appendix f: preliminary engineering drawings of the
TRANSCRIPT
Basin Electric Deer Creek Station Project
Addendum to the South Dakota PUC Application Docket EL09-015 F-1
Appendix F: Preliminary Engineering Drawings of the Electric Transmission Line and Structures
Basin Electric Deer Creek Station Project
F-2 Addendum to the South Dakota PUC Application Docket EL09-015
This page intentionally left blank.
-10+00 -5+00 0+00 5+00 10+00 15+00 20+00 25+00 30+00 1750
1800
1850
1900
1950
2000
1750
1800
1850
1900
1950
2000
PI 0
°00
'00
"
PI 7
3°5
9'4
7"
PI -6
1°3
9'3
5"
PI 0
°00
'00
"
AP
0+
00
.00
AP
11
+3
2.0
2
WA
PA
CR
OS
SIN
G 1
2+
66
.78
W
AP
A C
RO
SS
ING
12
+9
8.3
2
WA
PA
CR
OS
SIN
G1
3+
29
.86
AP
15
+5
5.0
6
AP
30
+8
5.7
4
STEEL A-FRAMESTA=0+00.00TAKEOFF
HD3-090STA=5+90.00001AP 1
HD3-070STA=11+32.02002AP 2
TPD-030STA=12+70.00003
HD3-070STA=15+55.06004AP 3
HS3-085STA=20+60.00005
HD3-070STA=27+00.00006
STEEL A-FRAMESTA=30+85.74TAKEOFF
590.00 542.02
137.98
285.06
504.94
640.00 385.74
160' R/W
150' R/W
WESTERNAREA
175' R/W
50'
100'
EXISTING 345KV (WAPA)WAPA STRUCTURE
POWERADMINISTRATION
WHITESUBSTATION
DEER CREEK STATION
BASIN ELECTRIC POWER COOPERATIVEW1700 FT, NE1/4 SECTION 25 T111N R48WCONTAINING 103.16 ACRESSTA 13+14.46 TO STA 30+85.73
HARRIS DAVIS REVOCABLE LIVING TRUSTN1/2, SW1/4 SECTION 25 T111N R48WSURVEY LENGTH 883.02, 3.44 ACRESSTA 4+05.5 TO STA 13+14.46
00300030
PARCEL 1
A.P. 2STA. 15+55.05N 222636.15E 2873850.97
N10°07'23"E
A.P. 1STA. 11+32.02N 222503.90E 2873449.14
N02°12'50"W
N71°46'55"E
TAKEOFF 001
002
003
004
005
006
TAKEOFF
5+
00
10
+0
0
15+00
20+
00
25+
00
30+
00
35
+0
0
40
+0
0
DEER CREEK STATION TO WAPA SUBSTATION
-
-
-
-
-
10,230
VARIES VARIES
DATE OF AERIAL PHOTOGRAPHYNOVEMBER 08, 2007
GEODIGITAL INTERNATIONAL
ZONE: SD NORTH 4001
DATE OF AERIAL PHOTOGRAPHYUNKNOWN
TERRASERVER DOWNLOAD
478-090-T3-001
1
DESCRIPTIONREV DRWN DSGN APPD DATE REV DESCRIPTION DRWN DSGN APPD DATE STATE NAME: SOUTH DAKOTA DESIGN BY: TRANSMISSION SYSTEM MAINTENANCE
478 - 345KV LINE - DEER CREEK TO WAPA WHITE SUBSTATION
DEER CREEK 345KV TIE LINE
PLAN AND PROFILE
DESIGN INFORMATION
-
OHGW
CONDUCTOR
SIZE STRINGINGTENSION
NESCTENSION DESIGN ACTUAL
DRAWN BY:
DESIGN CHK:
DRAFT CHK:
APPROVED:
SCALE: COUNTY NAME:
BASIN DRAWING NO. REV.
BASIN ELECTRICPOWER COOPERATIVE1717 EAST INTERSTATE AVENUEBISMARCK, NORTH DAKOTAPHONE 701-223-0441
CDB
2
3
4
FACILITY:
LOCATION UNIT:
AS SHOWN
0
- - -
-
7/16" E.H.S. STEEL
1272.0 KCMIL 45/7 ACSR
RULINGSPAN
RULINGSPAN
10-29-09
BROOKINGS
LEFT PROFILE 30`
RIGHT PROFILE 30`
FOR REVIEW ONLYNOT FOR CONSTRUCTION
PRINTED ON: 12/16/2009
CDB 10-29-09
SW 11-23-09
VARIES VARIES
100° C CONDUCTOR SAG
30 FT GROUND CLEARANCE
SW/DGE 11-24-09
VERT. SCALE
HORIZ. SCALE20.0 FT.
200.0 FT.
NO
RT
H