ceesp electrical energy project management 9 human resources
TRANSCRIPT
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 1/52
Electrical EnergyConversion andPower Systems
Universidadde Oviedo
ELECTRICAL ENERGYPROJECT MANAGEMENT
Part 9 – Human Resources
Lecturer: José Ángel Díaz Álvarez
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 2/52
9. Human Resources
In the Project Management world
Brands
CompaniesFame
Prestige
2
do not secure results. People do.
Clients do not only hire companies, they want to secure
good teams too. E.g. Tender processes.
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 3/52
9. Human Resources
Human Resources are the BEST actives in a company, agood project team and a good HR management are a key
to success.
It is needed to:
3
• get the best new resources
and
•
maximize the performance of the existing ones
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 4/52
9. Human Resources
Human resources management process include:
HUMAN RESOURCES PLANNING
4
PROJECT TEAM ACQUISITION
PROJECT TEAM DEVELOPMENT
PROJECT TEAM MANAGEMENT
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 5/52
9. Human Resources
Human resources management process include:
HUMAN RESOURCES PLANNING
5
PROJECT TEAM ACQUISITION
PROJECT TEAM DEVELOPMENT
PROJECT TEAM MANAGEMENT
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 6/52
9.1 Human Resources Planning
Identify and document project roles, responsibilities andreporting structure.
Create the Staff Management Plan
6
For Human Resources planning it must be taken intoaccount:
• Organizational structure of the company
• Technical interfaces• Interpersonal interfaces
• Logistics
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 7/52
9.1 Human Resources Planning
Tools and techniques used for Human Resourcesplanning:
• Organization charts and role description
7
MatrixHierarchical Text
Oriented
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 8/52
9.1 Human Resources Planning
8Hierarchical
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 9/52
9.1 Human Resources Planning
9Matrix (RACI)
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 10/52
9.1 Human Resources Planning
Role_______________________________________________________________________________________________________________________
Responsibilities___________________________________________
______________________________________________________________
______________________________________________________________
____________________________________________________________________________________________________________________________
______________________________________________________________
______________________________________________________________
10
______________________________________________________________
Authority:________________________________________________________________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
Text oriented
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 11/52
9.1 Human Resources Planning
As the result of the HR Planning we get:
•
Roles and Responsibilities Roles
Authority
Responsibility
11
Competence
• Project Organization Chart
• Staff Management Plan Staff Adquisition
Timetable: Resource Histogram
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 12/52
9.1 Human Resources Planning
12
When the resource demand exceeds the maximum available, it is
needed a RESOURCE BALANCING STRATEGY
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 13/52
9. Human Resources
Human resources management process include:
HUMAN RESOURCES PLANNING
13
PROJECT TEAM ACQUISITION
PROJECT TEAM DEVELOPMENT
PROJECT TEAM MANAGEMENT
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 14/52
9.2 Project Team Acquisition
Project Team Acquisition is the process to get the humanresources needed to complete the project
The Project Management Team can have control over theselected team members or not
14
For Project Team Acquisition it must be taken into account:
• Environmental factors of the Company
• Organizational processes
• Roles and responsibilities
• Project organization chart
• Staff Management Plan
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 15/52
9.2 Project Team Acquisition
Project Team Acquisition is the process to get the humanresources needed to complete the project
The Project Management Team can have control over theselected team members or not
15
For Project Team Acquisition it must be taken into account:
• Environmental factors of the Company
• Organizational processes
• Roles and responsibilities
• Project organization chart
• Staff Management Plan
Availability: Who and When?
Capacity: What competences?Experience: Similar works? Well done?
Interests: People interested in the project?
Cost: How much to pay?
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 16/52
9.2 Project Team Acquisition
Project Team Acquisition is the process to get the humanresources needed to complete the project
The Project Management Team can have control over theselected team members or not
16
For Project Team Acquisition it must be taken into account:
• Environmental factors of the Company
• Organizational processes
• Roles and responsibilities
• Project organization chart
• Staff Management Plan
Internal procedures for staff assignment
HHRR Department cooperation Hiring
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 17/52
9.2 Project Team Acquisition
Tools and techniques used for Project Team Acquisition :
• Previous assignment
• Negotiation
Experience in similar projects
Tender Process
Pre-assignment
With functional managers
17
• Acquisition
• Virtual teams
Other project directors (sharing, relay…)Not enough resources in house
Team members that do not meet face to face (VC,e-mail). It allows:
Create teams with people from different geographies
Bring in the experience of an expert that lives away
Create teams with people working in different time zones
Included disabled people
Reduce or eliminate travel expenses
COMMS. PLANNING IS KEY FOR VIRTUAL TEAMS!
