ANNEX 1 APPENDIX B - INSTALLATION DRAWINGS FORMARINE CENTER HNEI POWER SYSTEM LAB AT PIER 35
965 N Nimitz Hwy, 817
TMK: 1-5-034:004 & 032
Lyman Morikawa HN
EI
PO
WE
R S
YS
TE
M L
AB
A
T P
IER
35
PROPOSED
852.60
340.08
91.80
503.16
198.25
239.56
107.
02
137.
25
144.06
55.01
143.3
89.98
EASEMENT "A"
EASEMENT "B"
EASE
MEN
T
INGRESS & EGRESS EASEMENT
EASEMENT "D"
EASEMENT "C"
TMK: (1) 1-5-034:026
TMK: (1) 1-5-034:006
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E1
GENERAL NOTES1.
2.
ALL ELECTRICAL WORK TO BE DONE IN ACCORDANCE WITH THE RULES AND
LIFE SAFETY CODE AND 2017 EDITION OF THE NATIONAL ELECTRICAL CODE.
CONTRACTOR TO OBTAIN AND PAY FOR THE ELECTRICAL PERMIT AS REQUIRED BYLAWS AND RULES. ARRANGE FOR PERIODIC INSPECTION BY LOCAL AUTHORITIES ASWORK PROGRESSES.
ALL MATERIALS TO BE NEW AND BE LISTED BY UNDERWRITERS LABORATORIES ASCONFORMING TO ITS STANDARDS WHERE SUCH STANDARDS EXIST.
ANY DEVIATIONS FROM THE PLANS AND SPECIFICATIONS TO BE REFERRED TO THEENGINEER PRIOR TO IMPLEMENTATION FOR APPROVAL.
VERIFY EQUIPMENT MOUNTING HEIGHTS WITH OWNER OR SUPPLIER PRIOR TO THE INSTALLATION.
VERIFY AND CHECK ALL DIMENSIONS AT JOB PRIOR TO PROCEEDING WITH WORK.
VERIFY EXISTING ELECTRICAL SYSTEM AND SITE WORKING CONDITIONS PRIOR TO SUBMITTING BID OR PROPOSAL.
TORQUE ELECTRICAL CONNECTIONS PER MANUFACTURER'S RECOMMENDED
BALANCE ELECTRICAL LOAD AT PANEL.
CONTRACTOR TO VERIFY THE SUITABLE REUSE OF EXISTING ELECTRICAL WIRING.
REMOVE ANY UN-USED ELECTRICAL WIRING.
COORDINATE AND SCHEDULE POWER OUTAGES WITH OWNER.
ALL WORK TO BE PERFORMED IN A NEATLY EXECUTED AND WORKMANLIKE MANNER.
PROVIDE EQUIPMENT GROUNDING AS REQUIRED BY CODE.
CONDUCTORS SHALL BE THHN/THWN, #12 MIN. COPPER.
REGULATIONS OF THE COUNTY OF HONOLULU AND THE CURRENT EDITION OF THE
AND REQUIREMENTS TO OBTAIN ELECTRICAL SERVICES.CONTRACTORS TO COMPLY WITH ALL HAWAIIAN ELECTRIC COMPANY STANDARDS
CONFORM TO THE TRUE INTENT AND MEANING OF THE DRAWINGS ANDOR PARTS INCLUDING INSTALLATION LABOR TO MAKE THE DEFECTIVE PORTIONACCEPTANCE OWNER TO BE REPLACED BY MATERIALS, APPARATUSSUPPLIED BY THE CONTRACTOR DEVELOPING DEFECTS WITHIN ONE (1) YEAR OF FINALINSTALLATION TO BE COMPLETE IN EVERY DETAIL AND READY FOR USE. ANY ITEM
TURN OVER TO THE ENGINEER AT THE COMPLETION OF THE WORK.LOGICAL ORDER. PREPARE A RECORD DRAWING REFLECTING ANY DEVIATIONS TOTHE CIRCUIT ROUTING AND LAYOUT ARE TYPICAL ONLY AND MAY BE VARIED IN A
3.
4.
5.
SPECIFICATIONS, AT NO ADDITIONAL COST TO THE OWNER.
6.
7.
8.
9.
10.
11.
12.
13.
14.SPECIFICATIONS.
15.
16.
17.
18.
BE PROTECTED BY METHODS DESCRIBED IN IBC 2006 SEC. 712.FIRE-RESISTANCE-RATED WALL ASSEMBLIES (LISTED IN IBC 2006 SEC. 712.3) SHALLPENETRATIONS OF HORIZONTAL ASSEMBLIES (LISTED IN IBC 2006 SEC. 712.4) AND19.
ELECTRICAL SITE PLANSCALE: 1" = 50'-0"
N I M I T
Z H
I G H
W A
Y
PIER 35
N
PROJECT LOCATIONUNIT 123
EXISTING BUILDINGEXISTING BUILDING
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
SINGLE LINE DIAGRAMNOT TO SCALE
E2
EXIS
T.
3P100A
EXIST. PANEL "4H"480Y/277V, 3PH, 4W
225A., 42 CKTS.
