT Market Services to RMS October 16, 2002

7

Master Project Plan

• Next Steps…– Conduct Project Management Office Procedures Training from October 30th

through November 13th 2002

– Remaining ERCOT resources aligned and scheduled against Q1 2003 projects by December 6th 2002

– Monthly project prioritization adjustments and recommendations:

• ERCOT Executive Steering Committee

• Market committees and subcommittees

• ERCOT IT and Business Teams

– Finalize and distribute documentation on the projects request/prioritization process

Page 8: 1 Update from ERCOT Market Services to RMS October 16, 2002

8

Move-in and Move-out

Solutions Update

Page 9: 1 Update from ERCOT Market Services to RMS October 16, 2002

9

Market Participant Meeting

Page 10: 1 Update from ERCOT Market Services to RMS October 16, 2002

10

MIMO Workshop

Page 11: 1 Update from ERCOT Market Services to RMS October 16, 2002

11

MIMO Workshops

• Methods– Three type of issues; Existing Systems, Current Execution, & Market Gaps

– Two measurements for identifying order of discussion for issues• pain level• quantity of ESI Ids affected.

– The issues that are being pursued are as follows:1. Those that rank high on the pain level and quantity affected and are expected to be

relatively easy to repair2. Those that either are easy to fix but don’t rank high on the measurements or rank

high on the measurements and are difficult to fix.3. Those that are most likely to remain as workarounds for a longer period of time.

– They rank low on pain and quantity, but appear difficult to fix

– Three time frames for solutions are being applied;• Short-Term (solutions that can be implemented immediately or prior to next April)• Mid-Term (solutions that can be implemented next year after April)• Long-Term (solutions that can be implemented after 1/1/2004)

Page 12: 1 Update from ERCOT Market Services to RMS October 16, 2002

12

MIMO WorkshopL

evel

of

Pain

Number of ESI ID’s affected

Issue 1

Issue 6

Issue 3

Issue 4

Issue 5

Issue 6

Issue 2

Issue 7

Issue 8

Issue 9

Low

High

High

Page 13: 1 Update from ERCOT Market Services to RMS October 16, 2002

13

MIMO WorkshopL

evel

of

Pain

Number of ESI ID’s affected

Issue 1

Issue 6

Issue 3

Issue 4

Issue 5

Issue 6

Issue 2

Issue 7

Issue 8

Issue 9

Low

High

High

Low -

Net

Effect

of Is

sue

- H

igh

Page 14: 1 Update from ERCOT Market Services to RMS October 16, 2002

14

MIMO WorkshopC

ost

of A

ddre

ssin

g

Net Effect of Issue on Market

Issue 1

Issue 6

Issue 3

Issue 4

Issue 5

Issue 6

Issue 2

Issue 7Issue 8

Issue 9

Low

High

High

Page 15: 1 Update from ERCOT Market Services to RMS October 16, 2002

15

MIMO WorkshopC

ost

of A

ddre

ssin

g

Net Effect of Issue on Market

Issue 1

Issue 6

Issue 3

Issue 4

Issue 5

Issue 6

Issue 2

Issue 7Issue 8

Issue 9

Low

High

High

Higher Impact

& Lower Cost

Page 16: 1 Update from ERCOT Market Services to RMS October 16, 2002

16

Timeline 08-29-02 RMS establishes Task Force09-05-02 Kickoff Meeting – assignments given for MP transaction

root cause analysis10-15-02 Complete root cause analysis and comprehensive list

of business scenarios TBD Develop detailed requirements document for RFP - RMS Approves MIMO requirements document(s)

- Release RFP(s) to vendors - RFP Responses due from vendors - Summarize vendor responses for Task Force review - Recommendations to EOTF on vendor “Short List” - Vendor presentations to Task Forces - EOTF recommendation to ERCOT Board - Begin contract negotiationsEnd 1Q03 Award contract

Move-in/Move-outLong-term Solution Status

Page 17: 1 Update from ERCOT Market Services to RMS October 16, 2002

17

RMS Update on Move-In / Move-Out Task Force

October 16, 2002

Page 18: 1 Update from ERCOT Market Services to RMS October 16, 2002

18

Airfare…

$1072.00

Page 19: 1 Update from ERCOT Market Services to RMS October 16, 2002

19

Mileage…

$512.00

Page 20: 1 Update from ERCOT Market Services to RMS October 16, 2002

20

Accommodations…

$747.26

Page 21: 1 Update from ERCOT Market Services to RMS October 16, 2002

21

Visiting 18 Market Participants in 11 days about the Move-In Move-Out Issues…

Priceless!

