Weeks No Days Description y/n R A G % 1 2 3 4 5 6 M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F S S M T W T F 21 5 CRITICAL GATEWAYS LEGEND Client Stakeholder engagement Go / No-Go meetings Project meeting UPDATE REGISTERS AND LOGGS AND REPROTS Lyons Jewellery, PROJECT PLAN: change to Shop window displays, POP, & POS alterations; comprising the construction of POP, POS & VM Displays plus off-site construction & On-Site demolition, alteration, and construction work packages GATEWAYS COMMUNICATION Week 7 Week 8 Week 9 Week 10 Week 11 STATUS Week -2 Week -1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 1) BREITLING JETMAN DISPLAY 2) DISPLAY SHELVING REPORTING OFF-SITE SECURITY PRODUCTION ON-SITE WORKS 7) Replacement wall units 6) Interactive tables 2) Breitling Shard 3) Breitling display jets 4) Breitling Holographic DATE PM N K-W 21 27 36 26 22 15 8. On-site demolition and construction 9. Display, POP, and POS installations 10. Project sign-off and Project close Key programme events 1. Client sign off for project start 2. Client approval for landlord & BC applications 3. Landlord approval and sign-off 4. Building control approval and sign-off 5. Production of Displays, POP & POS 7. Client sign off of displays 24 SHEET NO. 01 8/4/12 GATEWAY 1 CLIENT APPROVAL GATEWAY 2 LANDLORD APPROVAL GATEWAY 3 BUILDING CONTROL APPROVAL GW 5 SITE WORKS GW 6 SITE SIGN OFF GATEWAY 4 CLIENT SIGN-OFF OF DISPLAYS CLIENT SIGN-OFF CLIENT SIGN-OFF DISPLAYS APPROVAL & SIGN-OFF. SECURITY APPROVAL BUILDING CONTROL APPROVAL DATE LANDLORD SIGN-OFF RETAIL DESIGN SIGN-OFF RISK ASSECMENT SIGN-OFF RETAIL DESIGN PACKAGE DETAILED DISPLAY DESIGN SITE SECURITY DETAILED HSE & SITE RISK PLANNING HSE & BC SIGN-OFF INSPECTION STORE DESIGN SUBMISSION FOR CLIENT APPROVAL DESIGN SUBMISSION FOR LANDLORD APPROVAL BUILDING CONTROL APPLICATION PROD. DWG DISPLAY GLAZING PRODUCTION GLAZING FRAMEWORK PRODUCTION SECURITY DOOR PRODUCTION SNAGGING SHIPPING PROD. DWG DEMOLITION CONSTRUCTION PROD. DWG JETMAN DISPLAY STAND JETMAN MANAKIN JETMAN COSTUME JETMAN WING & GRAPHICS JETMAN HELMET ASSEMBLY SNAGGING PACK PROD. DWG ASSEMBLY DISPLAY TRAY MANAFACTURE 1ST FIX SNAG PACK SHELVING SOFTWARE WRITING INTERACTIVE TABLE LEAD TIME BRACKETS MANUFACTURE STAND MANAFACTURE INTERACTIVE COLUMNS MANAFACTURE ASSEMBLE SNAG PACK PROD. DWG MANUFACTURE UNITS GRAPHICS LEAD TIME INST. GRAPHIC ASSEMBLE SNAG PROD. DWG SHARD MANUFACTURE LEAD TIME TRUNTABLE ASSEMBLE SNAG PACK PROD. DWG MODEL JET PRODUCTION ASSEMBLE SNAG. PACK PACK ASSEMBLE HOLOGRAPHIC PROGRAMMING. PROD. DWG HOLOGRAPHIC PDISPLAY CASE MANUFACTURE. Y / N Y / N Y / N Y / N Y / N PM PM PM PM PM PM PM PM PM PM LOGS PM LOGS LOGS LOGS LOGS LOGS LOGS LOGS LOGS LOGS LOGS RISK BENIFITS PRESENTATION TRAINING PRESENTATION STRUCUTRAL ASSESMENTS SALES BENIFITS PRESENTATION SITE INPECTIONS DISPLAYS INSPECTION BUILDING CONTROL UPDATE BUILDERS COMISSIONED TRAINING PRESENTATION DISPLAYS COMMISSIONED SITE CONTRTOR CHOSEN SITE MOBILISATION STAFF TRAINING ASSESMENT STAFF TRAINING PROGRAMME TRAINING APPROVAL SITE CONSTRUCTION FINAL DISPLAY ASSEMBLY PM GO / NO-GO BC DISPLAYS PM SHOP BUILD PM GO / NO-GO FROM LANDLORD Y / N PM GO / NO-GO FROM CLIENT PROJECT INITIATION PROGRESS REPORT PROGRESS REPORT PROGRESS REPORT PROJECT CLOSE PM PROJECT HANDOVER INSALL INSTALL INSTALL CLIENT SIGN-OFF CLIENT SIGN-OFF CLIENT SIGN-OFF PACK INSTALL CLIENT SIGN-OFF INSTALL GRAPHICS LEAD-IN TIME WIRES LEAD-IN TIME INSTALL CLIENT SIGN-OFF INSTALL CLIENT SIGN-OFF SHIP SHIP SHIP SHIP SHIP SHIP SHIP INSTALL LOGS PROJECT START CLIENT DISPLAYS SIGN OFF RETURN TO FULL TRADING AREA PROJECT CLOSE REDUCED RETAIL TRADING AREA DISPLAY, POP & POS MANUFACTURING OFF-SITE SECURITY GLAGING MANUFACTURING Y / N PM SNAG

Upload: nick-kirkman-wood-ma

Post on 17-Aug-2015

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Breitling programme V-2a

Weeks No Days

Description y/n R A G % 1 2 3 4 5 6 M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F S S M T W T F