60A
EXIST. PANEL "4A6"480Y/277V, 3PH, 4W
600A., 42 CKTS.
2P300A
3P350A
480V-208Y/120V, 3PH, 4W, 115°C RISE
NEW 225 KVA
3P60
0A
EXIST. PANEL "2A6"208Y/120V, 3PH, 4W
100A., 30 CKTS.
NEW PANEL "2C6"120/240V, 1PH, 3W
600A., 30 CKTS.
2P60
0AF
480V-208Y/120V, 3PH, 4WEXIST. 225 KVA TRANSFORMER
TRANSFORMER "C6"NEW 100 KVA
EXIST. PANEL "2DP"208Y/120V, 3PH, 4W800A.
60A
NEW (2) 3"C-4#350 KCMIL, #2/0 N, #2/0 GRD
TO EXIST. HECO
3P16
00A
M
M3P225A
3P400AT
3P400A
EXIST. MAIN SWITCHBOARD "MSB"480Y/277V, 3PH, 4W, 1600A
4"C-8#350 KCMIL, 1#1/0 GRD. GRD.
NEW (2) 2-1/2"C-3#350 KCMIL, #2/0 GRD
NEW (1)2-1/2"C-2#350 KCMIL, #2/0 GRD.
3"C-3#500 KCMIL,#2/0 GRD
EXIST. 60A., 480VRECEPTACLE
MAIN ELECTRICAL ROOM UNIT 123
EXIST. HECOMETER #617230
C=200
EXIST. E-GAUGE METER
(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN
3P600AF
TRANSFORMER
NEW PANEL "2B6"208Y/120V, 3PH, 4W
600A., 30 CKTS.
EXIST. PANEL LAB "PV-01"208Y/120V, 3PH, 4W
400A., 18 CKTS.
150A
2"C-4#3/0, 1#6 GRD.
480V-120/240V, 1PH, 3W, 115°C RISE
TRANSFORMER "B6"
NEMA-1
NEMA-1
(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN
3P60A
60A
NEW 3P60A., 480VRECEPTACLE
1"C-4#6, #8 GRD
SCHEMATIC DIAGRAMNOT TO SCALE
EMERGENCY STOP SHUNT TRIP UNIT
ST2STN 3TEST
ST1TRIPPNL "4AG"
CAPTRIP
DEVICE
120 VDC
L1 N120 VACCKT 2AG-29
ST1
RLED
TO SHUNT TRIP CKT/EMERGENCY STOP
(+) (-)
EMERG.STOP P.B. *
ST3STN 2TEST
ST4STN 1TEST
* ILLUMINATED PUSHBUTTON, TWIST TORELEASE TYPE
2P100A
2P100A
2P100A
2P100A
2P50A
GRID SIMULATOR
TO TEST STATION 2
TO TEST STATION 3
1-1/4"C-3#2, 1#6 GRD
3P100A
3P100A
3P100A
3P100A TO TEST STATION 2
TO TEST STATION 3
1-1/4"C-4#2, 1#6 GRD
2P50A
2P50A
2P50A
3P45A
EXIST. INVERTER 1FRONIUS PRIMO 8.2-1
EXIST. INVERTER 2FRONIUS PRIMO 8.2-1
EXIST. INVERTER 3FRONIUS PRIMO 8.2-1
EXIST. INVERTER 4FRONIUS SYMO 12.0-3
1"C-3#6, 1#8 GRD
1"C-4#6, 1#8 GRD
3P80
0A
2P50A
2P50A
1"C-3#6, 1#8 GRD
EXIST. INVERTER 3
EXIST. INVERTER 2
3P45A
1"C-4#6, 1#8 GRD
EXIST. INVERTER 4
3P450AT
NOTE(S):
AND A TRIP RATING OF 3P350A.
2P55
0AT
1
1
1
1
1 09/07/21 PALEKANA COMMENTS
1
FRONIUS PRIMO 8.2-1
FRONIUS PRIMO 8.2-1
FRONIUS SYMO 12.0-3
ADD NEW 3P600A BRKR WITH SHUNT TRIP
REFER TO SHEET E6 & E6.1 FOR MOREDETAILS REGARDING THE EXIST. PV SYSTEM.
11.
2.
PV BUS RATING CALCULATIONS:
(8200W * 3) / 240 * 1.25 = 125.13A705(B)(2)(3)(b)2C6
600 * 1.2 - (50 * 3) - 550 = 20A
705(B)(2)(3)(b)2B612000W / 208 / 1.732 * 1.25 = 41.64A600 * 1.2 - 45 - 600 = 75A
705(B)(2)(3)(a)4A612000W / 480 / 1.732 * 1.25 = 18.04A(8200W * 3) / 480 / 1.732 * 1.25 = 36.99A30000W / 480 / 1.732 * 1.25 = 45.11A
(NOTE 1)
1
1
TRANSFORMER INSULATION SYSTEM: 220°CINSULATION WITH TEMPERATURE RISE NOT
3.
EXCEEDING 115°C UNDER FULL RATED LOADIN AMBIENT TEMPERATURE OF 40°C.