Page 22: 1 Update from ERCOT Market Services to RMS October 16, 2002

22

Some things money can’t buy, for everything else there’s…

Larry Grimms’ Credit Card

Page 23: 1 Update from ERCOT Market Services to RMS October 16, 2002

23

MP Visits

• Purpose– ‘Root out’ all sources of pain associated with Move-Ins

– Get each MPs opinion of worst problems

– Discuss possible solutions

– Find out if identified problems are common among all types of market participants

– Discuss concepts with consumer advocacy group

– Verify that all participants are dedicated to solving the problems and aware of the possible systemic impacts

– Discuss deployment of workarounds (Safety Net, Same CR Move-Ins, etc.)

Page 24: 1 Update from ERCOT Market Services to RMS October 16, 2002

24

MP Visits

Page 25: 1 Update from ERCOT Market Services to RMS October 16, 2002

25

MP Visits

• Audience– TDSPs (5 - CenterPoint, AEP, Oncor, Entergy, TNMP)

– AREPs (4 - Reliant Retail, AEP, TXU E, Entergy)

– CREPs (6 - Coral, GEXA, Republic, TCE, Constellation New Energy, Green Mountain)

– Vendors (2 - Exolink, EC Power)

– Consumer Protection (1 - Public Utility Council)

Page 26: 1 Update from ERCOT Market Services to RMS October 16, 2002

26

MP Visits

• Results– Identified several issues that were not previously identified

– Confirmed several common problems across many Market Participants

– Discussed concepts for solving identified issues

– Developed an average ‘pain’ level and frequency for major issues based on input from each MP

– Discussed several concepts with consumer advocacy group to verify compliance with Customer Protection

– Revealed inconsistencies and improper executions of workarounds

Page 27: 1 Update from ERCOT Market Services to RMS October 16, 2002

27

MIMO Workshop

Page 28: 1 Update from ERCOT Market Services to RMS October 16, 2002

28

MIMO Workshop

• Attendees– CenterPoint

– TXU Energy

– Oncor

– TCE

– Republic

– Entergy Solutions

– Entergy Gulf States

– AEP Retail

– Reliant Resources

– Green Mountain

Page 29: 1 Update from ERCOT Market Services to RMS October 16, 2002

29

MIMO Workshop

• Methods– Three type of issues; System, Execution, & Market Gaps– Two measurements for identifying order of discussion for issues; pain

level and quantity of ESI Ids affected.– The issues that are being pursued first are those that rank high on the pain

level and quantity affected and are easy to repair, second are those that either are easy to fix but don’t rank high on the measurements or rank high on the measurements and are difficult to fix. The last category (rank low on pain and quantity, but are difficult to fix) are those that are most likely to remain as workarounds for a longer period of time.

– Three time frames for solutions; Short-Term (solutions that can be implemented immediately or prior to next April), Mid-Term (solutions that can be implemented next year after April), and Long-Term (solutions that can be implemented after 1/1/2004)

Page 30: 1 Update from ERCOT Market Services to RMS October 16, 2002

30

MIMO Workshop

• Results– 32 Concepts were discussed

• 7 Concepts were dismissed for various reasons• 1 Concept was determined as solved in Version 1.5• 23 Concepts were discussed

– 4 Concepts were tabled until additional information can be obtained

– 19 Concepts were discussed at length and are being considered for recommendation to RMS

» 10 Short-Term» 9 Mid-Term

• 1 Concept was not discussed (lack of time)

Page 31: 1 Update from ERCOT Market Services to RMS October 16, 2002

31

Recommendations to RMS

Page 32: 1 Update from ERCOT Market Services to RMS October 16, 2002

32

Recommendations

Clarification of Switch vs. Move-In

• A switch transaction is to be used when a customer wants to switch providers without changing their premise; it is intended to switch a customer from one CR to another. A Move-In is used when different customer is requesting power at an ESI ID than the customer that was formerly associated with the ESI ID whether or not the premise is de-energized.

• It needs to be noted that a CR using a Move-In transaction to affect a switch violates procedures that have been put in place by the Public Utility Commission including Customer Protection rules. Misuse of the Switch or Move-In transactions may result in disciplinary action from the PUC.

Page 33: 1 Update from ERCOT Market Services to RMS October 16, 2002

33

Recommendations

• Safety Net Guidelines (Short-Term)– The requested date on a Move-In sent through ERCOT that is

intended to match with a Safety Net Move-In previously sent to the TDSP must have the same requested date as the Safety Net Move-In.

– CRs should send Safety Net Move-Ins one day prior to the requested date on the Safety Net Move-In and only after validating against one of the ERCOT reports or one of the TDSP reports to avoid duplication with a previously submitted 814_16 through ERCOT.

