Installation Guide
Durapath
Created by barjibutfrom the Noun Project Created by Mani Amini
from the Noun Project
Created by Lorena Salagrefrom the Noun Project
Product Information
Introducing Durapath, the only ground support you’ll ever need.A durable and permanent ground solution, replacing the need for traditional and costly hard standing products. Tested, practical and robust design conforms to the Sustainable Urban Drainage Systems Laws, allowing water to permeate through the ground.
High Street, Wickham Market IP13 0RFTEL : +44 (0) 1728 747 777 FAX :+44 (0) 1728 748 222
SustainableRecycled HDPE - Black option only
Conforms to SuDS
Made in the UK = Minimal Carbon Footprint
Durapath in use
GravelGeotextile Sheet
Weight1.28KG per tile
5.12KG per sqm
Tile Size500 x 500 x
40 mm
Working TemperatureHDPE -20 to +80°C
PP -20 to +70°CGround
Sand
Details
Durable
Load Factor - Tested up to 160 tonnes per sqm
Fire Rating - HB tested to BSEN 150 & Durapath independently tested by ESG, certified Global Sign Primary SHA 11925-2:2010 standardWithstands load without lift off
Integrated webbing for stability
Made to order in the UK
Unique hinge allows for an easy deployment and take up
Durapath is available in virtually any colour
Signage markers in various of colours, inculding flourescent or glow in the dark available
Versatile
Indentify and plan the final design before installation
Installation Visual Guide
1 2
Stage 1Plan & Prepare
High Street, Wickham Market IP13 0RFTEL : +44 (0) 1728 747 777 FAX :+44 (0) 1728 748 222
Stage 2Lay Down Base
Ensure a base of type 1 hardcore. Lay down 5-10mm of sharp sand and smooth it out
3 Lay down geotextile sheet to prevent weeds from growing through
Created by Calvin Goodmanfrom the Noun Project
4
Stage 3Place & Finish
Insert clips intothe slots
Incase of removal - use a flathead screwdriver
Lay the Durapath and clip together.5 Back fill durapath with gravel no bigger than 10mm and rake off excess6
Created by Calvin Goodmanfrom the Noun Project
Created by Calvin Goodmanfrom the Noun Project
Prepare the ground - smooth out and remove large rocks