(NOTE 3)
(NOTE 3)1
1
3P100A
3P100ATO TEST STATION 1
1-1/4"C-4#2, 1#6 GRD
2P100A
2P100ATO TEST STATION 1
1-1/4"C-4#2, 1#6 GRD
EXIST. INVERTER 1FRONIUS PRIMO 8.2-11"C-3#6, 1#8 GRD
600 - 55.03 - 45.11 - 450 = 49.86A
ELECTRICAL POWER PLAN (EXISTING)SCALE: 1/2" = 1'-0"
TEST STATION 3 TEST STATION 2
1/4"X4"X12" GROUNDING BUS BAR(HARGER PART NO. GBI14412J OR EQUAL)
TEST STATION 1
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E3
PANEL "2A6"208Y/120V, 3PH, 4W,100A., 30 CKTS.
EXIST. 60A., 480V3PH, 4W, RECEPTACLE
UNIT 123
PANEL "4A6"480Y/277V, 3PH, 4W
600A., 42 CKTS.NEMA-12
EXIST. INVERTER #3
EXIST. INVERTER #2
EXIST. INVERTER #1
(1PH)
(1PH)
(1PH)
PANEL LAB "PV-01"208Y/120V, 3PH, 4W
400A., 18 CKTS.
EXIST. INVERTER #4(3PH)
NEW PANEL "2B6"208Y/120V, 3PH, 4W
600A., 30 CKTS.NEMA-1
NEW PANEL "2C6"120/240V, 1PH, 3W600A., 30 CKTS.NEMA-1
480V-208Y/120V, 3PH, 4W, 115°C RISE
NEW 225 KVA
(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN
TRANSFORMER "B6"
(1)3"C-3#500 KCMIL, #2/0 GRD.
(1)2-1/2"C-2#350 KCMIL, #2/0 GRD.
(1)3"C-3#500 KCMIL, #2/0 GRD.(2) 3"C-4#350 KCMIL, #2/0 N, #2/0 GRD
(1)2-1/2"C-2#350 KCMIL, #2/0 GRD.(2) 2-1/2"C-3#350 KCMIL, #2/0 N, #2/0 GRD
1"C-4#6, #8 GRD
24"X4" CABLE TRAY(ABOVE)
1E4
A
C
D B
TRANSFORMER "C6"NEW 100 KVA
480V-120/240V, 1PH, 3W, 115°C RISE(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN(MOUNTED ONSUPPORT STRUCTURE)
1"C AC & DC RACEWAYSTO TEST STATIONS (TYP.)
GRID SIMULATOR
OPAL-RT
PANEL "PV-DC"
NEW PANEL "GS-AC"NEW TEST STATIONRACK #1
NEW TEST STATIONRACK #2
NEW TEST STATIONRACK #3
3/4"C-4#12, 1#12 GRDNEW EMERGENCY STOP PULLBOXSEE DIAGRAM ON SHEET E2
3/4"C-4#12, 1#12 GRD
NEW SHUNT TRIPDEVICE PANEL
BONDING AND GROUNDINGOF TEST BENCHES #6 B.C.
1/4"X4"X12" GROUNDING BUS BAR(HARGER PART NO. GBI14412J OR EQUAL)
NEW GROUND BUS DETAILNOT TO SCALE
TO STRUCTURALSTEEL GROUND
#2 BC
5/8"X10'GROUND ROD
GROUND TOTEST BENCH
#2 BC#2 BC#2 BC
3/4"C-4#12, 1#12 GRD
2-N.O., 2-N.C. CONTACTSWITH LED INDICATING LIGHT.
1/4"X4"X12" GROUNDING BUS BAR(HARGER PART NO. GBI14412J OR EQUAL)
4"X4" J-BOX
GRID SIMULATOR RCPTNEW 60A, 600 VDC
4A6-38,40,42NEW 60A, 480V RCPT
3/4"C-2#4, #6 GRD
NEW PANEL "GS-DC"225A, 600 VDC
3/4"C-4#12, 1#12 GRD
NO
TE 3
NO
TE 1
NOTE:1. SPACE UNISTRUT BRACING PER EQUIPMENT SUBMITTAL
MOUNTING DIMENSIONS.
24"24"24"
6'-0"
2. LOCATE UNISTRUT BRACING HORIZONTALLY CENTEREDON ADJACENT TEST STATION. COORDINATE WITH OWNER.
NOTE 2
EQUIPMENT ELEVATIONSCALE: 1/2" = 1'-0"
1-5/8"X2-7/16" STRUT12 GAGE, SOLID
(2) 1-5/8"X2-7/16" STRUT12 GAGE, SOLID
ELEVSECTION A-A AA
(2) 1-5/8"X2-7/16" STRUT12 GAGE, SOLID
1-5/8"X2-7/16" STRUT12 GAGE, SOLID
WALL
FLOOR
NEW TEST STATION RACK (TYP. OF 3)
24"X4"
VERIFY MOUNTING HEIGHT WITH CAB3.