– The MIMO Task Force is working on some procedures for the TDSPs, but these procedures are not ready for RMS presentation

Page 34: 1 Update from ERCOT Market Services to RMS October 16, 2002

34

Recommendations

• Expediting ESI ID Creates (Short-Term)– When possible, TDSPs should create ESI Ids off

Development/Builder plats. Create transactions may contain default values for required fields if doing so increases the speed at which the Create transaction is sent to ERCOT. Any other reasonable means of speeding up the ESI ID Create process should be seriously entertained.

– Timing around changing the default values to corrected values with an 814_20 maintain need to be established.

Page 35: 1 Update from ERCOT Market Services to RMS October 16, 2002

35

Recommendations

• ERCOT Monitoring (Short-Term)– The recommendation is that ERCOT monitors potential cancel

with exceptions. This monitoring should be performed by daily pulling a report of any Instances that are scheduled to go cancelled with exception within 5 business days. After verifying that the 814_04 (or 814_25) has not been received, ERCOT should generate a report for each of the TDSPs that they can use to expedite the 814_04s (or 814_25).

– The recommendation is that ERCOT monitor the following transactions for rejects: 814_07s, 814_09s, 814_13s, 814_15s, 814_23s, 814_19s, 814_21s, 814_29s (after version 1.5). Rejects should be followed up with the sender of the reject. In some cases, it may be necessary to route an original transaction (814_06, 814_08, etc,) to the MP that should have received the transaction.

Page 36: 1 Update from ERCOT Market Services to RMS October 16, 2002

36

Recommendations

• Programmatically prohibit back-dated transactions (Short-Term)– CRs will programmatically not allow backdated Move-Ins and

Move-Outs at the customer service/Call Center level. Only situations that CRs may back date Move-Ins and Move-Outs are for:

• Transactions for Move-Ins or Move-Outs previously requested on safety net (since safety net does not allow back dated Move-Ins and Move-Outs)

• Back office clean up efforts coordinated with ERCOT and TDSP (QRE, Market Sync, etc.) This includes any efforts regardless of effective date that are coordinated with ERCOT and TDSPs.

Page 37: 1 Update from ERCOT Market Services to RMS October 16, 2002

37

Recommendations

• Effective Date on Meter Number Correction (Short-Term)– If the TDSP needs to make a meter correction, the 814_20

maintain transaction will have an effective date of the later of these 2 dates:

• The value from the DTM151 of the last usage transaction that contained the prior meter #.

• The value from the Date on the last initial read.

Page 38: 1 Update from ERCOT Market Services to RMS October 16, 2002

38

Recommendations

• Date Reasonableness at ERCOT (Short-Term)– ERCOT should reject any initiating transactions with requested

implementation dates of more than 90 calendar days in the future or 270 calendar days in the past.

Page 39: 1 Update from ERCOT Market Services to RMS October 16, 2002

39

Questions?

Page 40: 1 Update from ERCOT Market Services to RMS October 16, 2002

40

RMS Vote

Page 41: 1 Update from ERCOT Market Services to RMS October 16, 2002

41

Next Steps

Page 42: 1 Update from ERCOT Market Services to RMS October 16, 2002

42

Next Steps

• MIMO Taskforce meetings– October 23, & 24 in Austin

– October 29, & 30 in Dallas (tentative)

• Recommendations to RMS at November RMS meeting– Potentially 15 Concepts

• Release of implementation timelines

• Development of Texas Set Change Controls, Protocol Revision Requests, and RFP (If necessary)

• Deployment of Solutions

• Re-Evaluation of Move-In/Move-Out processes

Page 43: 1 Update from ERCOT Market Services to RMS October 16, 2002

43

Thank-you

Page 44: 1 Update from ERCOT Market Services to RMS October 16, 2002

44

GISB 1.4 Update

Page 45: 1 Update from ERCOT Market Services to RMS October 16, 2002

45

GISB 1.4 Update

• RMS agreed at August meeting to move forward with implementing GISB 1.4 at ERCOT

• Internal testing and implementation of a GISB 1.4 interface is underway at ERCOT, – Production Sign-off scheduled for 10/25

• All production components are in place as of 10/11– Acceptance Testing and Market Participant Testing – 10/15-24

• TDTWG is surveying market participants to finalize migration readiness dates– Preliminary migration schedule reviewed at 10-4-02 TDTWG – Market Participant migration will begin week of 10-29-02– Goal is to complete migration by April 1, 2003

Page 46: 1 Update from ERCOT Market Services to RMS October 16, 2002

46

ERCOT Data Transparency(ETS)