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 18/52
9.2 Project Team Acquisition
As the result of the Project Team Acquisition we get:
• Project Staff AssignmentAppropriate people chosen
• Resources Availability
18
Time availability of team members (to dedicate to the project)
• Staff Management Plan (Updates)Dynamic updating, from feedback or other situations:
Retiring Promotions
Medical leaves
…
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 19/52
9. Human Resources
Human resources management process include:
HUMAN RESOURCES PLANNING
19
PROJECT TEAM ACQUISITION
PROJECT TEAM DEVELOPMENT
PROJECT TEAM MANAGEMENT
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 20/52
9.3 Project Team Development
Project Team Development improves the competences andinteraction of team members, in order to improve the projectperformance
The targets are:
20
• mprove eam mem ers a es
• Improve the team as a group
For Project Team Development it must be taken into account:
• Project Staff Assignment• Resources Availability
• Staff Management Plan
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 21/52
9.3 Project Team Development
Project Team Development improves the competences andinteraction of team members, in order to improve the projectperformance
The targets are:
21
• mprove eam mem ers a es
• Improve the team as a group
For Project Team Development it must be taken into account:
• Project Staff Assignment• Resources Availability
• Staff Management Plan
List of team members needed in order to start the development
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 22/52
9.3 Project Team Development
Project Team Development improves the competences andinteraction of team members, in order to improve the projectperformance
The targets are:
22
• mprove eam mem ers a es
• Improve the team as a group
For Project Team Development it must be taken into account:
• Project Staff Assignment• Resources Availability
• Staff Management PlanWhen the team members can participate in team development activities
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 23/52
9.3 Project Team Development
Project Team Development improves the competences andinteraction of team members, in order to improve the projectperformance
The targets are:
23
• mprove eam mem ers a es
• Improve the team as a group
For Project Team Development it must be taken into account:
• Project Staff Assignment• Resources Availability
• Staff Management Plan
Identifies strategies and training plan to develop the project team
Continuous assessment as the project progresses
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 24/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
• General Management Abilities• Training
• Team Development Activities
24
•
Basic Rules• Relocation
• Recognition and Rewarding
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 25/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
• General Management Abilities• Training
• Team Development Activities
Interpersonal abilities, very important for team development:
25
•
Basic Rules• Relocation
• Recognition and Rewarding
, ,
Valuable actives to manage the project team
Reduce problems and improve cooperation
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 26/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
• General Management Abilities• Training
• Team Development Activities
Activities oriented to improve team members’ competencies
26
•
Basic Rules• Relocation
• Recognition and Rewarding
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 27/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
• General Management Abilities• Training
• Team Development Activities
27
•
Basic Rules• Relocation
• Recognition and Rewarding
Oriented to: Improve cohesion
Improve confidence
Improve interpersonal relationships
Especially relevant for virtual teams
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 28/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
•
General Management Abilities• Training
• Team Development Activities
28
•
Basic Rules• Relocation
• Recognition and Rewarding
Establish clean expectations from the beginning of the project, reduces
misunderstandings and improves productivity
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 29/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
•
General Management Abilities• Training
• Team Development Activities
29
•
Basic Rules• Relocation
• Recognition and RewardingLocate the most active team members in the same physical place, in order to
improve their team capacity.