24"X4"
12"
12"
(2) 1 1/4"C(4)-1"C1"C
CABLE TRAY
CABLE TRAY
NEW (2) 3"C-4#350 KCMIL, 1#2/0 N, 1#2/0 GRD
NEW (2) 2-1/2"C-3#350 KCMIL, 1#2/0 N, 1#2/0 GRD1
1
1
1
1 09/07/21 PALEKANA COMMENTS
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E3.1
SS
PANEL "2A6"208Y/120V, 3PH, 4W,100A., 30 CKTS.
UNIT 123
PANEL LAB "PV-01"208Y/120V, 3PH, 4W
400A., 18 CKTS.
NEW PANEL "2B6"208Y/120V, 3PH, 4W
600A., 42 CKTS.NEMA-1
NEW PANEL "2C6"120/240V, 1PH, 3W600A., 42 CKTS.NEMA-1
480V-208Y/120V, 3PH, 4W, 115°C RISE
NEW 225 KVA
(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN
TRANSFORMER "B6"
ELECTRICAL LIGHTING PLAN (EXISTING)SCALE: 1/2" = 1'-0"
TRANSFORMER "C6"NEW 100 KVA
480V-120/240V, 1PH, 3W, 115°C RISE(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN(MOUNTED ON
PANEL "4A6"480Y/277V, 3PH, 4W
600A., 42 CKTS.NEMA-12
SUPPORT STRUCTURE)
24"X4" CABLE TRAY(ABOVE)
NEW PANEL "GS-AC"NEW TEST STATIONRACK #1
NEW TEST STATIONRACK #2
NEW TEST STATIONRACK #3
NEW PANEL "GS-DC"225A, 600 VDC
4L1-6
EXIST. INVERTER #3
EXIST. INVERTER #2
EXIST. INVERTER #1
(1PH)
(1PH)
(1PH)
EXIST. INVERTER #4(3PH)
PANEL "PV-DC"
1
1
1
1
1 09/07/21 PALEKANA COMMENTS
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E4
NEW TEST STATION 3 NEW TEST STATION 2 NEW TEST STATION 1
480V-208Y/120V, 3PH, 4W, 115°C RISE
NEW 225 KVA
(4) 2-1/2% TAPS AN(2) 2-1/2% TAPS BN
TRANSFORMER "B6"
480V-120/240V, 1PH, 3W, 115°C RISENEW 100 KVA TRANSFORMER "C6"
(4) 2-1/2% TAPS AN, (2) 2-1/2% TAPS BN
(1PH)INV. #3
(1PH)INV. #2
(1PH)INV. #1
PANEL "2A6"208Y/120V, 3PH, 4W,
100A., 30 CKTS.
EQUIPMENT ELEVATIONSSCALE: 1/2" = 1'-0"
1E4
ELEV. "A"
ELEV. "D"
ELEV. "B"
TRANSFORMER SUPPORTSCALE: 1/2" = 1'-0"
4"X4" STEEL POST3/4"X8" HOT DIPPED
3/4" BOLT, TYP.
4"X2" STEEL CHANNELWELDED TO4"X4" STEEL SUPPORT
4"X4" STEEL POST, TYP.
4"X4" STEEL SUPPORT
FINISHED FLOOR
FRONT ELEV. SIDE ELEV.PLAN VIEW
4"X4" STEEL POST, TYP.
4"X4" STEEL POST, TYP.
4'-8"
3'-0
"
2'-8"
4'-8"2'-8" 2'-3"
5'-6
"
4"X4X"3/8" STEEL GUSSET @ BACK LEGSWELDED TO FRAME
5'-6
"
MTS MTS MTS
4"X4X"3/8" STEEL GUSSET, TYP. OF BOTH SIDES.
NOTE:1. GROUND FRAME TO EQUIPMENT GROUNDING CONDUCTOR OF 120/240V, 1PH, 3W2. FRAME TO BE PAINTED SAFETY YELLOW.3. FRAME AND MOUNTING HOLE LOCATIONS TO BE IN ACCORDANCE TO EQUIPMENT DIMENSIONS.
TO BE MOUNTED ON NEOPRENE VIBRATIONISOLATION PADS, MIN. 3"X3" AT EACH
4"X4" STEEL POST, TYP.
4"X2" STEEL CHANNEL
NEW 60A, 480V RCPT4A6-38,40,42
EXIST. AIR COND. DUCT
GALVANIZEDWEDGE ANCHOR (TYP.)
24"X4" CABLE TRAY
1"C AC & DCRACEWAYS (TYPICAL)
1"C AC & DCRACEWAYS (TYPICAL)
NEW 60A, 600V RCPT
EXIST. PANEL "PV-DC"
NEW PNL "GS-AC"
WELDED TO FRAME
TO NEW E-STOP AND SHUNT TRIP BREAKERS
3/4"C-4#12, 1#12 GRDNEW SHUNT TRIP
DEVICE PANEL
NEW PNL "GS-DC"
1-5/8"X2-7/16" STRUT12 GAGE, SOLID
(3PH)INV. #4
EXIST. PANEL LAB "PV-01"208Y/120V, 3PH, 4W,400A., 18 CKTS.