Page 47: 1 Update from ERCOT Market Services to RMS October 16, 2002

47

Data Transparency Project

• ETS Phase I Progress– Development and Production Database Servers and Application Servers

are configured and installed on the network

– Report Development 99% complete

– Production testing is underway

– Database transaction loading to start 10/21

– User Documentation is being finalized

– Backup and restart procedures coordinated

– Implementation Schedule is being revised to ensure adequate testing• Estimated to move three weeks to last week in November

Page 48: 1 Update from ERCOT Market Services to RMS October 16, 2002

48

Quick Recovery Team Update

Page 49: 1 Update from ERCOT Market Services to RMS October 16, 2002

49

ESI Ids Reported to QRE (as of October 15, 2002)

Current Status Quantity

New 461

In Analysis 6766

In Progress 50140

Resolved 79638

Total 137005

Entity Quantity

TDSP 34271

QRE Team 7049

CR 8820

Total 50140

Point of Failure Quantity

Cause Not Reported 6990

CR 37000

ERCOT EAI 3979

ERCOT FTP 694

ERCOT Manual Process (814_08)

3428

ERCOT PaperFree 7359

ERCOT Siebel 2129

ERCOT TCH 6427

TDSP 11632

Total 79638

Page 50: 1 Update from ERCOT Market Services to RMS October 16, 2002

50

New Power Transition Status

Page 51: 1 Update from ERCOT Market Services to RMS October 16, 2002

51

New Power Transition

Status as of 10/11/2002

• Two ESI Ids remain to be completed

• “Scheduled” at ERCOT

• Waiting for 867-04

• Scheduled meter read date 9/24/2002 (backdated)

Page 52: 1 Update from ERCOT Market Services to RMS October 16, 2002

52

Final New Power Transition Numbers

42,690 ESI IDs TXU Energy Services

37,175 ESI IDs Reliant Retail Services

2,022 ESI IDs 3rd Party Competitive Retailers

260 ESI IDs New Power Submitted Move-Outs

82,147 ESI Ids Total Transitioned

Page 53: 1 Update from ERCOT Market Services to RMS October 16, 2002

53

Market Synchronization Activities

Page 54: 1 Update from ERCOT Market Services to RMS October 16, 2002

54

• Objective – Address market issues resulting in an out of sync “Rep of Record” between

ERCOT, TDSP, and CR systems for all ESI IDs resulting from market startup/processing issues as well as subsequent workarounds

• Completed– ERCOT identified “Perfect Sync” and “1 Day Perfect” – sent lists to MPs– ERCOT identified out-of-sync categories at Sept 10th design meeting– Task Force identified additional ESI IDs considered “In Sync” – sent lists to MPs– Task Force prioritized 8 categories based upon potential customer impact – sent

lists to MPs

• In Progress– TDSPs and CRs to complete analysis of priority 1-4 files and respond to ERCOT

by October 18th (priority 5-6 response date TBD)– Weekly conference calls scheduled on Tuesdays through October– “How to” make repairs face-to-face meeting scheduled for October 25th

.

Market Synchronization Retailer Synchronization Project

Page 55: 1 Update from ERCOT Market Services to RMS October 16, 2002

550

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

Market Synchronization Retailer Synchronization Project

Considered In Sync5,399,860

Under Analysis739,039

Non-ERCOT area Removed from Analysis

945,000

ESI IDs

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

Considered In Sync5,279,063

Under Analysis859,836

Non-ERCOT area Removed from Analysis

945,000

ESI IDs

September 26, 2002 Report October 16, 2002 Report

Page 56: 1 Update from ERCOT Market Services to RMS October 16, 2002

56

• Next Steps

– October 15th, 22nd, 29th Follow-up Conference Calls Define items for immediate “fix” and report on progress Define issues to raise to RMS

– October 25th Face-to-face meeting to finalize decision on “backdating” fixes

– November 13th Present any disputed scenarios to RMS

– December 5th

Escalate issues to TAC (if required)

Market Synchronization Retailer Synchronization (continued)

Page 57: 1 Update from ERCOT Market Services to RMS October 16, 2002

57

For those scenarios that the market synch project identified as out-of-sync, if the Market Synch Task Force unanimously agrees on the steps necessary to correct the out-of-sync market condition, then the market participants shall correct the out-of-synch market condition accordingly.

The Market Sync Task Force shall report to RMS any decisions reached to correct out-of-sync market conditions.

If there is any disagreement regarding the steps necessary to correct the out-of-synch scenario, the issue shall be passed to RMS for resolution.

