    Electrical EnergyConversion andPower Systems

    Universidadde Oviedo

    ELECTRICAL ENERGYPROJECT MANAGEMENT

    Part 10 Quality Management

    Lecturer: Jos ngel Daz lvarez

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    2/43

    10. Quality Management

    In the Quality Management world it is used a terminologythat seems similar to the one we use in our daily

    language.

    However, there are several concepts that have nuances in

    2

    its meaning, those nuances make them different to whatwe intuitively understand.

    It is important to review them first.

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    3/43

    10. Quality Management

    Object: something perceivable or conceivable.

    Process: set of activities interrelated that uses resourcesin order to change one objet into another.

    3

    roce ure: spec c way o per orm ng act v t es. t can ewritten or not.

    Register: document that brings objective evidence aboutthe performed activities and the obtained results.

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    4/43

    10. Quality Management

    Product: Process result. Services are considered as nontouchable products.

    Client: the one who receives a product

    4

    Supplier: the one who provides a product

    Client and supplier can be external or internal

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    5/43

    10. Quality Management

    Human Resources

    Procedures

    PROCESS

    SUPPLIER CLIENT

    Product Product

    5

    Material Resources

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    6/43

    10. Quality Management

    ContractBasic

    engineering

    Detailed

    EngineeringPurchasing

    Shipping PackingFactory

    Manufacturing

    6

    Site

    assembly Commissioning Tests Acceptance

    Project lifecycle as an interrelated structured process

    WTG supply contract (t-k)

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    7/43

    10. Quality Management

    Quality definitions:

    Philip Crosby: Quality is the fulfilling of requirements

    7

    .

    ISO 9000: The ability of a set of intrinsic characteristics tosatisfy requirements

    Requirements: Needs or expectations. They can be explicit or implicit and

    must be identified during the project requirement development process

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    8/43

    10. Quality Management

    Quality problem: It is produced when the full requirementsatisfaction is not achieved

    Non conformity: Non compliance with a requirement

    8

    e ect: on comp ance w t a requ rement assoc atewith a planned use

    Defects and non conformities are not the same. There isa very important difference because of legal implications:responsibility of products

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    9/43

    10. Quality Management

    Corrective action: Action taken in order to eliminate anexisting non conformity origin

    Preventive action: Action taken in order to eliminate apotential non conformity origin

    9

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    10/43

    10. Quality Management

    Efficacy: Extension in what the planned activities areperformed or planned targets are achieved (effectiveness)

    Efficiency: Ratio between the achieved results and theused resources

    10

    Improvement action: Action taken in order to improvethe efficacy and efficiency

    Corrective actions and preventive actions

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    11/43

    10. Quality Management

    The Quality Management System is the set of: Organizational structure

    Processes

    Resources

    Procedures

    needed to set and fulfill quality policy and quality targets

    11

    The Project Quality Management processes include all theactivities that establish Quality policies

    Quality Targets Quality Responsibilities

    in order that the project satisfies the needs that originated it

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    12/43

    10. Quality Management

    The Quality Plan is a document where

    Standards

    Processes Resources

    Practices

    12

    are described for a specific project

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    13/43

    10. Quality Management

    CONTRACTORS

    QUALITY

    MANAGEMENTSYSTEM

    CLIENTS

    REQUIREMENTSPROJECT

    13

    QUALITY

    MANUALCONTRACT

    PROJECT

    QUALITY

    PLAN

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    14/43

    10. Quality Management

    Project Quality Management process include:

    QUALITY PLANNING

    14

    QUALITY ASSURANCE (QA)

    QUALITY CONTROL (QC)

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    15/43

    10. Quality Management

    Project Quality Management process include:

    QUALITY PLANNING

    15

    QUALITY ASSURANCE

    QUALITY CONTROL

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    16/43

    10.1 Quality Planning

    Identify quality rules relevant for the project, and how toachieve them

    Must be done during the project planning phase, and caninfluence the rest of the planning activities

    16

    For Quality Planning it must be taken into account:

    External factors

    Internal factors Project scope statement

    Project management plan

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    17/43

    10.1 Quality Planning

    Tools and techniques used for Quality Planning:

    Cost/benefit analysis

    17

    Benchmark with other projects

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    18/43

    10.1 Quality Planning

    Tools and techniques used for Quality Planning:

    Cost/benefit analysisCost: Quality Management costs

    Benefit: less reprocess less cost

    18

    Benchmark with other projects

    more stakeholders satisfactionCost of Quality: total quality cost, management plus reprocess costs

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    19/43

    10.1 Quality Planning

    Tools and techniques used for Quality Planning:

    Cost/benefit analysis

    19

    Benchmark with other projects

    Improvement ideas

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    20/43

    10.1 Quality Planning

    As the result of the Quality Planning we get:

    Quality Management Plan Quality Metrics

    Quality Checklists

    20

    Quality baseline Updated Project Management Plan

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    21/43

    10.1 Quality Planning

    As the result of the Quality Planning we get:

    Quality Management Plan Quality Metrics

    Quality Checklists

    Describes the practical implementation of the Quality Management System

    Part of the Project Management Plan

    Includes the a roach to:

    21

    Quality baseline Updated Project Management Plan

    Quality AssuranceQuality Control

    Continuous Improvement

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    22/43

    10.1 Quality Planning

    As the result of the Quality Planning we get:

    Quality Management Plan Quality Metrics

    Quality Checklists

    Used in Quality Assurance and Quality Control processes

    22

    Quality baseline Updated Project Management Plan

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    23/43

    10.1 Quality Planning

    As the result of the Quality Planning we get:

    Quality Management Plan Quality Metrics

    Quality Checklists

    23

    Quality baseline Updated Project Management Plan

    Verify all the needed stepsUsed in QC process

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    24/43

    10.1 Quality Planning

    As the result of the Quality Planning we get:

    Quality Management Plan Quality Metrics

    Quality Checklists

    24

    Quality baseline Updated Project Management PlanQuality targets are registered

    Quality performance measured against it

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    25/43

    10.1 Quality Planning

    As the result of the Quality Planning we get:

    Quality Management Plan Quality Metrics

    Quality Checklists

    25

    Quality baseline

    Updated Project Management Plan

    Including Quality Management Plan

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    26/43

    10. Quality Management

    Project Quality Management process include:

    QUALITY PLANNING

    26

    QUALITY ASSURANCE

    QUALITY CONTROL

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    27/43

    10.2 Quality Assurance

    Application of all the planned and systematic quality activitiesin order to ensure that the project uses all the neededprocesses to meet requirements

    Usually supervised by specific teams

    27

    Quality Management Plan Quality Metrics Work Performance Information Change Requests Quality Control measurements (feedback for QA) Corrective and preventive actions Defect reparation

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    28/43

    10.2 Quality Assurance

    Tools and techniques used for Quality Assurance:

    Quality AuditsStructured and independent review to check if the project activities

    comply with the organizations politics, processes and procedures

    28

    o programmed or random

    o internally or externally made

    Process AnalysisIn order to identify improvements both technical and organizational

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    29/43

    10.2 Quality Assurance

    As the result of the Quality Assurance we get:

    Requested changes Updates:

    Organizations process actives

    29

    ro ect anagement an

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    30/43

    10. Quality Management

    Project Quality Management process include:

    QUALITY PLANNING

    30

    QUALITY ASSURANCE

    QUALITY CONTROL

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    31/43

    10.3 Quality Control

    Supervise the final specific project results (deliverables,cost performance, schedule), to check if the relevant

    quality rules are met

    Identify the way to eliminate unsatisfactory results

    31

    It must be continuous during all the project

    Performed by an specific department or unit

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    32/43

    10.3 Quality Control

    For Quality Control it must be taken into account:

    Project Management Plan Quality Metrics

    Quality Checklists

    32

    Work performance report Approved change requests

    Deliverables

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    33/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Root cause analysis (Ishikawa diagram) Control diagrams

    Flux diagrams

    33

    Histograms Pareto diagrams

    Dispersion diagram

    Statistic sampling

    Inspection

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    34/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Root cause analysis (Ishikawa diagram): it shows howdifferent factors/causes can be linked to problems/effects

    34

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    35/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Control diagrams: they show the steadiness of the process.Normally used for repetitive activities (e.g. production lots)

    35

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    36/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Flux diagrams: graphical representation of a process. Theyhelp to analyze how problems can be created.

    36

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    37/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Histograms: they show variables distribution. It helps toidentify the problem causes by the shape and width of thedistribution

    37

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    38/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Pareto diagrams: Specific histogram ordered by frequency, toguide the corrective actions. Also called 80/20 (80% ofproblems coming from 20% of causes Paretos law

    38

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    39/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Dispersion diagram: they show the relation pattern betweenvariables

    39

    l l

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    40/43

    10.3 Quality Control

    Tools and techniques used for Quality Control:

    Statistic sampling: Choose a part of the population forinspection.

    40

    Inspection: Product or work exam, to check its compliancewith the rules. They can be made at all levels:

    Activities

    Final project result

    10 3 Q li C l

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    41/43

    10.3 Quality Control

    As the result of the Quality Control we get:

    Quality Control Measurements (QC that feedback QA) Recommended corrective actions

    Recommended preventive actions

    41

    Requested changes

    Defect fixing (defects identified and fixing recommended)

    Validated deliverables

    Updates:

    Quality baseline

    Organizations process actives (fulfilled checklists, learned lessons)

    Project Management Plan

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    42/43

    Questions & Answers

    42

  • 7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management

    43/43

    43