TO MAIN ELEC. RM
NEW PANEL "2B6"208Y/120V, 3PH, 4W
600A., 42 CKTS.NEMA-1
NEW PANEL "2C6"120/240V, 1PH, 3W
600A., 42 CKTS.NEMA-1
EXIST. PANEL "4A6"480Y/277V, 3PH, 4W
600A., 42 CKTS.NEMA-12
MTS
ELEV. "C"
EXIST. LIGHT FIXTURE, TYP.
MOUNTING LOCATION ON FRAMETEST STATION
RACK #1TEST STATION
RACK #2TEST STATION
RACK #3
NEWNEW NEW NEWEXIST.
EXIST. DC SWITCHEXIST. AC SWITCH(TYP.)
(TYP.) 1 1 09/07/21 PALEKANA COMMENTS
EXIST. EXIST. EXIST.1 1 1 1
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E5
1357911131517192123252729313335373941
Voltage: Phase: Wire: Bus Amps:
No. Ckts:Mounting: NEMA Config: Breaker Type: Bolt-On - 24,000 AIC Minimum
PANEL SCHEDULE: EXIST. PANEL "4A6"42
600A. W/ 3P450A MAIN BRKR W/ SHUNT TRIP1SURFACE
3 4480Y/277V
Ckt Description Ph B WireBrkrPh A
24681012141618202224262830323436384042
Ckt Description Ph BPh A WireBrkrPh CPh C
1357911131517192123252729
Voltage: Phase: Wire: Bus Amps: No. Ckts:
Mounting: NEMA Config: Breaker Type: 10,000 AIC
PANEL SCHEDULE: EXIST. PANEL "2A6"30100A.
1SURFACE3 4
RECEPT-DUPLEXRECEPT-DUPLEX
208Y/120V
RECEPT-DUPLEXRECEPT-DUPLEXRECEPT-QUADRECEPT-QUADRECEPT-QUADRECEPT-QUADRECEPT-QUADSPARE
Ckt Description Ph B WireBrkrPh A
1P20 24681012141618202224262830
FCU-1E
RECEPT-TWISTLOCK
RECEPT-TWISTLOCK
RECEPT-TWISTLOCK
RECEPT-TWISTLOCK
RECEPT-TWISTLOCK
(SPACE)(SPACE)(SPACE)
Ckt Description Ph BPh A WireBrkr
2P15
Ph CPh C
1357911131517192123252729
24681012141618202224262830
Voltage: Phase: Wire: Bus Amps: No. Ckts:
Mounting: NEMA Config: Breaker Type: Bolt-On - 24,000 AIC Minimum
PANEL SCHEDULE: NEW PANEL "2B6"30600A. W/ 3P600A MAIN BREAKER
1SURFACE3 4208Y/120V
Ckt Description Ph B WireBrkrPh A Ckt Description Ph BPh A WireBrkrPh CPh C
2P30
2P30
2P30
2P30
2P30
Voltage: Phase: Wire:
Mounting: NEMA Config: Breaker Type: Bolt-On - 24,000 AIC Minimum1SURFACE1 3240/120V
Ckt Description Ph B WireBrkrPh A Ckt Description Ph BPh A WireBrkr
1357911131517192123252729
24681012141618202224262830
Bus Amps: No. Ckts:
PANEL SCHEDULE: NEW PANEL "2C6"30600A. W/ 2P550A MAIN BREAKER
3P100
3P60
3P100
TRANS. "C6" MAIN 2P300
TRANS. "B6" MAIN 3P350
1357911131517
Voltage: Phase: Wire: Bus Amps:
Mounting: NEMA Config: Breaker Type: Bolt-On - 24,000 AIC Minimum
PANEL SCHEDULE: EXIST. PANEL LAB "PV-01"1SURFACE
3 4208Y/120V
Ckt Description Ph B WireBrkrPh A
24681012141618
Ckt Description Ph BPh A WireBrkrPh CPh C
400A No. Ckts: 18
INVERTER #4 2P45INVERTER #1 2P50
INVERTER #2 2P50
2P100TEST STATION 1A 2
TEST STATION 2A 2P100
TEST STATION 3A
2
2P100TEST STATION 1B 2
2P100TEST STATION 2B 2
2P100TEST STATION 3B 2
TEST STATION 1A 3P100 2
TEST STATION 2A
TEST STATION 3A
3P100 2
TEST STATION 1B 3P100 2
TEST STATION 2B 3P100 2
TEST STATION 3B 3P100 2
66
6
SPARE
SPARE
SPARE
3P60GRID SIMULATOR
INVERTER #4 3P45 6
2P100
INVERTER #1
2
2P50
INVERTER #2
6
2P50
INVERTER #3
6
3P100 2
2P50 6
1357911131517192123
Voltage: Phase: Wire: Bus Amps: No. Ckts:
Mounting: NEMA Config: Breaker Type: Bolt-On - 24,000 DC AIC Minimum