Market Synchronization Retailer Synchronization (continued)

Page 58: 1 Update from ERCOT Market Services to RMS October 16, 2002

58

Backdating Definitions (per Oct 8th Conf Call)

1 Repair of all records and service history rows to match dates across all Market Participants.

2 Repair of record and service history rows to match dates per analysis break-out.

Note: This is the mechanism selected by MPs for ERCOT to correct instances where ERCOT is “out-of-sync”.

3 No-backdating:

Select a date going forward (like November 01, 2002) and those entities without records will start the records as of that date.

Page 59: 1 Update from ERCOT Market Services to RMS October 16, 2002

59

Example – ERCOT “out-of-sync” fixes

• Priority 1 & 2 = Relationship Row reported by only two MPs

• Analysis Detail

~110K ESI IDs

Backdating Definition 1Make all records match:•ERCOT add record.

Backdating Definition 2Make all records match per analysis:•ERCOT adds record.

Backdating Definition 3 Does Not apply

Start Date Stop Date

TDSP 05-01-2002 Null

ERCOT NA NA

CR 05-01-2002 Null

• Subcategory = Same CR in TDSP and CR records but ERCOT has

no record at all

Page 60: 1 Update from ERCOT Market Services to RMS October 16, 2002

60

Example (1a) Priority 4 Related

• Priority 4 = One and only one Relationship Row from a TDSP, a CR

and ERCOT

• Subcategory = Same CR in TDSP, CR, and ERCOT records

• Analysis Detail

~25K ESI IDs

Backdating Definition 1Make all records match:•Who corrects the stop date and which date is used?

Backdating Definition 2Make all records match per analysis:•Who corrects the stop date and which date is used?

Backdating Definition 3 Does Not apply

Start Date Stop Date

TDSP 05-01-2002 Null

ERCOT 05-01-2002 Null

CR 05-01-2002 07-01-2002

Page 61: 1 Update from ERCOT Market Services to RMS October 16, 2002

61

Example (1b) Priority 4 Related

• Priority 4 = One and only one Relationship Row from a TDSP, a CR

and ERCOT

• Subcategory = Same CR in TDSP, CR, and ERCOT records

• Analysis Detail

~21K ESI IDs

Backdating Definition 1Make all records match:•Who corrects the stop date and which date is used?

Backdating Definition 2Make all records match per analysis:•Who corrects the stop date and which date is used?

Backdating Definition 3 Does Not apply

Start Date Stop Date

TDSP 05-01-2002 07-01-2002

ERCOT 05-01-2002 Null

CR 05-01-2002 08-01-2002

Page 62: 1 Update from ERCOT Market Services to RMS October 16, 2002

62

Example (2) Priority 4 Related

• Priority 4 = One and only one Relationship Row from a TDSP, a CR

and ERCOT

• Subcategory = Same CR in TDSP, CR, and ERCOT records

• Analysis Detail

~10K ESI IDs

Backdating Definition 1 Make all records match:•Who corrects the start date and which date is used?•Who corrects the stop date and which date is used?

Backdating Definition 2Make all records match per analysis:•Who corrects the start date and which date is used?•Who corrects the stop date and which date is used?

Backdating Definition 3Ignore start dates:

•Start Considered in-sync

•Who corrects the stop date and which date is used?

Start Date Stop Date

TDSP 05-01-2002 07-01-2002

ERCOT 05-15-2002 Null

CR 06-01-2002 08-01-2002

Page 63: 1 Update from ERCOT Market Services to RMS October 16, 2002

63

Example (3a) Priority 1 Related

• Priority 1 = Relationship Row reported by only two MPs

• Subcategory = Same CR in TDSP and ERCOT records but No CR

reported the ESI IDs

• Analysis Detail

Backdating Definition 1 Make all records match:

•CR to add record?

Backdating Definition 2Make all records match per analysis:

•CR to add record?

Backdating Definition 3Select a current start date for added records:

•CR starts record as of 11-01-2002?

Start Date Stop Date

TDSP 05-01-2002 Null

ERCOT 05-01-2002 Null

CR NA NA

Page 64: 1 Update from ERCOT Market Services to RMS October 16, 2002

64

Example (3b) Priority 1 Related

• Priority 1 = Relationship Row reported by only two MPs

• Subcategory = Same CR in TDSP and ERCOT records but No CR

reported the ESI IDs

• Analysis Detail

Backdating Definition 1 Make all records match:

•Which start date to use? •CR to add record?•ERCOT or TDSP correct start?

Backdating Definition 2Make all records match per analysis:

•Which start date to use? •CR to add record?•ERCOT or TDSP correct start?

Backdating Definition 3Select a current start date for added records:

•CR starts record as of 11-01-2002?