Use planning charts, dashboards, etc.Not used for virtual teams
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 30/52
9.3 Project Team Development
Tools and techniques used for Project Team Development:
•
General Management Abilities• Training
• Team Development Activities
30
•
Basic Rules• Relocation
• Recognition and RewardingPerformed as designed during the Human Resources planning phase
R&R decisions taken during the team management process throughperformance assessment
Only to reward the desired behaviour. Justice must be perceived by all
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 31/52
9.3 Project Team Development
As the result of the Project Team Development we get:
•
Team Performance AssessmentDynamic assessment after development efforts implementation
Indicator examples:
31
Improvements in competencies Less staff rotation ratio
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 32/52
9. Human Resources
Human resources management process include:
HUMAN RESOURCES PLANNING
32
PROJECT TEAM ACQUISITION
PROJECT TEAM DEVELOPMENT
PROJECT TEAM MANAGEMENT
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 33/52
9.4 Project Team Management
Project Team Management means:• Team Members Performance follow-up
• Provide feedback
• Solve conflicts
• Coordinate changes
33
Improves project performance
It is complicated in matrix team structures (doublereporting, project oriented and functional)
Generally under the responsibility of the Project Director
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 34/52
9.4 Project Team Management
34
Matrix organization. Double reporting.
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 35/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
35
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 36/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
Policies, procedures and systems used in the organization
36
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 37/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
Provide a list of team members to be assessed
37
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 38/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
38
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
List used to supervise and assess the performance
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 39/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
39
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
Provides reporting lines picture
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 40/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
40
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
Informs about the period when team members work together and the
training plan
9 4 P j T M
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 41/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
41
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance Reports
The management team continuously assess the project team performance
Corrective actions can be taken
9 4 P j t T M t
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 42/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
•
Organization process actives• Project team assignment
• Roles and responsibilities
42
• Project organization chart
• Staff Management Plan
• Team Performance Assessment
• Team Performance Information
• Performance ReportsTeam members performance is observed as they work
9 4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 43/52
9.4 Project Team Management
For Project Team Management it must be taken intoaccount:
• Organization process actives
• Project team assignment
• Roles and responsibilities
43
• Staff Management Plan• Team Performance Assessment
• Team Performance Information
•
Performance ReportsNeeded to compare against project management plan:
Time
Cost Control
Scope
9 4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 44/52
9.4 Project Team Management
Tools and techniques used for Project Team Management :
• Observation and conversation
• Conflict Management
44
• Performance Assessment
• Polemics Register
9 4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 45/52
9.4 Project Team Management
Tools and techniques used for Project Team Management :
• Observation and conversation
• Conflict Management
Used to keep in touch with the work and team members’ attitudes.
Behavioural observation
45
• Performance Assessment
• Polemics Register
9 4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 46/52
9.4 Project Team Management
Tools and techniques used for Project Team Management :
• Observation and conversation
• Conflict Management
46
• Performance Assessment
• Polemics Register
Group normsCommunications planning Reduces conflict
Role definition
Opinion differences are not necessarily negative More creativity
Better decisionsIf conflict arises Dealt in early stages
Dealt in private environment
Direct and constructive approach
If needed, intensify actions until disciplinary
9 4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 47/52
9.4 Project Team Management
Tools and techniques used for Project Team Management :
• Observation and conversation
• Conflict Management
47
• Performance Assessment
• Polemics Register
Must be provided as feedback to team members
360º can be chosenIt helps to clarify roles and responsibilities
structured time for stopping and feeding back
find opened or unsolved conflicts
develop IDPs
set target for new periods
9 4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 48/52
9.4 Project Team Management
Tools and techniques used for Project Team Management :
• Observation and conversation
• Conflict Management
48
• Performance Assessment
• Polemics Register
Documents: solution responsible/target day. Written register
9.4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 49/52
9.4 Project Team Management
As the result of the Project Team Management we get:
• Requested changes
Staff changes might affect the rest of the project plan (e.g. scheduledelay or cost overrun) process a request
49
• Recommended corrective actions
Staff changes (transfer, externalize works, replace team members)Additional Training
Disciplinary actions
• Recommended preventive actionsReduce the probability to have HR conflicts
9.4 Project Team Management
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 50/52
9.4 Project Team Management
As the result of the Project Team Management we get:
• Organization process actives (updating)
Performance assessment input
Lessons learned documentation
50
• Project Management Plan (updated)Change requests PMP updates:
Corrective actions - new roles for team members
- additional training actions
- reward decisions
- …
Questions & Answers
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 51/52
Questions & Answers
51
7/29/2019 CEESP Electrical Energy Project Management 9 Human Resources
http://slidepdf.com/reader/full/ceesp-electrical-energy-project-management-9-human-resources 52/52
52