PANEL SCHEDULE: NEW PANEL "PV-DC"24225A
1SURFACE1 2600VDC
Ckt Description NEG WireBrkrPOS
24681012141618202224
Ckt Description NEGPOS WireBrkr
1P15 1P151357911131517192123
Voltage: Phase: Wire: Bus Amps: No. Ckts:
Mounting: NEMA Config: Breaker Type: Bolt-On - 10,000 AIC Minimum
PANEL SCHEDULE: NEW PANEL "GS-AC"30225A. W/ 3P60A MAIN BREAKER
1SURFACE3 4480Y/277V
Ckt Description Ph B WireBrkrPh A
24681012141618202224
Ckt Description Ph BPh A WireBrkrPh CPh C
TEST STATION 1 #1
TEST STATION 2
3P60
3P60
INVERTER #4 3P45
INVERTER #1-DC-2
INVERTER #2-DC-1 1P15
INVERTER #3-DC-21P15
INVERTER #3-DC-1
1P15
1P15
350
500
4
10
10
10
10
10
4
4
6
10
*USE PV WIRE RATED AT 600V
1P20 12SHUNT TRIP DEV. PNL
1357911
Voltage: Phase: Wire: Bus Amps: No. Ckts:
Mounting: NEMA Config: Breaker Type: Bolt-On - 24,000 DC AIC Minimum
PANEL SCHEDULE: NEW PANEL "GS-DC"12225A
1SURFACE1 2600VDC
Ckt Description NEG WireBrkrPOS
24681012
Ckt Description NEGPOS WireBrkr
TEST STATION 1 2P60 TEST STATION 3 2P60
TEST STATION 2 2P60
6
6
6
*USE PV WIRE RATED AT 600V
INVERTER #1-DC-1
INVERTER #2-DC-2
1P30INVERTER #4-DC
TEST STN 1
TEST STN 2
TEST STN 3
2P60
2P60
2P60
10
6
6
6
**DENOTES SHUNT-TRIP BREAKER
( )** ( )** ( )**
INVERTER #3 2P50 6
252729
262830
TEST STATION 3 3P60 4
TEST STATION 1 #2 2P60 4
TEST STATION 1 #3 2P60 4
TEST STATION 1 #4 2P60 4
(NOTE 1)
1
1 09/07/21 PALEKANA COMMENTS
1
INVERTER #1 2P50
INVERTER #2
INVERTER #3
2P50
2P50
6
6
6
1
NOTE(S):
AND A TRIP RATING OF 3P450A TO PANEL "4A6"ADD NEW 3P600A BRKR WITH SHUNT TRIP
REFER TO SHEET E6 & E6.1 FOR MOREDETAILS REGARDING THE EXIST. PV SYSTEM.
1
1.
2.
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E6(TYPICAL FOR INVERTERS #4 (3-PHASE))NOT TO SCALE
100A
100A
100A
100A
OFF
MPPT 1
OUTAC
100A
100A
SW-4AEXIST. DC TRANSFER
SW-4BEXIST. DC TRANSFER
UTILITY LOCKABLE
TB - TERMINAL BLOCK
NOTES:
FU - PULLOUT FUSE
EXIST. INVERTER #4
INVERTER SCHEMATIC DIAGRAM (EXISTING)
EXIST. DC TEST BLOCK
TO NEW PANEL "PV-DC" TO NEW PANEL "GS-AC"480Y/277V, 3PH, 4W
OFFOFF
AC T
ERM
INAL
DIS
TR. P
NL
BOX
(HEC
O G
RID
)
MPP
T 2
DC
TER
MIN
ALBO
X
MPP
T 1
DC
TER
MIN
ALBO
X
TB TBM
PPT
2
MPP
T 1
MPPT 2
FU
TO EXIST. PV ON ROOF
FU FU
EXIST. PV DC FUSE &DISCONNECT
208Y/120V, 3PH, 4WEXIST. PANEL LAB "PV-01"
18 CKTS.
2P50A
2P50A2P50A
TO EXIST. INVERTER #1
TO EXIST. INVERTER #2TO EXIST. INVERTER #3
3P45A
TO 208Y/120VTRANSFORMER
AT MAIN ELEC. RM
FRONIUS PRIMO 8.2-1
FRONIUS PRIMO 8.2-1FRONIUS PRIMO 8.2-1
12 M
OD
S/ST
RIN
G
12 M
OD
S/ST
RIN
G
11 M
OD
S/ST
RIN
G
12 M
OD
S/ST
RIN
G
100A
100A
OFF
3P45A INVERTER #4 - 2B6-19,21,23
3P60
0A
NEW PANEL "2B6"208Y/120V, 3PH, 4W
600A., 42 CKTS.NEMA-1
TO NEW 225 KVATRANSFORMER "B6"
TO NEW PANEL "2B6"
NEW 3P100A, 480V, NEMA-1
11 M
OD
S/ST
RIN
G(N
OT
USE
D)
3/4"C-2#10 PV WIRE
3/4"C-2#10 PV WIRE
3/4"C-2#10 PV WIRE
3/4"C-2#10 PV WIRE3/4"C-2#10 PV WIRE
1"C-4#6,1#8 GRD
1"C-4#6,1#8 GRD
1"C-4#6,1#8 GRD
208Y/120V, 3PH, 4W
MANUAL TRANSFER SWITCH
AC TRANSFER SW-4
1EXIST.