Start Date Stop Date

TDSP 05-01-2002 Null

ERCOT 06-01-2002 Null

CR NA NA

Page 65: 1 Update from ERCOT Market Services to RMS October 16, 2002

65

Example (3c) Priority 1 Related

• Priority 1 = Relationship Row reported by only two MPs

• Subcategory = Same CR in TDSP and ERCOT records but No CR

reported the ESI IDs

• Analysis Detail

Backdating Definition 1 Make all records match:•Which start and stop dates to use? •CR to add record?•ERCOT or TDSP correct start/stop?

Backdating Definition 2Make all records match per analysis:•Which start and stop dates to use? •CR to add record?•ERCOT or TDSP correct start/stop?

Backdating Definition 3Select a current start date for added records:•CR starts record as of 11-01-2002?•Which stop date to use?•ERCOT or TDSP correct stop?

Start Date Stop Date

TDSP 05-01-2002 08-10-2002

ERCOT 06-01-2002 Null

CR NA NA

Page 66: 1 Update from ERCOT Market Services to RMS October 16, 2002

66

Example (4a) Priority 6 Related

• Priority 6 = Active row (null stop) from TDSP, a CR and ERCOT

• Subcategory = Same CR in TDSP, CR, and ERCOT records

• Analysis Detail

Backdating Definition 1Make all records match:•Who corrects the start dates?

Backdating Definition 2Make all records match per analysis:•Who corrects the start dates?

Backdating Definition 3Ignore start date:

•Considered in-sync

Start Date Stop Date

TDSP 05-01-2002 Null

ERCOT 05-01-2002 Null

CR 06-01-2002 Null

Page 67: 1 Update from ERCOT Market Services to RMS October 16, 2002

67

Example (4b) Priority 6 Related

• Priority 6 = Active row (null stop) from TDSP, a CR and ERCOT

• Subcategory = Same CR in TDSP and ERCOT records but different

CR claims ESI ID • Analysis Detail

Backdating Definition 1Make all records match:•CR2 removes record while CR1 adds record?

Backdating Definition 2Make all records match per analysis:•CR2 removes record while CR1 adds record?

Backdating Definition 3Ignore start date:

•CR2 removes record while CR1 adds record starting 11-01-2002?

Start Date Stop Date

TDSP (CR1) 05-01-2002 Null

ERCOT (CR1) 05-01-2002 Null

CR2 05-01-2002 Null

Page 68: 1 Update from ERCOT Market Services to RMS October 16, 2002

68

Example (4c) Priority 6 Related

• Priority 6 = Active row (null stop) from TDSP, a CR and ERCOT

• Subcategory = Same CR in TDSP and ERCOT records but different

CR claims ESI ID • Analysis Detail

Backdating Definition 1Make all records match:•CR2 removes record while CR1 adds record?•Which start date is used?•Correct previous records affected by start date change.

Backdating Definition 2Make all records match per analysis:•CR2 removes record while CR1 adds record?•Which start date is used?

Backdating Definition 3Ignore start date:

•CR2 removes record while CR1 adds record starting 11-01-2002?

Start Date Stop Date

TDSP (CR1) 05-01-2002 Null

ERCOT (CR1) 07-01-2002 Null

CR2 05-01-2002 Null

Page 69: 1 Update from ERCOT Market Services to RMS October 16, 2002

69

Market Synchronization“TDSP as LSE” Clean-up

October 10, 2002 RelationshipStatus exists after Active as of

Feb 01,2002 10/10/2002CenterPoint 8,350 505ONCOR 18,328 433TNMP 515 71CPL 2,246 793WTU 3,164 314

Market 32,603 2,116

• Objective– Ensure that all ESI ID are converted from the “TDSP as LSE” by the time True-

Up Settlement of February 2002 begins (December 7, 2002)

• Clean-up Plan – ERCOT to send TDSPs list of ESI ID affiliated

with “TDSP as LSE” any time after Feb 01, 2002 – TDSPs to provide correct effective date concurrent

with usage record prior to February 01, 2002 or identify de-energized/inactive ESI IDs

– ERCOT to make correction based upon TDSP response (complete pending orders, establish relationship, etc…)

– Weekly conference calls with TDSPs (already takes place with ONCOR and CenterPoint)

• In Progress– ERCOT to send revised lists to TDSPs by 10-21-2002– TDSPs to respond with new effective dates or status data by November 01, 2002

Page 70: 1 Update from ERCOT Market Services to RMS October 16, 2002

70

Market Synchronization – Non Price to Beat

• Objective– Make necessary corrections to ensure that >1MW Customers were switched

on the correct date in January 2002• Completed Items

– Per RMS direction, ERCOT sent lists to each MP for reconciliation:• Full list of ESI ID in the >1MW project was confirmed• Still to be fixed list (subset of the full list) was also confirmed

