    Aspects of Surveying inConstruction

    CIVIL ENGINEERING DESIGN 1forSTRUCTURAL STEELWORK DESIGN

    2011

  • 8/3/2019 Aspect of Surveying in Construction 2

    2/28

    3. THE PROJECTThe SitePutra interstate coach terminal is located at

    Jalan Putra, Kuala Lumpur, latitude 3 degree10 2 North of the Equator and longitude 101

    degree 41 25 East of the Prime Meridian.

    Any Project has Spatial Aspect

  • 8/3/2019 Aspect of Surveying in Construction 2

    3/28

    Spatial Aspect of Project

    b) The Brief

    i) Brief Manifesto

    The brief calls for the design of a high rise mixed-used

    tower building to be situated at Terminal Putra, KualaLumpur.

    The students are expected to contain the site limitationor boundaries are as per the existing footprints of thePutra Coach terminal respecting all statutory and theDewan Bandaraya Kuala Lumpur Urban Designguidelines (UDG).

  • 8/3/2019 Aspect of Surveying in Construction 2

    4/28

    List of Surveys Activities

    Recce survey

    Topo survey/plan

    Original Ground Level (OGL)

    Boundary Survey Pre-construction plan

    Setting out survey/plan

    Building pegging Construction survey

    As-built plan

  • 8/3/2019 Aspect of Surveying in Construction 2

    5/28

    Why Require Survey ?

    Requirement by Law

    Pre-construction

    Setting-out

    Requirement by Practice

    Topo survey

    Boundary survey

    As-built plan

    Construction survey

  • 8/3/2019 Aspect of Surveying in Construction 2

    6/28

    Requirement by Law

    Uniform Building by-Law 1984 Part II Submission of Plans For Approval

    Para 10. Plans required.

  • 8/3/2019 Aspect of Surveying in Construction 2

    7/28

    Pre-construction survey plan

  • 8/3/2019 Aspect of Surveying in Construction 2

    8/28

  • 8/3/2019 Aspect of Surveying in Construction 2

    9/28

  • 8/3/2019 Aspect of Surveying in Construction 2

    10/28

    The site of the proposed building lot

  • 8/3/2019 Aspect of Surveying in Construction 2

    11/28

    The means of access to the site from the street and thename of the street.

  • 8/3/2019 Aspect of Surveying in Construction 2

    12/28

    Complete lines of surface water and foulwater drainage

  • 8/3/2019 Aspect of Surveying in Construction 2

    13/28

    Requirement by Law

    Para 23. Notice of Completion of settingout

    (1)As soon as the setting out of building has been

    completed, the qualified person shall give written noticeto the local authority in Form C in the Second Schedule

    Hence requires setting out plan

  • 8/3/2019 Aspect of Surveying in Construction 2

    14/28

  • 8/3/2019 Aspect of Surveying in Construction 2

    15/28

    Setting Out Plan

  • 8/3/2019 Aspect of Surveying in Construction 2

    16/28

    Setting Out Plan

  • 8/3/2019 Aspect of Surveying in Construction 2

    17/28

    Setting Out Plan

  • 8/3/2019 Aspect of Surveying in Construction 2

    18/28

    Setting Out Data

    585.10

    200.153200.149600.176400.184dist22

    "'52.151222

    40816.0tan8.9

    4

    N 184.400

    E 149.200

    N 176.600E 153.200

    CP

    P1

    Dist CP to P1 is 10.585 mBearing CP to P1 is

    3334747.4

  • 8/3/2019 Aspect of Surveying in Construction 2

    19/28

    Requirement by Practice Topo survey

    Boundary survey As-built plan

    Construction survey

  • 8/3/2019 Aspect of Surveying in Construction 2

    20/28

    Boundary Survey

    Correct site

    Project within the boundary of proposedsite

    the site limitation or boundaries are as per the existing

    footprints of the Putra Coach terminal

  • 8/3/2019 Aspect of Surveying in Construction 2

    21/28

    Topo, Boundary, OGL (other details?)

  • 8/3/2019 Aspect of Surveying in Construction 2

    22/28

    From Topo Survey

    Engineer and architect will base theirdesign

    Retaining wall required?

    Cut and fill required?

    Point of discharge of proposed drains

    etc

  • 8/3/2019 Aspect of Surveying in Construction 2

    23/28

    Construction Start

    Construction survey

    Control of verticality

  • 8/3/2019 Aspect of Surveying in Construction 2

    24/28

  • 8/3/2019 Aspect of Surveying in Construction 2

    25/28

    As-built plan (building, road, sewerage)

  • 8/3/2019 Aspect of Surveying in Construction 2

    26/28

    Spatial aspectOf project

    Recce survey

    Topo survey

    Pre-const survey

    design

    Setting-out survey/Building pegging

    ConstructionTake place

    Construction survey

    As-built survey plan