1
1
1
11
1
1
1
1 09/07/21 PALEKANA COMMENTS
NOTE(S):
INVERTERS WILL NOT TO CONNECTED TOTHE DC INPUT AND AC OUTPUT OF THE
1
MORE THAN A SINGLE POINT.
A STANDARD OPERATING PROCEDUREMUST BE DEVELOPED TO ENSURE THATEQUIPMENT ARE NOT DAMAGED WHENUSING THE TRANSFER SWITCHES.
1
1.
2.
(208VAC, 3 PHASE)
208Y/120V, 3PH, 4WEXIST. PANEL LAB "PV-01"
18 CKTS.
2P50A
2P50A2P50A
TO EXIST. INVERTER #1
TO EXIST. INVERTER #2TO EXIST. INVERTER #3
3P45A
TO 208Y/120VTRANSFORMER
AT MAIN ELEC. RM
(TYPICAL FOR INVERTERS #1,2,3 (1-PHASE))NOT TO SCALE
100A
100A
100A
100A
OFF
FU
MPPT 1
OUTAC
100A
100A
SW-XAEXIST. DC TRANSFER
SW-XBEXIST. DC TRANSFER
TO EXIST. PV ON ROOF
TB - TERMINAL BLOCK
NOTES:
FU - PULLOUT FUSE
EXIST. INVERTER 1, 2 OR 3
INVERTER SCHEMATIC DIAGRAM
EXIST. DC TEST BLOCK
OFFOFF
AC T
ERM
INAL
DIS
TR. P
NL
BOX
(HEC
O G
RID
)
MPP
T 2
DC
TER
MIN
ALBO
X
MPP
T 1
DC
TER
MIN
ALBO
X
FU
TB TBM
PPT
2
MPP
T 1
MPPT 2
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E6.1
TO RESPECTIVEINVERTER BREAKER
TO EXIST. INVERTER #4FRONIUS PRIMO 8.2-1
FRONIUS PRIMO 8.2-1FRONIUS PRIMO 8.2-1
FRONIUS SYMO 12.0-3
12 M
OD
S/ST
RIN
G
12 M
OD
S/ST
RIN
G
EXIST. PV DC FUSE &DISCONNECT TO NEW PANEL "GS-AC"
480Y/277V, 3PH, 4W
100A
100A
OFF
2P50A INVERTER #1 - 2C6-13,15
2P60
0AF
TO NEW PANEL "PV-DC"
INVERTER #2 - 2C6-17,19INVERTER #3 - 2C6-21, 23
NEW PANEL "2C6"120/240V, 1PH, 3W
600A., 42 CKTS.NEMA-1
TO NEW 100 KVATRANSFORMER "C6"
X - INVERTER NUMBER
1"C-3#6,1#8 GRD
1"C-3#6,1#8 GRD
1"C-3#6,1#8 GRD
3/4"C-2#10 PV WIRE
3/4"C-2#10 PV WIRE
3/4"C-2#10 PV WIRE
3/4"C-2#10 PV WIRETO NEW PANEL "2C6"
NEW 3P100A, 600V, NEMA-1
120/240V, 1PH, 3W
AC TRANSFER SWITCH
UTILITY LOCKABLEAC TRANSFER SW-X
1EXIST.
11
1
11
1 1
1
1 09/07/21 PALEKANA COMMENTS
1
NOTE(S):
1
A STANDARD OPERATING PROCEDUREMUST BE DEVELOPED TO ENSURE THATEQUIPMENT ARE NOT DAMAGED WHENUSING THE TRANSFER SWITCHES.
1.
2.
2P55
0AT
1
INVERTERS WILL NOT TO CONNECTED TOTHE DC INPUT AND AC OUTPUT OF THE
MORE THAN A SINGLE POINT.
(208VAC OR 240VAC, 1 PHASE)
GRID SIMULATOR RECEPTACLE PLANNOT TO SCALE
EXPIRES: 4/30/22
AT
PIE
R 3
5H
NE
I P
OW
ER
SY
ST
EM
LA
B
ELEC
TRIC
AL P
LAN
S FO
R:
Fax: (808) 572-6323
Pukalani, Hawaii 96788
Tel: (808) 572-1745
Electrical Engineering Services431 Aulii DriveP.O. Box 880280
DR
AWIN
G D
ATE:
9/7
/202
1
supervision and construction of this projectThis work was prepared by me or under my
will be under my observation.
Alaska - Hawaii - Idaho-Nevada - Oregon - Washington -
Licensed in:
California - Michigan - Arizona - Guam -
L.M.K.N.