– 1,133 ESI Ids (>1 MW) identified by CRs (meeting the April 30 deadline)• Number increase attributed to reconciliation of lists with Market

Participants– 1001 (88%) ESI IDs are corrected– 74 ( 7%) ESI IDs were agreed not to fix by TDSP and CR

• In Progress– 58 (5%) ESI IDs remaining to be fixed

• 11 – CR of RECORD needs to be fixed• 42 – Date of when CR became CR of Record needs to be fixed• 5 – where CR and TDSP are not in agreement – CR will have to escalate

Page 71: 1 Update from ERCOT Market Services to RMS October 16, 2002

71

Market Synchronization – Non Price to Beat

• Next Steps– ERCOT to continue to confirm changes in Siebel and Lodestar

– Final analysis in progress at ERCOT

– ERCOT will provide suggested next steps to the submitting CR and TDSP

– Conference calls being held with TDSP to determine next steps for those ESI IDs that still need to be fixed (ERCOT metering team included on calls)

– Affected CR to determine next steps for ESI IDs where no agreement is reached

CR1 CR2 CR3 CR4 CR5 CR6 Total

TDSP 1 3 0 2 5 0 7 17

TDSP 2 0 1 0 0 0 2 3

TDSP 3 0 0 0 1 5 5 11

TDSP 4 0 1 10 1 2 13 27

Total 3 2 12 7 7 27 58

Page 72: 1 Update from ERCOT Market Services to RMS October 16, 2002

72

Consumption Data Loading Reports

Page 73: 1 Update from ERCOT Market Services to RMS October 16, 2002

73

% of IDR Data Loaded by MRE (as of 09-24-2002)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

7/31 8/14 8/28 9/11 9/25 10/9 10/23 11/6 11/20 12/4 12/18 1/1 1/15 1/29 2/12 2/26 3/12 3/26 4/9 4/23 5/7 5/21 6/4 6/18 7/2 7/16 7/30 8/13 8/27 9/10

CPL

WTU

ONCOR

CenterPt

TNMP

Brazos

LCRA

Rayburn

STEC

System

IDR Data Loaded into LodestarSeptember 24th Report

95% or better expected

91%

Page 74: 1 Update from ERCOT Market Services to RMS October 16, 2002

74

% of IDR Data Loaded by MRE (as of 10-11-2002)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

10/1 10/15 10/29 11/12 11/26 12/10 12/24 1/7 1/21 2/4 2/18 3/4 3/18 4/1 4/15 4/29 5/13 5/27 6/10 6/24 7/8 7/22 8/5 8/19 9/2 9/16 9/30

CPL

WTU

ONCOR

CenterPt

TNMP

Brazos

LCRA

Rayburn

STEC

System

IDR Data Loaded into LodestarOctober 11th Report

95% or better expected

93%

Page 75: 1 Update from ERCOT Market Services to RMS October 16, 2002

75

IDR Data Status Report 99% Data Available per MRE

As of As ofSeptember 24, 2002 October 11, 2002

CPL 12/03/01 01/14/02CenterPoint 12/31/01 12/18/01ONCOR 12/03/01 12/28/01TNMP 06/25/02 01/14/02WTU 01/22/02 01/25/02

Brazos 09/15/02 09/30/02LCRA 09/12/02 10/02/02Rayburn 08/31/02 09/30/02STEC 09/03/02 09/30/02

Market 12/20/01 01/17/02

Meter Reading Entity(MRE)