21

5

CRITICAL GATEWAYS

LEGEND

Client Stakeholder engagement Go / No-Go meetings

Project meeting UPDATE REGISTERS AND LOGGS AND REPROTS

Lyons Jewellery, PROJECT PLAN: change to Shop window displays, POP, & POS alterations; comprising the construction of POP, POS & VM Displays plus off-site construction & On-Site demolition, alteration, and construction work packages

GATEWAYS

COMMUNICATION

Week 7 Week 8 Week 9 Week 10 Week 11STATUS Week -2 Week -1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

1) BREITLING JETMAN DISPLAY

2) DISPLAY SHELVING

REPORTING

OFF-SITE SECURITY PRODUCTION

ON-SITE WORKS

7) Replacement wall units

6) Interactive tables

2) Breitling Shard

3) Breitling display jets

4) Breitling Holographic

DATEPM N K-W

21

27

36

26

22

15

8. On-site demolition and construction

9. Display, POP, and POS installations

10. Project sign-off and Project close

Key programme events 1. Client sign off for project start

2. Client approval for landlord & BC applications

3. Landlord approval and sign-off

4. Building control approval and sign-off

5. Production of Displays, POP & POS

7. Client sign off of displays

24

SHEET NO. 018/4/12

GATEWAY 1 CLIENT APPROVAL GATEWAY 2 LANDLORD APPROVAL GATEWAY 3 BUILDING CONTROL APPROVAL GW 5 SITE WORKS GW 6 SITE SIGN OFFGATEWAY 4 CLIENT SIGN-OFF OF DISPLAYS

CLIENT SIGN-OFF

CLIENT SIGN-OFF

DISPLAYS APPROVAL & SIGN-OFF.SECURITY APPROVALBUILDING CONTROL APPROVAL DATELANDLORD SIGN-OFFRETAIL DESIGN SIGN-OFF RISK ASSECMENT SIGN-OFF

RETAIL DESIGN PACKAGE DETAILED DISPLAY DESIGN SITE SECURITY DETAILED HSE & SITE RISK PLANNING

HSE & BC SIGN-OFF INSPECTION

STORE DESIGN SUBMISSION FOR CLIENT APPROVAL DESIGN SUBMISSION FOR LANDLORD APPROVAL

BUILDING CONTROL APPLICATION

PROD. DWG DISPLAY GLAZING PRODUCTION

GLAZING FRAMEWORK PRODUCTIONSECURITY DOOR PRODUCTION SNAGGING SHIPPING

PROD. DWG DEMOLITION

CONSTRUCTION

PROD. DWG JETMAN DISPLAY STAND

JETMAN MANAKIN JETMAN COSTUME

JETMAN WING & GRAPHICS JETMAN HELMET ASSEMBLY SNAGGING

PACK

PROD. DWG

ASSEMBLY

DISPLAY TRAY MANAFACTURE 1ST FIX SNAG

PACKSHELVING

SOFTWARE WRITING

INTERACTIVE TABLE LEAD TIME

BRACKETS MANUFACTURE STAND MANAFACTURE INTERACTIVE COLUMNS MANAFACTURE

ASSEMBLE

SNAG

PACK

PROD. DWG MANUFACTURE UNITS

GRAPHICS LEAD TIME INST. GRAPHIC

ASSEMBLE

SNAG

PROD. DWG SHARD MANUFACTURE

LEAD TIME TRUNTABLE

ASSEMBLE

SNAG

PACK

PROD. DWG MODEL JET PRODUCTION ASSEMBLE

SNAG.

PACK

PACKASSEMBLE

HOLOGRAPHIC PROGRAMMING.

PROD. DWG HOLOGRAPHIC PDISPLAY CASE MANUFACTURE.

Y / N Y / N Y / N Y / N Y / N

PM

PM

PMPM PM PM PM PM PMPMLOGS

PM

LOGS LOGS

LOGS LOGS

LOGS

LOGS

LOGS

LOGS LOGS

LOGS

RISK BENIFITS PRESENTATION TRAINING PRESENTATIONSTRUCUTRAL ASSESMENTSSALES BENIFITS PRESENTATION SITE INPECTIONSDISPLAYS INSPECTIONBUILDING CONTROL UPDATE BUILDERS COMISSIONEDTRAINING PRESENTATION

DISPLAYS COMMISSIONED SITE CONTRTOR CHOSEN SITE MOBILISATION

STAFF TRAINING ASSESMENT

STAFF TRAINING PROGRAMME

TRAINING APPROVAL

SITE CONSTRUCTIONFINAL DISPLAY ASSEMBLY

PM GO / NO-GO BC DISPLAYSPM

SHOP BUILD

PM GO / NO-GO FROM LANDLORDY / N PM GO / NO-GO FROM CLIENTPROJECT INITIATION

PROGRESS REPORTPROGRESS REPORTPROGRESS REPORT

PROJECT CLOSE PM

PROJECT HANDOVER

INSALL

INSTALL

INSTALL

CLIENT SIGN-OFF

CLIENT SIGN-OFF

CLIENT SIGN-OFFPACK

INSTALL

CLIENT SIGN-OFF

INSTALL

GRAPHICS LEAD-IN TIME WIRES LEAD-IN TIME INSTALL

CLIENT SIGN-OFF

INSTALL

CLIENT SIGN-OFF

SHIP

SHIP

SHIP

SHIP

SHIP

SHIP

SHIP

INSTALL

LOGS

PROJECT START CLIENT DISPLAYS SIGN OFF RETURN TO FULL TRADING AREA

PROJECT CLOSEREDUCED RETAIL TRADING AREADISPLAY, POP & POS MANUFACTURING

OFF-SITE SECURITY GLAGING MANUFACTURING

Y / N

PM

SNAG