03-15-1919-003
965
N. N
IMIT
Z H
IGH
WAY
, HO
NO
LULU
, OAH
U, H
AWAI
I 968
17TM
K: (1
) 1-5
-034
: 004
& 0
32
1"1/
4"2"
01/
2"
IF B
AR S
CAL
E IS
NO
T EQ
UAL
TO
2 IN
CH
ES, P
RIN
T IS
NO
T TO
SC
ALE
- SC
ALE
ACC
OR
DIN
GLY
Wyoming
E7
3Ø60A
1Ø60A
1Ø60A
1Ø60A
TEST STATION 3
60A3Ø60A
1Ø60A
1Ø60A
1Ø60A
TEST STATION 2
60A3Ø60A
1Ø60A
1Ø60A
1Ø60A
TEST STATION 1
60A
NEMA-1
3P60A
3P60A
3P60A
4#4, #6 GRD
NEW TEST STATION
AC DC AC DC AC DC
3P60
AM
AIN
225A, 24 CKTS480Y/277V, 3PH, 4W
PANEL "GS-AC"
EXIST. INVERTER #4 - (2X12 MODULES = 24 MODULES)
3P45A
2P50A
2P50A
2P50AEXIST. INVERTER #1 - AC (FRONIUS 8.2KW, 1PH, 208V/240V)
EXIST. INVERTER #2 - AC (FRONIUS 8.2KW, 1PH, 208V/240V)
EXIST. INVERTER #3 - AC (FRONIUS 8.2KW, 1PH, 208V/240V)
EXIST. INVERTER #4 - AC (FRONIUS 12KW, 3PH, 208V)
60A, 600 VAC RCPT
EXIST. INVERTER #1 - MPPT1
EXIST. INVERTER #1 - MPPT2
1"C-4#4,
EXIST. INVERTER #2 - MPPT1
EXIST. INVERTER #2 - MPPT2
EXIST. INVERTER #3 - MPPT1
EXIST. INVERTER #3 - MPPT2
NEW PANEL "PV-DC"600V DC
225A, 24 CKTS
2P60A
2P60A
2P60A
1"C-EMT
NEMA-1
2P30A
2P15A
2P15A
2P15A
2P15A
2P15A
2P15A
2#10 (PV WIRE)
60A, 1000V RCPT
600V DC
NEMA-1
EXIST. GRIDSIMULATOR
600V DC
PANEL "GS-DC"
225A, 12 CKTS
2P60A
2P60A
2P60A
ST2
ST3
ST4
TO EMERGENCY STOPPUSH BUTTON
2P100A
1"C-2#2, #6 GRD(1 KV CONDUCTOR)
60ADC
60ADC
60ADC
2#6, #10 GRD
CABLE
1"C-EMT4#6, 1#8 GRD
CABLE TRAY
TRIP UNIT
(NOTE 1)
(NOTE 2)
(NOTE 2)
(NOTE 2)
(NOTE 1)
(NOTE 2)
(NOTE 2)
(NOTE 2)
(NOTE 1)
(NOTE 2)
(NOTE 2)
(NOTE 2) NOTES:1. RECEPTACLE MODEL: DSN60, 60A RECEPTACLE ON 63-64147 MOUNTING ANGLE.2. RECEPTACLE MODEL: DSN60, 60A RECEPTACLE ON 63-64146 MOUNTING ANGLE.3. RECEPTACLE MODEL: DSDC9, 60A RECEPTACLE ON 33-94058-S82 MOUNTING ANGLE.
(1) STRING OF (12) 325W MODULES
(2) STRING OF (12) 325W MODULES
1#8 GRD
DC MODE
AC MODE
1"C-EMT2#6, #10 GRD
(600V CONDUCTOR)
(600V CONDUCTOR)
TO PANEL "4A6"
(NOTE 3)
4. RECEPTACLE MODEL: DS100C, 100A RECEPTACLE ON 33-64237-C-K16 MOUNTING ANGLE.5. RECEPTACLE MODEL: DS100C, 100A RECEPTACLE ON 33-64176-C-K07 MOUNTING ANGLE.
(NOTE 3)
100A
100A
(NOTE 4)
(NOTE 4)
100A
100A
(NOTE 5)
(NOTE 5)
2#6, #6 GRD, 600 VDCCABLE
(1) STRING OF (12) 325W MODULES
(1) STRING OF (12) 325W MODULES
(1) STRING OF (12) 325W MODULES
(1) STRING OF (12) 325W MODULES
(1) STRING OF (12) 325W MODULES
TO PANEL "2C6"
TO PANEL "2B6"
100A
100A
(NOTE 4)
(NOTE 4)
100A
100A
(NOTE 5)
(NOTE 5)
100A
100A
(NOTE 4)
(NOTE 4)
100A
100A
(NOTE 5)
(NOTE 5)
(6) 1-1/4"C-4#2, 1#6 GRD
(6) 1-1/4"C-3#2, 1#6 GRD
2P60A
2P60A
2P60A
1"C-3#6,1#8 GRD
1"C-EMT3#6, 1#8 GRD
1 09/07/21 PALEKANA COMMENTS
1
1
6. REFER TO SHEET E6 & E6.1 FOR MORE DETAILS REGARDING THE EXIST. PV SYSTEM.
(NOTE 6)
(NOTE 6)
(NOTE 6)
(NOTE 6)
1 7. PANEL "GS-AC" CAN BE PROVIDED VARIABLE VOLTAGES THROUGH THE USE OF THECONNECTED GRID SIMULATOR. A STANDARD OPERATING PROCEDURE MUST BEDEVELOPED TO ENSURE THAT NO DAMAGE IS CAUSED TO EQUIPMENT DUE TO VOLTAGEDIFFERENCES.