Page 76: 1 Update from ERCOT Market Services to RMS October 16, 2002

76

Non-IDR Data Status Report September 23, 2002

Percent of Actual Non-IDR Datafrom September 23, 2002 Batch Process

32%

38%

33%

38% 39%

0%

36%

94%96%

91% 92% 93% 95%

100% 99% 100% 99%95%

99%

0% NA0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

CenterPoint ONCOR TNMP CPL WTU Sharyland Market

Initial (9-8-02) -16 Days After

Final (7-28-02) - 59 Days After

Re-Settle (9-3-01) - 385 Days After

Page 77: 1 Update from ERCOT Market Services to RMS October 16, 2002

77

Non-IDR Data Status Report October 11, 2002

Percent of Actual Non-IDR Datafrom October 11, 2002 Batch Process

32%

37%

20%

32% 34%

0%

34%

95% 96%

80%

92% 93% 95%

100% 99% 99% 99%95%

99%

0% NA0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

CenterPoint ONCOR TNMP CPL WTU Sharyland Market

Initial (9-25-02) -16 Days After

Final (8-14-02) - 59 Days After

Re-Settle (10-8-01) - 369 Days After

Page 78: 1 Update from ERCOT Market Services to RMS October 16, 2002

78

Non-IDR Data Status Report October 14, 2002

Percent of Actual Non-IDR Datafrom October 14, 2002 Batch Process

38%

42%

36%

44% 45%

0%

41%

97% 98%

80%

91% 93%96%

100% 99% 99% 99%95%

99%

0% NA0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

CenterPoint ONCOR TNMP CPL WTU Sharyland Market

Initial (9-29-02) -16 Days After

Final (8-18-02) - 59 Days After

Re-Settle (10-16-01) - 367 Days After

Page 79: 1 Update from ERCOT Market Services to RMS October 16, 2002

79

Lodestar IDR Data Loading Improvement Recommendations by TDSPs

Page 80: 1 Update from ERCOT Market Services to RMS October 16, 2002

80

• Objective – Implement process improvements which alleviate problems loading IDR

data into ERCOT’s Lodestar system

• Completed Items– ERCOT and MPs met August 15th to define scope of 9 items– Conference call held on August 26th to refine scope and follow-up– 6 items are complete (see matrix on next page)– TX SET reviewed 2 EDI related recommendations on Sept 16th (see

matrix)

• In Progress– 2 items defined for immediate action (both are currently in test)– 4 items defined as long term fixes (project request being drafted)

• Next Steps– ERCOT to submit details for “Lodestar Data Loading Improvements”

project

IDR Data Loading Recommendations by TDSPs

Page 81: 1 Update from ERCOT Market Services to RMS October 16, 2002

81

.

IDR Data Loading Recommendations by TDSPs

Issue Recommendations Immediate Action Items Long Term Fixes1 Allow 867_03 IDR data to cross

select Service History Record rowsAEP and TNMP to investigate standardizing on midnight as the cutoff time for all IDR 867_03s.

Modifying IDR loading logic to allow data to cross select Service History Rows.

2a Allow selective replacements of IDR data cuts

Complete - IDR and TX SET groups agreed this will apply to IDR ESI IDs only and will define mechanism when gap validation for IDR is removed. (see #3)

NA

2b Code 867_03 to pass through to CR and not load at ERCOT.

Complete - IDR and TX SET groups agreed this in not needed - removed from scope.

NA

3 Remove gap validation from IDR loading logic.

Project initiated to remove gap validation for IDR data loading. Contingent on Protocol requirement for whole day IDR data (PRR 363)

NA

4 ERCOT to provide TDSPs with a view of the Lodestar IDR usage.

Complete - ERCOT will provide IDR data dumps upon TDSP request.

NA

5 Process 867_03 in order of receipt. Complete - ERCOT has corrected sorting of IDR and NIDR 867 files to sort by transition type, ESI ID then date.

ERCOT will be researching other options in handling IDR data loading.

6a Error report needs unit of measure. ERCOT has fix in test environment NA

6b Provide a positive response for every IDR file loaded.

NA ERCOT to add positive response row for each .lse file loaded into lodestar.

7 Modify Lodestar import validation process to disregard KVARH data.

TDSP can disregard any error associated with loading KVARH (channel 3) data.

ERCOT to modify IDR loading logic to omit creation of .lse file other than KWH.

8 Processing of 867_03 Final for IDR data creates an incorrect stop date on switch.

Complete - ERCOT has completed system change to create correct Siebel meter read date for IDR 867_03 Finals.

NA

9 Invalid forwarding DUNS numbers in 867_03 transaction.

Complete - Issues resolved as ERCOT will submit a reject notice back to TDSP for incorrect forwarding DUNS numbers in 867_03s.

NA

Page 82: 1 Update from ERCOT Market Services to RMS October 16, 2002

82

Resettlement Update

Page 83: 1 Update from ERCOT Market Services to RMS October 16, 2002

83

Resettlement of True-up Status Update

SeptOct

NovDec

JanFeb

MarApr

MayJun

JulAug

SepOct

NovDec

20032004

December 7, 2002

True-Up Settlement of February 01, 2002

The date all ESI IDs should no longer be with

the “TDSP as LSE”.

November 1, 2002

True-Up Settlement of November 20, 2001

The date we move from the ERCOT Board resolution to the Protocols IDR Data Threshold

April 1, 2003

Date we expect to be back to six month after the trade day True-Up

Settlements

November 14, 2002

True-Up Settlement of December 17, 2001

Drop dead date for correction of Non-PTB ESID Backdating

October 16, 2002

80 re-settlements performed to date(Through Oct 18, 2001)